IR 05000369/2019010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:/RA/
{{#Wiki_filter:ust 7, 2019


*
==SUBJECT:==
WILLIAM B. MCGUIRE NUCLEAR STATION - TRIENNIAL INSPECTION OF EVALUATION OF CHANGES, TESTS AND EXPERIMENTS BASELINE INSPECTION REPORT 05000369/2019010 AND 05000370/2019010
 
==Dear Mr. Ray:==
On July 18, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at William B. McGuire Nuclear Station and discussed the results of this inspection with Ed Pigott and other members of your staff. The results of this inspection are documented in the enclosed report.
 
The NRC inspectors did not identify any finding or violation of more than minor significance.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely,
/RA/
James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000369 and 05000370 License Nos. NPF-17 and NPF-9 Enclosure:
As stated cc w/ encl: Distribution via LISTSERV
 
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial inspection of evaluation of changes, tests and experiments baseline inspection at William B McGuire Nuclear Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
List of Findings and Violations No findings or violations of more than minor significance were identified.
 
Additional Tracking Items None.
 
=INSPECTION SCOPES=
 
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
 
==REACTOR SAFETY==
 
===71111.17T - Evaluations of Changes, Tests, and Experiments Sample Selection (IP Section 02.01) ===
{{IP sample|IP=IP 71111.17|count=20}}
The inspectors reviewed the following evaluations, screenings, and/or applicability determinations for 10 CFR 50.59 from July 15-18, 2019.
: (1) 50.59 Evaluation - AR 02073877, Allow Use of Upgraded VIPRE Code for Analysis
: (2) 50.59 Evaluation, AR 01983884, UFSAR Change in Support of Lifting Reactor Vessel Upper Internals Lift Rig
: (3) 50.59 Screening - AR 1339299, Replace 1A EDG Voltage Regulators U1 (EC 104503)
: (4) 50.59 Screening - AR 2168938, ECCS and NS System Gas Void Acceptance Criteria (EC 410608)
: (5) 50.59 Screening - AR 1267495, RN Strainer Backwash Pump - 1A MOD (EC 102477)
: (6) Applicability Determination - AR 2162253, Replace Bussman BAF-3A Fuses For 125VDC Vital I&C Distribution Center Voltmeter CKTS & U1/U2 PNLBD Loss of Voltage (EC 409942)
: (7) Applicability Determination - AR 1338041, RN Suction Overpressure Protection "1A" (OBDN) - Unit 1 Exemption "40" List - 43-14 (EC 107089)
: (8) 50.59 Evaluation - AR 02014647, Allow Replacement of Digital Rod Position Indication (DRPI) Controller (EC 113220)
: (9) 50.59 Evaluation - AR 02050448, Tune Distributed Control System (CS) Controls Due to Hot Leg Streaming (EC 404368)
: (10) 50.59 Screening - AR 1228654, VC/YC Chiller Compressor Oil Pump (EC 101374)
: (11) 50.59 Screening - AR 1349726, 1C NCP Motor Stator Upgrade (EC 104254)
: (12) 50.59 Screening - AR 1286447, Replace Panelboard 2EKVB Mod (EC 105979)
: (13) Applicability Determination - AR 2052086, Revise Unit 1 CA Pump Motor Time Overcurrent Relay 51 Setting (EC 405274)
: (14) Applicability Determination - AR 1339802, Replace Solenoid Valves on 2NCSV0273AC and 2NCSV0275B With Different Model Target Rock Valve (EC 111336)
: (15) 50.59 Evaluation - AR 1955292, Assured CA Suction for Extended SBO Per NRC Order EA-12-049 & INPO IER L1-11-4 (Fukushima Dai-ichi Accident Response) Unit 2 (EC 109072)
: (16) 50.59 Evaluation - AR 2047562, Revision to Methodology Report DPC-NE-2009-P-A to Implement WCAP-12610-P-A and CENPD-404-P-A, Addendum 1-A, Optimized ZIRLO, and Addendum 2-A, Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO
: (17) 50.59 Screening - AR 1336245, 0000103936 - 000 - Change Actuator On 2RN0279 from NA2 to NA1E (EC 103936)
: (18) 50.59 Screening - AR 2081907, 0000400132 - 000 CA Discharge Piping Design Pressure Increase Per NCR 01901450 (EC 400132)
: (19) 50.59 Screening - AR 1990687, The acceptable Valve Stroke Times (VST) for valves 1NM-22AC,1NM-25AC, 1NV-141A, 0RN-10AC, 0RN-147AC, 0RN-148AC, 1RN-64A, 2RN-70A, 1RN-253A, 1 RN-276A, 2RN-279B, 2RN-299A, 1VE-5A, and 2VI-362A are revised to restore margin to the MOV stroke time for these valves (EC 402504)
: (20) 50.59 Screening - AR 2051913, 0000101492 - 000 Unit 1 NI and NV Cold Leg Throttle Valve Seat Clearance Capital (EC 101492)
 
==INSPECTION RESULTS==
No findings were identified.
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
* On July 18, 2019, the inspectors presented the triennial inspection of evaluation of changes, tests and experiments baseline inspection results to Ed Pigott and other members of the licensee staff.
 
=DOCUMENTS REVIEWED=
 
Inspection Type              Designation      Description or Title                                Revision or
Procedure                                                                                          Date
71111.17T Calculations      DPC -1552.08-00- Safety Injection Flows For Safety Analysis          Rev. 25
0109
MCC 1206.02-83-  EC101494 - Addition of Valve 2NV-1077                Rev. 27
0034
MCC 1223.02-00-  Engineered Safety Feature Valves Response Time      Rev. 24
0001            Testing Response
MCC 1223.02-00-  Engineered Safety Feature Valves Response Time      Rev. 22
0002            Testing Response
MCC-1201.05-00-  Rerate Qualification Report for 3X4X9E MSD 9 Stage  Rev. 1
0006            Auxiliary Feedwater Pump
MCC-1201.05-00-  Rerate Qualification Report for 4X6X10B MSD-D 10    Rev. 1
0007            Stage Auxiliary Feedwater Pump
MCC-1206.02-83-  Piping Analysis Problem NV-353                      Rev. 27
0034
MCC-1223.42-00-  CA System Parameter Design Parameter Verification    Rev. 5
0004
MCC-1381.05-00-  Maximum Allowable Cable Lengths for Size 1 and 2    Rev. 9
0147            Starters at McGuire
Corrective Action AR 1228654      VC/YC Chiller Compressor Oil Pump                    Rev.0
Documents        AR 1286447      Replace Panelboard 2EKVB Modification                Rev.0
AR 1302083      RN Strainer Backwash Pump - 1A MOD                  dated
05/14/2012
AR 1309768      10 CFR 50.59 Screen 0000108639 - 000 - Revise RN,    dated
NM, NV, VE and VI System TAC Sheet Valve Stroke      09/05/2013
Times.
AR 1336245      0000103936 - 000 - Change Actuator On 2RN0279 from  dated
NA2 to NA1E                                          03/14/2013
AR 1338041      EC107089 & EC107090: RN Suction Supplemental Vent    dated
Line 1A & 2A                                        06/04/2013
AR 1339299      0000104503 - 000 - Replace 1A EDG Voltage Regulators dated
U1                                                  08/08/2013
Inspection Type Designation Description or Title                                    Revision or
Procedure                                                                            Date
AR 1339802  Replace Solenoid Valves on 2NCSV0273AC AND              Rev.0
2NCSV0275B with Different Model Target Rock Valve
AR 1349726  1C NCP Motor Stator Upgrade                              Rev.10
AR 1955292  Assured CA Suction for Extended SBO Per NRC Order        dated
EA-12-049 & INPO IER L1-11-4 (Fukushima Dai-ichi        09/20/2015
Accident Response) Unit 2
AR 1983884  Use of Containment Building Polar Crane for Lifts of    dated
Reactor Vessel Upper Internal Lifts Rig                  02/19/2016
AR 1990687  The acceptable Valve Stroke Times (VST) for valves      dated
1NM-22AC, 1NM-25AC, 1NV-141A, 0RN-10AC, 0RN-            02/01/2016
147AC, 0RN148AC, 1RN-64A, 2RN-70A, 1RN-253A, 1
RN-276A, 2RN-279B, 2RN-299A, 1VE-5A, and 2VI-362A
are revised to add
margin to the MOV stroke time for these valves. (10 CFR
50.59 Screen)
AR 1990687  The acceptable Valve Stroke Times (VST) for valves      dated
1NM-22AC,1NM-25AC, 1NV-141A, 0RN-10AC, 0RN-              01/13/2016
147AC, 0RN-148AC, 1RN-64A, 2RN-70A, 1RN-253A, 1
RN-276A, 2RN-279B, 2RN-299A, 1VE-5A, and 2VI-362A
are revised to restore margin to the MOV stroke time for
these valves
AR 2021488  PT/1/A/4200/009 A to Support EC-402504.                dated
2/06/2016
AR 2021491  PT/2/A/4200/009 A to Support EC-402504 (Rev. 102)        dated
10/25/2016
AR 2021494  PT/2/A/4200/009 B to Support EC-402504.                  dated
05/10/2016
AR 2047562  Revision to Methodology Report DPC-NE-2009-P-A to        dated
Implement WCAP-12610-P-A and CENPD-404-P-A,              07/21/2016
Addendum 1-A, Optimized ZIRLO, and Addendum 2-A,
Westinghouse Clad Corrosion Model for ZIRLO and
Optimized ZIRLO
AR 2051913  0000101492 - 000 Unit 1 NI and NV Cold Leg Throttle      dated
Valve Seat Clearance Capital                            08/08/2016
Inspection Type              Designation    Description or Title                                      Revision or
Procedure                                                                                              Date
AR 2052086      Revise Unit 1 CA Pump Motor Time Overcurrent Relay        Rev.0
Setting
AR 2073877      MNS 50.59 evaluation for VIPRE upgrade from mod 2r to    dated
mod                                                      10/27/2016
AR 2081907      0000400132 - 000 CA Discharge Piping Design Pressure      dated
Increase Per NCR 01901450                                11/28/2016
AR 2162253      Replace Bussmann BAF-3A Fuses For 125VDC                  dated
11/01/2017
AR 2168938      0000410608 - 000 ECCS and NS System Gas Void              dated
Acceptance                                                01/22/2018
NCR 1655939    Control circuit cable lengths for several motor operated  dated
valves exceed the maximum allowable cable length per      03/13/2014
the new revision of MCC 1381.05-00-0147 (Maximum
Allowable Cable Lengths for Size 1 and Size 2 starters at
McGuire)
NCR 1901864    Update calculation MCC-1381.05-00-0147 R07                dated
                                            (Maximum Allowable Cable Lengths For Size 1 AND 2        02/10/2016
Starters at McGuire) for replacement of Starters with 65%
Coil Pickup
NCR 1903794    Calculation MCC-1381.05-00-0263 has been revised to      dated
Rev. 7 and MNS engineering needs to evaluate the          12/06/2018
results and take appropriate actions.
Corrective Action NCR 2282169    2019 NRC 50.59 Inspection - 5AD question improper        dated
Documents                        response                                                  07/16/2019
Resulting from
Inspection
Drawings          MCFD-1553-01.00 Flow Diagram of Reactor Coolant System (NC)              Rev. 12
MCFD-1554-03.01 Flow Diagram of Chemical & Volume Control                Rev. 25
System (NV)
MCFD-1562-01.00 Flow Diagram of Safety Injection System (NI)              Rev. 12
MCFD-1562-03.00 Flow Diagram of Safety Injection System (NI)              Rev. 18
MCFD-1562-03.01 Flow Diagram of Safety Injection System (NI)              Rev. 15
MCM 1205.00-    Swing Check Valve                                        Rev. A
0073.001
Inspection Type          Designation    Description or Title                                    Revision or
Procedure                                                                                        Date
Engineering  EC 101492      UNIT 1 NI and NV Cold Leg Throttle Valve Seat            Rev. 8
Changes                      Clearance Capital
EC 102477      RN Strainer Backwash Pump - 1A Mod                      Rev. 21
EC 103936      Change Actuator on 2RN-279B From NA2 To NA1E            Rev. 4
EC 104503      Replace 1A EDG Voltage Regulators U1 (MOD)              Rev. 3
EC 107089      RN Suction Overpressure Protection "1A" (OBDN) - Unit    Rev. 8
EC 108639      Revise RN, NM, NV, VE and VI System TAC Sheet Valve      Rev. 0
Stroke Times.
EC 108775      Equivalency For Joslyn Clark Coil Replacement            Rev. 0
EC 109072      Assured CA Suction For Extended SBO Per NRC              Rev. 9
ORDER EA-12-049 & INPO IER L1-11-4
EC 113220      Allow Replacement of Digital Rod Position Indication    Rev.0
                                        (DRPI) Controller
EC 400132      CA Discharge Piping Design Pressure Increase Per NCR    Rev. 0
01901450
EC 402504      Update Valve Stroke Times For Low Voltage Coil          Rev. 0
Installation
EC 404368      Tune Distributed Control System (DCS) Controls Due to    Rev.1
Hot Leg Streaming
EC 409942      Replace Bussmann BAF-3A Fuses For 125VDC Vital I&C      Rev. 1
Distribution Center
EC 410608      ECCS and NS System Gas Void Acceptance Criteria          Rev. 0
Miscellaneous DPC-NE-2009-PA  Duke Power Company Westinghouse Fuel Transition          Rev. 3b
Report
MCM-1399.05-    Vendor Manual-Digital Rod Position Indicator            REv D03
206.01
MCM-1399.05-    Vendor Manual- Digital Rod Position Indicator System    D03
207.001
MCS-1206.00-02- Specification PS 900.2                                  Rev. 202
0002
MDSS-          EDA System- Digital Rod Position Indication ( DRPI)      Rev. 1
0806.EDA.00001  Digital System Specification
MDSS-          Digital Rod Position Indication System Software and Data Rev. 1
Inspection Type      Designation        Description or Title                                  Revision or
Procedure                                                                                        Date
0806.EDA.00001      Quality Assurance Plan
Memo To File EC    Coil Comparison for EC108775, Joslyn Clark Coil        Rev. 0
108775              Replacement
SER                Acceptance For Referencing Of Licensing Topical Report dated
                                          , EPRT NP-2511-CCM, "VIPRE-01: A Thermal -            05/01/1986
Hydraulic Analysis Code FOQ Reactor Cores", Volumes
1, 2, 3 and 4
UFSAR Change        EC 109072                                              dated
Number 15-51                                                              11/05/2015
UFSAR Change        EC 400132                                              dated
Number 16-13                                                              01/10/2017
WCAP-12610-P-A &    Optimized Zirlo                                        dated July
CENPD-404-P-A,                                                            2006
Addendum 1A
WCAP-12610-P-A &    Westinghouse Clad Corrosion Model for Zirlo and        dated
CENPD-404-P-A,      Optimized Zirlo                                        October
Addendum 2-A                                                              2013
Procedures AD-EG-ALL-1155      Post Modification Testing                              Rev. 4
AD-EG-ALL-1206      Equipment Reliability Classification                  Rev. 4
EDM-601            Engineering Change Manual                              Rev. 18
EDM-601            Engineering Directives Manual                          Rev. 29
PT/1/A/4200/009A    Engineered Safety Features Actuation Periodic Test    Rev. 148
Train A
PT/1/A/4200/009B    Engineered Safety Features Actuation Periodic Test    Rev. 17
Train B
PT/1/A/4200/017 A  NV To Cold Legs Flow Balance                          Rev. 15
PT/1/A/4206/001A    1A NI Pump Performance Test                            Rev. 57
PT/2/A/4200/009A    Engineered Safety Features Actuation Periodic Test    Rev. 107
Train A
PT/2/A/4200/009B    Engineered Safety Features Actuation Periodic Test    Rev. 19
Train B
TT/1/A/EC104503/000 Post Modification Testing for EC104503 - EDG 1A        Rev. 2
Voltage Regulator Replacement
Inspection Type        Designation Description or Title                  Revision or
Procedure                                                                Date
Work Orders 20069641-01 DRPI Modification/Validation Test Plan 03/28/16
10
}}
}}

Latest revision as of 11:21, 19 October 2019

William B. McGuire Nuclear Station - Triennial Inspection of Evaluation of Changes, Tests, and Experiments Baseline Inspection Report 05000369/2019010 and 05000370/2019010
ML19219A668
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/07/2019
From: James Baptist
Division of Reactor Safety II, NRC/RGN-II/DRS/EB1
To: Teresa Ray
Duke Energy Carolinas
Reeder D
References
IR 2019010
Download: ML19219A668 (12)


Text

ust 7, 2019

SUBJECT:

WILLIAM B. MCGUIRE NUCLEAR STATION - TRIENNIAL INSPECTION OF EVALUATION OF CHANGES, TESTS AND EXPERIMENTS BASELINE INSPECTION REPORT 05000369/2019010 AND 05000370/2019010

Dear Mr. Ray:

On July 18, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at William B. McGuire Nuclear Station and discussed the results of this inspection with Ed Pigott and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000369 and 05000370 License Nos. NPF-17 and NPF-9 Enclosure:

As stated cc w/ encl: Distribution via LISTSERV

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial inspection of evaluation of changes, tests and experiments baseline inspection at William B McGuire Nuclear Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.17T - Evaluations of Changes, Tests, and Experiments Sample Selection (IP Section 02.01)

The inspectors reviewed the following evaluations, screenings, and/or applicability determinations for 10 CFR 50.59 from July 15-18, 2019.

(1) 50.59 Evaluation - AR 02073877, Allow Use of Upgraded VIPRE Code for Analysis
(2) 50.59 Evaluation, AR 01983884, UFSAR Change in Support of Lifting Reactor Vessel Upper Internals Lift Rig
(3) 50.59 Screening - AR 1339299, Replace 1A EDG Voltage Regulators U1 (EC 104503)
(4) 50.59 Screening - AR 2168938, ECCS and NS System Gas Void Acceptance Criteria (EC 410608)
(5) 50.59 Screening - AR 1267495, RN Strainer Backwash Pump - 1A MOD (EC 102477)
(6) Applicability Determination - AR 2162253, Replace Bussman BAF-3A Fuses For 125VDC Vital I&C Distribution Center Voltmeter CKTS & U1/U2 PNLBD Loss of Voltage (EC 409942)
(7) Applicability Determination - AR 1338041, RN Suction Overpressure Protection "1A" (OBDN) - Unit 1 Exemption "40" List - 43-14 (EC 107089)
(8) 50.59 Evaluation - AR 02014647, Allow Replacement of Digital Rod Position Indication (DRPI) Controller (EC 113220)
(9) 50.59 Evaluation - AR 02050448, Tune Distributed Control System (CS) Controls Due to Hot Leg Streaming (EC 404368)
(10) 50.59 Screening - AR 1228654, VC/YC Chiller Compressor Oil Pump (EC 101374)
(11) 50.59 Screening - AR 1349726, 1C NCP Motor Stator Upgrade (EC 104254)
(12) 50.59 Screening - AR 1286447, Replace Panelboard 2EKVB Mod (EC 105979)
(13) Applicability Determination - AR 2052086, Revise Unit 1 CA Pump Motor Time Overcurrent Relay 51 Setting (EC 405274)
(14) Applicability Determination - AR 1339802, Replace Solenoid Valves on 2NCSV0273AC and 2NCSV0275B With Different Model Target Rock Valve (EC 111336)
(15) 50.59 Evaluation - AR 1955292, Assured CA Suction for Extended SBO Per NRC Order EA-12-049 & INPO IER L1-11-4 (Fukushima Dai-ichi Accident Response) Unit 2 (EC 109072)
(16) 50.59 Evaluation - AR 2047562, Revision to Methodology Report DPC-NE-2009-P-A to Implement WCAP-12610-P-A and CENPD-404-P-A, Addendum 1-A, Optimized ZIRLO, and Addendum 2-A, Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO
(17) 50.59 Screening - AR 1336245, 0000103936 - 000 - Change Actuator On 2RN0279 from NA2 to NA1E (EC 103936)
(18) 50.59 Screening - AR 2081907, 0000400132 - 000 CA Discharge Piping Design Pressure Increase Per NCR 01901450 (EC 400132)
(19) 50.59 Screening - AR 1990687, The acceptable Valve Stroke Times (VST) for valves 1NM-22AC,1NM-25AC, 1NV-141A, 0RN-10AC, 0RN-147AC, 0RN-148AC, 1RN-64A, 2RN-70A, 1RN-253A, 1 RN-276A, 2RN-279B, 2RN-299A, 1VE-5A, and 2VI-362A are revised to restore margin to the MOV stroke time for these valves (EC 402504)
(20) 50.59 Screening - AR 2051913, 0000101492 - 000 Unit 1 NI and NV Cold Leg Throttle Valve Seat Clearance Capital (EC 101492)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 18, 2019, the inspectors presented the triennial inspection of evaluation of changes, tests and experiments baseline inspection results to Ed Pigott and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.17T Calculations DPC -1552.08-00- Safety Injection Flows For Safety Analysis Rev. 25

0109

MCC 1206.02-83- EC101494 - Addition of Valve 2NV-1077 Rev. 27

0034

MCC 1223.02-00- Engineered Safety Feature Valves Response Time Rev. 24

0001 Testing Response

MCC 1223.02-00- Engineered Safety Feature Valves Response Time Rev. 22

0002 Testing Response

MCC-1201.05-00- Rerate Qualification Report for 3X4X9E MSD 9 Stage Rev. 1

0006 Auxiliary Feedwater Pump

MCC-1201.05-00- Rerate Qualification Report for 4X6X10B MSD-D 10 Rev. 1

0007 Stage Auxiliary Feedwater Pump

MCC-1206.02-83- Piping Analysis Problem NV-353 Rev. 27

0034

MCC-1223.42-00- CA System Parameter Design Parameter Verification Rev. 5

0004

MCC-1381.05-00- Maximum Allowable Cable Lengths for Size 1 and 2 Rev. 9

0147 Starters at McGuire

Corrective Action AR 1228654 VC/YC Chiller Compressor Oil Pump Rev.0

Documents AR 1286447 Replace Panelboard 2EKVB Modification Rev.0

AR 1302083 RN Strainer Backwash Pump - 1A MOD dated

05/14/2012

AR 1309768 10 CFR 50.59 Screen 0000108639 - 000 - Revise RN, dated

NM, NV, VE and VI System TAC Sheet Valve Stroke 09/05/2013

Times.

AR 1336245 0000103936 - 000 - Change Actuator On 2RN0279 from dated

NA2 to NA1E 03/14/2013

AR 1338041 EC107089 & EC107090: RN Suction Supplemental Vent dated

Line 1A & 2A 06/04/2013

AR 1339299 0000104503 - 000 - Replace 1A EDG Voltage Regulators dated

U1 08/08/2013

Inspection Type Designation Description or Title Revision or

Procedure Date

AR 1339802 Replace Solenoid Valves on 2NCSV0273AC AND Rev.0

2NCSV0275B with Different Model Target Rock Valve

AR 1349726 1C NCP Motor Stator Upgrade Rev.10

AR 1955292 Assured CA Suction for Extended SBO Per NRC Order dated

EA-12-049 & INPO IER L1-11-4 (Fukushima Dai-ichi 09/20/2015

Accident Response) Unit 2

AR 1983884 Use of Containment Building Polar Crane for Lifts of dated

Reactor Vessel Upper Internal Lifts Rig 02/19/2016

AR 1990687 The acceptable Valve Stroke Times (VST) for valves dated

1NM-22AC, 1NM-25AC, 1NV-141A, 0RN-10AC, 0RN- 02/01/2016

147AC, 0RN148AC, 1RN-64A, 2RN-70A, 1RN-253A, 1

RN-276A, 2RN-279B, 2RN-299A, 1VE-5A, and 2VI-362A

are revised to add

margin to the MOV stroke time for these valves. (10 CFR 50.59 Screen)

AR 1990687 The acceptable Valve Stroke Times (VST) for valves dated

1NM-22AC,1NM-25AC, 1NV-141A, 0RN-10AC, 0RN- 01/13/2016

147AC, 0RN-148AC, 1RN-64A, 2RN-70A, 1RN-253A, 1

RN-276A, 2RN-279B, 2RN-299A, 1VE-5A, and 2VI-362A

are revised to restore margin to the MOV stroke time for

these valves

AR 2021488 PT/1/A/4200/009 A to Support EC-402504. dated

2/06/2016

AR 2021491 PT/2/A/4200/009 A to Support EC-402504 (Rev. 102) dated

10/25/2016

AR 2021494 PT/2/A/4200/009 B to Support EC-402504. dated

05/10/2016

AR 2047562 Revision to Methodology Report DPC-NE-2009-P-A to dated

Implement WCAP-12610-P-A and CENPD-404-P-A, 07/21/2016

Addendum 1-A, Optimized ZIRLO, and Addendum 2-A,

Westinghouse Clad Corrosion Model for ZIRLO and

Optimized ZIRLO

AR 2051913 0000101492 - 000 Unit 1 NI and NV Cold Leg Throttle dated

Valve Seat Clearance Capital 08/08/2016

Inspection Type Designation Description or Title Revision or

Procedure Date

AR 2052086 Revise Unit 1 CA Pump Motor Time Overcurrent Relay Rev.0

Setting

AR 2073877 MNS 50.59 evaluation for VIPRE upgrade from mod 2r to dated

mod 10/27/2016

AR 2081907 0000400132 - 000 CA Discharge Piping Design Pressure dated

Increase Per NCR 01901450 11/28/2016

AR 2162253 Replace Bussmann BAF-3A Fuses For 125VDC dated

11/01/2017

AR 2168938 0000410608 - 000 ECCS and NS System Gas Void dated

Acceptance 01/22/2018

NCR 1655939 Control circuit cable lengths for several motor operated dated

valves exceed the maximum allowable cable length per 03/13/2014

the new revision of MCC 1381.05-00-0147 (Maximum

Allowable Cable Lengths for Size 1 and Size 2 starters at

McGuire)

NCR 1901864 Update calculation MCC-1381.05-00-0147 R07 dated

(Maximum Allowable Cable Lengths For Size 1 AND 2 02/10/2016

Starters at McGuire) for replacement of Starters with 65%

Coil Pickup

NCR 1903794 Calculation MCC-1381.05-00-0263 has been revised to dated

Rev. 7 and MNS engineering needs to evaluate the 12/06/2018

results and take appropriate actions.

Corrective Action NCR 2282169 2019 NRC 50.59 Inspection - 5AD question improper dated

Documents response 07/16/2019

Resulting from

Inspection

Drawings MCFD-1553-01.00 Flow Diagram of Reactor Coolant System (NC) Rev. 12

MCFD-1554-03.01 Flow Diagram of Chemical & Volume Control Rev. 25

System (NV)

MCFD-1562-01.00 Flow Diagram of Safety Injection System (NI) Rev. 12

MCFD-1562-03.00 Flow Diagram of Safety Injection System (NI) Rev. 18

MCFD-1562-03.01 Flow Diagram of Safety Injection System (NI) Rev. 15

MCM 1205.00- Swing Check Valve Rev. A

0073.001

Inspection Type Designation Description or Title Revision or

Procedure Date

Engineering EC 101492 UNIT 1 NI and NV Cold Leg Throttle Valve Seat Rev. 8

Changes Clearance Capital

EC 102477 RN Strainer Backwash Pump - 1A Mod Rev. 21

EC 103936 Change Actuator on 2RN-279B From NA2 To NA1E Rev. 4

EC 104503 Replace 1A EDG Voltage Regulators U1 (MOD) Rev. 3

EC 107089 RN Suction Overpressure Protection "1A" (OBDN) - Unit Rev. 8

EC 108639 Revise RN, NM, NV, VE and VI System TAC Sheet Valve Rev. 0

Stroke Times.

EC 108775 Equivalency For Joslyn Clark Coil Replacement Rev. 0

EC 109072 Assured CA Suction For Extended SBO Per NRC Rev. 9

ORDER EA-12-049 & INPO IER L1-11-4

EC 113220 Allow Replacement of Digital Rod Position Indication Rev.0

(DRPI) Controller

EC 400132 CA Discharge Piping Design Pressure Increase Per NCR Rev. 0

01901450

EC 402504 Update Valve Stroke Times For Low Voltage Coil Rev. 0

Installation

EC 404368 Tune Distributed Control System (DCS) Controls Due to Rev.1

Hot Leg Streaming

EC 409942 Replace Bussmann BAF-3A Fuses For 125VDC Vital I&C Rev. 1

Distribution Center

EC 410608 ECCS and NS System Gas Void Acceptance Criteria Rev. 0

Miscellaneous DPC-NE-2009-PA Duke Power Company Westinghouse Fuel Transition Rev. 3b

Report

MCM-1399.05- Vendor Manual-Digital Rod Position Indicator REv D03

206.01

MCM-1399.05- Vendor Manual- Digital Rod Position Indicator System D03

207.001

MCS-1206.00-02- Specification PS 900.2 Rev. 202

0002

MDSS- EDA System- Digital Rod Position Indication ( DRPI) Rev. 1

0806.EDA.00001 Digital System Specification

MDSS- Digital Rod Position Indication System Software and Data Rev. 1

Inspection Type Designation Description or Title Revision or

Procedure Date

0806.EDA.00001 Quality Assurance Plan

Memo To File EC Coil Comparison for EC108775, Joslyn Clark Coil Rev. 0

108775 Replacement

SER Acceptance For Referencing Of Licensing Topical Report dated

, EPRT NP-2511-CCM, "VIPRE-01: A Thermal - 05/01/1986

Hydraulic Analysis Code FOQ Reactor Cores", Volumes

1, 2, 3 and 4

UFSAR Change EC 109072 dated

Number 15-51 11/05/2015

UFSAR Change EC 400132 dated

Number 16-13 01/10/2017

WCAP-12610-P-A & Optimized Zirlo dated July

CENPD-404-P-A, 2006

Addendum 1A

WCAP-12610-P-A & Westinghouse Clad Corrosion Model for Zirlo and dated

CENPD-404-P-A, Optimized Zirlo October

Addendum 2-A 2013

Procedures AD-EG-ALL-1155 Post Modification Testing Rev. 4

AD-EG-ALL-1206 Equipment Reliability Classification Rev. 4

EDM-601 Engineering Change Manual Rev. 18

EDM-601 Engineering Directives Manual Rev. 29

PT/1/A/4200/009A Engineered Safety Features Actuation Periodic Test Rev. 148

Train A

PT/1/A/4200/009B Engineered Safety Features Actuation Periodic Test Rev. 17

Train B

PT/1/A/4200/017 A NV To Cold Legs Flow Balance Rev. 15

PT/1/A/4206/001A 1A NI Pump Performance Test Rev. 57

PT/2/A/4200/009A Engineered Safety Features Actuation Periodic Test Rev. 107

Train A

PT/2/A/4200/009B Engineered Safety Features Actuation Periodic Test Rev. 19

Train B

TT/1/A/EC104503/000 Post Modification Testing for EC104503 - EDG 1A Rev. 2

Voltage Regulator Replacement

Inspection Type Designation Description or Title Revision or

Procedure Date

Work Orders 20069641-01 DRPI Modification/Validation Test Plan 03/28/16

10