{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352  
{{#Wiki_filter:UNITED STATES
  January 20, 2011  
                          NUCLEAR REGULATORY COMMISSION
 
                                            REGION III
Mr. Jack M. Davis Senior Vice President and   Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166 SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION TO PERFORM A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION; INSPECTION REPORT 05000341/2011-009(DRS) Dear Mr. Davis On March 23, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire protection baseline inspection at your Fermi Power Plant, Unit 2. This inspection will be performed in accordance with Inspection Procedure (IP) 71111.05T, the NRC's baseline fire protection inspection procedure.   Based on the latest revision to IP 71111.05T, dated September 30, 2010, changes were made to the IP which now requires the fire protection inspection to review your actions to mitigate  
                              2443 WARRENVILLE ROAD, SUITE 210
postulated events that could potentially cause loss of large areas of power reactor facilities due to explosions or fires. This requirement was implemented by the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b and the subsequent requirements of 10 CFR 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this inspection, the B.5.b requirements review will be performed during the first on-site week of the  
                                      LISLE, IL 60532-4352
inspection starting on March 23, 2011. The schedule for the on-site inspection activity is as follows: Information Gathering Visit: March 21 - 23, 2011 B.5.b Requirements: March 23 - 25, 2011; and Fire Protection Inspection: April 11 - 15, 2011 and April 25 - 29, 2011 The purpose of the information gathering visit is: (1) to obtain information and documentation needed to support the inspection; (2) to become familiar with the Fermi Power Plant fire  
                                        January 20, 2011
protection programs, fire protection features, post-fire safe shutdown capabilities, and plant layout; and (3) to arrange administrative details, such as office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges.
Mr. Jack M. Davis
J. Davis    -2-
Senior Vice President and
Experience has shown that the baseline fire protection inspections are extremely resource intensive both for the NRC inspectors and the licensee staff.  In order to minimize the inspection impact on the site and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for the inspection.  These documents have been divided into four groups.  The first group lists information necessary to aid the inspection team in
  Chief Nuclear Officer
choosing specific focus areas for the inspection.  It is requested that this information be provided to the lead inspector via mail or electronically no later than March 7, 2011.  The second group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection.  It is requested this information be
Detroit Edison Company
available during the information gathering visit (March 21, 2011).  The third group of requested documents consists of those items that the team will review, or need access to, during the inspection.  Please have this information available by the first day of the second on-site inspection week (April 11, 2011).  The fourth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection.  It is requested that this information be provided to the lead inspector as the information is generated during the inspection.  It is important that all of these documents are up to date and complete in order
Fermi 2 - 210 NOC
to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. The lead inspector for this inspection is Mr. R. Langstaff.  We understand that our regulatory contact for this inspection is Mr. R. Salmon of your organization.  If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-
6400 North Dixie Highway
9747 or via e-mail at Ronald.Langstaff@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document
Newport, MI 48166
 
SUBJECT:       FERMI POWER PLANT, UNIT 2 - NOTIFICATION TO PERFORM A TRIENNIAL
  J. Davis      -3- system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, 
                FIRE PROTECTION BASELINE INSPECTION; INSPECTION REPORT
/RA by R. A. Langstaff for/
                05000341/2011-009(DRS)
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-341 License Nos. NPF-43 Enclosure: Fire Protection Inspection Document Request cc w/encl: Distribution via ListServ
Dear Mr. Davis
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
On March 23, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire
protection baseline inspection at your Fermi Power Plant, Unit 2. This inspection will be
Enclosure
performed in accordance with Inspection Procedure (IP) 71111.05T, the NRCs baseline fire
1Inspection Report
protection inspection procedure.
:    05000341/2011-009(DRS) On-site Inspection Dates
Based on the latest revision to IP 71111.05T, dated September 30, 2010, changes were made
: March 21 - 23, 2011  (Information Gathering Visit)    March 23 - 25, 2011  (B.5.b Requirements)      April 11 - 15, 2011  (Fire Protection Inspection)    April 25 - 29, 2011  (Fire Protection Inspection) Inspection Procedures:  IP71111.05T, "Fire Protection (Triennial)" IP71152, "Identification and Resolution of Problems" Inspectors
to the IP which now requires the fire protection inspection to review your actions to mitigate
:    R. A. Langstaff, Senior Reactor Inspector    (630) 829-9747
postulated events that could potentially cause loss of large areas of power reactor facilities due
to explosions or fires. This requirement was implemented by the issuance of the Interim
Compensatory Measures Order EA-02-026, Section B.5.b and the subsequent requirements of
10 CFR 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this
inspection, the B.5.b requirements review will be performed during the first on-site week of the
inspection starting on March 23, 2011.
The schedule for the on-site inspection activity is as follows:
Information Gathering Visit: March 21 - 23, 2011
B.5.b Requirements: March 23 - 25, 2011; and
Fire Protection Inspection: April 11 - 15, 2011 and April 25 - 29, 2011
The purpose of the information gathering visit is: (1) to obtain information and documentation
needed to support the inspection; (2) to become familiar with the Fermi Power Plant fire
protection programs, fire protection features, post-fire safe shutdown capabilities, and plant
layout; and (3) to arrange administrative details, such as office space, availability of
knowledgeable office personnel and to ensure unescorted site access privileges.


    Ronald.Langstaff@nrc.gov
J. Davis                                        -2-
    G. M. Hausman, Senior Reactor Inspector    (630) 829-9743
Experience has shown that the baseline fire protection inspections are extremely resource
    George.Hausman@nrc.gov
intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection
D. Szwarc, Reactor Inspector  (630) 829-9803
impact on the site and to ensure a productive inspection for both organizations, we have
enclosed a request for documents needed for the inspection. These documents have been
divided into four groups. The first group lists information necessary to aid the inspection team in
choosing specific focus areas for the inspection. It is requested that this information be
provided to the lead inspector via mail or electronically no later than March 7, 2011. The
second group also lists information and areas for discussion necessary to aid the inspection
team in choosing specific fire protection focus areas for the inspection and to ensure that the
inspection team is adequately prepared for the inspection. It is requested this information be
available during the information gathering visit (March 21, 2011). The third group of requested
documents consists of those items that the team will review, or need access to, during the
inspection. Please have this information available by the first day of the second on-site
inspection week (April 11, 2011). The fourth group lists the information necessary to aid the
inspection team in tracking issues identified as a result of the inspection. It is requested that
this information be provided to the lead inspector as the information is generated during the
inspection. It is important that all of these documents are up to date and complete in order
to minimize the number of additional documents requested during the preparation and/or the
on-site portions of the inspection.
The lead inspector for this inspection is Mr. R. Langstaff. We understand that our regulatory
contact for this inspection is Mr. R. Salmon of your organization. If there are any questions
about the inspection or the material requested, please contact the lead inspector at (630) 829-
9747 or via e-mail at Ronald.Langstaff@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to a request for
information or an information collection requirement unless the requesting document displays a
currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document


Dariusz.Szwarc@nrc.gov
J. Davis                                          -3-
Observer:  N. A. Valos    (630) 829-9761
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                          Sincerely,
                                          /RA by R. A. Langstaff for/
                                          Robert C. Daley, Chief
                                          Engineering Branch 3
                                          Division of Reactor Safety
Docket Nos. 50-341
License Nos. NPF-43
Enclosure:    Fire Protection Inspection Document Request
cc w/encl:    Distribution via ListServ


    Nicholas.Valos@nrc.gov
                FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
    J. S. Bowen    (301) 415-3471
Inspection Report:            05000341/2011-009(DRS)
     Jeremy.Bowen@nrc.gov
On-site Inspection Dates:     March 21 - 23, 2011            (Information Gathering Visit)
I. Information Requested Prior To the Information Gathering Visit The following information is requested by March 7, 2011. If you have any questions regarding this request, please call the lead inspector as soon as possible. All information
                              March 23 - 25, 2011           (B.5.b Requirements)
should be sent to R.A. Langstaff (e-mail address Ronald.Langstaff@nrc.gov). Electronic media is preferred.  The preferred file format is a searchable "pdf" file on a compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if possible. Please provide four copies of each CD submitted (one for each inspector). 1. The most risk-significant fire areas as determined by probabilistic risk analyses, if available.  Otherwise, the reactor plant's Individual Plant Examination for External Events (IPEEE) for fire and results of any post-IPEEE reviews for fire.  
                              April 11 - 15, 2011            (Fire Protection Inspection)
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
                              April 25 - 29, 2011            (Fire Protection Inspection)
Inspection Procedures:        IP71111.05T, Fire Protection (Triennial)
Enclosure
                              IP71152, "Identification and Resolution of Problems"
22. A copy of the current version of the fire protection program (FPP), fire hazards analysis (FHA), safe shutdown analysis (SSA), updated safety analysis report (USAR), Technical Specifications and license. 3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for which 10 CFR Part 50, Appendix R, Section III G requirements are satisfied under Section III.G.3), or where both safe shutdown trains can be affected. 4. Plant operating procedures which would be used and describe shutdown for a postulated fire (for both areas requiring alternative shutdown and areas which do not
Inspectors:                  R. A. Langstaff, Senior Reactor Inspector
require alternative shutdown). Only those procedures with actions specific to shutdown in the event of a fire need be included. II. Information Requested During the Information Gathering Visit (MARCH 21, 2011) The following information is requested to be provided to the inspection team during the on-site information gathering visit.  Except for Item 8, it is requested that the following information be provided on three sets of CDs (searchable, if possible) with the B.5.b Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD.  In
                              (630) 829-9747
addition, one set of hard copy drawings are requested for Items 4.a. through 4.e. 1. One set of hard-copy documents for facility layout drawings, which identify plant
                              Ronald.Langstaff@nrc.gov
fire area delineation; areas protected by automatic fire suppression and detection;
                              G. M. Hausman, Senior Reactor Inspector
and locations of fire protection equipment. 2. Licensing Information: a. The facility's license, including the fire protection license condition; b. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs) applicable to fire protection (specifically including those SERs referenced by the plant fire protection license condition) and all licensing correspondence referenced by the SERs; c. All licensing correspondence associated with the comparison to Standard Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes; d. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated licensing correspondence; e. For pre-1979 plants, all licensing correspondence associated with those sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant under 10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with those fire protection features proposed or implemented by the licensee that have been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection  
                              (630) 829-9743
SERs issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection features, which were accepted by the NRC staff in comprehensive fire protection SERs issued before Appendix A to BTP APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii)); and
                              George.Hausman@nrc.gov
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
                              D. Szwarc, Reactor Inspector
                              (630) 829-9803
Enclosure
                              Dariusz.Szwarc@nrc.gov
3f. For post-1979 plants, all licensing correspondence associated with the comparison to Standard Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes. 3. Fire Protection Program: a. A listing of changes made to the FPP since the last triennial fire protection inspection; b. For pre-1979 plants, a listing of the protection methodologies identified under 10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for selected fire zones/areas (to be determined during information gathering visit).  That is, please specify whether 3-hour rated fire barriers; (Section III.G.2.a), 20 foot separation along with detection and suppression; (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression; (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a strategy for each selected fire zone/area; c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe-shutdown evaluations); d. A list of applicable codes and standards related to the design of plant fire protection features.  The list should include National Fire Protection Association (NFPA) code versions committed to (i.e., the NFPA Codes of Record); and e. List of plant deviations from code commitments and associated evaluations.  4. Facility Information: a. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for fires outside the control room, those components used for those areas requiring alternative shutdown capability, and systems relied upon for B.5.b mitigation strategies. These can be of
Observer:                    N. A. Valos
the type that are used for training; b. One-line schematic drawings of the electrical distribution system for 4160 Volts alternating current (Vac) down to 480Vac; c. One-line schematic drawings of the electrical distribution system for 250 Volts direct current (Vdc) and 125Vdc systems as applicable; d. Logic diagrams showing the components used to achieve and maintain hot standby and cold shutdown; and e. Safe shutdown cable routing database (requested electronically such as on compact disc, if available.  
                              (630) 829-9761
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
                              Nicholas.Valos@nrc.gov
                              J. S. Bowen
Enclosure
                              (301) 415-3471
45. Operations Response for Fire Protection: a. Pre-fire plans for selected fire zones/areas (to be determined during information gathering visit); and b. Plant operating procedures which specify the initial operations response to a fire alarm or annunciator; c. Procedure for calling out the fire brigade and requesting off-site assistance. 6. Corrective Actions: a. Listing of open and closed fire protection condition reports (i.e., problem identification forms and their resolution reports) since the date of the last triennial fire protection inspection; and b. List of current fire impairments, including duration. 7. General Information: a. A listing of abbreviations and/or designators for plant systems;  b. Organization charts of site personnel down to the level of fire protection staff personnel; and  c. A phone list for on-site licensee personnel. 8. B.5.b Mitigating Strategies: a. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and
                              Jeremy.Bowen@nrc.gov
10 CFR 50.54(hh)(2); b. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies.  These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc.; c. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are used to implement each strategy;  d. A listing of engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies; e. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies;  
I. Information Requested Prior To the Information Gathering Visit
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
  The following information is requested by March 7, 2011. If you have any questions
  regarding this request, please call the lead inspector as soon as possible. All information
Enclosure
  should be sent to R.A. Langstaff (e-mail address Ronald.Langstaff@nrc.gov). Electronic
5f. A list of B.5.b mitigating strategies, if any, which have implementing details that differ from that documented in the submittals and the safety evaluation report; g. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required to implement any mitigating strategies; and h. A list of changes made to B.5.b mitigating strategies and associated procedures since the previous NRC inspection of B.5.b mitigating strategies (October 2008). 9. On-site Discussions: In addition, during the information gathering visit, it is requested that licensee staff be available for the following: a. Informal discussion on plant procedures operators would use in the event of fire or explosion (including B.5.b mitigation strategies) and under what conditions would the plant be shutdown using alternative shutdown methodology; b. Informal discussion on the plant's safe shutdown cable routing database and the plant-wide cable routing database, as applicable; and c. A tour of alternative shutdown and risk-significant fire areas. III. Information Requested to be Available on First Day of
  media is preferred. The preferred file format is a searchable pdf file on a compact
the Second On-site Inspection Week (APRIL 11, 2011) The following information is requested to be provided on the first day of inspection. It is requested that this information be provided on three sets of CDs (searchable, if possible). 1. Program Procedures: a. Procedures for: i. Administrative controls (such as allowed out of service times and compensatory measures) for fire protection systems and components ii. Control of transient combustibles iii. Control of hot work b. List of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps, and suppression systems; and c. List of maintenance procedures which routinely verify fuse breaker coordination in accordance with the post-fire safe shutdown coordination analysis.  
  disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if possible.
FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
  Please provide four copies of each CD submitted (one for each inspector).
  1. The most risk-significant fire areas as determined by probabilistic risk analyses, if
Enclosure
      available. Otherwise, the reactor plant's Individual Plant Examination for External
62. Design and Equipment Information: a. Coordination calculations and/or justifications that verify fuse/breaker coordination for selected fire zones/areas (to be determined during information gathering visit) that are fed off of the same electrical buses as components in the protected safe shutdown train; b. Copies of significant fire protection and post-fire safe shutdown related design change package descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter (GL) 86-10 (or adverse to safe shutdown)
      Events (IPEEE) for fire and results of any post-IPEEE reviews for fire.
evaluations; c. Gaseous suppression system pre-operational testing, if applicable, for selected fire zones/areas (to be determined during information gathering visit); d. Hydraulic calculations and supporting test data which demonstrate operability for water suppression systems, if applicable, for selected fire zones/areas (to be determined during information gathering visit
                                                1                                      Enclosure
); e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac electrical systems; f. List of all fire protection or Appendix R calculations. 3. Assessment and Corrective Actions: a. The three most recent fire protection Quality Assurance (QA) audits and/or fire protection self-assessments. 4. Any updates to information previously provided. IV. Information Requested to Be Provided Throughout the Inspection 1. Copies of any corrective action documents generated as a result of the inspection team's questions or queries during this inspection. 2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member). If you have questions regarding the information requested, please contact the lead inspector.
 
  J. Davis    -3- system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room) Sincerely, 
                    FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
/RA by R. A. Langstaff for/
    2. A copy of the current version of the fire protection program (FPP), fire hazards analysis
Robert C. Daley, Chief
        (FHA), safe shutdown analysis (SSA), updated safety analysis report (USAR), Technical
Engineering Branch 3
        Specifications and license.
Division of Reactor Safety Docket Nos. 50-341 License Nos. NPF-43 Enclosure: Fire Protection Inspection Document Request cc w/encl: Distribution via ListServ
    3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for which
        10 CFR Part 50, Appendix R, Section III G requirements are satisfied under
DISTRIBUTION:
        Section III.G.3), or where both safe shutdown trains can be affected.
Daniel Merzke
    4. Plant operating procedures which would be used and describe shutdown for a
RidsNrrDorlLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth
        postulated fire (for both areas requiring alternative shutdown and areas which do not
Jared Heck Allan Barker Carole Ariano
        require alternative shutdown). Only those procedures with actions specific to shutdown
Linda Linn DRPIII DRSIII Patricia Buckley
        in the event of a fire need be included.
Tammy Tomczak ROPreports Resource
II. Information Requested During the Information Gathering Visit (MARCH 21, 2011)
   
    The following information is requested to be provided to the inspection team during the
DOCUMENT NAME:  G:\DRSIII\DRS\Work in Progress\Ltr 012011 Fermi 2011009 Fire Protection RFI .docx Publicly Available Non-Publicly Available       Sensitive         Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl; "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII     NAME RLangstaff:ls RLangstaff for RDaley   DATE 01/20/11 01/20/11   OFFICIAL RECORD COPY
    on-site information gathering visit. Except for Item 8, it is requested that the following
    information be provided on three sets of CDs (searchable, if possible) with the B.5.b
    Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD. In
    addition, one set of hard copy drawings are requested for Items 4.a. through 4.e.
    1. One set of hard-copy documents for facility layout drawings, which identify plant fire area
        delineation; areas protected by automatic fire suppression and detection; and locations
        of fire protection equipment.
    2. Licensing Information:
        a.     The facilitys license, including the fire protection license condition;
        b.    All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs)
              applicable to fire protection (specifically including those SERs referenced by
              the plant fire protection license condition) and all licensing correspondence
              referenced by the SERs;
        c.     All licensing correspondence associated with the comparison to Standard Review
              Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;
        d.    Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated
              licensing correspondence;
        e.     For pre-1979 plants, all licensing correspondence associated with those
              sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant under
              10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with
              those fire protection features proposed or implemented by the licensee that have
              been accepted by the NRC staff as satisfying the provisions of Appendix A to
              Branch Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection
              SERs issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire
              protection features, which were accepted by the NRC staff in comprehensive fire
              protection SERs issued before Appendix A to BTP APCSB 9.5-1 was published in
              August 1976 (10 CFR 50.48(b)(1)(ii)); and
                                                    2                                      Enclosure
 
              FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
  f.    For post-1979 plants, all licensing correspondence associated with the comparison
        to Standard Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing
        purposes.
3. Fire Protection Program:
  a.   A listing of changes made to the FPP since the last triennial fire protection
        inspection;
  b.   For pre-1979 plants, a listing of the protection methodologies identified under
        10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for selected
        fire zones/areas (to be determined during information gathering visit). That is,
        please specify whether 3-hour rated fire barriers; (Section III.G.2.a), 20 foot
        separation along with detection and suppression; (Section III.G.2.b), 1-hour rated
        fire barriers with detection and suppression; (Section III.G.2.c), or alternative
        shutdown capability; (Section III.G.3) is used as a strategy for each selected fire
        zone/area;
  c.    A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe-shutdown
        evaluations);
  d.   A list of applicable codes and standards related to the design of plant fire
        protection features. The list should include National Fire Protection Association
        (NFPA) code versions committed to (i.e., the NFPA Codes of Record); and
  e.    List of plant deviations from code commitments and associated evaluations.
4. Facility Information:
  a.   Piping and instrumentation (flow) diagrams showing the components used to
        achieve and maintain hot standby and cold shutdown for fires outside the control
        room, those components used for those areas requiring alternative shutdown
        capability, and systems relied upon for B.5.b mitigation strategies. These can be of
        the type that are used for training;
  b.   One-line schematic drawings of the electrical distribution system for 4160 Volts
        alternating current (Vac) down to 480Vac;
  c.   One-line schematic drawings of the electrical distribution system for 250 Volts
        direct current (Vdc) and 125Vdc systems as applicable;
  d.   Logic diagrams showing the components used to achieve and maintain hot
        standby and cold shutdown; and
  e.   Safe shutdown cable routing database (requested electronically such as on
        compact disc, if available.
                                              3                                        Enclosure
 
            FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
5. Operations Response for Fire Protection:
  a.   Pre-fire plans for selected fire zones/areas (to be determined during information
        gathering visit); and
  b.  Plant operating procedures which specify the initial operations response to a fire
        alarm or annunciator;
  c.   Procedure for calling out the fire brigade and requesting off-site assistance.
6. Corrective Actions:
  a.   Listing of open and closed fire protection condition reports (i.e., problem
        identification forms and their resolution reports) since the date of the last triennial
        fire protection inspection; and
  b.   List of current fire impairments, including duration.
7. General Information:
  a.   A listing of abbreviations and/or designators for plant systems;
  b.  Organization charts of site personnel down to the level of fire protection staff
        personnel; and
  c.  A phone list for on-site licensee personnel.
8. B.5.b Mitigating Strategies:
  a.   A list of all modifications to regulatory commitments made to meet the
        requirements of Section B.5.b of the ICM Order, EA-02-026, dated
        February 25, 2002, the subsequently imposed license conditions, and
        10 CFR 50.54(hh)(2);
  b.   Copies of procedures/guidelines that were revised or generated to implement the
        mitigation strategies. These could be extensive damage mitigation guidelines
        (EDMGs), severe accident management guidelines (SAMGs), emergency
        operating procedures (EOPs), abnormal operating procedures (AOPs), etc.;
  c.   A matrix that shows the correlation between the mitigation strategies identified in
        Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that
        are used to implement each strategy;
  d.   A listing of engineering evaluations/calculations that were used to verify
        engineering bases for the mitigation strategies;
  e.  Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.)
        required to be used to implement the mitigation strategies;
                                              4                                      Enclosure
 
                    FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
        f.   A list of B.5.b mitigating strategies, if any, which have implementing details that
              differ from that documented in the submittals and the safety evaluation report;
        g.    Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments)
              required to implement any mitigating strategies; and
        h.   A list of changes made to B.5.b mitigating strategies and associated procedures
              since the previous NRC inspection of B.5.b mitigating strategies (October 2008).
    9. On-site Discussions:
        In addition, during the information gathering visit, it is requested that licensee staff be
        available for the following:
        a.   Informal discussion on plant procedures operators would use in the event of fire or
              explosion (including B.5.b mitigation strategies) and under what conditions would
              the plant be shutdown using alternative shutdown methodology;
        b.    Informal discussion on the plants safe shutdown cable routing database and the
              plant-wide cable routing database, as applicable; and
        c.    A tour of alternative shutdown and risk-significant fire areas.
III. Information Requested to be Available on First Day of the Second On-site Inspection
    Week (APRIL 11, 2011)
    The following information is requested to be provided on the first day of inspection. It is
    requested that this information be provided on three sets of CDs (searchable, if possible).
    1. Program Procedures:
        a.      Procedures for:
                i.  Administrative controls (such as allowed out of service times and
                      compensatory measures) for fire protection systems and components
                  ii. Control of transient combustibles
                iii. Control of hot work
        b.     List of maintenance and surveillance testing procedures for alternative shutdown
                capability and fire barriers, detectors, pumps, and suppression systems; and
        c.     List of maintenance procedures which routinely verify fuse breaker coordination
                in accordance with the post-fire safe shutdown coordination analysis.
                                                    5                                      Enclosure
 
                  FIRE PROTECTION INSPECTION DOCUMENT REQUESTS
    2. Design and Equipment Information:
        a.      Coordination calculations and/or justifications that verify fuse/breaker
                coordination for selected fire zones/areas (to be determined during
                information gathering visit) that are fed off of the same electrical buses as
                components in the protected safe shutdown train;
        b.      Copies of significant fire protection and post-fire safe shutdown related design
                change package descriptions (including their associated 10 CFR 50.59
                evaluations) and Generic Letter (GL) 86-10 (or adverse to safe shutdown)
                evaluations;
        c.     Gaseous suppression system pre-operational testing, if applicable, for selected
                fire zones/areas (to be determined during information gathering visit);
        d.     Hydraulic calculations and supporting test data which demonstrate operability for
                water suppression systems, if applicable, for selected fire zones/areas (to be
                determined during information gathering visit);
        e.     Alternating current (ac) coordination calculations for 4160Vac down to 480Vac
                electrical systems;
        f.     List of all fire protection or Appendix R calculations.
    3. Assessment and Corrective Actions:
        a.      The three most recent fire protection Quality Assurance (QA) audits and/or fire
                protection self-assessments.
    4. Any updates to information previously provided.
IV. Information Requested to Be Provided Throughout the Inspection
    1. Copies of any corrective action documents generated as a result of the inspection
        teams questions or queries during this inspection.
    2. Copies of the list of questions submitted by the inspection team members and the
        status/resolution of the information requested (provided daily during the inspection to
        each inspection team member).
If you have questions regarding the information requested, please contact the lead inspector.
                                                    6                                    Enclosure
 
J. Davis                                                          -3-
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room)
                                                                                Sincerely,
                                                                                /RA by R. A. Langstaff for/
                                                                                Robert C. Daley, Chief
                                                                                Engineering Branch 3
                                                                                Division of Reactor Safety
Docket Nos. 50-341
License Nos. NPF-43
Enclosure:                  Fire Protection Inspection Document Request
cc w/encl:                  Distribution via ListServ
DISTRIBUTION:
Daniel Merzke
RidsNrrDorlLpl3-1 Resource
RidsNrrPMFermi2 Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Steven Orth
Jared Heck
Allan Barker
Carole Ariano
Linda Linn
DRPIII
DRSIII
Patricia Buckley
Tammy Tomczak
ROPreports Resource
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 012011 Fermi 2011009 Fire
Protection RFI .docx
9 Publicly Available                     9 Non-Publicly Available                       9 Sensitive               9 Non-Sensitive
To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy
OFFICE                             RIII                         RIII
NAME                               RLangstaff:ls                 RLangstaff for RDaley
DATE                               01/20/11                     01/20/11
                                                              OFFICIAL RECORD COPY
}}
}}

Latest revision as of 04:20, 13 November 2019

Notification to Perform a Triennial Fire Protection Baseline Inspection, IR 05000341-11-009 DRS
ML110200355
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/20/2011
From: Robert Daley
Engineering Branch 3
To: Jennifer Davis
Detroit Edison
References
Download: ML110200355 (10)


See also: IR 05000341/2011009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

January 20, 2011

Mr. Jack M. Davis

Senior Vice President and

Chief Nuclear Officer

Detroit Edison Company

Fermi 2 - 210 NOC

6400 North Dixie Highway

Newport, MI 48166

SUBJECT: FERMI POWER PLANT, UNIT 2 - NOTIFICATION TO PERFORM A TRIENNIAL

FIRE PROTECTION BASELINE INSPECTION; INSPECTION REPORT

05000341/2011-009(DRS)

Dear Mr. Davis

On March 23, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire

protection baseline inspection at your Fermi Power Plant, Unit 2. This inspection will be

performed in accordance with Inspection Procedure (IP) 71111.05T, the NRCs baseline fire

protection inspection procedure.

Based on the latest revision to IP 71111.05T, dated September 30, 2010, changes were made

to the IP which now requires the fire protection inspection to review your actions to mitigate

postulated events that could potentially cause loss of large areas of power reactor facilities due

to explosions or fires. This requirement was implemented by the issuance of the Interim

Compensatory Measures Order EA-02-026, Section B.5.b and the subsequent requirements of

10 CFR 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this

inspection, the B.5.b requirements review will be performed during the first on-site week of the

inspection starting on March 23, 2011.

The schedule for the on-site inspection activity is as follows:

y Information Gathering Visit: March 21 - 23, 2011

y B.5.b Requirements: March 23 - 25, 2011; and

y Fire Protection Inspection: April 11 - 15, 2011 and April 25 - 29, 2011

The purpose of the information gathering visit is: (1) to obtain information and documentation

needed to support the inspection; (2) to become familiar with the Fermi Power Plant fire

protection programs, fire protection features, post-fire safe shutdown capabilities, and plant

layout; and (3) to arrange administrative details, such as office space, availability of

knowledgeable office personnel and to ensure unescorted site access privileges.

J. Davis -2-

Experience has shown that the baseline fire protection inspections are extremely resource

intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection

impact on the site and to ensure a productive inspection for both organizations, we have

enclosed a request for documents needed for the inspection. These documents have been

divided into four groups. The first group lists information necessary to aid the inspection team in

choosing specific focus areas for the inspection. It is requested that this information be

provided to the lead inspector via mail or electronically no later than March 7, 2011. The

second group also lists information and areas for discussion necessary to aid the inspection

team in choosing specific fire protection focus areas for the inspection and to ensure that the

inspection team is adequately prepared for the inspection. It is requested this information be

available during the information gathering visit (March 21, 2011). The third group of requested

documents consists of those items that the team will review, or need access to, during the

inspection. Please have this information available by the first day of the second on-site

inspection week (April 11, 2011). The fourth group lists the information necessary to aid the

inspection team in tracking issues identified as a result of the inspection. It is requested that

this information be provided to the lead inspector as the information is generated during the

inspection. It is important that all of these documents are up to date and complete in order

to minimize the number of additional documents requested during the preparation and/or the

on-site portions of the inspection.

The lead inspector for this inspection is Mr. R. Langstaff. We understand that our regulatory

contact for this inspection is Mr. R. Salmon of your organization. If there are any questions

about the inspection or the material requested, please contact the lead inspector at (630) 829-

9747 or via e-mail at Ronald.Langstaff@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document

J. Davis -3-

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by R. A. Langstaff for/

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-341

License Nos. NPF-43

Enclosure: Fire Protection Inspection Document Request

cc w/encl: Distribution via ListServ

FIRE PROTECTION INSPECTION DOCUMENT REQUESTS

Inspection Report: 05000341/2011-009(DRS)

On-site Inspection Dates: March 21 - 23, 2011 (Information Gathering Visit)

March 23 - 25, 2011 (B.5.b Requirements)

April 11 - 15, 2011 (Fire Protection Inspection)

April 25 - 29, 2011 (Fire Protection Inspection)

Inspection Procedures: IP71111.05T, Fire Protection (Triennial)

IP71152, "Identification and Resolution of Problems"

Inspectors: R. A. Langstaff, Senior Reactor Inspector

(630) 829-9747

Ronald.Langstaff@nrc.gov

G. M. Hausman, Senior Reactor Inspector

(630) 829-9743

George.Hausman@nrc.gov

D. Szwarc, Reactor Inspector

(630) 829-9803

Dariusz.Szwarc@nrc.gov

Observer: N. A. Valos

(630) 829-9761

Nicholas.Valos@nrc.gov

J. S. Bowen

(301) 415-3471

Jeremy.Bowen@nrc.gov

I. Information Requested Prior To the Information Gathering Visit

The following information is requested by March 7, 2011. If you have any questions

regarding this request, please call the lead inspector as soon as possible. All information

should be sent to R.A. Langstaff (e-mail address Ronald.Langstaff@nrc.gov). Electronic

media is preferred. The preferred file format is a searchable pdf file on a compact

disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if possible.

Please provide four copies of each CD submitted (one for each inspector).

1. The most risk-significant fire areas as determined by probabilistic risk analyses, if

available. Otherwise, the reactor plant's Individual Plant Examination for External

Events (IPEEE) for fire and results of any post-IPEEE reviews for fire.

1 Enclosure

FIRE PROTECTION INSPECTION DOCUMENT REQUESTS

2. A copy of the current version of the fire protection program (FPP), fire hazards analysis

(FHA), safe shutdown analysis (SSA), updated safety analysis report (USAR), Technical

Specifications and license.

3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for which

10 CFR Part 50, Appendix R, Section III G requirements are satisfied under

Section III.G.3), or where both safe shutdown trains can be affected.

4. Plant operating procedures which would be used and describe shutdown for a

postulated fire (for both areas requiring alternative shutdown and areas which do not

require alternative shutdown). Only those procedures with actions specific to shutdown

in the event of a fire need be included.

II. Information Requested During the Information Gathering Visit (MARCH 21, 2011)

The following information is requested to be provided to the inspection team during the

on-site information gathering visit. Except for Item 8, it is requested that the following

information be provided on three sets of CDs (searchable, if possible) with the B.5.b

Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD. In

addition, one set of hard copy drawings are requested for Items 4.a. through 4.e.

1. One set of hard-copy documents for facility layout drawings, which identify plant fire area

delineation; areas protected by automatic fire suppression and detection; and locations

of fire protection equipment.

2. Licensing Information:

a. The facilitys license, including the fire protection license condition;

b. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs)

applicable to fire protection (specifically including those SERs referenced by

the plant fire protection license condition) and all licensing correspondence

referenced by the SERs;

c. All licensing correspondence associated with the comparison to Standard Review

Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;

d. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated

licensing correspondence;

e. For pre-1979 plants, all licensing correspondence associated with those

sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant under

10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with

those fire protection features proposed or implemented by the licensee that have

been accepted by the NRC staff as satisfying the provisions of Appendix A to

Branch Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection

SERs issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire

protection features, which were accepted by the NRC staff in comprehensive fire

protection SERs issued before Appendix A to BTP APCSB 9.5-1 was published in

August 1976 (10 CFR 50.48(b)(1)(ii)); and

2 Enclosure

FIRE PROTECTION INSPECTION DOCUMENT REQUESTS

f. For post-1979 plants, all licensing correspondence associated with the comparison

to Standard Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing

purposes.

3. Fire Protection Program:

a. A listing of changes made to the FPP since the last triennial fire protection

inspection;

b. For pre-1979 plants, a listing of the protection methodologies identified under

10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for selected

fire zones/areas (to be determined during information gathering visit). That is,

please specify whether 3-hour rated fire barriers; (Section III.G.2.a), 20 foot

separation along with detection and suppression; (Section III.G.2.b), 1-hour rated

fire barriers with detection and suppression; (Section III.G.2.c), or alternative

shutdown capability; (Section III.G.3) is used as a strategy for each selected fire

zone/area;

c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe-shutdown

evaluations);

d. A list of applicable codes and standards related to the design of plant fire

protection features. The list should include National Fire Protection Association

(NFPA) code versions committed to (i.e., the NFPA Codes of Record); and

e. List of plant deviations from code commitments and associated evaluations.

4. Facility Information:

a. Piping and instrumentation (flow) diagrams showing the components used to

achieve and maintain hot standby and cold shutdown for fires outside the control

room, those components used for those areas requiring alternative shutdown

capability, and systems relied upon for B.5.b mitigation strategies. These can be of

the type that are used for training;

b. One-line schematic drawings of the electrical distribution system for 4160 Volts

alternating current (Vac) down to 480Vac;

c. One-line schematic drawings of the electrical distribution system for 250 Volts

direct current (Vdc) and 125Vdc systems as applicable;

d. Logic diagrams showing the components used to achieve and maintain hot

standby and cold shutdown; and

e. Safe shutdown cable routing database (requested electronically such as on

compact disc, if available.

3 Enclosure

FIRE PROTECTION INSPECTION DOCUMENT REQUESTS

5. Operations Response for Fire Protection:

a. Pre-fire plans for selected fire zones/areas (to be determined during information

gathering visit); and

b. Plant operating procedures which specify the initial operations response to a fire

alarm or annunciator;

c. Procedure for calling out the fire brigade and requesting off-site assistance.

6. Corrective Actions:

a. Listing of open and closed fire protection condition reports (i.e., problem

identification forms and their resolution reports) since the date of the last triennial

fire protection inspection; and

b. List of current fire impairments, including duration.

7. General Information:

a. A listing of abbreviations and/or designators for plant systems;

b. Organization charts of site personnel down to the level of fire protection staff

personnel; and

c. A phone list for on-site licensee personnel.

8. B.5.b Mitigating Strategies:

a. A list of all modifications to regulatory commitments made to meet the

requirements of Section B.5.b of the ICM Order, EA-02-026, dated

February 25, 2002, the subsequently imposed license conditions, and

10 CFR 50.54(hh)(2);

b. Copies of procedures/guidelines that were revised or generated to implement the

mitigation strategies. These could be extensive damage mitigation guidelines

(EDMGs), severe accident management guidelines (SAMGs), emergency

operating procedures (EOPs), abnormal operating procedures (AOPs), etc.;

c. A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that

are used to implement each strategy;

d. A listing of engineering evaluations/calculations that were used to verify

engineering bases for the mitigation strategies;

e. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.)

required to be used to implement the mitigation strategies;

4 Enclosure

FIRE PROTECTION INSPECTION DOCUMENT REQUESTS

f. A list of B.5.b mitigating strategies, if any, which have implementing details that

differ from that documented in the submittals and the safety evaluation report;

g. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments)

required to implement any mitigating strategies; and

h. A list of changes made to B.5.b mitigating strategies and associated procedures

since the previous NRC inspection of B.5.b mitigating strategies (October 2008).

9. On-site Discussions:

In addition, during the information gathering visit, it is requested that licensee staff be

available for the following:

a. Informal discussion on plant procedures operators would use in the event of fire or

explosion (including B.5.b mitigation strategies) and under what conditions would

the plant be shutdown using alternative shutdown methodology;

b. Informal discussion on the plants safe shutdown cable routing database and the

plant-wide cable routing database, as applicable; and

c. A tour of alternative shutdown and risk-significant fire areas.

III. Information Requested to be Available on First Day of the Second On-site Inspection

Week (APRIL 11, 2011)

The following information is requested to be provided on the first day of inspection. It is

requested that this information be provided on three sets of CDs (searchable, if possible).

1. Program Procedures:

a. Procedures for:

i. Administrative controls (such as allowed out of service times and

compensatory measures) for fire protection systems and components

ii. Control of transient combustibles

iii. Control of hot work

b. List of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps, and suppression systems; and

c. List of maintenance procedures which routinely verify fuse breaker coordination

in accordance with the post-fire safe shutdown coordination analysis.

5 Enclosure

FIRE PROTECTION INSPECTION DOCUMENT REQUESTS

2. Design and Equipment Information:

a. Coordination calculations and/or justifications that verify fuse/breaker

coordination for selected fire zones/areas (to be determined during

information gathering visit) that are fed off of the same electrical buses as

components in the protected safe shutdown train;

b. Copies of significant fire protection and post-fire safe shutdown related design

change package descriptions (including their associated 10 CFR 50.59

evaluations) and Generic Letter (GL) 86-10 (or adverse to safe shutdown)

evaluations;

c. Gaseous suppression system pre-operational testing, if applicable, for selected

fire zones/areas (to be determined during information gathering visit);

d. Hydraulic calculations and supporting test data which demonstrate operability for

water suppression systems, if applicable, for selected fire zones/areas (to be

determined during information gathering visit);

e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac

electrical systems;

f. List of all fire protection or Appendix R calculations.

3. Assessment and Corrective Actions:

a. The three most recent fire protection Quality Assurance (QA) audits and/or fire

protection self-assessments.

4. Any updates to information previously provided.

IV. Information Requested to Be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during this inspection.

2. Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

If you have questions regarding the information requested, please contact the lead inspector.

6 Enclosure

J. Davis -3-

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room)

Sincerely,

/RA by R. A. Langstaff for/

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-341

License Nos. NPF-43

Enclosure: Fire Protection Inspection Document Request

cc w/encl: Distribution via ListServ

DISTRIBUTION:

Daniel Merzke

RidsNrrDorlLpl3-1 Resource

RidsNrrPMFermi2 Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

ROPreports Resource

DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 012011 Fermi 2011009 Fire

Protection RFI .docx

9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive

To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy

OFFICE RIII RIII

NAME RLangstaff:ls RLangstaff for RDaley

DATE 01/20/11 01/20/11

OFFICIAL RECORD COPY