WILLIAM B. MCGUIRE NUCLEAR STATION - TRIENNIAL INSPECTION OF EVALUATION OF CHANGES, TESTS AND EXPERIMENTS BASELINE INSPECTION REPORT 05000369/2019010 AND 05000370/2019010 | |||
==Dear Mr. Ray:== | |||
On July 18, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at William B. McGuire Nuclear Station and discussed the results of this inspection with Ed Pigott and other members of your staff. The results of this inspection are documented in the enclosed report. | |||
The NRC inspectors did not identify any finding or violation of more than minor significance. | |||
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, | |||
/RA/ | |||
James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000369 and 05000370 License Nos. NPF-17 and NPF-9 Enclosure: | |||
As stated cc w/ encl: Distribution via LISTSERV | |||
=SUMMARY= | |||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial inspection of evaluation of changes, tests and experiments baseline inspection at William B McGuire Nuclear Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | |||
List of Findings and Violations No findings or violations of more than minor significance were identified. | |||
Additional Tracking Items None. | |||
=INSPECTION SCOPES= | |||
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. | |||
==REACTOR SAFETY== | |||
===71111.17T - Evaluations of Changes, Tests, and Experiments Sample Selection (IP Section 02.01) === | |||
{{IP sample|IP=IP 71111.17|count=20}} | |||
The inspectors reviewed the following evaluations, screenings, and/or applicability determinations for 10 CFR 50.59 from July 15-18, 2019. | |||
: (1) 50.59 Evaluation - AR 02073877, Allow Use of Upgraded VIPRE Code for Analysis | |||
: (2) 50.59 Evaluation, AR 01983884, UFSAR Change in Support of Lifting Reactor Vessel Upper Internals Lift Rig | |||
: (3) 50.59 Screening - AR 1339299, Replace 1A EDG Voltage Regulators U1 (EC 104503) | |||
: (4) 50.59 Screening - AR 2168938, ECCS and NS System Gas Void Acceptance Criteria (EC 410608) | |||
: (5) 50.59 Screening - AR 1267495, RN Strainer Backwash Pump - 1A MOD (EC 102477) | |||
: (6) Applicability Determination - AR 2162253, Replace Bussman BAF-3A Fuses For 125VDC Vital I&C Distribution Center Voltmeter CKTS & U1/U2 PNLBD Loss of Voltage (EC 409942) | |||
: (7) Applicability Determination - AR 1338041, RN Suction Overpressure Protection "1A" (OBDN) - Unit 1 Exemption "40" List - 43-14 (EC 107089) | |||
: (8) 50.59 Evaluation - AR 02014647, Allow Replacement of Digital Rod Position Indication (DRPI) Controller (EC 113220) | |||
: (9) 50.59 Evaluation - AR 02050448, Tune Distributed Control System (CS) Controls Due to Hot Leg Streaming (EC 404368) | |||
: (10) 50.59 Screening - AR 1228654, VC/YC Chiller Compressor Oil Pump (EC 101374) | |||
: (11) 50.59 Screening - AR 1349726, 1C NCP Motor Stator Upgrade (EC 104254) | |||
: (12) 50.59 Screening - AR 1286447, Replace Panelboard 2EKVB Mod (EC 105979) | |||
: (13) Applicability Determination - AR 2052086, Revise Unit 1 CA Pump Motor Time Overcurrent Relay 51 Setting (EC 405274) | |||
: (14) Applicability Determination - AR 1339802, Replace Solenoid Valves on 2NCSV0273AC and 2NCSV0275B With Different Model Target Rock Valve (EC 111336) | |||
: (15) 50.59 Evaluation - AR 1955292, Assured CA Suction for Extended SBO Per NRC Order EA-12-049 & INPO IER L1-11-4 (Fukushima Dai-ichi Accident Response) Unit 2 (EC 109072) | |||
: (16) 50.59 Evaluation - AR 2047562, Revision to Methodology Report DPC-NE-2009-P-A to Implement WCAP-12610-P-A and CENPD-404-P-A, Addendum 1-A, Optimized ZIRLO, and Addendum 2-A, Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO | |||
: (17) 50.59 Screening - AR 1336245, 0000103936 - 000 - Change Actuator On 2RN0279 from NA2 to NA1E (EC 103936) | |||
: (18) 50.59 Screening - AR 2081907, 0000400132 - 000 CA Discharge Piping Design Pressure Increase Per NCR 01901450 (EC 400132) | |||
: (19) 50.59 Screening - AR 1990687, The acceptable Valve Stroke Times (VST) for valves 1NM-22AC,1NM-25AC, 1NV-141A, 0RN-10AC, 0RN-147AC, 0RN-148AC, 1RN-64A, 2RN-70A, 1RN-253A, 1 RN-276A, 2RN-279B, 2RN-299A, 1VE-5A, and 2VI-362A are revised to restore margin to the MOV stroke time for these valves (EC 402504) | |||
: (20) 50.59 Screening - AR 2051913, 0000101492 - 000 Unit 1 NI and NV Cold Leg Throttle Valve Seat Clearance Capital (EC 101492) | |||
==INSPECTION RESULTS== | |||
No findings were identified. | |||
==EXIT MEETINGS AND DEBRIEFS== | |||
The inspectors verified no proprietary information was retained or documented in this report. | |||
* On July 18, 2019, the inspectors presented the triennial inspection of evaluation of changes, tests and experiments baseline inspection results to Ed Pigott and other members of the licensee staff. | |||
=DOCUMENTS REVIEWED= | |||
Inspection Type Designation Description or Title Revision or | |||
Procedure Date | |||
71111.17T Calculations DPC -1552.08-00- Safety Injection Flows For Safety Analysis Rev. 25 | |||
0109 | |||
MCC 1206.02-83- EC101494 - Addition of Valve 2NV-1077 Rev. 27 | |||
0034 | |||
MCC 1223.02-00- Engineered Safety Feature Valves Response Time Rev. 24 | |||
0001 Testing Response | |||
MCC 1223.02-00- Engineered Safety Feature Valves Response Time Rev. 22 | |||
0002 Testing Response | |||
MCC-1201.05-00- Rerate Qualification Report for 3X4X9E MSD 9 Stage Rev. 1 | |||
0006 Auxiliary Feedwater Pump | |||
MCC-1201.05-00- Rerate Qualification Report for 4X6X10B MSD-D 10 Rev. 1 | |||
0007 Stage Auxiliary Feedwater Pump | |||
MCC-1206.02-83- Piping Analysis Problem NV-353 Rev. 27 | |||
0034 | |||
MCC-1223.42-00- CA System Parameter Design Parameter Verification Rev. 5 | |||
0004 | |||
MCC-1381.05-00- Maximum Allowable Cable Lengths for Size 1 and 2 Rev. 9 | |||
0147 Starters at McGuire | |||
Corrective Action AR 1228654 VC/YC Chiller Compressor Oil Pump Rev.0 | |||
Documents AR 1286447 Replace Panelboard 2EKVB Modification Rev.0 | |||
AR 1302083 RN Strainer Backwash Pump - 1A MOD dated | |||
05/14/2012 | |||
AR 1309768 10 CFR 50.59 Screen 0000108639 - 000 - Revise RN, dated | |||
NM, NV, VE and VI System TAC Sheet Valve Stroke 09/05/2013 | |||
Times. | |||
AR 1336245 0000103936 - 000 - Change Actuator On 2RN0279 from dated | |||
NA2 to NA1E 03/14/2013 | |||
AR 1338041 EC107089 & EC107090: RN Suction Supplemental Vent dated | |||
Line 1A & 2A 06/04/2013 | |||
AR 1339299 0000104503 - 000 - Replace 1A EDG Voltage Regulators dated | |||
U1 08/08/2013 | |||
Inspection Type Designation Description or Title Revision or | |||
Procedure Date | |||
AR 1339802 Replace Solenoid Valves on 2NCSV0273AC AND Rev.0 | |||
2NCSV0275B with Different Model Target Rock Valve | |||
AR 1349726 1C NCP Motor Stator Upgrade Rev.10 | |||
AR 1955292 Assured CA Suction for Extended SBO Per NRC Order dated | |||
EA-12-049 & INPO IER L1-11-4 (Fukushima Dai-ichi 09/20/2015 | |||
Accident Response) Unit 2 | |||
AR 1983884 Use of Containment Building Polar Crane for Lifts of dated | |||
Reactor Vessel Upper Internal Lifts Rig 02/19/2016 | |||
AR 1990687 The acceptable Valve Stroke Times (VST) for valves dated | |||
1NM-22AC, 1NM-25AC, 1NV-141A, 0RN-10AC, 0RN- 02/01/2016 | |||
147AC, 0RN148AC, 1RN-64A, 2RN-70A, 1RN-253A, 1 | |||
RN-276A, 2RN-279B, 2RN-299A, 1VE-5A, and 2VI-362A | |||
are revised to add | |||
margin to the MOV stroke time for these valves. (10 CFR | |||
50.59 Screen) | |||
AR 1990687 The acceptable Valve Stroke Times (VST) for valves dated | |||
1NM-22AC,1NM-25AC, 1NV-141A, 0RN-10AC, 0RN- 01/13/2016 | |||
147AC, 0RN-148AC, 1RN-64A, 2RN-70A, 1RN-253A, 1 | |||
RN-276A, 2RN-279B, 2RN-299A, 1VE-5A, and 2VI-362A | |||
are revised to restore margin to the MOV stroke time for | |||
these valves | |||
AR 2021488 PT/1/A/4200/009 A to Support EC-402504. dated | |||
2/06/2016 | |||
AR 2021491 PT/2/A/4200/009 A to Support EC-402504 (Rev. 102) dated | |||
10/25/2016 | |||
AR 2021494 PT/2/A/4200/009 B to Support EC-402504. dated | |||
05/10/2016 | |||
AR 2047562 Revision to Methodology Report DPC-NE-2009-P-A to dated | |||
Implement WCAP-12610-P-A and CENPD-404-P-A, 07/21/2016 | |||
Addendum 1-A, Optimized ZIRLO, and Addendum 2-A, | |||
Westinghouse Clad Corrosion Model for ZIRLO and | |||
Optimized ZIRLO | |||
AR 2051913 0000101492 - 000 Unit 1 NI and NV Cold Leg Throttle dated | |||
Valve Seat Clearance Capital 08/08/2016 | |||
Inspection Type Designation Description or Title Revision or | |||
Procedure Date | |||
AR 2052086 Revise Unit 1 CA Pump Motor Time Overcurrent Relay Rev.0 | |||
Setting | |||
AR 2073877 MNS 50.59 evaluation for VIPRE upgrade from mod 2r to dated | |||
mod 10/27/2016 | |||
AR 2081907 0000400132 - 000 CA Discharge Piping Design Pressure dated | |||
Increase Per NCR 01901450 11/28/2016 | |||
AR 2162253 Replace Bussmann BAF-3A Fuses For 125VDC dated | |||
11/01/2017 | |||
AR 2168938 0000410608 - 000 ECCS and NS System Gas Void dated | |||
Acceptance 01/22/2018 | |||
NCR 1655939 Control circuit cable lengths for several motor operated dated | |||
valves exceed the maximum allowable cable length per 03/13/2014 | |||
the new revision of MCC 1381.05-00-0147 (Maximum | |||
Allowable Cable Lengths for Size 1 and Size 2 starters at | |||
McGuire) | |||
NCR 1901864 Update calculation MCC-1381.05-00-0147 R07 dated | |||
(Maximum Allowable Cable Lengths For Size 1 AND 2 02/10/2016 | |||
Starters at McGuire) for replacement of Starters with 65% | |||
Coil Pickup | |||
NCR 1903794 Calculation MCC-1381.05-00-0263 has been revised to dated | |||
Rev. 7 and MNS engineering needs to evaluate the 12/06/2018 | |||
results and take appropriate actions. | |||
Corrective Action NCR 2282169 2019 NRC 50.59 Inspection - 5AD question improper dated | |||
Documents response 07/16/2019 | |||
Resulting from | |||
Inspection | |||
Drawings MCFD-1553-01.00 Flow Diagram of Reactor Coolant System (NC) Rev. 12 | |||
MCFD-1554-03.01 Flow Diagram of Chemical & Volume Control Rev. 25 | |||
System (NV) | |||
MCFD-1562-01.00 Flow Diagram of Safety Injection System (NI) Rev. 12 | |||
MCFD-1562-03.00 Flow Diagram of Safety Injection System (NI) Rev. 18 | |||
MCFD-1562-03.01 Flow Diagram of Safety Injection System (NI) Rev. 15 | |||
MCM 1205.00- Swing Check Valve Rev. A | |||
0073.001 | |||
Inspection Type Designation Description or Title Revision or | |||
Procedure Date | |||
Engineering EC 101492 UNIT 1 NI and NV Cold Leg Throttle Valve Seat Rev. 8 | |||
Changes Clearance Capital | |||
EC 102477 RN Strainer Backwash Pump - 1A Mod Rev. 21 | |||
EC 103936 Change Actuator on 2RN-279B From NA2 To NA1E Rev. 4 | |||
EC 104503 Replace 1A EDG Voltage Regulators U1 (MOD) Rev. 3 | |||
EC 107089 RN Suction Overpressure Protection "1A" (OBDN) - Unit Rev. 8 | |||
EC 108639 Revise RN, NM, NV, VE and VI System TAC Sheet Valve Rev. 0 | |||
Stroke Times. | |||
EC 108775 Equivalency For Joslyn Clark Coil Replacement Rev. 0 | |||
EC 109072 Assured CA Suction For Extended SBO Per NRC Rev. 9 | |||
ORDER EA-12-049 & INPO IER L1-11-4 | |||
EC 113220 Allow Replacement of Digital Rod Position Indication Rev.0 | |||
(DRPI) Controller | |||
EC 400132 CA Discharge Piping Design Pressure Increase Per NCR Rev. 0 | |||
01901450 | |||
EC 402504 Update Valve Stroke Times For Low Voltage Coil Rev. 0 | |||
Installation | |||
EC 404368 Tune Distributed Control System (DCS) Controls Due to Rev.1 | |||
Hot Leg Streaming | |||
EC 409942 Replace Bussmann BAF-3A Fuses For 125VDC Vital I&C Rev. 1 | |||
Distribution Center | |||
EC 410608 ECCS and NS System Gas Void Acceptance Criteria Rev. 0 | |||
Miscellaneous DPC-NE-2009-PA Duke Power Company Westinghouse Fuel Transition Rev. 3b | |||
Report | |||
MCM-1399.05- Vendor Manual-Digital Rod Position Indicator REv D03 | |||
206.01 | |||
MCM-1399.05- Vendor Manual- Digital Rod Position Indicator System D03 | |||
207.001 | |||
MCS-1206.00-02- Specification PS 900.2 Rev. 202 | |||
0002 | |||
MDSS- EDA System- Digital Rod Position Indication ( DRPI) Rev. 1 | |||
0806.EDA.00001 Digital System Specification | |||
MDSS- Digital Rod Position Indication System Software and Data Rev. 1 | |||
Inspection Type Designation Description or Title Revision or | |||
Procedure Date | |||
0806.EDA.00001 Quality Assurance Plan | |||
Memo To File EC Coil Comparison for EC108775, Joslyn Clark Coil Rev. 0 | |||
108775 Replacement | |||
SER Acceptance For Referencing Of Licensing Topical Report dated | |||
, EPRT NP-2511-CCM, "VIPRE-01: A Thermal - 05/01/1986 | |||
Hydraulic Analysis Code FOQ Reactor Cores", Volumes | |||
1, 2, 3 and 4 | |||
UFSAR Change EC 109072 dated | |||
Number 15-51 11/05/2015 | |||
UFSAR Change EC 400132 dated | |||
Number 16-13 01/10/2017 | |||
WCAP-12610-P-A & Optimized Zirlo dated July | |||
CENPD-404-P-A, 2006 | |||
Addendum 1A | |||
WCAP-12610-P-A & Westinghouse Clad Corrosion Model for Zirlo and dated | |||
CENPD-404-P-A, Optimized Zirlo October | |||
Addendum 2-A 2013 | |||
Procedures AD-EG-ALL-1155 Post Modification Testing Rev. 4 | |||
AD-EG-ALL-1206 Equipment Reliability Classification Rev. 4 | |||
EDM-601 Engineering Change Manual Rev. 18 | |||
EDM-601 Engineering Directives Manual Rev. 29 | |||
PT/1/A/4200/009A Engineered Safety Features Actuation Periodic Test Rev. 148 | |||
Train A | |||
PT/1/A/4200/009B Engineered Safety Features Actuation Periodic Test Rev. 17 | |||
Train B | |||
PT/1/A/4200/017 A NV To Cold Legs Flow Balance Rev. 15 | |||
PT/1/A/4206/001A 1A NI Pump Performance Test Rev. 57 | |||
PT/2/A/4200/009A Engineered Safety Features Actuation Periodic Test Rev. 107 | |||
Train A | |||
PT/2/A/4200/009B Engineered Safety Features Actuation Periodic Test Rev. 19 | |||
Train B | |||
TT/1/A/EC104503/000 Post Modification Testing for EC104503 - EDG 1A Rev. 2 | |||
Voltage Regulator Replacement | |||
Inspection Type Designation Description or Title Revision or | |||
Procedure Date | |||
Work Orders 20069641-01 DRPI Modification/Validation Test Plan 03/28/16 | |||
10 | |||
}} | }} |
Latest revision as of 11:21, 19 October 2019
ML19219A668 | |
Person / Time | |
---|---|
Site: | McGuire, Mcguire |
Issue date: | 08/07/2019 |
From: | James Baptist Division of Reactor Safety II, NRC/RGN-II/DRS/EB1 |
To: | Teresa Ray Duke Energy Carolinas |
Reeder D | |
References | |
IR 2019010 | |
Download: ML19219A668 (12) | |
Text
ust 7, 2019
SUBJECT:
WILLIAM B. MCGUIRE NUCLEAR STATION - TRIENNIAL INSPECTION OF EVALUATION OF CHANGES, TESTS AND EXPERIMENTS BASELINE INSPECTION REPORT 05000369/2019010 AND 05000370/2019010
Dear Mr. Ray:
On July 18, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at William B. McGuire Nuclear Station and discussed the results of this inspection with Ed Pigott and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000369 and 05000370 License Nos. NPF-17 and NPF-9 Enclosure:
As stated cc w/ encl: Distribution via LISTSERV
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial inspection of evaluation of changes, tests and experiments baseline inspection at William B McGuire Nuclear Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified.
Additional Tracking Items None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.17T - Evaluations of Changes, Tests, and Experiments Sample Selection (IP Section 02.01)
The inspectors reviewed the following evaluations, screenings, and/or applicability determinations for 10 CFR 50.59 from July 15-18, 2019.
- (1) 50.59 Evaluation - AR 02073877, Allow Use of Upgraded VIPRE Code for Analysis
- (2) 50.59 Evaluation, AR 01983884, UFSAR Change in Support of Lifting Reactor Vessel Upper Internals Lift Rig
- (3) 50.59 Screening - AR 1339299, Replace 1A EDG Voltage Regulators U1 (EC 104503)
- (4) 50.59 Screening - AR 2168938, ECCS and NS System Gas Void Acceptance Criteria (EC 410608)
- (5) 50.59 Screening - AR 1267495, RN Strainer Backwash Pump - 1A MOD (EC 102477)
- (6) Applicability Determination - AR 2162253, Replace Bussman BAF-3A Fuses For 125VDC Vital I&C Distribution Center Voltmeter CKTS & U1/U2 PNLBD Loss of Voltage (EC 409942)
- (7) Applicability Determination - AR 1338041, RN Suction Overpressure Protection "1A" (OBDN) - Unit 1 Exemption "40" List - 43-14 (EC 107089)
- (8) 50.59 Evaluation - AR 02014647, Allow Replacement of Digital Rod Position Indication (DRPI) Controller (EC 113220)
- (9) 50.59 Evaluation - AR 02050448, Tune Distributed Control System (CS) Controls Due to Hot Leg Streaming (EC 404368)
- (10) 50.59 Screening - AR 1228654, VC/YC Chiller Compressor Oil Pump (EC 101374)
- (11) 50.59 Screening - AR 1349726, 1C NCP Motor Stator Upgrade (EC 104254)
- (12) 50.59 Screening - AR 1286447, Replace Panelboard 2EKVB Mod (EC 105979)
- (13) Applicability Determination - AR 2052086, Revise Unit 1 CA Pump Motor Time Overcurrent Relay 51 Setting (EC 405274)
- (14) Applicability Determination - AR 1339802, Replace Solenoid Valves on 2NCSV0273AC and 2NCSV0275B With Different Model Target Rock Valve (EC 111336)
- (15) 50.59 Evaluation - AR 1955292, Assured CA Suction for Extended SBO Per NRC Order EA-12-049 & INPO IER L1-11-4 (Fukushima Dai-ichi Accident Response) Unit 2 (EC 109072)
- (16) 50.59 Evaluation - AR 2047562, Revision to Methodology Report DPC-NE-2009-P-A to Implement WCAP-12610-P-A and CENPD-404-P-A, Addendum 1-A, Optimized ZIRLO, and Addendum 2-A, Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO
- (17) 50.59 Screening - AR 1336245, 0000103936 - 000 - Change Actuator On 2RN0279 from NA2 to NA1E (EC 103936)
- (18) 50.59 Screening - AR 2081907, 0000400132 - 000 CA Discharge Piping Design Pressure Increase Per NCR 01901450 (EC 400132)
- (19) 50.59 Screening - AR 1990687, The acceptable Valve Stroke Times (VST) for valves 1NM-22AC,1NM-25AC, 1NV-141A, 0RN-10AC, 0RN-147AC, 0RN-148AC, 1RN-64A, 2RN-70A, 1RN-253A, 1 RN-276A, 2RN-279B, 2RN-299A, 1VE-5A, and 2VI-362A are revised to restore margin to the MOV stroke time for these valves (EC 402504)
- (20) 50.59 Screening - AR 2051913, 0000101492 - 000 Unit 1 NI and NV Cold Leg Throttle Valve Seat Clearance Capital (EC 101492)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On July 18, 2019, the inspectors presented the triennial inspection of evaluation of changes, tests and experiments baseline inspection results to Ed Pigott and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.17T Calculations DPC -1552.08-00- Safety Injection Flows For Safety Analysis Rev. 25
0109
MCC 1206.02-83- EC101494 - Addition of Valve 2NV-1077 Rev. 27
0034
MCC 1223.02-00- Engineered Safety Feature Valves Response Time Rev. 24
0001 Testing Response
MCC 1223.02-00- Engineered Safety Feature Valves Response Time Rev. 22
0002 Testing Response
MCC-1201.05-00- Rerate Qualification Report for 3X4X9E MSD 9 Stage Rev. 1
0006 Auxiliary Feedwater Pump
MCC-1201.05-00- Rerate Qualification Report for 4X6X10B MSD-D 10 Rev. 1
0007 Stage Auxiliary Feedwater Pump
MCC-1206.02-83- Piping Analysis Problem NV-353 Rev. 27
0034
MCC-1223.42-00- CA System Parameter Design Parameter Verification Rev. 5
0004
MCC-1381.05-00- Maximum Allowable Cable Lengths for Size 1 and 2 Rev. 9
0147 Starters at McGuire
Corrective Action AR 1228654 VC/YC Chiller Compressor Oil Pump Rev.0
Documents AR 1286447 Replace Panelboard 2EKVB Modification Rev.0
AR 1302083 RN Strainer Backwash Pump - 1A MOD dated
05/14/2012
AR 1309768 10 CFR 50.59 Screen 0000108639 - 000 - Revise RN, dated
NM, NV, VE and VI System TAC Sheet Valve Stroke 09/05/2013
Times.
AR 1336245 0000103936 - 000 - Change Actuator On 2RN0279 from dated
NA2 to NA1E 03/14/2013
AR 1338041 EC107089 & EC107090: RN Suction Supplemental Vent dated
Line 1A & 2A 06/04/2013
AR 1339299 0000104503 - 000 - Replace 1A EDG Voltage Regulators dated
U1 08/08/2013
Inspection Type Designation Description or Title Revision or
Procedure Date
AR 1339802 Replace Solenoid Valves on 2NCSV0273AC AND Rev.0
2NCSV0275B with Different Model Target Rock Valve
AR 1349726 1C NCP Motor Stator Upgrade Rev.10
AR 1955292 Assured CA Suction for Extended SBO Per NRC Order dated
EA-12-049 & INPO IER L1-11-4 (Fukushima Dai-ichi 09/20/2015
Accident Response) Unit 2
AR 1983884 Use of Containment Building Polar Crane for Lifts of dated
Reactor Vessel Upper Internal Lifts Rig 02/19/2016
AR 1990687 The acceptable Valve Stroke Times (VST) for valves dated
1NM-22AC, 1NM-25AC, 1NV-141A, 0RN-10AC, 0RN- 02/01/2016
147AC, 0RN148AC, 1RN-64A, 2RN-70A, 1RN-253A, 1
RN-276A, 2RN-279B, 2RN-299A, 1VE-5A, and 2VI-362A
are revised to add
margin to the MOV stroke time for these valves. (10 CFR 50.59 Screen)
AR 1990687 The acceptable Valve Stroke Times (VST) for valves dated
1NM-22AC,1NM-25AC, 1NV-141A, 0RN-10AC, 0RN- 01/13/2016
147AC, 0RN-148AC, 1RN-64A, 2RN-70A, 1RN-253A, 1
RN-276A, 2RN-279B, 2RN-299A, 1VE-5A, and 2VI-362A
are revised to restore margin to the MOV stroke time for
these valves
AR 2021488 PT/1/A/4200/009 A to Support EC-402504. dated
2/06/2016
AR 2021491 PT/2/A/4200/009 A to Support EC-402504 (Rev. 102) dated
10/25/2016
AR 2021494 PT/2/A/4200/009 B to Support EC-402504. dated
05/10/2016
AR 2047562 Revision to Methodology Report DPC-NE-2009-P-A to dated
Implement WCAP-12610-P-A and CENPD-404-P-A, 07/21/2016
Addendum 1-A, Optimized ZIRLO, and Addendum 2-A,
Westinghouse Clad Corrosion Model for ZIRLO and
Optimized ZIRLO
AR 2051913 0000101492 - 000 Unit 1 NI and NV Cold Leg Throttle dated
Valve Seat Clearance Capital 08/08/2016
Inspection Type Designation Description or Title Revision or
Procedure Date
AR 2052086 Revise Unit 1 CA Pump Motor Time Overcurrent Relay Rev.0
Setting
AR 2073877 MNS 50.59 evaluation for VIPRE upgrade from mod 2r to dated
mod 10/27/2016
AR 2081907 0000400132 - 000 CA Discharge Piping Design Pressure dated
Increase Per NCR 01901450 11/28/2016
AR 2162253 Replace Bussmann BAF-3A Fuses For 125VDC dated
11/01/2017
AR 2168938 0000410608 - 000 ECCS and NS System Gas Void dated
Acceptance 01/22/2018
NCR 1655939 Control circuit cable lengths for several motor operated dated
valves exceed the maximum allowable cable length per 03/13/2014
the new revision of MCC 1381.05-00-0147 (Maximum
Allowable Cable Lengths for Size 1 and Size 2 starters at
McGuire)
NCR 1901864 Update calculation MCC-1381.05-00-0147 R07 dated
(Maximum Allowable Cable Lengths For Size 1 AND 2 02/10/2016
Starters at McGuire) for replacement of Starters with 65%
Coil Pickup
NCR 1903794 Calculation MCC-1381.05-00-0263 has been revised to dated
Rev. 7 and MNS engineering needs to evaluate the 12/06/2018
results and take appropriate actions.
Corrective Action NCR 2282169 2019 NRC 50.59 Inspection - 5AD question improper dated
Documents response 07/16/2019
Resulting from
Inspection
Drawings MCFD-1553-01.00 Flow Diagram of Reactor Coolant System (NC) Rev. 12
MCFD-1554-03.01 Flow Diagram of Chemical & Volume Control Rev. 25
System (NV)
MCFD-1562-01.00 Flow Diagram of Safety Injection System (NI) Rev. 12
MCFD-1562-03.00 Flow Diagram of Safety Injection System (NI) Rev. 18
MCFD-1562-03.01 Flow Diagram of Safety Injection System (NI) Rev. 15
MCM 1205.00- Swing Check Valve Rev. A
0073.001
Inspection Type Designation Description or Title Revision or
Procedure Date
Engineering EC 101492 UNIT 1 NI and NV Cold Leg Throttle Valve Seat Rev. 8
Changes Clearance Capital
EC 102477 RN Strainer Backwash Pump - 1A Mod Rev. 21
EC 103936 Change Actuator on 2RN-279B From NA2 To NA1E Rev. 4
EC 104503 Replace 1A EDG Voltage Regulators U1 (MOD) Rev. 3
EC 107089 RN Suction Overpressure Protection "1A" (OBDN) - Unit Rev. 8
EC 108639 Revise RN, NM, NV, VE and VI System TAC Sheet Valve Rev. 0
EC 108775 Equivalency For Joslyn Clark Coil Replacement Rev. 0
EC 109072 Assured CA Suction For Extended SBO Per NRC Rev. 9
ORDER EA-12-049 & INPO IER L1-11-4
EC 113220 Allow Replacement of Digital Rod Position Indication Rev.0
(DRPI) Controller
EC 400132 CA Discharge Piping Design Pressure Increase Per NCR Rev. 0
01901450
EC 402504 Update Valve Stroke Times For Low Voltage Coil Rev. 0
Installation
EC 404368 Tune Distributed Control System (DCS) Controls Due to Rev.1
Hot Leg Streaming
EC 409942 Replace Bussmann BAF-3A Fuses For 125VDC Vital I&C Rev. 1
Distribution Center
EC 410608 ECCS and NS System Gas Void Acceptance Criteria Rev. 0
Miscellaneous DPC-NE-2009-PA Duke Power Company Westinghouse Fuel Transition Rev. 3b
Report
MCM-1399.05- Vendor Manual-Digital Rod Position Indicator REv D03
206.01
MCM-1399.05- Vendor Manual- Digital Rod Position Indicator System D03
207.001
MCS-1206.00-02- Specification PS 900.2 Rev. 202
0002
MDSS- EDA System- Digital Rod Position Indication ( DRPI) Rev. 1
0806.EDA.00001 Digital System Specification
MDSS- Digital Rod Position Indication System Software and Data Rev. 1
Inspection Type Designation Description or Title Revision or
Procedure Date
0806.EDA.00001 Quality Assurance Plan
Memo To File EC Coil Comparison for EC108775, Joslyn Clark Coil Rev. 0
108775 Replacement
SER Acceptance For Referencing Of Licensing Topical Report dated
, EPRT NP-2511-CCM, "VIPRE-01: A Thermal - 05/01/1986
Hydraulic Analysis Code FOQ Reactor Cores", Volumes
1, 2, 3 and 4
Number 15-51 11/05/2015
Number 16-13 01/10/2017
WCAP-12610-P-A & Optimized Zirlo dated July
CENPD-404-P-A, 2006
Addendum 1A
WCAP-12610-P-A & Westinghouse Clad Corrosion Model for Zirlo and dated
CENPD-404-P-A, Optimized Zirlo October
Addendum 2-A 2013
Procedures AD-EG-ALL-1155 Post Modification Testing Rev. 4
AD-EG-ALL-1206 Equipment Reliability Classification Rev. 4
EDM-601 Engineering Change Manual Rev. 18
EDM-601 Engineering Directives Manual Rev. 29
PT/1/A/4200/009A Engineered Safety Features Actuation Periodic Test Rev. 148
Train A
PT/1/A/4200/009B Engineered Safety Features Actuation Periodic Test Rev. 17
Train B
PT/1/A/4200/017 A NV To Cold Legs Flow Balance Rev. 15
PT/1/A/4206/001A 1A NI Pump Performance Test Rev. 57
PT/2/A/4200/009A Engineered Safety Features Actuation Periodic Test Rev. 107
Train A
PT/2/A/4200/009B Engineered Safety Features Actuation Periodic Test Rev. 19
Train B
TT/1/A/EC104503/000 Post Modification Testing for EC104503 - EDG 1A Rev. 2
Voltage Regulator Replacement
Inspection Type Designation Description or Title Revision or
Procedure Date
Work Orders 20069641-01 DRPI Modification/Validation Test Plan 03/28/16
10