ML030840286: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000325/2003301]]
{{Adams
| number = ML030840286
| issue date = 09/09/2002
| title = February 50-325/2003-301 Exam Draft JPMs & Outlines
| author name = Ernstes M
| author affiliation = NRC/RGN-II/DRS/OLHPB
| addressee name = Keenan J
| addressee affiliation = Carolina Power & Light Co
| docket = 05000324, 05000325
| license number = DPR-062, DPR-071, NPF-037, NPF-066
| contact person =
| case reference number = -RFPFR, 50-324/03-301, 50-325/03-301
| document type = License-Operator, Part 55 Examination Related Material
| page count = 208
}}
See also: [[see also::IR 05000325/2003301]]
 
=Text=
{{#Wiki_filter:Draft Submittal
                  (Pink Paper)
        BRUNSWICK EXAM
              50-2003-301
            50-325 & 50-324
    FEBRUARY 10 - 14 & 19, 2003
(A  1.  Administrative Questions/JPMs
&' 2.  In-plant JPMs      /
t' 3.  Control Room JPMs (simulator JPMs) /
eb 4 . Administrative Topics Outline ES-301-1 -'
  V'5.  Control Room Systems and Facility Walk-Through V
        Test Outline ES-301-2
 
Administrative Topics Outline
RO
Administrative  Subject/Description Method of evaluation
Topic
A.1            GEN                JPM
                2.1.33              Complete Jet Pump Operability per OPT-1 3.1
                (3.4)              Note: Data will indicate a failed Jet Pump. The RO
                                    should understandthe TS implications (and safety
                                    implications) of the failed pump.
A.1            GEN                Questions:
                2.1.33/2.1.25      1. Fuel Loading has just been completed. The Night
                (2.6/2.8)          Orders specify completing Control Rod Operability on
                                    your shift. The Reactor Engineer needs to use the
                                    fuel bridge over the Reactor Cavity the whole shift to
                                    make a final core loading verification. Can these jobs
                                    be performed simultaneously? If not, what would
                                    prevent it?
                                    2. Given a copy of the Generator Loading Curve
                                    determine the maximum MVARs with the Gross
                                    Generation at [xxx MW].
A.2            GEN                JPM
                2.2.14/2.2.11      Given an approved Temporary Change (TC) make
                (2.5)              the necessary changes to the applicable drawings.
A.3            GEN                Questions:
                2.3.10              1. You have just been notified by the Refuel Floor
                (2.9)              SRO that a spent fuel element has just dropped into
                                    the Fuel Pool and he is evacuating the Reactor
                                    Building. What actions must you take to protect
                                    yourself from any ensuing radiation?
                                    2. If these actions are taken within 10 minutes, what is
                                    your stay time in the control room. Cite your
                                    references.
A.4            GEN                JPM
                2.1.17              Given information from the SRO regarding
                                    Emergency Classification and PAGs, complete all
                                    required notification(s)
 
Administrative Topics Outline
SRO
Administrative  Subject/Description Method of evaluation
Topic
A.1              GEN                JPM
                  2.2.32/2.2.27      Using a prepared, partial view of the newly refueled
                  (3.5)              core and Core Loading Plan, determine if the core
                                      loading has been done correctly.
                                      Note: One bundle will be oriented 180 degrees out of
                                      normal.
A.1              GEN                JPM
                  2.1.33/2.2.12      Complete Jet Pump Operability per OPT-13.1
                  (4.0)              Note: Data will indicate a failed Jet Pump. The SRO
                                      should understandthe TS implications (and safety
                                      implications)of the failed pump.
A.2              GEN                JPM
                  2.2.14/2.2.11      Given an approved Temporary Change (TC)
                  (3.0)              complete SRO responsibilities for installation per
                                      OOLP-22.
A.3              GEN                JPM
                  2.3.6              Given data provided by the on-shift Chemistry
                  (3.1)              Technician, issue a Liquid Radwaste Discharge per
                                      OOP-06.4
A.4              GEN                JPM
                  2.4.40            You are in Steam Cooling OEOP-01-STCP at Step
                  (4.0)              018. TSC has not yet been activated. Given the
                                      following release data [Table of stack gas and Met
                                      data] determine the Emergency Classification and
                                      Protective Action Guidelines to be given to the State
                                      of North Carolina.
 
B.1 Control Room Systems
System/JPM Title                                                Type      Safety
                                                                  Code      Function
(202001) Reactor Recirculation Pump Start [With a malfunction    (D)(A)(S) I
(TBD)]
(204000) Reduce RPV water level using RWCU to Radwaste          (N)(S)    2
(239001) Emergency equalization around MSIVs using Hard Card    (D)(S)    3
(203000) Initiate Shutdown Cooling [Min flow valve fails open]  (M)(A)(S) 4
                                                                  (L)
(223001) Vent the Drywell per OP-10 wiStack Rad Monitor          (D)(A)(S) 5
Increases >50%
(290003) Place Control Room HVAC in Filtered Recirculation Mode  (N)(S)    9
(205005) Core Performance Parameter Check- manual APRM GAF      (D)(A)(S) 7
Adjustment Required
Facility Walk-Through
  System/JPM Title                                                Type      Safety
                                                                  Code      Function
  (217000) Start RCIC from remote S/D Panel                      (D)(R)    2
  (264000) Manually start an EDG locally-local manual start using (D)      6
  prelube start control
  (234000) Complete Refuel Interlocks Checks on Refuel Bridge    (M)(R)    8
  (Partial)
 
                    CAROLINA POWER & LIGHT COMPANY
                        BRUNSWICK TRAINING SECTION
                        JOB PERFORMANCE MEASURE
                                    ADMIN
LESSON TITLE: Evaluate Jet Pump Performance Per PT-13.1.
                                                              4(zcý,j P
REVISION NO:        0
RECOMMENDED BY:                                          DATE
                      Instructor/Developer
CONCURRENCEBY:                                          DATE
                      Line Superintendent/Supervisor
APPROVED BY:                                            DATE
                      Superintendent/Supervisor Training
 
                      Evaluate Jet Pump Performance Per PT-1 3.1.
Special Instructions
  Transfer the following data onto a current revision of PT-i 3.1:
  Reactor power level    96.6%
  Recirc Pump A speed 88%
  Recirc Pump B speed 88%
  Recirc Pump A Flow      52 gpm X 1000
  Recirc Pump B Flow      43 gpm X 1000
  Jet Pump Loop A          30 mlbm/hr
  Jet Pump Loop B          39 mlbm/hr
    Attachment 2, Work Sheet 1
    Loop A                      Loop B
    JP 1 -30%                  JP-11 - 40%
    JP-2 - 32%                  JP-12 -42%
    JP-3 - 31%                  JP-13  -  39%
    JP-4 - 33%                  JP-14 - 43%
    JP-5 - 32%                  JP-15 -40%
                                JP-16 -  38%
    JP-6 - 33%
                                JP-17  - 39%
    JP-7 - 31%
    JP-8 - 32%                  JP-18 -38%
    JP-9 - 25%                  JP-19 - 39%
    JP-10 - 21%                JP-20 - 42%
    NOTE: Average of Loop A is 30.0%, Loop B is 40%
                                            Page 2 of 9            REV. 0
3A1-1
 
                          Evaluate Jet Pump Performance Per PT-13.1.
SAFETY CONSIDERATIONS
    None
EVALUATOR NOTES: (Do not read to trainee)
  1. The applicable procedure section WILL be provided to the trainee.
  2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
      Appendix E, or similar to the trainee.
                              Read the following to trainee.
TASK CONDITIONS:
    1. Unit Two (2) is operating at power.
    2. OPT-13.1, Reactor Recirculation Jet Pump Operability is being performed.
    3. Another operator has recorded data required for the PT in Section 7.3, and on
                                                                                          to be
        Attachment 2, Test Information Work Sheet 1. Attachment 2, Work Sheet 2 is not
        used.
INITIATING CUE:
                                                                                  acceptance
    You are directed to evaluate the data for Jet Pump performance, determine if
    criteria is met, and inform the Unit SCO of the results.
                                    £1 cn**-        "R'E                                        0
              ..  .D..,,n                              ,-nO                              REV. 0
  3A1 -1                                        age    u
 
                    * Evaluate Jet Pump Performance Per PT-13.1.
                                PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in the Comments.
Step 1 - Obtain a current revision of OPT-13.1 and 20P-02.
              Current Revision of OPT-13.1 and 20P-02 obtained and verified, if applicable.
                                                                          SATIU NSAT*
Step 2 - Confirm Recirc Pump A flow is within the band of the established curves.
                                                                                Figure 4.1.
              Determine Recirc Pump A flow is NOT within the band of 20P-02,
                                                    ** CRITICAL STEP ** SATIUNSAT*
                                                                          curves.
Step 3 - Confirm Recirc Pump B flow is within the band of the established
                                                                                  4.2.
              Determine Recirc Pump A flow is within the band of 20P-02, Figure
                                                                          SAT/U NSAT*
Step 4 - Confirm Jet Pump loop A flow is within the band of the established curves.
              Determine Jet Pump Loop A flow is NOT within the band of 20P-02, Figure 5.1.
                                                    ** CRITICAL STEP ** SATIUNSAT*
                                              Page 4 of 9                              REV. 0
  3A1-1
 
                      Evaluate Jet Pump Performance Per PT-13.1.
Step 5 - Confirm Jet Pump loop B flow is within the band of the established curves.
            Determine Jet Pump Loop A flow is within the band of 20P-02, Figure 5.2.
                                                                          SATIU NSAT*
Step 6 - Calculate average jet pump % psid for each loop.
            Determines Loop A average is 30% and Loop B average is 40%.
                                                                          SATIUNSAT*
Step 7 - Compare the % psid for each jet pump and calculated average jet pump % psid for
        each loop with the established curves (20P-02, Figures 6.1 through 6.10).
              Determinejet pump 10 falls outside the established curve in 20P-02, Figure 6.5
              (all otherjet pumps within limits)
                                                  ** CRITICAL STEP ** SAT/UNSAT*
Step 8 - Inform Unit SCO that jet pump 10 fails to meet acceptance criteria.
              Unit SCO informed jet pump 10 fails to meet acceptance criteria.
                                                                          SAT/UNSAT*
                                            Page 5 of 9                              REV. 0
WA-1
 
                    Evaluate Jet Pump Performance Per PT-1 3.1.
      <NTtTefolwn          is~pplia1
                        ltp&#xfd;              SRO eainetrY                tjK
                                                                                        be
Step 9 - Determine that LCO 3.4.2 is not met, condition A applies, requiring the unit to
        placed in Mode 3 in 12 hours, and Mode 4 in 36 hours.
            Determines that LCO 3.4.2 is not met, condition A applies, requiring the unit to
            be placed in Mode 3 in 12 hours, and Mode 4 in 36 hours.
                                                ** CRITICAL STEP ** SAT/UNSAT*
* Comments required for any step evaluated as UNSAT.
                                          Page 6 of 9                                      REV. 0
3A1-1
 
                    Evaluate Jet Pump Performance Per PT-1 3.1.
RELATED TASKS:
  202001 B201, Perform Reactor Recirculation Jet Pump Operability Test Per PT-1 3.1
K/A REFERENCE AND IMPORTANCE RATING:
    GEN 2.1.33  3.4/4.0
    GEN 2.2.12  3.0/3.4
REFERENCES:
    OPT-1 3.1
    20P-02
TOOLS AND EQUIPMENT:
    Calculator.
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
    Admin Al - Conduct Of Operations
REASON FOR REVISION:
    New JPM.
                                        Page 7 of 9                                  REV. 0
  WA-1
 
                        Evaluate Jet Pump Performance Per PT-13.1.
                  Time Required for Completion:            15    Minutes (approximate).
                            APPLICABLE METHOD OF TESTING
Performance:      Simulate                        Actual    4                      Unit:      2
Setting:    Control Room                          Simulator      ( Not applicable to In-Plant JPMs
Time Critical:            Yes                          No    4              Time Limit        N/A
Alternate Path:          Yes                          No    4
                                          EVALUATION
Trainee:                                            SSN:
JPM:            Pass                  Fail
Remedial Training Required: Yes                  No
Did Trainee Verify Procedure as Authorized Copy?: Yes                        No
(Each Student should verify one JPM per evaluation set.)
Comments:
Comments reviewed with Student
Evaluator Signature:                                                  Date:
3A1-1                                            Page 8 of 9                                        REV. 0
 
TASK CONDITIONS:
  1. Unit Two (2) is operating at power.
  2. OPT-13.1, Reactor Recirculation Jet Pump Operability is being performed.
  3. Another operator has recorded data required for the PT in Section 7.3, and on
      Attachment 2, Test Information Work Sheet 1. Attachment 2, Work Sheet 2 is not to be
      used.
INITIATING CUE:
  You are directed to evaluate the data for Jet Pump performance, determine if acceptance
  criteria is met, and inform the Unit SCO of the results.
 
                  CAROLINA POWER & LIGHT COMPANY
                      BRUNSWICK TRAINING SECTION
    K  BPERFORMANCE MEASURE
                                                      IN-PLANT
            LOT-OJT-JP-301 -A.1.2 RO
              LOT-OJT-JP-301-A .1.2 RO
LESSON TITLE: Evaluate Overtime Eligibility.
REVISION NO:        0
RECOMMENDED BY:
                    Instructor/Developer                      DATE
CONCURRENCE BY:
                    Line Superintendent/Supervisor            DATE
APPROVED BY:
                        Superintendent/Supervisor Training    DATE
 
                              Evaluate Overtime Eligibility.
SAFETY CONSIDERATIONS:
    None.
EVALUATOR NOTES: (Do not read to trainee)
    1. When requested, provide the copy of procedure OAP-001.
    2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
        Appendix E, or similar to the trainee.
                        Read the following to trainee.
TASK CONDITIONS:
  1. A startup of Unit 1 is planned for the following shift. One Reactor Operator must be held
      over three hours for startup
  2. The following is the work history (excluding shift turnover time) of the available reactor
      operators on shift (hours reflect those worked PRIOR to the 3 hour holdover). A break
      of at least 8 hours occurred between all work periods. All operators began their shift
      schedule at the same time each day.
                                                                                            REV. 0
                                              Page 2
  LOT-OJT-JP-201 -COI
LOT-OJT-JP-201-C01                            Page 2                                      REV. 0
 
                            Evaluate Overtime Eligibility.
  DAY          1          2          3        4          5          6        7          8
                                                                                        (Today)
Operator
    #1          0          4          12        10        10        14        10          11
Operator
    #2          0        12          10        12        3        12        8          13
Operator
    #3          0          0          12        12        12        8          8        14
  Operator
    #4          0          8          12        10        10        8        10          11
  Operator
    #5          0          0          12        14        12        10        13        10
INITIATING CUE:
      Evaluate the work history for all 5 operators. Determine which operator(s), if any, can
      be held over for three hours without prior overtime approval, and determine which
      operators CANNOT be held over for three hours without prior overtime approval. Also
      identify any deviations to OAP-001 that may have already occurred between Day I and
      Day 7.
NOTE:          A break of at least 8 hours has occurred between all work periods.
LOT-OJT-JP-201-C01                          Page 3                                      REV. 0
 
                          Evaluate Overtime Eligibility.
                                PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in the Comments.
Step 1 -    Obtain a current revision of OAP-001.
            Current Revision of OAP-001 obtained and verified via NRCS, if applicable.
                                                                      SAT/U NSAT*
Step 2 -      Determine Operator #1 would exceed 72 hours in a 7 day period and would
              require overtime authorization.
              Determined that Operator#1 would exceed 72 hours in a 7 day period.
                                                  ** CRITICAL STEP ** SAT/UNSAT*
Step 3  -  - Determine Operator #2 would exceed 72 hours in a 7 day period and would
            require overtime authorization.
            Determinedthat Operator#2 would exceed 72 hours in a 7 day period.
                                                    ** CRITICAL STEP **SAT/UNSAT*
Step 4 -    Determine Operator #3 would exceed 16 hours strait and 16 hours in a 24 hour
            period (today) and 24 hours in a.48 hours period between days 7 and 8 and
            would require overtime authorization.
            Determined that Operator#3 would exceed 16 hours strait 16 hours in a 24 hour
            period (today) and 24 hours in a.48 hours period between days 7 and 8 and
            would require overtime authorization.
                                                    ** CRITICAL STEP ** SAT/UNSAT*
LOT-OJT-JP-201-C01                            Page 4                                  REV. 0
 
                            Evaluate Overtime Eligibility.
Step 5 -        Determine Operator #4 would not exceed any overtime restrictions and could
                be held over for the 3 hours.
                Determinedthat Operator#4 would not exceed any overtime restrictionsand
                could be held over for the 3 hours.
                                                                        SAT/UNSAT*
Step 6 -      Determine Operator #5 would exceed 24 hours in a 48 period and would exceed
              72 hours in a 7 day period
              Determined that Operator#5 would exceed 72 hours in a 7 day period and would
              exceed 24 hours in a 48 hour period.
                                                    **  CRITICAL STEP ** SAT/UNSAT*
Examiner Prompt:
IF asked, provide copy of approved Attachment 1 for operator # 5.
Step 7 -      Determine that Operator # 5 exceeded 24 hours in a 48 hour period between
              days 4 and 5.
              Determinedthat Operator # 5 exceeded 24 hours in a 48 hour period between
              days 4 and 5.
                                                ** CRITICAL STEP ** SAT/UNSAT*
TERMINATING CUE: When the examinee has evaluated overtime restriction s, this JPM i
                        complete.
*Comments      required for any step evaluated as UNSAT.
                                                                                      REV. 0
                                              Page 5
    LOT-OJT-JP-201 -001
LOT-OJT-JP-201-C01                            Page 5                                  REV. 0
 
                          Evaluate Overtime Eligibility.
RELATED TASKS:
    Conduct shift turnover and relief
K/A REFERENCE AND IMPORTANCE RATING:
    GEN 2.1.5
REFERENCES:
    OAP-001, Rev 9
TOOLS AND EQUIPMENT:
    None.
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
      A.1 - Conduct Of Operations
REASON FOR REVISION:
      New JPM for NRC exam.
LOT-OJT-JP-201-C01                        Page 6        REV. 0
 
                          Evaluate Overtime Eligibility.
Time Required for Completion:    10    Minutes (approximate).
                        APPLICABLE METHOD OF TESTING
Performance:      Simulate    4              Actual                          Unit:
Setting:    Control Room    4          Simulator    __ (Not applicable to In-Plant JPMs)
Time Critical:        Yes                      No      4            Time Limit        N/A
Alternate Path:      Yes    __                No      4
                                      EVALUATION
Trainee:_                                      SSN:
JPM:            Pass              Fail  __
Remedial Training Required: Yes        -    No
Did Trainee Verify Procedure using NRCS?: Yes __            No
(EACH STUDENT SHOULD VERIFY ONE JPM PER EVALUATION SET USING NRCS.)
Comments:
Comments reviewed with Student
Evaluator Signature:                                          Date:
LOT-OJT-JP-201-C01                          Page 7                                        REV. 0
 
                                    APPLICANT HANDOUT
TASK CONDITIONS:
  1. A startup of Unit 1 is planned for the following shift. One Reactor Operator must be held
      over three hours for startup
  2. The following is the work history (excluding shift turnover time) of the available reactor
      operators on shift (hours reflect those worked PRIOR to the 3 hour holdover). A break
      of at least 8 hours occurred between all work periods. All operators began their shift
      schedule at the same time each day.
    DAY            1          2          3        4          5        6          7          8
                                                                                            (Today)
  Operator
      #1          0          4          12        10          10        14        10        11
  Operator
      #2          0        12          10        12          3        12          8        13
  Operator
      #3          0          0          12        12          12        8          8        14
  Operator
      #4            0        8          12        10        10        8        10        11
  Operator
      #5            0        0          12        14        12        10        13        10
INITIATING CUE:
        Evaluate the work history for all 5 operators. Determine which operator(s), if any, can
        be held over for three hours without prior overtime approval, and determine which
        operators CANNOT be held over for three hours without prior overtime approval. Also
        identify any deviations to OAP-001 that may have already occurred between Day 1 and
        Day 7.
NOTE:          A break of at least 8 hours has occurred between all work periods.
LOT-OJT-JP-201-C01                            Page 8                                      REV. 0
 
                    CAROLINA POWER & LIGHT COMPANY
                        BRUNSWICK TRAINING SECTION
                          JOB PERFORMANCE MEASURE
                                      ADMIN
                            BNP-03-AI-2
LESSON TITLE: Evaluate Partial View Of Core For Correct Core Loading.
                                                                        J
                                                                      KV
                                                                      Ox
REVISION NO:        0
                                                                          V'
RECOMMENDED BY:
                      Instructor/Developer                      DATE
CONCURRENCE BY:
                      Line Superintendent/Supervisor            DATE
APPROVED BY:                                                    UAII
                      Superintendent/Supervisor  Training      DAIE
                      Superintendent/Supervisor Training
 
                  Evaluate Partial View Of Core For Correct Core Loading.
SPECIAL INSTRUCTIONS
    Prepare a picture of a partial core (4 cells - 16 Bundles).
    Ensure I bundle is rotated 1800.
    Ensure each bundle has a different serial number on the bail handle.
    Prepare a core loading sequence sheet for the 16 bundles.
    Ensure 2 of the bundles are in the incorrect location (but properly oriented).
SAFETY CONSIDERATIONS:
    None
EVALUATOR NOTES: (Do not read to trainee)
  1. The applicable procedure section WILL be provided to the trainee.
  2. If this is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
      Appendix E, or similar to the trainee.
  3. Provide examinee with copy of prepared partial core view, prepared core load sequence
      sheets, and reactor vessel core map (ENP-24.12, Figure 1).
                            Read the following to trainee.
TASK CONDITIONS:
    1. Unit 2 is in Mode 5. Core reload has just been completed.
    2. You have a partial view of the reloaded core, along with the Core Component
        Sequence Sheets for those bundles, and Figure 1 from ENP-24.12, Reactor Vessel
        Core Map.
INITIATING CUE:
    You are directed by the Shift Superintendent to evaluate the partial core loading for core
    verification and inform the Shift Superintendent of the results.
3A1ls                                        Page 2 of 7                                  REV. 0
 
                  Evaluate Partial View Of Core For Correct Core Loading.
                                    PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in the Comments.
Step 1 - Evaluate partial Core View, Core Component Sequence Sheets for those bundles,
          and Figure 1 from ENP-24.12, Reactor Vessel Core Map.
              PartialCore View, Core Component Sequence Sheets for those bundles, and
              Figure 1 from ENP-24.12, Reactor Vessel Core Map evaluated.
                                                                            SAT/UNSAT*
NOTE: It is,critical that the examinee identifies the two bundles incorreclyjIaddItiNO
        critical the examinee ideintifies 'the locations are swa~pppd.
Step 2 - Identify that bundle LYJ568 (Step 5 of the Core Component Sequence Sheets) is
          specified for location 9-10 but bundle LYJ468 is loaded in that location.
                Identify that bundle LYJ568 (Step 5 of the Core Component Sequence Sheets) is
                not loaded in the correct location.
                                                      ** CRITICAL STEP ** SAT/UNSAT*
Step 3 - Identify that bundle LYJ468 (Step 10 of the Core Component Sequence Sheets) is
          specified for location 13-10 but bundle LYJ568 is loaded in that location.
                Identify that bundle LYJ468 (Step 10 of the Core Component Sequence Sheets)
                is not loaded in the correct location.
                                                      ** CRITICAL STEP ** SAT/UNSAT*
  WA s                                        Page 3 of 7                            REV. 0
 
                  Evaluate Partial View Of Core For Correct Core Loading.
Step 3 - Identify that bundle LYJ549 (Step 19 of the Core Component Sequence Sheets) is
          loaded in the incorrect orientation and that the Fastener location should be
          Southeast (as specified on the Core Component Sequence Sheets and not
          Northwest as shown in the partial core view (or that the bundle is rotated 1800).
                Identify that bundle LYJ549 (Step 19 of the Core Component Sequence Sheets)
                is loaded in the incorrect orientation.
                                                      ** CRITICAL STEP ** SAT/UNSAT*
NOTE:    All other bundles are correctly, loaded; however whoever loaded these 16 b6ndlelds
          will burl y lose 'his/her SROi ice'ns eg
Step 4 - Identifies all other bundles are correctly loaded.
                Identifies all other bundles are correctly loaded.
                                                                                  SAT/U NSAT*
Step 5 - Inform Shift Superintendent of results of partial core verification.
                Shift Superintendentinformed of results of partialcore verification.
                                                                                  SAT/U NSAT*
I TERMINATING CUE: When evaluation;of the partial core load has been competed; tnisJI-'M
      I                    ~ ~~~is
                              complete.                    ___ _____ ____    _____  _____  ____
                                                                                                    a
  * Comments required for any step evaluated as UNSAT.
  3A1 s                                          Page 4 of 7                                  REV. 0
 
              Evaluate Partial View Of Core For Correct Core Loading.
RELATED TASKS:
  None
K/A REFERENCE AND IMPORTANCE RATING:
  GEN 2.2.32    3.5
REFERENCES:
  ENP-24.12
  ENP-24.13
  FH-11
TOOLS AND EQUIPMENT:
  None
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
  Admin Section Al
REASON FOR REVISION:
  New JPM.
3Als                                    Page 5 of 7                  REV. 0
 
                  Evaluate Partial View Of Core For Correct Core Loading.
                  Time Required for Completion:          20  Minutes (approximate).
                            APPLICABLE METHOD OF TESTING
Performance:        Simulate      4                Actual                            Unit:      2
Setting:    Control Room                          Simulator      ( Not applicable to In-Plant JPMs)
Time Critical:            Yes                          No    4              Time Limit        N/A
Alternate Path:          Yes                          No    4
                                          EVALUATION
Trainee:                                            SSN:
JPM:            Pass                  Fail
Remedial Training Required: Yes                  No
Did Trainee Verify Procedure as Authorized Copy?: Yes                        No
(Each Student should verify one JPM per evaluation set.)
Comments:
Comments reviewed with Student
Evaluator Signature:                                                Date:
3Als                                            Page 6 of 7                                        REV. 0
 
'C1&#xfd;
    TASK CONDITIONS:
        1. Unit 2 is in Mode 5. Core reload has just been completed.
        2. You have a partial view of the reloaded core, along with the Core Component
            Sequence Sheets for those bundles, and Figure 1 from ENP-24.12, Reactor Vessel
            Core Map.
    INITIATING CUE:
        You are directed by the Shift Superintendent to evaluate the partial core loading for core
        verification and inform the Shift Superintendent of the results.
K-,
 
9113 15North
              12
              10
      n  %  J %
                6
 
                      CAROLINA POWER & LIGHT COMPANY
                          BRUNSWICK TRAINING SECTION
                          JOB PERFORMANCE MEASURE
                                      ADMIN
                            BNP-03-A1-2
LESSON TITLE: Evaluate Partial View Of Core For Correct Core Loading.
REVISION NO:        0
RECOMMENDED BY:
                      Instructor/Developer                      DATE
CONCURRENCE BY:.
                      Line Superintendent/Supervisor            DATE
APPROVED BY:-
                      Superintendent/Supervisor Training        DATE
 
                  Evaluate Partial View Of Core For Correct Core Loadinq.
SPECIAL INSTRUCTIONS
    Prepare a picture of a partial core (4 cells - 16 Bundles).
    Ensure 1 bundle is rotated 1800.
    Ensure each bundle has a different serial number on the bail handle.
    Prepare a core loading sequence sheet for the 16 bundles.
    Ensure 2 of the bundles are in the incorrect location (but properly oriented).
SAFETY CONSIDERATIONS:
    None
EVALUATOR NOTES: (Do not read to trainee)
  1. The applicable procedure section WILL be provided to the trainee.
  2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
      Appendix E, or similar to the trainee.
  3. Provide examinee with copy of prepared partial core view, prepared core load sequence
      sheets, and reactor vessel core map (ENP-24.12, Figure 1).
                            Read the following to trainee.
TASK CONDITIONS:
    1. Unit 2 is in Mode 5. Core reload has just been completed.
    2. You have a partial view of the reloaded core, along with the Core Component
        Sequence Sheets for those bundles, and Figure 1 from ENP-24.12, Reactor Vessel
        Core Map.
INITIATING CUE:
    You are directed by the Shift Superintendent to evaluate the partial core loading for core
    verification and inform the Shift Superintendent of the results.
3A1ls                                        Page 2 of 7                                  REV. 0
 
                  Evaluate Partial View Of Core For Correct Core Loadina.
                                    PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in the Comments.
Step 1 - Evaluate partial Core View, Core Component Sequence Sheets for those bundles,
          and Figure 1 from ENP-24.12, Reactor Vessel Core Map.
                PartialCore View, Core Component Sequence Sheets for those bundles, and
                Figure 1 from ENP-24.12, Reactor Vessel Core Map evaluated.
                                                                                    SAT/UNSAT*
!NTE it is critical that the examinee idnftifies the two bundles indorrdctlv Idaddd. It is NOT
        critical the examinee ienti~fie's-the locationsaesw      d
Step 2 - Identify that bundle LYJ568 (Step 5 of the Core Component Sequence Sheets) is
          specified for location 9-10 but bundle LYJ468 is loaded in that location.
                Identify that bundle L YJ568 (Step 5 of the Core Component Sequence Sheets) is
                not loaded in the correct location.
                                                          ** CRITICAL STEP ** SAT/UNSAT*
Step 3 - Identify that bundle LYJ468 (Step 10 of the Core Component Sequence Sheets) is
          specified for location 13-10 but bundle LYJ568 is loaded in that location.
                Identify that bundle L YJ468 (Step 10 of the Core Component Sequence Sheets)
              is not loaded in the correct location.
                                                          ** CRITICAL STEP ** SAT/UNSAT*
WA s                                        Page 3 of 7                                  REV. 0
 
                        Evaluate Partial View Of Core For Correct Core LoadinQ.
    Step 3 - Identify that bundle LYJ549 (Step 19 of the Core Component Sequence Sheets) is
              loaded in the incorrect orientation and that the Fastener location should be
              Southeast (as specified on the Core Component Sequence Sheets and not
              Northwest as shown in the partial core view (or that the bundle is rotated 1800).
                    Identify that bundle L YJ549 (Step 19 of the Core Component Sequence Sheets)
                    is loaded in the incorrectorientation.
                                                                ** CRITICAL STEP ** SAT/UNSAT*
    NOM      All other brtlyloaded;                    however whoever loaded these 16 bundles will
            .,sunl lose, hislher SRO license.&#xfd;&#xfd;:
    Step 4 - Identifies all other bundles are correctly loaded.
                    Identifies all other bundles are correctly loaded.
                                                                                        SAT/UNSAT*
    Step 5 - Inform Shift Superintendent of results of partial core verification.
                    Shift Superintendentinformed of results of partialcore verification.
                                                                                        SAT/UNSAT*
                                                                                                    -I
                                                                                                      I
  ITERMINATIN9          CUE: When evaluationof the partial core load has been competed, this JPM
                              is compnlete
l,,
    * Comments required for any step evaluated as UNSAT.
    3Als                                          Page 4 of 7                                  REV. 0
 
              Evaluate Partial View Of Core For Correct Core Loadini.
RELATED TASKS:
  None
K/A REFERENCE AND IMPORTANCE RATING:
  GEN 2.2.32    3.5
REFERENCES:
  ENP-24.12
  ENP-24.13
  FH-11
TOOLS AND EQUIPMENT:
  None
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
  Admin Section Al
REASON FOR REVISION:
  New JPM.
3A1 s                                    Page 5 of 7                  REV. 0
 
                Evaluate Partial View Of Core For Correct Core Loading.
                  Time Required for Completion:          20  Minutes (approximate).
                            APPLICABLE METHOD OF TESTING
Performance:      Simulate        V.              Actual                          Unit:      2..t
Setting:    Control Room        -                Simulator-.  ( Not applicable to In-Plant JPMs)
Time Critical:            Yes    -                    No    V              Time Limit      _N/A__
Alternate Path:          Yes    -                    No    V
                                          EMALUATION
Trainee:                                            SSN:
JPM:            Pass      __        Fail
Remedial Training Required: Yes            -    No
Did Trainee Verify Procedure as Authorized Copy?: Yes            __        No
(Each Student should verify one JPM per evaluation set.)
Comments:
Comments reviewed with Student
Evaluator Signature:                                                Date:          -
                                                  Page 6 of 7                                      REV. 0
3Als
 
TASK CONDITIONS:
  1. Unit 2 is in Mode 5. Core reload has just been completed.
  2. You have a partial view of the reloaded core, along with the Core Component
      Sequence Sheets for those bundles, and Figure 1 from ENP-24.12, Reactor Vessel
      Core Map.
INITIATING CUE:
  You are directed by the Shift Superintendent to evaluate the partial core loading for core
  verification and inform the Shift Superintendent of the results.
 
          1"', fL
      OL
*Ll II
    WN
 
(                                                                              (
    Core Component Sequence Sheet                                                                                                  FORM OENP-24.12-3 (8/02)
                                                                                                                                                  ISSUE NO.
                                                                                                                                            PAGE                OF
                                                                                    PREPARED BY:                                                    DATE:
                UNIT .*                                                            REVIEWED BY:                                                    DATE:
                                                                                NMC APPROVAL:                                                      DATE:
                                                                          UNIT SRO APPROVAL:                                                        DATE:
                                                                                                MOVEMENT            SRM COUNTS
  STEP # COMPONENT FROM COORDINATE FASTENER                TO    COORDINATE FASTENER COMPLETE                  A    B    C    D                COMMENTS
                                              LOCATION                            LOCATION INIT/DATE
    +/-Lj    LN'XST      I SFP        P-LD        SE        Core      15-              SE
    Is L:1L413 sF? Cs fq4                      N'        cort      k-'6                                        -W
    16 u'N-ag41 &#xa3;.EtA&#x17d;*          F.J9 1                      oe      9-%              ,jCF        ___
    1-1  _____16        SrF    EL4C3          Sw coft              fl-(          SWw            __
    1$ &DS          .Core          WU12 ANJASET                      8:16            NIAA.        _
    \'&#xfd;  L-isSM      a  SF?    SbMAI          SE cov                ))-2          & E
    %O- L'1rI1It&sect;SF              %6.A2          NW      Cott          0i - ro_      &#x17d;&#x17d;X
                                                                                      0 %N__                                                                      _
  NOTE:    An * in COMMENTS indicates that proper blade guide seating must be verified at the fuel support piece by camera before OR coupling or insertion.
  NOTE:    "Repeatbacks" per AP-050, Site Command, Control, and Communications Manual are required.
  0ENP-24.12                                                                    Rev. 23                                                                      Page 31 of 56
 
(                                                                                (                                                                                    (
    Core Component Sequence Sheet                                                                                                    FORM OENP-24.12-3 (8/02)
                                                                                                                                                    ISSUE NO.
                                                                                                                                              PAGE                OF
                                                                                      PREPARED BY:                                                    DATE:
                UNIT  a.                                                            REVIEWED BY:                                                    DATE:
                                                                                  NMC APPROVAL:.                                                      DATE:
                                                                            UNIT SRO APPROVAL:                                                        DATE:
                                                                                                  MOVEMENT            SRM COUNTS
  STEP # COMPONENT FROM COORDINATE FASTENER                  TO    COORDINATE FASTENER COMPLETE                                                        COMMENTS
                                                LOCATION                            LOCATION INIT/DATE
        I    Y3119-ri    sr-? jAS                  NeCo              912,
                                                                      Cl              "E.                                                    _____
      2,    LYTS..    !S F? ESFA                  SN      Co.        W-fo            Sw
      L1
            D%G Cort Iill
          L.-y 395 SF? ESD2I sE
                                                  N?1        SF P
                                                              ct
                                                                      A 30
                                                                          \- 12,
                                                                                      WUA
                                                                                        SE
      S    LV'SSgI          rSP    EIS EI            WVCae              5-10          NW
      G  L"I5Sazti        r-9    ESD.*          "s,S      .r        13"-I          5k ,F
      2      3BG        Cor                    kIps-                  AA
                                                                        A32,        Jrt                                                                      __A
                                                                                                                                                              _s_
                L~zsj
            L--1oj        -sfr-      G,&E S        s__1ESOr              s-i2,        SE
      0  ILY-TH    (.9 SEP      %(iAq          NVJ -Ate            13-1O          Nw
    I    14LNTH3 SF? I %AS                      tiGME  ICrel        132S            r-3 G I_______ __
    Ix. Ly "o3 SF? 9-SE3                          SW Cot,          I ,S-6            SW        I        ___,_
          13 'S                                      A ISf?9
                                                  N%1oe~i~              A34M            I 1fA          _                                        _      _      _  _    _
  NOTE:      An * in COMMENTS indicates that proper blade guide seating must be verified at the fuel support piece by camera before CR coupling or insertion.
  NOTE:    "Repeatbacks" per AP-050, Site Command, Control, and Communications Manual are required.
  OENP-24.12                                            I                        Rev. 23                                                                      Page 31 of 56
 
                                                  FIGURE 1
                                                Page 1 of 1
                                      Reactor Vessel Core Map
        1    3 5  7  9  11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51
                                      18-51  22-51  26-51  30-51  34-51
                                                                                        -*-        North
                              14-47  18-47  22-47  26847  30-47  34-47    38-47  42-47
                      10-47
              06-43  10-43  114-43 1 8-43 j22-43              0    4 32-3
                                                                          -43    38-43 142-431  46-43.
                      10-39    14-39  18-39  22-39  26-39  30-39  34-39    38-39  42-39  46-39
              06-39
        02-35  06-35  10-35    14-3,9  18-35  22-35  26-35  30-35  34-351T38-35 142-35      46-35  50-35
        02-31  06-31  10.31    14-31  18-31  22-31  26-31  30-31  34-31  j38-31    42-31  46-3I  50-31
        02-27  06-27  10-27    14-27  18-271 22-27    26-27  30-27  34-271    38-27  42-27  46-27  50-27
        02-23 06 23  10-23    14-23  18-23  22-23  26-23  30233-      2I823        42-23  40-23  50-23
        02-19 06.19  10-19    14-IS  18-19  22-19  26-19  30-19  34-19    38-19  42-19  46-19  50-19
                              14415  18-15  22-15  26-15  30-15  34-15        a1542-15    46-15
              06-IS  10-15
              G6-11 10-I1    14-1l  18-lI  22-12-11        30-11 134-111    38-11  42If4-l
                      10-07114-07      18-07  22-07  26-07  30-07  34-07    38-07    42-07
                                      18-03  22-03  26-03  30-03  34-03
N  IRMs          IRM A - 12-41                    IRM E - 28-25                    SRM  A- 12-33
                  IRM 8 - 36-41                    IRM F - 20-25                    SRM  B - 28-41
*  LPRMs
                  IRM C - 20-33                    IRM G - 36-09                    SRM  C - 36-25
  A SRMs
                  IRM 0 - 28-33                    IRM H - 12-09                    SRM  D - 20-17
LPRM  04-21      LPRM  12-37        LPRM  20-29        LPRM 28-21          LPRM 36-13          LPRM 44-13
LPPM  04-29      LPRM  12-45        LPRM  20-37        LPRM 28-29          LPRM  36-21        LPRM 44-21
                                      LPRM  20-45        LPRM 28-37          LPRM  36-29        LPRM 44-29
LPRM  04-37      LPRM  20-05
                  LPRM  20-13        LPRM  28-05        LPRM 28-45          LPRM  36-37        LPRM 44-37
LPRM  12-13
                  LPRM  20-21        LPRM  28-13        LPRM 36-05          LPRM  36-45        LPRM 44-45
LPRM  12-21
LPRM  12-29
OENP-24.12                                          Rev. 23                                          Page 20 of 56
 
                    CAROLINA POWER & LIGHT COMPANY
                          BRUNSWICK TRAINING SECTION
                          JOB PERFORMANCE MEASURE
                                      ADMIN
                              BNP-03-A2
LESSON TITLE: Evaluate Proposed Temporary Change.
REVISION NO:        0
RECOMMENDED BY:
                      Instructor/Developer              DATE
CONCURRENCE BY:
                      Line Superintendent/Supervisor    DATE
APPROVED BY:                                            L)AI
                                                Training
                      Superintendent/Supervisor Training DATE
                      Superintendent/Supervisor
 
                        Evaluate Proposed Temporary Change.
Special Instructions
  Obtain copies of prints D-02549, Sheet IB, 2-FP-05924, Sheet 2, LL-09243, Sheet 15 and
  LL09244, Sheet 15
  On D-02549, change V35 and V36 to show closed, and denote valves closed per EC TC
  03-001.
  On 2-FP-9524, Sheet 2, draw cloud around G41-N005 connections 1NC and 1C, denote
  leads lifted per EC TC 03-001.
  On 2-FP-9524, Sheet 2, draw cloud around G41-N005 connections 2NC and 2C, denote
  leads lifted per EC TC 03-001.
  On LL-09243, Sheet 15, draw jumper from terminals 2-H02/CC5 to 2-H02/AA11. Denote
  jumper installed per TC EC 03-001.
                                                                                  Denote
    On LL-09244, Sheet 15, draw jumper from terminals 2-H02/CC17 to 2-H02/BB14.
  jumper installed per TC EC 03-001.
    Mark up EGR-NGGC-005, Form 2 to reflect temporary changes.
                                          Page 2 of 9                                REV. 0
03-A2
 
                          Evaluate Proposed Temporary Change.
SAFETY CONSIDERATIONS:
  None.
EVALUATOR NOTES: (Do not read to trainee)
1. The applicable procedure section WILL NOT be provided to the trainee.
2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
    Appendix E, or similar to the trainee.
3. This JPM may be administered in any setting.
                          Read the following to trainee.
TASK CONDITIONS:
  1. Unit Two (2) Fuel Pool Cooling Skimmer Surge Tank low level alarm switch 2-G41-LSL
      N005 has failed. The shelf condition of this level switch is closed. This failed level
      switch has resulted in Annunciator A-4 6-7 (Fuel Pool Cooling Alarm) being sealed in on
      Panel P603.
  2. The failed level switch is obsolete. A temporary change has been developed in
      accordance with EGR-NGGC-0005 to abandon this level switch in place until a suitable
      replacement can be located and installed.
  3. This temporary change is to valve out the failed level switch and lift leads and/or jumper
      the level switch contacts. This temporary change will defeat the level switch input to
      Annunciator A-4 6-7 (a multiple input Annunciator). This temporary change will also
      defeat low level indicating lights located on local panels 2-G41 P001 and 2-G41-P002.
      The low level trip function for the Fuel Pool Cooling Pumps will not be affected.
  4. A Temporary Change Log form (EGR-NGGC-0005, Form 2) has been prepared
      indicating a description of this temporary change and the Priority 0 drawings affected.
      The Priority 0 drawings referenced have been marked up to reflect the temporary
      change.
03-A2                                      Page 3 of 9                                    REV. 0
 
                        Evaluate Proposed Temporary Change.
INITIATING CUE:
  You are directed by the WCC SRO to review the marked up Priority 0 drawings identified
  on the Temporary Change Log Form 2 and ensure the changes reflected on the identified
  Priority 0 drawings meet the intent of the temporary change, and inform the WCC SRO of
  the results of your evaluation.
03-A2                                      Page 4 of 9                              REV. 0
 
                        Evaluate Proposed Temporary Change.
                                PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in the Comments.
Step 1 - Review Temporary Change Log, Form 2 and evaluate drawings listed as Priority 0 on
        the Log.
            Reviews Temporary Change Log, Form 2 and evaluate drawings listed as
            Priority0 on the Log.
                                                                        SAT/UNSAT*
Step 2 - Determine jumper installed from terminals 2-H02/CC5 to 2-H02/AA1 1 on drawing LL
        09243, Sheet is for level switch N006, not N005 and should not be installed.
            Determinesjumper should not be installed from terminals 2-H02/CC5 to 2
            H02/AA 11 on LL-09243, Sheet 15.
                                                    ** CRITICAL STEP ** SAT/UNSAT*
Step 3 - Determine jumper installed from terminals 2-H02/CC1 7 to 2-H02/BB23 on drawing
          LL-09244, Sheet is for level switch N006, not N005 and should not be installed.
              Determinesjumper should not be installed from terminals 2-H02/CC17 to 2
              H02/BB23 on LL-09244, Sheet 15.
                                                    ** CRITICAL STEP ** SAT/UNSAT*
03-A2                                        Page 5 of 9                                REV. 0
 
                        Evaluate Proposed Temporary Change.
Step 4 - Determine other drawing changes meet the intent of the TC.
              Determines other drawing changes meet the intent of the TC.
                                                ** CRITICAL STEP ** SAT/UNSAT*
Step 5 - Inform WCC SRO of results.
              WCC SRO informed of results.
                                                                        SAT/UNSAT*
TERMINATING CUE: This box will tell the evaluator when the JPM iscomplete Obased on :  I
                      student perfrmane)>I
* Comments required for any step evaluated as UNSAT.
03-A2                                    Page 6 of 9                              REV. 0
 
                          Evaluate Proposed Temporary Change.
RELATED TASKS:
    200 665 B5 04, Perform AO Actions For A Loss Of Division I DC Panels Per AOP-39.0
K/A REFERENCE AND IMPORTANCE RATING:
    295004      AA1.01 3.3/3.4
    Ability to operate D.C. electrical distribution systems as it applies to Partial Loss of D.C.
    power.
REFERENCES:
    AOP-39.0, Revision 11
    Loss of DC Power
TOOLS AND EQUIPMENT:
    Plant Page.
    Keys.
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
    6 - Electrical (DC Electrical Distribution)
REASON FOR REVISION:
    Renamed from AOR to AOT, changed format to WORD from WP 5.1, updated for
    procedure revision, changed to support either unit, removed record of revision page.
03-A2                                        Page 7 of 9                                    REV. 0
 
                            Evaluate Proposed Temporary Change.
                  Time Required for Completion:          15  Minutes (approximate).
                            APPLICABLE METHOD OF TESTING
Performance:        Simulate      4              Actual                            Unit:      2
Setting:      Control Room                        Simulator      ( Not applicable to In-Plant JPMs)
Time Critical:            Yes                          No    4              Time Limit        N/A
Alternate Path:          Yes                          No    4
                                          EVALUATION
Trainee:                                            SSN:
JPM:            Pass                  Fail
Remedial Training Required: Yes                  No
Did Trainee Verify Procedure as Authorized Copy?: Yes                -      No
(Each Student should verify one JPM per evaluation set.)
Comments:
Comments reviewed with Student
Evaluator Signature:                                                Date:
03-A2                                            Page 8 of 9                                        REV. 0
 
TASK CONDITIONS:
  1. Unit Two (2) Fuel Pool Cooling Skimmer Surge Tank low level alarm switch 2-G41-LSL
      N005 has failed. The shelf condition of this level switch is closed. This failed level
      switch has resulted in annunciator A-4 6-7 (Fuel Pool Cooling Alarm) being sealed in on
      Panel P603.
  2. The failed level switch is obsolete. A temporary change has been developed in
      accordance with EGR-NGGC-0005 to abandon this level switch in place until a suitable
      replacement can be located and installed.
  3. This temporary change is to valve out the failed level switch and lift leads and/or jumper
      the level switch contacts. This temporary change will defeat the level switch input to
      annunciator A-4 6-7 (a multiple input annunciator). This temporary change will also
      defeat low level indicating lights located on local panels 2-G41 P001 and 2-G41-P002.
      The low level trip function for the Fuel Pool Cooling Pumps will not be affected.
  4. A Temporary Change Log form (EGR-NGGC-0005, Form 2) has been prepared
      indicating a description of this temporary change and the Priority 0 drawings affected.
      The Priority 0 drawings referenced have been marked up to reflect the temporary
      change.
INITIATING CUE:
  You are directed by the WCC SRO to review the marked up Priority 0 drawings identified
  on the Temporary Change Log Form 2 and ensure the changes reflected on the identified
  Priority 0 drawings meet the intent of the temporary change, and inform the WCC SRO of
  the results of your evaluation.
 
                      CAROLINA POWER & LIGHT COMPANY
                        BRUNSWICK TRAINING SECTION
                          JOB PERFORMANCE MEASURE
                                    ADMIN
                              BNP-03-A2
LESSON TITLE: Evaluate Proposed Temporary Change.
REVISION NO:        0
RECOMMENDED BY:
                    Instructor/Developer              DATE
CONCURRENCE BY:.
                    Line Superintendent/Supervisor    DATE
APPROVED BY:
                    Superintendent/Supervisor Training DATE
 
                          Evaluate Proposed Temporary Chanqe.
  Special Instructions
    Obtain copies of prints D-02549, Sheet 1B, 2-FP-05924, Sheet 2, LL-09243, Sheet 15 and
    LL09244, Sheet 15
    On D-02549, change V35 and V36 to show closed, and denote valves closed per EC TC
    03-001.
    On 2-FP-9524, Sheet 2, draw cloud around G41 -NO05 connections 1 NC and 1C, denote
    leads lifted per EC TC 03-001.
    On 2-FP-9524, Sheet 2, draw cloud around G41 -NO05 connections 2NC and 2C, denote
    leads lifted per EC TC 03-001.
    On LL-09243, Sheet 15, draw jumper from terminals 2-H02/CC5 to 2-H02/AA11. Denote
    jumper installed per TC EC 03-001.
    On LL-09244, Sheet 15, draw jumper from terminals 2-H02/CC17 to 2-H02/B814. Denote
    jumper installed per TC EC 03-001.
      Mark up EGR-NGGC-005, Form 2 to reflect temporary changes.
- 03-A2                                    Page 2 of 9                                REV. 0
 
                          Evaluate Prooosed Temoorarv Chanae.
SAFETY CONSIDERATIONS:
    None.
EVALUATOR NOTES: (Do not read to trainee)
  1. The applicable procedure section WILL NOT be provided to the trainee.
2. If this is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
      Appendix E, or similar to the trainee.
3. This JPM may be administered in any setting.
                            Read the following to trainee.
TASK CONDITIONS:
    1. Unit Two (2) Fuel Pool Cooling Skimmer Surge Tank low level alarm switch 2-G41-LSL
      N005 has failed. The shelf condition of this level switch is closed. This failed level
      switch has resulted in Annunciator A-4 6-7 (Fuel Pool Cooling Alarm) being sealed in on
      Panel P603.
  2. The failed level switch is obsolete. A temporary change has been developed in
      accordance with EGR-NGGC-0005 to abandon this level switch in place until a suitable
      replacement can be located and installed.
    3. This temporary change is to valve out the failed level switch and lift leads and/or jumper
      the level switch contacts. This temporary change will defeat the level switch input to
      Annunciator A-4 6-7 (a multiple input Annunciator). This t 'r          change will also
      defeat low level indicating lights located on local panels 2- 41-eO1    and 2-G41-P002.
      The low level trip function for the Fuel Pool Cooling Pumps      not be affected.
  4. A Temporary Change Log form (EGR-NGGC-0005, Form 2) has been prepared
      indicating a description of this temporary change and the Priority 0 drawings affected.
      The Priority 0 drawings referenced have been marked up to reflect the temporary
      change.
03-A2                                        Page 3 of 9                                    REV. 0
 
                          Evaluate Proposed Temporary Change.
INITIATING CUE:
    You are directed by the WCC SRO to review the marked up Priority 0 drawings identified
    on the Temporary Change Log Form 2 and ensure the changes reflected on the identified
    Priority 0 drawings meet the intent of the temporary change, and inform the WCC SRO of
    the results of your evaluation.
03-A2                                      Page 4 of 9                              REV. 0
 
                        Evaluate Pronosed Temporarv Chanqe.
                                PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in the Comments.
Step 1 - Review Temporary Change Log, Form 2 and evaluate drawings listed as Priority 0 on
        the Log.
            Reviews Temporary Change Log, Form 2 and evaluate drawingslisted as
            Priority0 on the Log.
                                                                                SAT/U NSAT*
Step 2 - Determine jumper installed from terminals 2-H02/CC5 to 2-H02/AA1 1 on drawing LL
        09243, Sheet is for level switch N006, not N005 and should not be installed.
              Determinesjumper should not be installedfrom terminals2-H02/CC5 to 2
              H02/AA 11 on LL-09243, Sheet 15.
                                                          ** CRITICAL STEP ** SAT/UNSAT*
Step 3 - Determine jumper installed from terminals 2-H02/CC17 to 2-H02/BB23 on drawing
          LL-09244, Sheet is for level switch N006, not N005 and should not be installed.
              Determines jumper should not be installed from terminals2-H02/CC17 to 2
              H02/BB23 on LL-09244, Sheet 15.
                                                          ** CRITICAL STEP ** SAT/UNSAT*
03-A2                                        Page 5 of 9                              REV., 0
 
                          Evaluate Proposed Temporary Change.
    Step 4 - Determine other drawing changes meet the intent of the TC.
                  Determines other drawing changes meet the intent of the TC.
                                                        **  CRITICAL STEP ** SAT/UNSAT*
    Step 5 - Inform WCC SRO of results.
                  WCC SRO informed of results.
                                                                              SAT/UNSAT*
    * Comments required for any step evaluated as UNSAT.
                                            Page 6 of 9                            REV. 0
*.*  03-A2
 
                          Evaluate Proposed Temporary Change.
RELATED TASKS:
  200 665 B5 04, Perform AO Actions For A Loss Of Division I DC Panels Per AOP-39.0
K/A REFERENCE AND IMPORTANCE RATING:
    295004      AA1.01 3.3/3.4
    Ability to operate D.C. electrical distribution systems as it applies to Partial Loss of D.C.
    power.
REFERENCES:
    AOP-39.0, Revision 11
    Loss of DC Power
TOOLS AND EQUIPMENT:
    Plant Page.
    Keys.
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
    6 - Electrical (DC Electrical Distribution)
REASON FOR REVISION:
    Renamed from AOR to AOT, changed format to WORD from WP 5.1, updated for
    procedure revision, changed to support either unit, removed record of revision page.
03-A2                                        Page 7 of 9                                    REV. 0
 
    C                                                                                        C                                                                                    (
                                                                                        FORM 2
                                                                                    Sheet 1 of 1
                                                                            Temporary Change Log
EC#T'C 03-O00 Rev#                        0        Title:Ot.So      .It I-G4l-LSL-NO0SoResponsibleEngineer(Ext.):                              v&#xfd;A.zow        SOA    (z.2.2&0)
NOTE: Accepting change indicates that affected Priority 0 drawings have been annotated and procedures have been revised.
Change Accepted by:                                                                                  /            Approved Plant Condition
                              (fln~r~tinng\ Print n~rmp          Sianntuire                                    Date
                                        TAGGING                                                          INSTALLATION                                            RESTORATION
  TAG #          DESCRIPTION                            POSITION/CONDITION FOR            PERFORMED &                VERIFIED              RESTORED            RESTORED/TAG        VERIFIED
                                                        TEMPORARY CHANGE                TAG INSTALLED                      ()            POSITION/          REMOVED                    ()
                                                                                                                                            CONDITION
                                                                                              BY          DATE        BY        DATE                              BY        DATE    BY      DATE
      "2.        a.-GHI-N3L                                C\oseA
                  2,- G341    - LS L-H            -
            4  TtC1% n&1 t4              C.ci11 +0
  Priority 0 drawings affected:  0-0.S9'            3~ F Si24-~                        Drawing annotated by/date:                        Drawing annotations removed by/date:
                LL-OSZM~i\-S, LL-O92A4j-IS
  Procedures Affected:                                                                  Procedures revised by/date:                      Procedures revised by/date:
FORM EGR-NGGC-0005-2-16
(*)        These columns are required only for those systems requiring independent verification or functional testing as required by site procedures,
('*)        Transmit original Temporary Change log to Document Services upon Temporary Change removal (restoration) acceptance for storage in the EC Master File.
Temporary Change Removal Accepted by(**):                                                              /
                                                            (Operations) Print name                            Signature                                                Date
  EGR-NGGC-0005                                                                        I                  Rev. 18                                                              Page 130 of 133I
 
C          C                    C
  D-02549 SHT IB, COORDINATE D3
 
(                              (                                            (
                            F- - -- -- -- -- - - - - - - - - - - - - - - - -
                                  LSL
  LEADS LIFTED PER
    EC TC 03-001                        U      2(,.        G45LOCAL
                                                              G41 -N005
                2-FP-05924, SHT 2, COORDINATE C13
 
(                  C                                C
  r                                                    -~1
                                    LEADS LIFTED PER
  I        (
                                      EC TC 03-001
              LSL
        SURGE TANK LOW LEVEL
                          LOCAL
                        G41-N005
  2-FP-05924, SHT 2, COORDINATE K3
 
                            Evaluate Prooosed Temoorarv Chanae.
                  Time Required for Completion: 7&sect;            Minutes (approximate).
                              APPLICABLE METHOD OF TESTING
Performance:        Simulate      s/              Actual                          Unit:      2_
Setting:      Control Room                        Simulator.    (Not applicable to In-Plant JPMs)
Time Critical:            Yes                          No  V            Time Limit        N/A
Alternate Path:            Yes                          No
                                          EVALUATION
Trainee:                                              SSN:
JPM:            Pass      __        Fail
Remedial Training Required: Yes            -    No    __
Did Trainee Verify Procedure as Authorized Copy?: Yes              __    No
(Each Student should verify one JPM per evaluation set.)
Comments:
Comments reviewed with Student
Evaluator Signature:                                              Date:-
03-A2                                            Page 8 of 9                                      REV. 0
 
(                    (                      ( 1
                        _1 ISlA*I
                            02-CC
                          25
                          116
  JUMPER PER                  LS 2-G41 -N006
  EC TC 03-001                      "*
                        2H02-AA1 1
                        2H02-AA12
              LL-09243 SHT 15
 
(                      (                  (
                    2
                                SIB
                            [FP-05924-1]
              2-H02
              CC1l,
                                25
                                  /
  JUMPER PER                    /ts
  EC TC 03-001          --  G41-N006
                            [FP-05924-1]
                          2-H02
                          BB23
                          2-H02
                          BB24
              LL-09244 SHT 15
 
TASK CONDITIONS:
  1. Unit Two (2) Fuel Pool Cooling Skimmer Surge Tank low level alarm switch 2-G41-LSL
      N005 has failed. The shelf condition of this level switch is closed. This failed level
      switch has resulted in annunciator A-4 6-7 (Fuel Pool Cooling Alarm) being sealed in on
      Panel P603.
  2. The failed level switch is obsolete. A temporary change has been developed in
      accordance with EGR-NGGC-0005 to abandon this level switch in place until a suitable
      replacement can be located and installed.
  3. This temporary change is to valve out the failed level switch and lift leads and/or jumper
      the level switch contacts. This temporary change will defeat the level switch input to
      annunciator A-4 6-7 (a multiple input annunciator). This temporary change will also
      defeat low level indicating lights located on local panels 2-G41 P001 and 2-G41 -P002.
      The low level trip function for the Fuel Pool Cooling Pumps will not be affected.
  4. A Temporary Change Log form (EGR-NGGC-0005, Form 2) has been prepared
      indicating a description of this temporary change and the Priority 0 drawings affected.
      The Priority 0 drawings referenced have been marked up to reflect the temporary
      change.
INITIATING CUE:
  You are directed by the WCC SRO to review the marked up Priority 0 drawings identified
  on the Temporary Change Log Form 2 and ensure the changes reflected on the identified
  Priority 0 drawings meet the intent of the temporary change, and inform the WCC SRO of
  the results of your evaluation.
 
                        CAROLINA POWER & LIGHT COMPANY
                            BRUNSWICK TRAINING SECTION
                            JOB PERFORMANCE MEASURE
                                        ADMIN
                          BNP-03-A3-SRO
  LESSON TITLE: Evaluate Liquid Discharge Release Permit.
<2
  REVISION NO:        0
  RECOMMENDED BY:
                        Instructor/Developer              DATE
  CONCURRENCE BY:,
                        Line Superintendent/Supervisor    DATE
  APPROVED BY:
                        Superintendent/Supervisor Training DATE
 
                        Evaluate Liquid Discharge Release Permit.
Special Instructions
  Prepare a Liquid Release Permit, OP-06.4, Attachment 4. Complete Part I, Part IIand Part
  III up to the Unit SCO approval line.
  Ensure required recirc time and sample taken time is filled in prior to the actual time
  required by OP-06.4.
  The remainder of the data should be correct.
  Fill out OE&RC-2009, Attachment 2, Part I. Ensure sample time matches time specified in
  the OP-06.4, Attachment 4.
  Obtain a copy of an E&RC Pre-Release Permit.
  An actual release may be obtained from the E&RC counting room to aid in filling out the
  required data.
3A3s                                      Page 2 of 8                                    REV. 0
 
                          Evaluate Liquid Discharge Release Permit.
SAFETY CONSIDERATIONS:
    None.
EVALUATOR NOTES: (Do not read to trainee)
  1. The applicable procedure section WILL be provided to the trainee.
  2. If this is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
      Appendix E, or similar to the trainee.
  3. Provide examinee with prepared copy of 0OP-06.4, Attachment 4, OE&RC-2009,
      Attachment 2, and the E&RC Pre-Release Permit.
                            Read the following to trainee.
TASK CONDITIONS:
    1. The Unit 1 Salt Water Release Tank is nearing capacity, and is scheduled to be
        released.
    2. A Radioactive Liquid Release Permit has been prepared in accordance with OOP-06.4.
                                                      *r
    3. A Pre-Release""Permit has been prepared by' E&RC in accordance with E&RC-2009.
              CUE:
INITIATING
    You are directed by the Shift Superintendent to review the Radioactive Liquid Release
    Permit, and the Pre-Release Permit, and determine if the Unit 1 Salt Water Release Tank
    can be released per the supporting documentation, and inform the Shift Superintendent of
    the results of your review.
3A3s                                          Page 3 of 8                              REV. 0
 
                          Evaluate Liquid Discharge Release Permit.
                                                                                          4/
                                    PERFORMANCE CHECKLIST
                                                                                              V
NOTE: Sequence is assumed unless denoted in the Comments.
I          The examiner should have a copv of OOP-06.4, Section 5.70to provide to the
I        -,examinee if re*uested, or allow examinee access to the entire procedure.
Step 1 - Obtain a current revision of OOP-06.4.
                Current Revision of OOP-06.4 obtained and verified, if applicable.
                                                                                    SAT/UNSAT*
  Step 2 - Determine Volume of U/1 SWRT at level of 79% is correct as specified on the
            Radioactive Liquid Release Permit.
                Determinedthat volume of U/1 SWRT of 28637.5 gallons is correct as specified
                on the Radioactive Liquid Release Permit.
                                                                                    SAT/UNSAT*
  Step 3 - Determine required Recirculation time for a U/1 SWRT at a tank level of 79% is
            correct as specified on the Radioactive Liquid Release Permit.
                Determinedthat requiredRecirculation time for the U/1 SWRT at a tank level of
                  79% of 316 minutes is correct as specified on the Radioactive Liquid Release
                Permit.
                                                                                    SAT/U NSAT*
  3A3s                                        Page 4 of 8                                REV. 0
 
                        Evaluate Liquid Discharge Release Permit.
Step 4 - Determine with a Start Recirculation time of 0040, the required Recirc completion
          time should be 0556 (not 0546) and that the sample taken time must be after 0556
          (not 0553) as specified on the Radioactive Liquid Release Permit.
                Determines requirements for Recirculationtime and/or sample time per COP
                06.4 have not been satisfied, and that the release should not be approved.
                                                          ** CRITICAL STEP ** SAT/UNSAT*
  Step 5 - Informs Shift Superintendent that the Release Permit may not be approved.
                Shift Superintendentinformed that the Release Permit may not be approved.
                                                                                  SAT/UNSAT*
                                                                                            : * :ll
I1:          I    CUE: When the Radioactive iquid Release Permit has been ev'aluated as
            :; :unsatisfactor this JPM is*complete.                                          j
  * Comments required for any step evaluated as UNSAT.
  3A3s                                      Page 5 of 8                                  REV. 0
 
                    Evaluate Liquid Discharge Release Permit.
RELATED TASKS:
  341012B302, Review Radioactive Waste Discharge/Release Permits Per E&RC-2009 prior
  To Approval.
K/A REFERENCE AND IMPORTANCE RATING:
  GEN 2.3.6    3.1
REFERENCES:
  OOP-06.4
  OE&RC-2009
  BSEP Radioactive Liquid Release Permit 02-0044
TOOLS AND EQUIPMENT:
  None.
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
  Admin A3
REASON FOR REVISION:
  New JPM.
3A3s                                  Page 6 of 8                            REV. 0
 
                              Evaluate Liauid Discharae Release Permit.
K-?
                      Time Required for Completion:            15    Minutes (approximate).
                                APPLICABLE METHOD OF TESTING
    Performance:      Simulate        VC            Actual    -                        Unit:
    Setting:    Control Room        -                Simulator-_    ( Not applicable to In-Plant JPMs)
    Time Critical:            Yes    -                    No    V              Time Limit        N/A
    Alternate Path:          Yes    -                    No
                                              EVALUATIOlN
    Trainee:                                            SSN:
    JPM:            Pass                  Fail  __
    Remedial Training Required: Yes            -    No
    Did Trainee Verify Procedure as Authorized Copy?: Yes              __      No,
    (Each Student should verify one JPM per evaluation set.)
    Comments:
    Comments reviewed with Student
    Evaluator Signature:                                                  Date:
    3A3s                                            Page 7 of 8                                          REV. 0
 
TASK CONDITIONS:
  1. The Unit 1 Salt Water Release Tank is nearing capacity, and is scheduled to be
      released.
  2. A Radioactive Liquid Release Permit has been prepared in accordance with OOP-06.4.
  3. A Pre-Release Permit has been prepared by E&RC in accordance with E&RC-2009.
INITIATING CUE: ($'        E  ..
  You are directed by the Shift Superintendent to review the Radioactive Liquid Release
  Permit, and the Pre-Release Permit, and determine if the Unit 1 Salt Water Release Tank
  can be released per the supporting documentation, and inform the Shift Superintendent of
  the results of your review.
 
                                      ATTACHMENT 4
                                          Page 1 of 6
                        BSEP Radioactive Liquid Release Permit
                                                                            Release# 03-000l
                                                                            D ate - o ay
                    BSEP RADIOACTIVE LIQUID RELEASE PERMIT
PART I.      TANK DATA
  A.  Tank to be released        U  It  SW -RT
  B.  Tank to be released will be recirculated and sampled as in accordance with
        section        S',-]      of OOP-06.4.
  6. Level            "-7 1      %            Volume    A*2 (o37".    gallons.
      1.      *Batch Release Tank Volumes
      NOTE: Attachment 3 of OE&RC-2009, Radioactive Effluent Releases and
      Reports, lists abnormal release volumes for miscellaneous tanks.
                              WSTs              = 208.4 gallons/% level
                              FDSTs            = 209.4 gallons/% level
                              DDTs              = 10.9 gallons/% level
                              U/1 SWRT          = 362.5 gallons/percent
  D.    Required Recirculation Time      4      min / % Level X -1 cl    % Level =
          3a1 _ Min
  E.    Start Recirculation                                  Date/Time Tocka        00 4cj
          Required recirc time completed                      Date/Time "rTooy'      O-SLA
          Sample Taken                                        Date/Time "TS)-Ay.L    OS-S
          (After required recirc time)
  F.    Source of water        U1    o,,ck U.,      Cirt      *.JcAer ?%+5
  G.    Treatment prior to release          k". n
  H.    *Has the tank to be released been subjected to PH adjustments due to NAOH
          or H2S04? Yes                  No    X
*Reference procedure E&RC-2009.
OOP-06.4                        I            Rev. 35                          Page 84 of 1011
 
                                  ATTACHMENT 4
                                      Page 2 of 6
                      BSEP Radioactive Liquid Release Permit
  1.  Tank to be released will be discharged in accordance with Section        ,.  of
      OOP-06.4.
  J.  Part I completed                                          Date/Time "T'oJ,,&
                                                  Radv ste Operator (signature)
PART II.  RADIATION MONITOR STATUS
  A.  Monitor is being used for discharge (General Electric D1 2-RM-K604)
      Yes      X      No
      (If monitor is NOT being used, list special instructions in Part Iil. See
      ODCMS 7.3.1 for additional sampling requirements.)
  B.  Monitor Hi-Hi setpoint is at \.oo
                                    -    E-0cps.
                                          _
      (If monitor is NOT being used, set monitor Hi-Hi setpoint to maximum to prevent
      spurious trip during release.)
  C. Monitor Hi-Hi setpoint set between background and maximum monitor setpoint
      (E&RC-2009). Yes ffi            No
  D.  Monitor indication prior to release (chart)    2 00 cps.
      (Circle one used) Unit 1/E
  E.  CONFIRM Radwaste effluent isolation valves are closed.
    1-D12-V27A Position        .ose    cL        2-D12-V27B Position        C- %o-s e 4,
                                      Unit 1                                        Unit 2
OOP-06.4                    I            Rev. 35                            Page 85 of 101I
 
                                      ATTACHMENT 4
                                        Page 3 of 6
                        BSEP Radioactive Liquid Release Permit
Pad I1l.    APPROVAL FOR USE
    A.    Both unit Reactor Operators have been informed of release and are aware of
          Circulating Water/Service Water Pump requirements.
              Unit I RO
                        Signat&r
              Unit 2 RO
                        Signatlue
    B. 1. Liquid Radwaste effluent flow measurement device operable (if inoperable,
              ODCMS 7.3.1 Required Compensatory Measure C1, requires the flow rate
              be estimated at least once/4 hours during actual releases.)
              Yes    X/_  No
        2.  Liquid Radwaste radioactivity effluent monitor operable (if inoperable,
              reference ODCMS 7.3.1)
              Yes __      No
    C. Special instructions for release:    N)0 A9-
    D. Approval to release:
                              Unit SCO                                            Date/Time
Key(s)  _              Received by
                                      Radwaste Operator (signature)
IOOP-06.4                      I          Rev. 35                          Page 86 of 101
 
                                        ATTACHMENT 4
                                          Page 4 of 6
                        BSEP Radioactive Liquid Release Permit
Part IV.      RELEASE DATE
  A.    Maximum permissible release rate                                              gpm
    B. Special instructions in Part III understood
                                        Radwaste Operator (signature)
    C. Release times:
Start (Date/Time)                  Stop (Date/Time)            Time Interval
                                                                                  minutes
                                                                                  minutes
                                                                                  minutes
                          Total release time:                              minutes
        NOTE:      Post-Trip and DDT Flushes go to the Floor Drains or the Oily Drain
        Collector Tank. Flush water flows through the radiation monitor and flow
        totalizer, while the 1-D12-V27A and 2-D12-V27B are closed. If a Post-Trip or
        DDT flush is performed, then the number of gallons of flush water should be
        logged below as this water is not released. If a post trip or DDT flush is not
        performed, N/A this reading.
    D.  Flow rate instrument verification in accordance with ODCMS TR 7.3.1.2
                    Flow Totalizer
                    2-G16-FIQ-3497
                    (Discharge via
                    2-G16-F187)
Release Zero Set
Flush to ODCT or Floor Drains                            gallons.
Release Final Reading
OOP-06.4                                    Rev. 35                        Page 87 of 1011
 
                                      ATTACHMENT 4
                                        Page 5 of 6
                        BSEP  Radioactive    Liquid Release Permit
    E.  Flow rate instrument verification (in accordance with TR 7.3.1.2).
        Flow rates (recorder) 2-G16-FR-R039
        Start          GPM      Stop              GPM
        NOTE: Reference
        operable.              of Part F7.3.1
                  CompletionODCMS        is NOTRequired  Compensatory
                                                  required                Measure C1.
                                                            if the 2-G 16-FIT-NO57  is
    F.  Flow estimate using tank level indicator.
        Formula: (Start % - Stop % = Difference % X Gallons/%          =
        Gallons from tank decrease      total release time = GPM)
        Start %            - Stop %                  = Difference                  %
        Difference          %X                  *Gallons/% =
        (From line above)                                      (Gal. from tank decrease)
        Gallons from tank decrease      _--        Total release time =                GPM
        (From line above)                            (In minutes)
    G. Monitor Flush:
                    Flow Totalizer
                    (Discharge via
                    2-G16-F187)
Flush Start
Flush Total
Difference
*Gallons/% obtained from E&RC-2009.
IOOP-06.4                                    Rev. 35                            Page 88 of 101l
 
                                    ATTACHMENT 4
                                      Page 6 of 6
                      BSEP Radioactive Liquid Release Permit
Post-flush readings (chart)                    CPS        Unit I / Unit 2
                                                          (Circle one used)
Comments:
  H.    Release completed Date                                  Time
                              Radwaste Operator (signature)
Part V.    Review
  A.    Key(s)          returned to Main Control Room
                                                              Initials
  B.    Radiation monitor channel check in accordance with ODCMS 7.3.1, and
        TR 7.3.1.1.
        NOTE:      Use same monitor as used in Part II. D.
        Highest reading during release (chart)                    CPS
        Average reading during release (chart)                    CPS
  C. Monitor Hi and Hi-Hi setpoints set above background reading.
                                                            Initials
        Unit SCO (signature)                      Date
OOP-06.4                                  Rev. 35                          Page 89 of 101
 
                                                                                                  c
                                                                                            Continuous
                                    ATTACHMENT 2
                                      Page 1 of 1
                          Routine Release Sample Data Sheet
Circle one:      FDSTA    FDSTB WSTA WSTB
                                                        DDT A DDT BERT
I.    TO BE COMPLETED BY E&C
      Liquid radwaste monitor in service: Yes          No*
      SDCP Release in Progress              Yes**-    No X*_
      Sample location:        I-Svfl.-JV1Date:            ToAc&'s        Time: 0S53
      Sample by:                                                  0  1A,
                      dr&#xfd;-O-Ps&#xfd;                            E&C or OPS*
      Release Permit Number      (03-0001 -pH              9. 0
                    O3OOO1-3001                Detector      '-      RW Bkg      2- 0 0
      File #
            Unit 1                    Unit_2                        TotalI# Pumps
      # Circ Pumps                #Circ Pumps                  Ciro      (o
      # Serv Pumps                #Serv Pumps                  Serv      H
      Release Rate          .,
      Calculation:      E& &#xfd;Technician                    E&C Technician*
II.  REFER TO PART III OF THE ATTACHED BSEP RADIOACTIVE LIQUID
      RELEASE PERMIT FOR SPECIAL INSTRUCTIONS.
                            Reviewed Prior to Release
                                                            Shift Superintendent / Date
Ill.  POSTRELEASE REVIEW
      Reviewed by:
                          E&C Technician                                Date
*Two independent samples, and verification thereof, are required when radwaste
effluent monitor is declared inoperative and two technically qualified E&C personnel are
required to verify and sign the release rate calculations.
**If SDCP Release is in Progress, subtract two Service Pumps from total service pumps
used in the release.
OE&RC-2009                                Rev. 20                            Page 39 of 50
 
CAROLINA POWER AND LIGHT COMPANY                                  PAGE      I
BRUNSWICK STEAM ELECTRIC PLANT
LIQUID RADIOACTIVE WASTE RELEASE PERMIT NUMBER:        03-0001
PRE-RELEASE PERMIT                      DATE:        TODAY      08:00:00
PART I:        PRE-RELEASE DATA:
RELEASE POINT:  SALT WATER TANK U I    WASTE SAMPLE PERMIT:      03-0001
                                        PERMIT REQUESTED BY:      KAB
PERMIT TIME:      TODAY/0800            SAMPLE PH            8.0
RAD MONITOR NUMBER: D12-RM-K604          RAD MONITOR BACKGRD:      3.000E+02 CPS
# CIRC WATER PUMPS:            6.0      RAD MONITOR EFF:          1.251E+07
# SERVICE WATER PUMPS:        4.0      DILUTION FACTOR:          1.547E-01
PART II:      PRE-RELEASE CALCULATIONS
TOTAL ACTIVITY:          1.677E-06 CI    TOTAL GAMMA ACTIVITY:    1,547E-8 UCIIML
TOTAL CONC/EC:          5.000E-02      RELEASE VOLUME:          2.864E+04 GAL
MAX MONITOR SETPOINT: 1.348E+04 CPS      MAX RELEASE RATE:        2.27 IE+06 GPM
PART HI:      SPECIAL INSTRUCTIONS
PRE-RELEASE COMPLIANCE CHECK PASSES
PRE-RELEASE ADMIN LIMIT PASSES
 
CAROLINA POWER AND LIGHT COMPANY                                      PAGE    2
BRUNSWICK STEAM ELECTRIC PLANT
LIQUID RADIOACTIVE WASTE RELEASE PERMIT NUMBER:    03-0001
PRE-RELEASE PERMIT                        DATE:    TODAY            08:00:00
                                  PRE-DILUTION DATA
        NUCLIDES                    (UCI/ML)              EC (UCIIML)
        1-131                        1.547E-08              1.000E-06
 
CAROLINA POWER AND LIGHT COMPANY                                                                      PAGE      3
BRUNSWICK STEAM ELECTRIC PLANT
LIQUID RADIOACTIVE WASTE RELEASE PERMIT NUMBER:                                    03-0001
PRE-RELEASE PERMIT                                          DATE:                TODAY                08:00:00
CUMULATIVE DOSE REPORT FROM THE PRE-RELEASE CALCULATIONS
CRITICAL AGE: ADULT
CONTROLLING LOCATION FOR LIQUID RELEASES: SW SECTOR AT 0.1 MILES
DOSE CALCULATIONS            (MREM)
              BONE          LIVER          TOT-BODY          THYROID        KIDNEY        LUNG          GI-LLI
FROM
THIS
RELEASE        2.29E-09      3-28E-09        1.88E-09          1.07E-06        5.62E-09      0.OOE+00      8.65E-10
----------------------------------------------------------------------------------------------------------
WEEK
PRIOR TO
RELEASE        0.00E+00      0.00E+00        0.00E+00          0.00E+00        0.00E+00      0.00E+00      0.00E+00
------ I----------------------------------------------------------------------------------------------------
WEEK
AFTER
RELEASE        2.29E-09        3.28E-09      1.88E-09          1.07E-06        5.62E-09      0.OQE+00      8.65E-10
----------------------------------------------------------------------------------------------------------
ADMIN
WEEKLY
LIMIT          3.85E-01      3.85E-01      1.15E-01          3.85E-01        3.85E-01        3.85E-01      3.85E-01
----------------------------------------------- ----------------------------------------------------------
PERCENT
WEEKLY
LIMIT          0.000%        0.000%          0.000%            0.000%          0.000%          0.000%        0.000%
----------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------
MONTH
PRIOR TO
RELEASE        0.OOE+00      0.OOE+00        0.OOE+00          0.OOE+00        0.OOE+00        0.OOE+00      0.00E+00
----------------------------------------------------------------------------------------------------------
MONTH
AFTER
RELEASE        2.29E-09      3.28E-09      1.88E-09          1.07E-06        5.62E-09        0.OOE+00      8.65E-10
---------------------------------------------------------------------------------------------------------
ADMIN
MONTHLY
LIMIT          1.67E+00      1.67E+00      5.00E-01          1.67E+00        1.67E+00        1.67E+00      1.67E+00
----------------------------------------------------------------------------------------------------------
PERCENT
MONTHLY
LIMIT          0.000%        0.000%        0.000%            0.000%          0.000%          0.000%        0.000%
---------------------------------------------------- ------------------------------------------------------
 
CAROLINA POWER AND LIGHT COMPANY                                      PAGE      4
BRUNSWICK STEAM ELECTRIC PLANT
LIQUID RADIOACTIVE WASTE RELEASE PERMIT NUMBER:        03-0001
PRE-RELEASE PERMIT                      DATE:          TODAY          08:00:00
CUMULATIVE DOSE REPORT FROM THE PRE-RELEASE CALCULATIONS
CRITICAL AGE: ADULT
CONTROLLING LOCATION FOR LIQUID RELEASES: SW SECTOR AT 0.1 MILES
DOSE CALCULATIONS    (MREM)
          BONE      LIVER    TOT-BODY    THYROID  KIDNEY      LUNG        GI-LLI
QUARTER
PRIOR TO
RELEASE    0.00E+00  0.OOE+00  0.00E+00    0.OOE+00  0.00E+00    0.00E+00    0.00E+00
QUARTER
AFTER
RELEASE    2.29E-09  3.28E-09  1.88E-09    1.07E-06  5.62E-09    0.00E+00    8.65E-10
ODCMS
QUARTER
LIMIT      1.00E+01  1.00E+01  3.00E+00    1.00E+01  1.00E+01    1.00E+01      1.00E+01
PERCENT
QUARTER
LIMIT      0.000%  0.000%    0.000%      0.000%    0.000%      0.000%      0.000%
YEAR
PRIOR TO
RELEASE    0.OOE+00 0.00E+00  0.00E+00    0.OOE+00  0.OOE+00    0.00E+00    0.00E+OO
YEAR
AFTER
RELEASE    2.29E-09  3.28E-09  1.88E-09    1.07E-06  5.62E-09    0.00E+00    8.65E-10
ODCMS
ANNUAL
LIMIT      2.OOE+01 2.00E+01  6.OOE+00    2.OOE01  2.OOE+01    2.OOE+01    2.00E+01
PERCENT
ANNUAL
LIMIT      0.000%  0.000%    0.000%      0.000%    0000%      0.000%      0.000%
 
                          CAROLINA POWER & LIGHT COMPANY
                              BRUNSWICK TRAINING SECTION
                              JOB PERFORMANCE MEASURE
                                          ADMIN
                            BNP-03-A4-SRO
    LESSON TITLE: Determine Off-Site Release Per PEP-03.4.7 And Recommend
                  Protective Actions.
                                                                              1)
                                                                          \leJ
    REVISION NO:        0
    RECOMMENDED BY:
                          Instructor/Developer                    DATE
    CONCURRENCE BY:
                          Line Superintendent/Supervisor          DATE
    APPROVED BY:
                            Superintendent/Supervisor Training  DATE
<-V
 
  Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.
SAFETY CONSIDERATIONS:
    None.
EVALUATOR NOTES: (Do not read to trainee)
    1. The applicable procedure section WILL be provided to the trainee.
    2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
        Appendix E, or similar to the trainee.
    3. This JPM may be performed in any location with a computer loaded with the CPL
        Dose program.
    4. Transfer data from attachment 2 of this JPM handwritten onto an actual attachment
        from PEP-03.4.7.
    5. The release at the site boundary should be approximately 6.38 E+01 mrem TEDE
        and 1.99 E+02 mrem CDE. Slight variances may be expected due to time data is
        entered in relation to Reactor shutdown. (Dose requires declaration of Site Area
        Emergency, however General Emergency EALs have been exceeded)
3A4s                                        Page 2                                    REV. 0
 
        Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions. \
TACOt frnK~rk1r~nkIC.
                                    Read the following to trainee. y
                                                                            RLng
                                                                                      V/
I I'&*
          ".J.J1 l        II
                  fl''IJflI    'J*.      A-.                                !
        1. A General Emergency has been declared due to a steam line break ex4ets-in the
            Turbine Building on Unit/. One set of MSIVs has failed to close and there are
            indications of fuel failure.
        2. The operating crew is currently executing the Radioactivity Release Control EOP, and
            Steam Cooling Procedure due to loss of all RPV injection sources. RPV level has been
            below TAF for 15 minutes and below LL4 for 5 minutes.
        3. Drywell High Range Radiation Monitors are reading 10,000 R/Hr at the 50' elevation,
            and 2000 R/Hr at the 20' elevation.
        4. The Unit ?"reactor initially failed to scram, but was successfully scrammed 15 minutes
            ago.            4-
        5. Attachment 2 of PEP-3.4.7 has been filled out for data entry.
INITIATING CUE:
        You are directed by the Shift Superintendent (SEC) to:
        1. Perform an initial dose calculation per PEP 03.4.7, Automation of Off-Site Dose
            Projection procedure. You are to determine the EAL classification for the radiation
            release for execution of the Radiation Release Control EOP.
        2. Determine required Protective Action Recommendations per OPEP-02.6.28 for the
            emergency in progress.
        You are to inform the Shift Superintendent (SEC) of the results of your assessments.
3A4s                                                Page 3                                    REV. 0
 
      Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.
                                                            ATTACHMENT 2
                                            Data Sheet for Dose Protection Inputs
CHARACTERISTIC      TIME
Main Stack          Release Rate (pCi/Sec)                                  2.4e6
                      Flow Rate (CFM)                                          40000
Turbine Building    #1 Release Rate (pCi/Sec)                                5.2E6
                      #1 Flow Rate (CFM)                                      15000
                      #2 Release Rate (pCi/See)                                5.2E6
                      #2 Flow Rate (CFM)                                      15000
Reactor Building    Release Rate (CPM)                                      3.5E2
                      Flow Rate (CFM)                                          0
Torus Vent          Release Rate (liCUSec)                                  0
                                  1
Core Uncovered      Time (1) lost (2) Returned
Effective Filtration Yes / No                                                Yes
Release Height      Ground                                                  Yes
                      Elevated                                                Yes
Release Duration    Anticipated Length of Time                              1 Hours
Shutdown            Date
                      Time
Met Data Wind Speed  Upper                                                    5 MPH
                      Lower                                                    4 MPH
Met Data Direction  Upper                                                    77 DEG
                      Lower                                                    75 DEG
Stability            Class                                                    B
Seabreeze            Yes / No                                                No
3A4s                                                          Page 4                  REV. 0
 
    Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.
                                PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in the Comments.
                                                                LA)'
Step 1 - Obtain a current revision of PEP-03.4.7.
              Current Revision ofPEP-03.4.7 obtained.
                                                                        SAT/UNSAT*
Step 2 - Access the Dose Projection program.
              Dose ProjectionProgram accessed.
                                                                        SAT/UNSAT*
Step 3 - Enter data from PEP-03.4.7 attachment into the dose projection program.
              Data correctly entered into the dose projectionprogram.
                      4svfelAf 4immttS5                                  SAT/UNSAT*
Step 4 - Determine highest off-site dose is approximately 6.38E+01 TEDE and 1.99E+2 CDE
        both at the site boundary.
              ,,Deteraud that projected dose at site boundary is364mrem          TEDE and
            C      29+02 mrem CDE
                                                    ** CRITICAL STEP ** SATIUNSAT*
3A4s                                            Page 5                                REV. 0
 
    Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.
NOT'E:      The EAL for the release (Site Area Emergency) is on bottom right of last display
            (results display, of Dose 'prograim and on last age of printout. The examinee' ma
            use this to determlne the EAL f*r the release,                            for the'
                                                              or may determine the EAL(EAL
            rees per.OPEP-02.1,:Attachment1, Secion.
            04.01MOi
Step 5 - Determine projected dose at the site boundary meets the EAL for a Site Area
            Emergency.
                  Determine projected dose at the site boundary meets the EAL for a Site Area
                  Emergency.
                                                        **  CRITICAL STEP ** SAT/UNSAT*
.01 ....  .. .............
              *
                                                                            ...
NOTE.!i;&#xfd;&#xfd;: :3The EAL for the release isia Site Area Emergency. However, since a General,
          .......
                                                                                        .. ..
                      c has been decl*e*n.d, Protebtive Action Recommendat1ons (PAR) are6....
                quired e PEP02628 Sncerelease does not exceed E EAL, the Guidance
            in Attahrent 2 does not need to be modified.
                                                                                                      I
Step 6 - Refer to OPEP-02.6.28 Determine with current met data that OPEP-02.6.28 requires
            a PAR to evacuate zones A,B,C,D,E and shelter zones F,G,H,K.
                  Determines with current met data that OPEP-02.6.28requires a PAR to evacuate
                  zones A,BC,D,E and shelterzones FG,HK.
                                                        **  CRITICAL STEP ** SAT/UNSAT*
Step 7 - Notifies Shift Superintendent of results.
                  Shift Superintendent notified of off-site dose projection results.
                                                                                SAT/UNSAT*
3A4s                                              Page 6                                      REV. 0
 
    Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.
TCUE:                  When the offsite dose projection has been performedand lines6 2&113/
                      of.the Emr gency.NotificI.atio.n fdrrn are filled Iin this.JPM s, c...o mplete. I -
* Comments required for any step evaluated as UNSAT.
3A4s                                        Page 7                                                REV. 0
 
  Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.
RELATED TASKS:
    344 058 B3 02
K/A REFERENCE AND IMPORTANCE RATING:
    GEN 2.4.40        4.0
REFERENCES:
    OPEP-03.4.7
    OPEP-02.1
    OPEP-02.6.28
TOOLS AND EQUIPMENT:
    Computer loaded with CPL Dose.
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
      Administrative - Emergency Plan
REASON FOR REVISION:
      New JPM.
3A4s                                    Page 8                                REV. 0
 
    Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.
                Time Required for Completion:    15  Minutes (approximate).
                        APPLICABLE METHOD OF TESTING
Performance:      Simulate                Actual    4 -                    Unit:  2 4 j29"
Setting:    Control Room                Simulator      ( Not applicable to In-Plant JPMs)
Time Critical:        Yes                      No    4              Time Limit        N/A
Alternate Path:      Yes                      No    4
                                    EVALUATION
Trainee:                                    SSN:
JPM:            Pass            Fail
Remedial Training Required: Yes          No
Did Trainee Verify Procedure?:  Yes  __    No
Comments:
Comments reviewed with Student
Evaluator Signature:                                        Date:
3A4s                                      Page 9                                          REV. 0
 
TASK CONDITIONS:
  1. A General Emergency has been declared due to a steam line break exists in the
      Turbine Building on Unit 2. One set of MSIVs has failed to close and there are
      indications of fuel failure.
  2. The operating crew is currently executing the Radioactivity Release Control EOP, and
      Steam Cooling Procedure due to loss of all RPV injection sources. RPV level has been
      below TAF for 15 minutes and below LL4 for 5 minutes.
  3. Drywell High Range Radiation Monitors are reading 10,000 R/Hr at the 50' elevation,
      and 2000 R/Hr at the 20' elevation.
  4. The Unit 2 reactor initially failed to scram, but was successfully scrammed 15 minutes
      ago.
  5. Attachment 2 of PEP-3.4.7 has been filled out for data entry.
INITIATING CUE:
  You are directed by the Shift Superintendent (SEC) to:
    1. Perform an initial dose calculation per PEP 03.4.7, Automation of Off-Site Dose
      Projection procedure. You are to determine the EAL classification for the radiation
      release for execution of the Radiation Release Control EOP.
  2. Determine required Protective Action Recommendations per OPEP-02.6.28 for the
      emergency in progress.
  You are to inform the Shift Superintendent (SEC) of the results of your assessments.
 
                    CAROLINA POWER & LIGHT COMPANY
                        BRUNSWICK TRAINING SECTION
                          JOB PERFORMANCE MEASURE
                                    IN-PLANT
LESSON TITLE: Start RCIC From The Remote Shutdown Panel.
REVISION NO:        0
RECOMMENDED BY
                      Instructor/Developer                DATE
CONCURRENCE BY'
                      Line Superintendent/Supervisor    DATE
APPROVED BY:
                      Superintendent/Supervisor Training DATE
 
                    Start RCIC From The Remote Shutdown Panel.
                                PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in the Comments.
Step 1 - Obtain a current revision of AOP-32.0.
              Current Revision of AOP-32.0 obtained.
                                                                                SAT/UNSAT*
                                                                Controller, E51-FIC-3325, is out.
Step 2 - Station 1, Verify yellow ALM light on RCIC Flow                      verified out
              Yellow ALM light on RCIC Flow Controller, E51-FIC-3325,
                                                                                SAT/UNSAT*
                      RCI
                  i a~umd      t b. t~      tbrr~l  tanby              foti8
                                                            algnment91111      JFAt$&#xfd;jstfit4+      P
                NOT:~
                                                Page 3 of 12                                    REV. 0
  3B2a
 
                      Start RCIC From The Remote Shutdown Panel.
Step 3 - Station 2, verify open or open RCIC CST Suction Valve E51-FOIO, at MCC 1(2)XBD,
          Compt B38, Row C2.
              E51-FOIO is verified open.
                                                                        SAT/UNSAT*
Step 4 - Station 2, verify closed or close RCIC Supp Pool Suction Valve E51-F031, at MCC
          I(2)XBD, Compt B45, Row GI.
              E51-F031 is verified closed.
                                                                          SAT/U NSAT*
Step 5 - Station 2, verify closed or close RCIC Supp Pool Suction Valve E51-F029, at MCC
          1(2)XBD, Compt B46, Row G2.
              E51-F029 is verified closed.
                                                                          SAT/UNSAT*
3132a                                      Page 4 of 12                              REV. 0
 
                      Start ROIC From The Remote Shutdown Panel.
                                                      Fm                                      I
                                              /u1'    01N
                                                        r
                  i~~nea~epabsb~~~t't              .pen ihitrefgt      n1#      9 fl  i& U
I
  Step 6 - Station 2, verify open or open RCIC Cooling Water Valve E51-F046, at MCC
          1(2)XBD, Compt B39, Row D1.
                E51-F046 is opened at the MCC.
                                                  ** CRITICAL STEP ** SAT/UNSAT*
  Step 7 - Station 2, verify open or open RCIC Pump Discharge Valve E51-F012, at MCC
            I(2)XBD, Compt B40, Row D2.
                E51-F046 is verified open.
                                                                        SAT/UNSAT*
                                            Page 5 of 12                                REV. 0
  3132a
 
                        Start RCIC From The Remote Shutdown Panel.
r,.                                                                                                      I
                                                        t E5t&#xfd;H      e.              RMr
    PRQMPT:*  W17h;6fl
                                ..
                          Nkeefnfr
                                    .. .. .    ... .
                                    exacesinealtsiafc t        F01n r8lighte is#d ofgrde lidI~th*&?4
                  Whn ekrnnepac.          ioi:viM
I
  Step 8 - Station 2, verify open or open RCIC Injection Valve E51-F013, at MCC 1(2)XBD,
            Compt B41, Row El.
                  E51-FO13 is opened at the MCC.
                                                            **  CRITICAL STEP ** SAT/UNSAT*
                                            ~~~~~~~I1i"    RCIbroerccneeracmprptp
    Step 9 - Station 2, Start the RCIC barometric condenser vacuum pump, at MCC 1(2)XBD,
            Compt B35, Row BI.
                  RCIC barometric condenser vacuum pump is running.
                                                              ** CRITICAL STEP ** SAT/UNSAT*
    3132a                                            Page 6 of 12                                  REV. 0
 
                    Start RCIC From The Remote Shutdown Panel.
Step 10 -Station 2, verify open or open RCIC Turbine Trip and Throttle Valve E51-V8, at MCC
          I(2)XBD, Compt B37, Row C1.
              E51-V8 is verified open.
                                                                        SAT/UNSAT*
Step 11 -Station 2, verify open or open RCIC Steam Supply Outboard Isolation Valve E51-
          F008, at MCC I(2)XBD, Compt B43, Row Fl.
              E51-F008 is verified open.
                                                                        SAT/UNSAT*
Step 12 -Station 3, verify open or open RCIC Steam Supply Inboard Isolation Valve E51-
          F007, at MCC 1(2)XC, Compt DS4, Row D3.
              E51-FO07 is verified open.
                                                                          SAT/UNSAT
3B2a                                    Page 7 of 12                                REV. 0
 
                    Start RCIC From The Remote Shutdown Panel.
Step 13 -Station 2, verify open or open RCIC Turbine Steam Supply Valve E51-F045, at MCC
        I(2)XBD, Compt B44, Row F2.
              E51-F045 is opened at the MCC.
                                                ** CRITICAL STEP ** SATIUNSAT*
      KP                  ra    'R -- lo~ ~sindictedoh E5{FJC-&#xfd;3325,iindic~d
                u6~~d;If inicateRCIO
                !ROMPT                                                      atei9"'Ogt
                                                                                    0..1 P
Step 14 -Station 1, Verify RCIC flow corresponds to ROIC Flow Controller, E51-FIC-3325,
          setting.
              RCIC flow corresponds to RCIC Flow Controller,E51-FIC-3325,setting.
                                                                        SAT/UNSAT
3132a                                    Page 8 of 12                                  REV. 0
 
                                Start RCIC From The Remote Shutdown Panel.
- PROMPT        When askd
  Zt<Ua &n* on~ide          ranieinforrn    exami'n~ee athtem~te
                                        levei instrumenf      reactor level indicates
                                                                  * shdtdown    panq! +(0u- O!thes;*B1&sect;tak
                                                                                          186!ipcdsand
  S    I>  K  R      04..............                                                t K2            .......  ,i
  Step 15 -Station 1, Adjust RCIC Flow Controller, E51 -FIC-3325, to maintain reactor vessel
              level between 170" and 200".
                    RCIC setpoint tape maintainedat 400 gpm, or adjusted to *<500 gpm.
                                                                                              SAT/U NSAT*
  Step 16 -Inform Unit SCO that RCIC is injectiong to the reactor vessel and level is being
              maintained 170: to 200".
                    Unit SCO informed.
                                                                                              SATIU NSAT*
          iiCTERMINATING~
                ... . . CUr*nR!@1a
                              . ..                &#xfd;    ....@
                                                            ~  t.~*p!*
                                                                  .    . .......                              *l
  * Comments required for any step evaluated as UNSAT.
  3B2a                                                  Page 9 of 12                                    REV. 0
 
                    Start RCIC From The Remote Shutdown Panel.
RELATED TASKS:
  200204B401, Perform The Station 1 Actions For Shutdown Outside The Control Room Per
  AOP-32.0
K/A REFERENCE AND IMPORTANCE RATING:
  295016    AAI.06      4.0/4.1
REFERENCES:
  AOP-32.0
TOOLS AND EQUIPMENT:
  None.
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
  2 - Inventory Control (Reactor Core Isolation Cooling)
REASON FOR REVISION:
  Bank JPM. Converted to WORD and updated for latest procedure revision.
3132a                                  Page 10 of 12                            REV. 0
 
                        Start RCIC From The Remote Shutdown Panel.
                  Time Required for Completion:          15  Minutes (approximate).
                            APPLICABLE METHOD OF TESTING
Performance:        Simulate      4                Actual                            Unit:      0
Setting:    Control Room                          Simulator      (Not applicable to In-Plant JPMs)
Time Critical:            Yes                          No    4              Time Limit      N/A
Alternate Path:          Yes                          No    4
                                          EVALUATION
Trainee:                                              SSN:
JPM:            Pass                  Fail
Remedial Training Required: Yes                  No
Did Trainee Verify Procedure as Authorized Copy?: Yes                        No
(Each Student should verify one JPM per evaluation set.)
Comments:
Comments reviewed with Student
Evaluator Signature:                                                  Date:
3132a                                          Page 11 of 12                                        REV. 0
 
TASK CONDITIONS:
  1. The Shift Superintendent has directed entry into AOP-32.0 and evacuation of the
        Control Room.
  2. All immediate actions of AOP-32.0 are complete.
  3. Remote shutdown equipment has been distributed and communications between
        remote shutdown stations is established.
  4. All Normal/Local switches listed in AOP-32.0 have been placed in Local.
  5. This task will be performed on Unit          . (Specified by the examiner)
INITIATING CUE:
  You are directed by the Unit SCO to perform ALL operator actions, including Remote
    Shutdown Panel actions (Stations 1, 2, & 3) requred to start RCIC for reactor vessel
    injection to maintain reactor vessel injection +170-200". You are to inform the Unit SCO
  when reactor vessel level is >170", or reactor vessel level is rising toward 170".
 
                    CAROLINA POWER & LIGHT COMPANY
                        BRUNSWICK TRAINING SECTION
                        JOB PERFORMANCE MEASURE
                                    IN-PLANT
                            BNP-03-B2b
LESSON TITLE: Local Manual Start Of A DG Using Prelube Start Control.
REVISION NO:        0
RECOMMENDED BY:
                    Instructor/Developer                      DATE
CONCURRENCE BY:
                    Line Superintendent/Supervisor            DATE
APPROVED BY:
                    Superintendent/Supervisor Training        DATE
 
                  Local Manual Start Of A DG Using Prelube Start Control.
SAFETY CONSIDERATIONS:
    Use caution in the vicinity of operating equipment.
    Use caution in vicinity of energized electrical equipment.
    Hearing Protection required in the Diesel Building.
EVALUATOR NOTES: (Do not read to trainee)
  1. The applicable procedure section WILL be provided to the trainee.
  2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
      Appendix E, or similar to the trainee.
  3. This JPM may be performed on any of four Diesel Generators (ensure DG is in standby
      alignment, not running or under clearance).
                            Read the following to trainee.
TASK CONDITIONS:
    1. All applicable prerequisites as listed in OP-39, Section 4.0 are met.
    2. Diesel Generators are in the standby mode in accordance with OP-39, Section 5.1.
    3. Diesel Generator #          is to be started.
    4.
    5. The Diesel Generator will be tied and loaded from the Control Room per OP-50.1.
INITIATING CUE:
    You are directed by the Unit SCO to perform a local manual start of Diesel Generator
    per OP-39, Section 5.4. You are to inform the Control Room when the Diesel Generator Fis
    ready for electrical operation per OP-50.1.
3132b                                        Page 2 of 10                              REV. 0
 
                Local Manual Start Of A DG Using Prelube Start Control.
                                  PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in the Comments.
Step 1 - Obtain a current revision of OOP-39, Section 5.4.
              Current Revision of OOP-39, Section 5.4 obtained and verified, if applicable.
                                                                            SAT/UNSAT*
Step 2 - Confirm the diesel Generator auxiliary systems are operable by observing the
        following conditions locally.
PROMPT: Ifretjtested, ipdicate each re~dinlg/indication fqr tF~e following :St6ess:! "as-seerg' f
              a.    Starting air pressure is between 240-260 psig as indicated by DG-PI
                    6514-1 (2, 3, 4)
                          Startingairpressure is observed to be between 240-260 psig as
                        indicated by DG-PI-6514-1 (2, 3, 4).
                                                                            SAT/U NSAT*
              b.      Starting air Receivers A & B pressures are between 325-350 psig as
                      indicated by DG-PI-1690 and 1692 (1674 and 1677,1663 and 1666, 787
                      and 788)
                          Starting air Receivers A & B pressuresare observed to be between
                          325-350 psig as indicatedby DG-PI-1690 and 1692 (1674 and 1677,
                          1663 and 1666, 787 and 788).
                                                                            SAT/UNSAT*
3132b                                        Page 3 of 10                                  REV. 0
 
        Local Manual Start Of A DG Using Prelube Start Control.
      c.    Engine control air pressure is between 90-125 psig as indicated by DG-PI
            1686 (1680,1660,1252).
                Engine control airpressure is observed to be between 90-125 psig as
                indicatedby DG-PI-1686 (1680, 1660, 1252).
                                                                  SAT/UNSAT*
      d.    Jacket Water Expansion Tank level is between A and % full in sight glass.
                Jacket Water Expansion Tank level is observed to be between $ and
                3/4 full in sight glass.
                                                                  SAT/UNSAT*
      e.    Jacket Water Heater Pump is in operation.
                Jacket Water Heater Pump observed to be in operation.
                                                                  SAT/UNSAT*
      f.    Jacket Water Heater temperature out is between 1500 to 1600 as
            indicated by MUD-TI-2117 (4144, 2171, 2198).
                Jacket Water Heatertemperatureout is observed to be between 1500
                to 160 0 as indicatedby MUD-TI-2117 (4144, 2171, 2198).
                                                                  SAT/UNSAT*
3132b                              Page 4 of 10                                REV. 0
 
              Local Manual Start Of A DG Using Prelube Start Control.
            g.    Lube Oil Filter Pump is in operation.
                      Lube Oil FilterPump observed to be in operation.
                                                                          SAT/UNSAT*
            h.    Lube oil bypass filter temperature is between 1300 to 1600 as indicated by
                  MUD-TI-2117 (4144, 2171, 2198).
                      Lube oil bypass filter temperature is observed to be between 1300 to
                      1600as indicated by MUD-TI-2117 (4144, 2171, 2198).
                                                                          SAT/U NSAT*
                  Governor oil level is at or above the high level mark.
                      Governor oil level is observed to be at or above the high level mark.
                                                                          SAT/UNSAT*
iNOT: ... h    c*  .epae      nLCL          IULmd      fr    oto    om pnlX-        ny
3132b                                    Page 5 of 10                                  REV. 0
 
                          Local Manual Start Of A DG Using Prelube Start Control.
  Step 3 - Request control room place the DG in the Local Manual mode.
                      DG is in the Local Manual Mode.
                                                                                                        SAT/U NSAT*
      PROM
            NOTE:Whenthe
                      ~ d~pre~sing
                    PROMPTl"
                                  restrt Nis derse! hi6axlais~~
                              examWhe
                                                              4
                                          stat sor&bd)ittedlydb
                                                                Y&/U,
                                            jaclbt aterpurp~$&hi~6~
                                                                            blwr auosttAAl1nin3(
                                  th Prestart are lhted in OP-A9,~ecItio .. ;Ses4atruht
                                      i~~~rse~~trPB-'ifrquested, ater'0--dd
                                                                                              eod.,At~~~~
                                                                                                            n
                                                                                                      20secondidct
                                                                                                                          j
                                                                                                                              I
                            fndcaiond 1Tddh~                  "tg b ~                    indica ion; o dylbt6p
          in        di MO                          rMiki                                    $KII7A            " .0
  Step 4 Der,"essa
            -                PRETAR puhbttnlctedon loal Engt66;f6&#xfd;ineCotrol Panel"                                  o
                      PRE TARTipused~hatbutobsq                    depressed.,                                  ings
                                                                                CRITICAL STEPl
                                                                          laSAINST
                                                                            *o
  NOTEi;*, i;****;**  **ii*ii!*vnl a*!!*
              The following            i( ii i*i~l
                                      alarm    **!~lmsl!!oae
                                                  located      oh~iconfrol
                                                            * iin  i!***  room*ii!ia~l;!
                                                                    o~~i iro!          !! &#xb8;*!*U2i!!
                                                                                                *i    *    *          *ii!*
                                                                                                                              IO
                  Aea.RMT    -p,rgo xi ,mat9l'y 10 &#xfd;s~eco nds, f'rom    n thetmtheniesasnfrexpne
              s~~~~~t~~
                      tthe DG.nin.t  i                    .....ha bee receive in..        th cotol.om.
        PRO~~~~~U~ %&#xfd;l1 [eustdidida~t>erSvice' Wter rsuqo                                          WP-5d~~
l    riaell                        pprox 04W    at-l01445 risig                                        A
  3B2b                                                            Page 6 of 10                                      REV. 0
 
                Local Manual Start Of A DG Using Prelube Start Control.
Step 5 - Ensure Service Water Pressure SW-PI-153-1 (2, 3, 4) on Engine Control Panel is 40
        50 psig, by adjusting Jacket Water Cooler Service Water Outlet Valve 2-SW-V206
        (V207, V208, V209), to maintain pressure.
              Service Water Pressure SW-PI-153-1 (2, 3, 4) on Engine Control Panelis
              observed to be 40-50 psig.
                                                                            SAT/UNSAT*
          Ipor~
      PROMP.
      PROMPT~ or66tidri,with that'.;6bot~erP~ tr
                  ~ xaiminee                    or,,    monitor-diesel !generator 6p rati6r:Jnp"t'.
                                                  Intdrdertrwill
                                                                                                    I
Step 6 - Inform the control room that the diesel generator is ready for electrical operation per
        OP-50.1.
              Control room informed that the diesel generatoris ready for electricaloperation
              per OP-50. 1.
                                                                            SAT/U NSAT*
                                                                  elrica~&#xfd;op erati1Rn4h'id
                                                                for
              It~~~~I          1 ~  I              ~~        I  It    MR-crplt            m
* Comments required for any step evaluated as UNSAT.
3132b                                      Page 7 of 10                                      REV. 0
 
                  Local Manual Start Of A DG Using Prelube Start Control.
RELATED TASKS:
    264004B204, Perform DG Monthly Load Test Per PT-1 2.2A-D
K/A REFERENCE AND IMPORTANCE RATING:
    264000      A1.03  2.9/2.9.
REFERENCES:
    OP-39
TOOLS AND EQUIPMENT:
    None.
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
    6 - Electrical (Emergency Generators)
REASON FOR REVISION:
    Bank JPM. Revised from WP to WORD.
3132b                                      Page 8 of 10                  REV. 0
 
                  Local Manual Start Of A DG Using Prelube Start Control.
                  Time Required for Completion:            10  Minutes (approximate).
                            APPLICABLE METHOD OF TESTING
Performance:        Simulate      4              Actual                            Unit:
Setting:      Control Room                        Simulator      ( Not applicable to In-Plant JPMs)
Time Critical:            Yes                            No    4              Time Limit        N/A
Alternate Path:          Yes                            No    4
                                          EVALUATION
Trainee:                                              SSN:
JPM:            Pass                  Fail
Remedial Training Required: Yes                    No
Did Trainee Verify Procedure as Authorized Copy?: Yes                        No
(Each Student should verify one JPM per evaluation set.)
Comments:
Comments reviewed with Student
Evaluator Signature:                                                  Date:
3132b                                            Page 9 of 10                                        REV. 0
 
TASK CONDITIONS:
  1. All applicable prerequisites as listed in OP-39, Section 4.0 are met.
  2. Diesel Generators are in the standby mode in accordance with OP-39, Section 5.1.
  3. Diesel Generator #        is to be started.
  4. The Diesel Generator will be tied and loaded from the Control Room per OP-50.1.
INITIATING CUE:
  You are directed by the Unit SCO to perform a local manual start of Diesel Generator
  per OP-39, Section 5.4. You are to inform the Control Room when the Diesel Generato'ris
  ready for electrical operation per OP-50.1.
 
                    CAROLINA POWER & LIGHT COMPANY
                        BRUNSWICK TRAINING SECTION
                          JOB PERFORMANCE MEASURE
                                    IN-PLANT
LESSON TITLE: Fire Water Injection Using The Motor Driven Fire Pump.
REVISION NO:        0
RECOMMENDED BY:
                    Instructor/Developer                        UDAI
CONCURRENCE BY:
                    Line Superintendent/Siu ervisor            DATE
APPROVED BY:
                    Superintendent/Supervisor Training          DATE
 
                  Fire Water Injection Using The Motor Driven Fire Pump.
SAFETY CONSIDERATIONS:
    Use caution in the vicinity of operating equipment.
    Use caution in vicinity of energized electrical equipment.
EVALUATOR NOTES: (Do not read to trainee)
  1. The applicable procedure section WILL be provided to the trainee.
  2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
      Appendix E, or similar to the trainee.
                            Read the following to trainee.
TASK CONDITIONS:
    1. Unit One is in accident conditions, and is executing EOP-01-RVCP due to low reactor
      water level. Reactor water level is below Top of Active Fuel. EOP-01-RVCP directs
      aligning all available alternate coolant injection per EOP-01-LEP-01. Reactor pressure
      is 10 psig.
    2. Off-Site Power is unavailable to either unit. DG2 is tripped, and Bus E2 is de
      energized, and cannot be energized by cross-tie. Buses El, E3, and E4 are energized
      by their respective DGs. Buses E5 and E6 have been cross-tied.
    3. The Diesel Driven Fire Pump is unavailable.
    4. The Motor Driven Fire Pump is aligned to its normal power supply. The Motor Driven
      Fire Pump cannot be started from the control room.
    5. Fire protection tank level is normal. A radwaste operator is available to control and
      monitor fire protection tank level.
    6. RHR Loop B injection flow path is available.
3132c                                        Page 2 of 9                                  REV. 0
 
                        Fire Water Injection Using The Motor Driven Fire Pump.
      INITIATING CUE:
          You are directed by the Unit CO to transfer the Motor Driven Fire Pump to its alternate
          power supply, start the Motor Driven Fire Pump locally, and perform the AO actions for
          aligning Fire Protection Injection per EOP-01-LEP-01, Section 6, and inform the CO when
          your actions are complete.
S3132c                                            Page 3 of 9                                  REV. 0
 
                  Fire Water Injection Using The Motor Driven Fire Pump.
                                  PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in the Comments.
,NOTE: J&#xfd;,Ste    ipL~O to' strtte ir umI(8
          wtuto      durihgd~~9P
                        excto9tee,-1)aei
                        edure.D          ste;ps mare          NOT, requed to Pe,
                                                                    aetei,
                                                                  OT!rmedi    be) ,erm0e- dJ,~
      li*&#xfd;                        ,i  &#xfd;, 0,I
Step 1 - Obtain a current revision of EOP-01-LEP-01 and OP-41.
              Current Revision of EOP-O1-LEP-01 and OP--41.
                                                                          SAT/U NSAT*
Step 2 - Shift the Motor Driven Fire Pump to the alternate supply as follows:
            a. Disengage position pin from position plate.
                      Positionpin is disengaged.
                                                    **  CRITICAL STEP ** SAT/UNSAT*
            b. Place Transfer switch located on front of 2-FP-P2-XFER-SW cabinet to position
                A.
                      Transferswitch located on front of 2-FP-P2-XFER-SWcabinet placed to
                      position A.
                                                    ** CRITICAL STEP ** SAT/UNSAT*
3132c                                          Page 4 of 9                            REV. 0
 
                  Fire Water Injection Using The Motor Driven Fire Pump.
            c. Ensure position pin engages position plate.
                      Position pin engaged.
                                                                                            SATIUNSAT*
I
    I
      PRMT fearnif1e4-can~taQctscontro ppmnrf~tstarthp' Motor-,Driven, ir~ Pup.nfr
            ea~ithe upwlht titfo the cotro room an0stoclysatd                                                                      I
  Step 3 - Momentarily depress the local start push button for the Motor Driven Fire Pump.
              Motor Driven Fire Pump is running.
                                                  ** CRITICAL STEP ** SAT/UNSAT*
                        i                              . .... .... . . . . . .. ... ... ... . ... . ... . .. .. . .. . .. .
  Step 4 - Unlock and open Fire Protection (Well Water) to Service Water Flush Supply Shutoff
          Valve 2-FP-PIV20.
                                                  ** CRITICAL STEP ** SAT/UNSAT*
              NOTE4disdipnct
                    El {O7      witcli~ n te 23 elvation of:the" abe fspre"'ae
  3132c                                    Page 5 of 9                                                                      REV. 0
 
                  Fire Water Injection Using The Motor Driven Fire Pump.
Step 5 - Place the El1-F073 disconnect switch to On at Node L1G in the cable spread area.
              Ell-F073 disconnect switch is in On at Node LIG in the cable spread area.
                                                  ** CRITICAL STEP ** SAT/UNSAr*
    PRMP:When ::Xaminqeeinforscoto ro.1i t~thpffe El1F7 d"sA                        (&#xfd;s"0;-.&#xfd;
            inforrningeqas&#xfd; tat,Eli                  haT1F73dic nnewthi n
Step 6 - Open RHR Service Water Header Flush Valve, SW-V140 (located 50' elevation
          behind B & D RHRSW booster pumps)
              SW-V140 is manually opened.
                                                    ** CRITICAL STEP ** SAT/UNSAT*
Step 7 - Open Well Water Flush To Service Water Shutoff Valve, WW-V203 (located 50'
          elevation behind B & D RHRSW booster pumps)
              WW-V203 is manually opened.
                                                    ** CRITICAL STEP ** SAT/UNSAT*
Step 8 - Inform CO local actions are complete to inject fire water to the reactor.
              CO informed actions for fire water injection are complete.
TTERMINATINGC
    I        K
                          s    boxit
                        dtuden~ pedtorM8n~
                                          the v    o when...heP..m.eado
                                                                                              I
* Comments required for any step evaluated as UNSAT.
3132c                                      Page 6 of 9                                REV. 0
 
                  Fire Water Injection Using The Motor Driven Fire Pump.
RELATED TASKS:
  200075B504, Perform Alternate Coolant Injection With Fire Water Per LEP-0O
K/A REFERENCE AND IMPORTANCE RATING:
  286000      A1.05  3.2/3.2
REFERENCES:
  OP-41
    EOP-01-LEP-01
TOOLS AND EQUIPMENT:
    None.
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
    8 - Fire Protection
REASON FOR REVISION:
    New JPM.
3132c                                      Page 7 of 9                      REV. 0
 
                  Fire Water Injection Using The Motor Driven Fire Pump.
                  Time Required for Completion:            20  Minutes (approximate).
                            APPLICABLE METHOD OF TESTING
Performance:      Simulate      4                Actual                            Unit:
Setting:    Control Room                          Simulator      ( Not applicable to In-Plant JPMs)
Time Critical:            Yes                          No    4              Time Limit        N/A
Alternate Path:          Yes                          No    4
                                          EVALUATION
Trainee:                                              SSN:
JPM:            Pass                  Fail
Remedial Training Required: Yes                  No
Did Trainee Verify Procedure as Authorized Copy?: Yes                      No
(Each Student should verify one JPM per evaluation set.)
Comments:
Comments reviewed with Student
Evaluator Signature:                                                Date:
3132c                                            Page 8 of 9                                        REV. 0
 
TASK CONDITIONS:
  1. Unit One is in accident conditions, and is executing EOP-01-RVCP due to low reactor
      water level. Reactor water level is below Top of Active Fuel. EOP-01-RVCP directs
      aligning all available alternate coolant injection per EOP-01-LEP-01. Reactor pressure
      is 10 psig.
  2. Off-Site Power is unavailable to either unit. DG2 is tripped, and Bus E2 is de
      energized, and cannot be energized by cross-tie. Buses El, E3, and E4 are energized
      by their respective DGs. Buses E5 and E6 have been cross-tied.
  3. The Diesel Driven Fire Pump is unavailable.
  4. The Motor Driven Fire Pump is aligned to its normal power supply. The Motor Driven
      Fire Pump cannot be started from the control room.
  5. Fire protection tank level is normal. A radwaste operator is available to control and
      monitor fire protection tank level.
  6. RHR Loop B injection flow path is available.
INITIATING CUE:
  You are directed by the Unit CO to transfer the Motor Driven Fire Pump to its alternate
  power supply, start the Motor Driven Fire Pump locally, and perform the AO actions for
  aligning Fire Protection Injection per EOP-01-LEP-01, Section 6, and inform the CO when
  your actions are complete.
 
                    CAROLINA POWER & LIGHT COMPANY
                        BRUNSWICK TRAINING SECTION
                          JOB PERFORMANCE MEASURE
                                  SIMULATOR
LESSON TITLE: Recirculation Pump Start - Recirculation Pump Speed Control Failure.
REVISION NO:        0
RECOMMENDED BY:
                      Instructor/Developer                      DATE
CONCURRENCE BY:
                      Line Superintendent/Supervisor          DATE
APPROVED BY:
                      Superintendent/Supervisor Training      DATE
 
          Recirculation Pump Start - Recirculation Pump Speed Control Failure.
SIMULATOR SETUP (Recommended)
    IC-11          BOC
    Rx Pwr        100%
    Core Age      BOC
Triggers
                                                                  TRUE
    El - Auto initiated, Recirc B Runback Reset Push Button =
Malfunctions
    None
Overrides
    El - Recirc B Flow Control 1.0 over 60 seconds
Remote
      None
Special Instructions
                                                            rods on ENP-24.
      Reduce core flow to ENP-24 limit, drive 1st 3 sets of
                                                                                and reduce
      Secure Recirc Pump B, place seal staging valve (V17) to Manual/Open,
      controller output to approx. 16%.
                                                                    flow >23,500 gpm. Ensure
      Ensure core flow >30.8 and <45 mlbm/hr, and Recirc A pump
                                                          Recirc A pump flow is reduced to 23.500
      scram avoidance region will not be entered when
      gpm.
                                            Page 2 of 15                                  REV. 0
  3B13a
 
                  Recirculation Pump Start - Recirculation Pump Speed Control Failure.
      SAFETY CONSIDERATIONS:
          None.
      EVALUATOR NOTES: (Do not read to trainee)
        1. The applicable procedure section WILL be provided to the trainee. Evaluator should
              provide copy of OP-02, Sections 5.2 and 8.2 completed up to the steps specified in the
              task conditions.
        2. If this is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
              Appendix E, or similar to the trainee.
        3. Steps in 20P-02 to place APRMs to setup are not applicable in the simulator due to
              simulator configuration with Unit One PRNM.
                                    Read the following to trainee.
      TASK CONDITIONS:
3/4
          1. Recirculation Pump 2B has tripped. The cause of the trip has been corrected.
          2. Recirculation Pump 2A is in operation.
          3. RWCU is in normal operation per 20P-14.
          4. An off-going operator has completed steps in 20P-02, Section 8.2, up to step 8.2.2.4,
                and Section 5.2, up to step 5.2.2.22.
          5. Another operator is available to make log entries as required.
      INITIATING CUE:
            You are directed to continue the startup of Recirculation Pump 2B and inform the Unit SCO
            when 20P-02 Sections 5.2 and 8.2 are complete.
  *._  313B1a                                        Page 3 of 15                              REV. 0
 
        Recirculation Pump Start - Recirculation Pump Speed Control Failure.
                                PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in Uie Comments.
Step I - Obtain a current revision of 20P-02, Sections 5.2 and 8.2.
              Current Revision of 20P-02, Sections 5.2 and 8.2 obtained and verified, if
              applicable.
                                                                        SAT/UNSAT*
Step 2 - Ensure temperature differential between the reactor coolant within the dome and
        bottom head drain is less than 145&deg;F as follows:
        a.  Determine reactor pressure, convert to psia by adding 14.7 and use steam tables
              to convert reactor pressure to temperature.
                  Reactor temperature in the dome determined by converting psig to psia and
                  using steam tables.
              K                                                          SAT/UNSAT*
33Bla                                        Page 4 of 15                                REV. 0
 
          Recirculation Pump Start - Recirculation Pump Speed Control Failure.
        b.    Determine bottom head drain temperature using G31-TI-R607 Point 5 (Panel
              H12-P603),, or 12-TR-R018 Channel 153.
                  Bottom head rain Lemperature using G31-TI-R607 Point 5 is determined.
            //
                                L          7`cM&#xfd;SATIU                                  NSAT*
        c.    Determine temperature difference and record time.
                  Temperature differential determined and time recorded in OP-02.
                                                                                    SAT/UNSAT*
PROM P lowexamiy.      reduce*s    noftheopaer*in  R*dal  tour ecirddifntl temperaingk Rcirr
  NOT:* Sterps23....
.......              and 24 of* 20P-02 Section 5.2.2 aret not= aplil'=cab  .......
                                                                          e*              >49K;.
Step 3 - Slowly, reduce speed of the operating Reactor Recirculation Pump using Recirc
          Pump 2A Speed Control potentiometer until loop flow is less than or equal to 50%
          (23,000 gpm) of rated loop flow.
              Recirc loop 2A flow is _<23,500 gpm on B32-FR-R614 or B32-R613.
                                                      **  CRITICAL STEP ** SAT/UNSAT*
33B1a                                        Page 5 of 15                                    REV. 0
 
          Recirculation Pump Start - Recirculation Pump Speed Control Failure.
Step 4 - Within 30 minutes prior to startup of the second pump, ensure temperature
        differential between operating loop and idle loop is less than or equal to 50&deg;F and
        that operating loop flow is less than or equal to 23,500 gpm as follows:
        a.    Operating loop temperature (B32-TR-R650) or process computer (B055-B058)
                    Loop 2A temperature recorded in 20P-02 using B32-TR-R650 or B055-B056.
                                                                                SAT/UNSAT*
        b.    Idle loop temperature (B32-TR-R650) or process computer (B055-B058)
                    Loop 2B temperature recorded in 20P-02 using B32-TR-R650 or B057-B058.
                                                                                SAT/U NSAT*
          c.    Determine differential temperature, record results and time in 20P-02
                    Differential temperature determined and recorded,along with time in 20P-02.
                                                                                SAT/UNSA'*
      I PROMPT:
            If ex~rninee r~quetsnth
                        lobo.r~r
                      inihe~~~~~M4
                                            idiiutorcrdifetalem
                                    CO aetyIs~onlt
                                                                                    rtrendie
                                                                                                  I
[I                                                            . ...          ...
                                                      6h~s6',      bpi.,I - Ort
  NOTE:  *            ,                    savaiab and should be Msqo
                          4flowrec*tery ,Bj21RR6l
                                  ;5MENNEN                                          f
                                                                                    -o!e n
33B1a                                      Page 6 of 15                                  REV. 0
 
            Recirculation Pump Start - Recirculation Pump Speed Control Failure.
            e  .      Operating loop flow rate on B32-FR-R614, if available, or flow indicator B32
                      R613 is less than or equal to 23,500 gpm (50% of rated loop flow) and time
                      recorded in 20P-02
                                      Loop 2A flow rate from B32-FR-R614 and time recoded in 20P-02.
                                                                                                            SAT/UNSAT*
                                                                        . me I
                I~-&#xfd;pAA*
            I~ ~~  ~~~~~~~ s;!;* *i i        i~
                                              .......* ***l;  * i+ ; ;    ..,'.*; ..
                                                                              .... ...  i  *? w  ; i !    *** 'ItiF*!
                                                                                                                    *i! 1.*;*
                                                                                                                          . 1**1*~*
                                                                                                                                i!*
                                                                                                                                j . i 11i
                                                                                                                                        i z*~ i *
    ~ ~~~~~~~~. .........................
  l;~
              * f~2
                ~~                                  ~ NOE
                                          ~ f2PO~Scin522i
                                          A~~~~~~~~~~~~
Step 5 - Ensure Pump 2B discharge valve B32-F031B is closed,
                                                            ~      ~    1          ntaplicable'
                                                                  rei6inakia!6ilerpevdwe~edica~evle
                                                                                                              sc~~&
                                                                                                                                                  I
                        Pump 2B discharge valve B32-FO31B is full closed.
                                                                                        ** CRITICAL STEP ** SAT/UNSAT*
NOTE Ste 29o&sect;0-2                                              ection S22"is no :a pplcbe
Step 6 - Ensure 30 minutes has not elapsed since temperature differentials and flow rate were
              determined.
                          30 minutes has not elapsed since temperature differentials and flow rate were
                          determined
                                                                                                            SATIUNSAT*
33B1a                                                                        Page 7 of 15                                                REV. 0
 
        Recirculation Pump Start - Recirculation Pump Speed Control Failure.
Step 7 - Start MG Set 2B drive motor and ensure the following:
              MG Set 2B drive motor is started
                                                  ** CRITICAL STEP ** SAT/UNSAT*
        a.  MG Set B drive motor breaker closes.
                Ensures MG Set 2B drive motor closes.
                                                                        SAT/U NSAT*
        b.  MG Set B accelerates to speed.
                Ensures MG 2B acceleratesto speed.
                                                                        SAT/U NSAT*
        c.  Approximately 6 seconds after the drive motor breaker closes, the generator field
              breaker closes and starts the Reactor Recirculation Pump.
                Ensures MG 2B field breaker closes and RecirculationPump 2B starts.
                                                                        SAT/U NSAT*
I NOTE: B32lowthe discharge byass
Sthrough                                    ve
                                                sincehe discharge valv is closed
                                                          .lW
                                                          .                        ........
33Bla                                    Page 8 of 15                                REV. 0
 
            Recirculation Pump Start - Recirculation Pump Speed Control Failure.
          d.    Recirc Pump 2B discharge flow B32-R613 indicates flow.
                    Ensures Recirc Pump 2B discharge flow B32-R613 indicates flow.
                                                                                    SAT/U NSAT*
                              reqe  t anthe idvdua !torecorld timii&#xfd;fetheMG &#xfd;Set 2B &#xfd;dr~iv'e mtr
I .....PRMPT:ilf:&#xfd;,6&#xb6;rnipJ                  & db o Ieit*h, rdpo.. l e.... i*...            .... .I
Step 8 - If in Modes        or 2 and the reactor is critical, perform the following:
            a.    Using 2 second jogs and 10 second rest times for the first minute, jog open
                  Pump 2B discharge valve B32-FO31B.
                      B32-FO31B is opened using 2 secondjogs and 10 second rest times for the
                      first minute (5 totaejogs).
                                                          ** CRITICAL STEP      **  SAT/UNSAT*
            b.    Fully open Pump 2B discharge valve B32-F031B.
                      B32-FO31B is fully opened.
                                                          **  CRITICAL STEP    **  SAT/UNSAT*
  NOTE:n35                        6;20P-2, Sectio5.2.2 are r;ot applaIe
331 a                                          Page 9 of 15                                    REV. 0
 
              Recirculation Pump Start - Recirculation Pump Speed Control Failure.
    Step 9 - Place the control switch for Seal Staging Valve B32-V17 to AUTO and ensure the
              valve remains open.
                  B32-V17 open with the control switch in AUTO.
                                                                            SATIUNSAT*
    Step 10 - Reset Recirculation runback in accordance with Section 8.3.
                  Recognizes runback must be reset and obtains copy of 20P-02, Section 8.3.
                                                                tI *7      SAT/UNSAT*
                                                                    f&deg;
    Step 11 - Adjust the potentiometer on Recirc Pump 2B Speed Control lowering the speed
              demand signal until speed signal shows a slight decrease in pump speed.
                  Recirc B Speed Control is lowered to achieve a slight decrease in pump speed.
                                                I/o,*t-  C4.                SAT/UNSAT*
    *NOTEj:AWhe6n',Ihe&#xfd;&#xfd;Rufl''back Re~set :O'h&#xfd;buitton":forReio typ2 icersed thsed
                  de WIn                                    ead~ga jIrrp3i0
                          &#xfd;ilbegin :to irncrqgase, pe reactor',        `4m            ~a6
                            sec&~~~d~eri6Q~
                                PupspM(-dpoes
                                  th.co          uei    nimdae pao      cino      O-3O
                      Locking...
  !
                    Z7 44'%6"          AZfl"ccjitJ      "40Ae1--/O-O
                                                                                          REV. 0
                                                    Page 10 of 15                        REV. 0
11      3Bla
    3B3la                                          Page 10 of 15
 
          Recirculation Pump Start - Recirculation Pump Speed Control Failure.
PROMPT,: I examinet              ICas6sistance in resetting the runa*c  ,
Step 12 - Reset the Recirculation runback for Reactor Recirculation Pump 2B as follows:
          a Depress the Reciro Runback Reset push button for Recirculation Pump 2B.
                Recirc Runback Reset pushbutton for Pump 2B is depressed.
                                                  ** CRITICAL STEP ** SAT/UNSAT*
          b Ensure reactor power and flow are stabilized.
                Recognize increasingspeed on Recirc Pump 2B and lock the scoop tube prior
                to exceeding maximum pump speed mismatch.
                                                  ** CRITICAL STEP ** SATIUNSAT*
                                                                                              II
        ei    cndtaineq          se        AO.When examin                k
I
PROMPT"      when informed as SC ofthe failure infor    examinee thatanothe  e'ratorWi
            eter aan nnounbe AOPnO3            L                            >1
33B1a                                  Page 11 of 15                                REV. 0
 
            Recirculation Pump Start - Recirculation Pump Speed Control Failure.
  Step 13 - Inform SCO of speed control failure.
                SCO informed of speed control failure.
                                                                          SAT/UNSAT
6
IS.
  TEMNTN
        .. .t
                  CU:hen the scoop tube is locked for Reciro MG
                    -
                                .;
                                .'
                                  ..
                                  .
                                                                  ... et 2B, this JPMis
                                                                                            *m
                                                                                                I
  * Comments required for any step evaluated as UNSAT.
  33Bla                                    Page 12 of 15                                REV. 0
 
          Recirculation Pump Start - Recirculation Pump Speed Control Failure.
RELATED TASKS:
  202004B1301, Startup A Reactor Recirculation Pump Per OP-02
  2020155B401, Respond To A Recirc Flow Control Failure Increasing Per AOP-03.0
K/A REFERENCE AND IMPORTANCE RATING:
  202001 A4.01        3.7/3.7
  Ability to manually operate and/or monitor in the control room: Recirculation pumps
REFERENCES:
  20P-02
TOOLS AND EQUIPMENT:
  Steam Tables
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
  1 - Reactivity Control (Recirculation System)
REASON FOR REVISION:
  Bank JPM LOR-SIM-JP-002-A07. Renamed from LOR to LOT, changed format to WORD
  from WP 5.1, updated for procedure revision.
3Bla                                    Page 13 of 15                                REV. 0
 
          Recirculation Pump Start - Recirculation Pump Speed Control Failure.
                  Time Required for Completion:            20  Minutes (approximate).
                            APPLICABLE METHOD OF TESTING
Performance:      Simulate                        Actual    4                      Unit:      2
Setting:    Co ntrol Room                        Simulator 4    ( Not applicable to In-Plant JPMs)
Time Critical:            Yes                          No    4              Time Limit        N/A    K
Alternate Path:          Yes    4                    No
                                          EVALUATION
Trainee:                                              SSN:
JPM:            Pass                  Fail
Remedial Training Required: Yes                  No
Did Trainee Verify Procedure as Authorized Copy?: Yes                        No
(Each Student should verify one JPM per evaluation set.)
Comments:
Comments reviewed with Student
Evaluator Signature:                                                Date:
33B1a                                          Page 14 of 15                                        REV. 0
 
TASK CONDITIONS:
  1. Recirculation Pump 2B has tripped. The cause of the trip has been corrected.
  2. Recirculation Pump 2A is in operation.
  3. RWCU is in normal operation per 20P-14.
  4. An off-going operator has completed steps in 20P-02, Section 8.2, up to step 8.2.2.4,
      and Section 5.2, up to step 5.2.2.22.
  5. Another operator is available to make log entries as required.
INITIATING CUE:
  You are directed to continue the start'up of Recirculation Pump 2B and inform the Unit SCO
  when 20P-02 Sections 5.2 and 8.2 are complete.
 
                    CAROLINA POWER & LIGHT COMPANY
                        BRUNSWICK TRAINING SECTION
                          JOB PERFORMANCE MEASURE
                                  SIMULATOR
                            BNP-03-Bl b
LESSON TITLE: Reduce RPV Water Level Using RWCU To Radwaste.
REVISION NO:        0
RECOMMENDED BY:
                    Instructor/Developer                DATE
CONCURRENCE BY:
                    Line Superintendent/Supervisor      DATE
APPROVED BY:
                    Superintendent/Supervisor Training  DATE
 
                  Reduce RPV Water Level Using RWCU To Radwaste.
SIMULATOR SETUP
    IC-03        BOC
    Rx Pwr        0%
    Core Age      BOC
Triggers
    None
Malfunctions
    None
Overrides
    None
Remote
    None
Special Instructions
    Secure RWCU reject flow by closing G31 -F033 and G31 -F034.
    Raise RPV level to approximately 195". Ensure alarm A7 2-2 is sealed in.
    Ensure both RWCU Filter Demins are in service.
331lb                                    Page 2 of 9                        REV. 0
 
                    Reduce RPV Water Level Usina RWCU To Radwaste.
SAFETY CONSIDERATIONS:
  None.
EVALUATOR NOTES: (Do not read to trainee)
  1. The applicable procedure section WILL NOT be provided to the trainee.
2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
      Appendix E, or similar to the trainee.
3. There is no direct procedural guidance for this JPM. It is considered within the operator's
      capability to control RPV water level using CRD and RWCU as directed by General
      Operating Procedures.
                            Read the following to trainee.
TASK CONDITIONS:
    1. Unit Two is in Mode 2, performing a reactor startup per GP-02.
    2. RPV level band is 182" to 192" as indicated on C32-LI-NO04A/B/C.
    3. CRD is operating for control rod withdrawal.
    4. RWCU is in operation. RWCU was aligned for reject to the main condenser, but that
        flow path has been secured for maintenance to repair a small leak in the header
        downstream of G31 -F034, Reject To Condenser.
    5. Reactor Level Hi/Lo has alarmed since securing the RWCU reject flow path.
    6.&#xfd; tl-vfl-V      Lt            &#xa3;t    Wof
INITIATING CUE:                                    /o
    You are directed by the Unit SCO establish a RWCU reject to Radwaste in accordance
    with GP-02, Step 5.3.4, and lower RPV water level to <192" as indicated on narrow range
    instruments C32-LI-NO04A/B/C. You are to inform the Unit SCO when the Reactor Hi/Lo
    Level alarm is clear.
331lb                                        Page 3 of 9                                REV. 0
 
                    Reduce RPV Water Level Usincg RWCU To Radwaste
                                    PERFORMANCE CHECKLIST
    NOTE: Sequence is assumed unless denoted in the Comments.
    I'T      The folowing actions are directed by GP-02. There are no specific instructions in
              OP-14 (Reactor Water Cleanup Operatinq Procedure) that applV for current plant      I
              conditions. The operator is expected to be able to control RPV level usinq CRD and  I
              RWOU reject during execution of General Operating Procedures.                      I
    PROMPT, When notified of reject operation to Radwaste, as Radwvaste CO, inform examinee
              that Vou have aliqned the reject flow path to the Waste Collictor Tank. Report
              Waste CollectorTank level is 20% and sufficient capacitv exiSts or approximately
              20,000 gallons of reject flow.
    Step 1 - Obtain current revision of GP-02.
                  Currentrevision of GP-02 is obtained.
                                                                                    SAT/UNSAT*
1/2->
    Step 2 - Notify Radwaste of intention to reject to Radwaste, and coordinate to ensure
            Radwaste can accept the reject flow.
                  Radwaste notified of reject to Radwaste.
                                                                                    SAT/UNSAT*
    Step 3 - Open Reject To Radwaste Viv, G31 -F035.
                  Reject To Radwaste VIv, G31-F035 is open.
                                                              ** CRITICAL STEP ** SAT/UNSAT*
    331lb                                        Page 4 of 9                              REV. 0
 
                  Reduce RPV Water Level Usinq RWCU To Radwaste.
Step 4 - Throttle open RWCU Reject Flow Control VIv, G31 -F033 to achieve a lowering RPV
          water level.
              G31-F033 is opened to achieve a lowering reactorwater trend.
                                                          ** CRITICAL STEP ** SAT/UNSAT*
EBpodMEI If asked, as Radwaste CO, Irep6rtWater C ollector Tank level, rising.
NO      I    e operator may (but is not r.euired to) reduce CR0 flcw rate to the RPV to aid in    I
          reducinq RPV level to the desired band. Ifthe operat6r rdduces CRD flow rate, ORD      I
          parameters should be maintainedlper      0    Section 6.0. ko-I
NOIE      The operator should monitor Reqen HX Outlet, Point 2, and/or Filter Inlet Point 3, on
          G31-TI-R607, to ensure Non-Reqen heat exchanqers outlet temperature remains            I
          below 1300F, but with RPV temperature,<2120F, this limitation will not be exceeded.
Step 5 - Monitor Regen HX Outlet, Point 2, and/or Filter Inlet, Point 3, on G31 -TI-R607, to
        ensure Non-Regen heat exchangers outlet temperature remains below 1300F.
              Operatormonitors Regen HX Outlet, Point2, and/or Filter Inlet, Point 3, on G31
              TI-R607, to ensure Non-Regen heat exchangers outlet temperature remains
              below 1300F.
                                                                                  SAT/UNSAT*
33Blb                                      Page 5 of 9                                    REV. 0
 
                  Reduce RPV Water Level Using RWCU To Radwaste.
Step 6 - Lower RPV water level at or below 192" as indicated by C32-LI-NO04A/B/C.
              RPV water level indicatesat or below 192" as indicatedby C32-LI-NOO4A/B/C
              and ReactorLevel Hi/Lo alarm is clear.
                                                        ** CRITICAL STEP ** SAT/UNSAT*
Step 7 - Inform Unit SCO that RPV water level is in the required band.
              Unit SCO informed RPV water level is in the requiredband.
                                                                                SAT/UNSAT*
                                                                                            I
fTRMINATING CUE: When RPVwatrf 6&#xfd;ev ,idicates! 192" on narrow range indicators
II          '          NOO4A/B/C, this JPM s complete. _                                  1
* Comments required for any step evaluated as UNSAT.
33Blb                                    Page 6 of 9                                REV. 0
 
                Reduce RPV Water Level Usina RWCU To Radwaste.
RELATED TASKS:
  204002B1301, Place The RWCU System In Service With The Reactor Not In Cold
  Shutdown Per OP-14.
K/A REFERENCE AND IMPORTANCE RATING:
  204000,    A4.08  3.4/3.4
REFERENCES:
  20P-14
  GP-02
TOOLS AND EQUIPMENT:
  None.
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
  2 - Inventory Control (Reactor Water Cleanup)
REASON FOR REVISION:
  New JPM.
3B3lb                                    Page 7 of 9                          REV. 0
 
                  Reduce RPV Water Level Using RWCU To Radwaste.
                  Time Required for Completion:            15      Minutes (approximate).
                            APPLICABLE METHOD OF TESTING
Performance:        Simulate    -                Actual      '                      Unit:      2__
Setting:    Control Room        -                Simulator      4/ (Not applicable to In-Plant JPMs)
Time Critical:            Yes                          No    Vt              Time Limit        N/A
Alternate Path:          Yes    -                    No    ,
                                          EVALUATIOlN
Trainee:.                                            SSN:
JPM:            Pass      __        Fail
Remedial Training Required: Yes              -    No    __
Did Trainee Verify Procedure as Authorized Copy?: Yes                  __    No
(Each Student should verify one JPM per evaluation set.)
Comments:
Comments reviewed with Student
Evaluator Signature:                                                    Date:
33Blb                                            Page 8 of 9                                          REV. 0
 
TASK CONDITIONS:
  1. Unit Two is in Mode 2, performing a reactor startup per GP-02.
  2. RPV level band is 182" to 192" as indicated on C32-LI-NO04A/B/C.
  3. CRD is operating for control rod withdrawal.
  4. RWCU is in operation. RWCU was aligned for reject to the main condenser, but that
      flow path has been secured for maintenance to repair a leak in the header downstream
      of G31-F034, Reject To Condenser.
  5. Reactor Level Hi/Lo has alarmed since securing the RWCU reject flow path.
INITIATING CUE:
  You are directed by the Unit SCO establish a RWCU reject to Radwaste in accordance
  with GP-02, Step 5.3.4, and lower RPV water level to <192" as indicated on narrow range
  instruments C32-LI-NO04A/B/C. You are to inform the Unit SCO when the Reactor Hi/Lo
  Level alarm is clear.
 
'C
                      CAROLINA POWER & LIGHT COMPANY
                          BRUNSWICK TRAINING SECTION
                            JOB PERFORMANCE MEASURE
                                  CONTROL ROOM
        F
                              BNP- 03-A'Ic
                                                                            I
  LESSON TITLE: Emergency Equalization Around MSIV's - Using the Hard Card
  REVISION NO:      I
  RECOMMENDED BY:
                      Instructor/Developer                    DATE
  CONCURRENCE BY:
                      Line Superintendent/Supervisor          DATE
  APPROVED BY:
                      Superintendentlsupervlsor  I raining      UAIL
                                                                DATE
                      Superintendent/Supervisor Training
 
              Emergency Equalization Around MSIV's - Using the Hard Card
SIMULATOR SETUP:
A.  Initial Conditions:
    1.      Recommended Initial Conditions
            IC          11
            Rx. Pwr.    100%
            Core Age    BOL
    2.      Required Plant Conditions
            MSIVs closed with control switches in open, condenser vacuum < 10", no other
            group 1 conditions present.
B.  Malfunctions
    A small steam leak in the drywell or secondary containment
C.  Overrides
    None
D.  Special Instructions
    Perform a MANUAL Scram carry out initial operator actions. Close the MSIVs. Ensure
    condenser vacuum drops to <10". After this is done place the MSIV control switches to
    OPEN.
3Alc                                        Page 2                                    REV. 1
 
              Emergency Equalization Around MSIV's - Using the Hard Card
SAFETY CONSIDERATIONS:
      1.    NONE.
EVALUATOR NOTES: (Do not read to examinee)
      1. The applicable procedure section WILL NOT be provided to the examinee (Hard Card
          from P601).
      2. If this is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
          Appendix E, or similar to the examinee.
                          Read the following to trainee.
TASK CONDITIONS:
  1.    A scram and Group 1 Isolation have occurred.
  2.    No fuel failure or steam line breaks have occurred.
  3.    The Main Condenser is available as a heat sink.
  4.    The SRO has anticipated that Emergency Depressurization may become required.
INITIATING CUE:
  You are directed to perform the control operator actions associated with Emergency
  Equalization around the MSIV's, and open MSIVs when pressure is <200 psid, using the
  Hard Card. You are to inform the Unit SCO when the Hard Card actions are complete.
3A1lc                                          Page 3                                  REV. I
 
            Emergency Equalization Around MSIV's - Using the Hard Card
                                PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in the Comments.
Step I - Obtain "Hard Card" for MSIV equalization
              "HardCard"obtained for MSIV equalization.
                                                                      SAT/UNSAT*
Step 2 - Request the condenser vacuum bypass switches in bypass position.
              Vacuum bypass switches placed in bypass
                                                    ** CRITICAL STEP** SAT/UNSAT*
Step 3 - Place all MSIV switches in the CLOSE position.
              All MSIV switches in CLOSE position (B21-FO22A, B, C & D, B21-FO28A, B, C &
              D).
                                                    ** CRITICAL STEP** SAT/UNSAT*
              #x-c*                          oer
                      Y
                          (-x-e,
                                  *
                                      K
                                      "
                                          A-4Z4/
                                                          "//I
                                                              /,        4fTIL
#1Ic                                            Page 4                            REV. 1
  6                    6t :- .
 
            Emerqency Equalization Around MSIV's - Using the Hard Card
Step 4 - Reset Group 1 Isolation.
            Resets Group l Isolation reset switches, A 72-S32 and S33, on P601, are
            depressed and White lights are ON.
                                                ** CRITICAL STEP ** SAT/UNSAT*
Step 5 - Open Outboard MSIV's.
            Outboard MSIV switches: B21-FO28A, B21-F028B, B21-F028C, B21-FO28D
            placed in OPEN and MSIVs are OPEN.
                                                ** CRITICAL STEP ** SAT/UNSAT*
Step 6 - Open MS-F020.
            MSL Drain Isolation Valve MS-F020 open.
                                                                        SAT/UNSAT*
Step 7 - Open B21-F019.
            MSL Outboarddrain Isolation Valve B217F019 open.
                                                  ** CRITICAL STEP ** SAT/UNSAT*
3A1lc                                      Page 5                                    REV. 1
 
            Emergency Equalization Around MSIV's - Using the Hard Card
Step 8 - Close MS-V28
              Steam supply to MSR's, SJAE's, RFP's, MS-V28 indicates full closed.
                                                                        SAT/UNSAT*
Step 9 - Close MVD-F021.
              Common drain line orifice Bypass Valve to condenser, MVD-F021 closed.
                                                                        SATIUNSAT*
Step 10 - Open B21-F016.
              MSL Inboarddrain Isolation Valve, B21-F016 open.
                                                  **  CRITICAL STEP** SAT/UNSAT*
Step 11- Open MS-F038 A, B, C, D-ae-        dr          t
                                                    9---e-,                        ,
              At least one MSL orifices bypass valve: MS-F038A, B, C, or D open to increase
              steam line pressure.
                                                  ** CRITICAL STEP ** SAT/UNSAT*
                      Zf  4-ow    ~"      4                  Arcc#
3Alc                                        Page 6                                    REV. I
 
                Emergency Equalization Around MSIV's - Using the Hard Card
K-
    Step 12 - Ensure steam line pressure is increasing downstream of Outboard MSIVs.
                Steam line pressure rising as indicated on Main Steam PressureA/B indications
                on XU-1.
                                                                          SAT/UNSAT*
    Step 13- Close MS-V46, V47, V48, V49 and V35.
                MSL drain valves MS-V46, MS-V47, MS-V48, & MS-V49 and V35 are closed.
                                                                          SAT/UNSAT*
1/2>
    Step 14 - When less than 200 psid across the valve, open Inboard MSIVs.
                Inboard MSIVs B21-FO22A, B, C & D are open.
                                                      ** CRITICAL STEP ** SAT/U NSAT*
    Step 15- Open MVD-F021.
                MVD-F021 indicatesopen.
                                                                            SAT/U NSAT*
    3A1lc                                      Page 7                                  REV. 1
 
            Emergency Equalization Around MSIV's - Using the Hard Card
MNOTE:iWhe re5Jstd6 oeMV-9uing Remt Func&#xfd;tion !MS" VMSO5.
45kOM.4 inflhl                        RIN4
                                                      1>                  Kv
                                                                gntinet1VA56bi.
                                                                    ~
Step 16 - Request AO open MVD-V5005.
            MVD-V5005 is open
                                                                      SAT/UNSAT*
Step 17 - Open MS-V46, V47, V48, V49 and V35.
            MS-V46, V47, V48, V49 and V35 are opened.
                                                                      SAT/UNSAT*
Step 18 - Ensure open MS-V43, MS-V44, MS-V45, MS-V37/39, MS-V411NV42, MS-V36.
            MS-V43, MS-V44, MS-V45, MS-V37/39, MS-V41NV4Z MS- V36 are open.
                                                                      SAT/UNSAT*
3Al c                                    Page 8                                  REV. I
 
              Emergency Equalization Around MSIV's - Using the Hard Card
            oeigM.V....
      0?,i~~,J                crt6I.0f4~bih6ndenserivacuumidrw
                                (trie6W~sasadSAE$ t,rt&&f<            Y 1/2
Step 19 - Open MS-V28.
                MS-V28 is open.
                                                  ** CRITICAL STEP ** SAT/UNSAT*
Step 20 - Notify Unit SCO that MSIVs are open and to continue with pressure control as
              directed by the EOPs.
                Supervisor notified MSIVs have been opened per the Hard Card.
                                                                        SAT/UNSAT*
                                                                                    WW
* Comments required for any step evaluated as UNSAT.
3A1lc                                        Page 9                                    REV. 1
 
              Emergency Equalization Around MSIV's - Using the Hard Card
                                    LIST OF REFERENCES
RELATED TASKS:
    239 201 B4 01
    Equalize Around And Open Main Steam Isolation Valves Per Hot Startup OP-25.
K/A REFERENCE AND IMPORTANCE RATING:
    239001        A4.01        4.2/4.0
    Ability to manually operate and or monitor in the Control Room: MSIVs
REFERENCES:
    EOP-01 -RVCP, Reactor Vessel Control Procedure
    Hard Card for MSIV equalization and reopening (S/1032)
TOOLS AND EQUIPMENT:
    None
SAFETY FUNCTION
      3 - Reactor Pressure Control (Main and Reheat Steam System)
REASON FOR REVISION:
      Bank JPM LOT-SIM-JP-025-AO1.        Updated to current revision of procedure (addition of
      MVD-V5005).
3Alc                                      Page 10                                      REV. 1
 
                Emergency Equalization Around MSIV's - Using the Hard Card
  Time Required for Completion:          15    Minutes (approximate).
                                APPLICABLE METHOD OF TESTING
  Performance:        Simulate                        Actual    4                    Unit:      2
  Setting:      Control Room                          Simulator 4 (Not applicable to In-Plant JPMs)
  Time Critical:            Yes                          No  4            Time Limit        N/A
  Alternate Path:            Yes                          No  4
                                            EVALUATION
  Trainee:                                              SSN:
  JPM:              Pass                  Fail
  Remedial Training Required: Yes                    No
  Did Trainee Verify Procedure?: Yes                    No
  ( Each Student should verify one JPM per evaluation set.)
  Comments:
  Comments reviewed with Student
  Evaluator Signature:                                              Date:
I 3Alc                                                Page 11                                      REV. I
 
K.
  TASK CONDITIONS:
    1.  A scram and Group 1 Isolation have occurred.
    2.  No fuel failure or steam line breaks have occurred.
    3.  The Main Condenser is available as a heat sink.
    4.  The SRO has anticipated that Emergency Depressurization may become required.
  INITIATING CUE:
    You are directed to perform the control operator actions associated with Emergency
      Equalization around the MSIV's, and open MSIVs when pressure is <200 psid, using the
      Hard Card. You are to inform the Unit SCO when the Hard Card actions are complete.
 
                    CAROLINA POWER & LIGHT COMPANY
                        BRUNSWICK TRAINING SECTION
                        JOB PERFORMANCE MEASURE
                                  SIMULATOR
                                                                  mmmm--%
                            BNP-03-Bld
LESSON TITLE: Shutdown Cooling Restoration With RHR Pump Overload.
REVISION NO:        0
RECOMMENDED BY:
                    Instructor/Developer                  DATE
CONCURRENCE BY:
                    Line Superintendent/Supervisor        DATE
APPROVED BY:
                    Superintendent/Supervisor Training    DATE
 
SIMULATOR SETUP
    IC-01
Malfunctions
    RP004F, RPS MG Set B Trip
Overrides
    El, ZA447 (RHR Pump B Overload alarm)
    El, ZUA1861 (4KV Bus E4 Motor Overload alarm)
    E2, ZA467 (RHR Pump D Overload alarm)
    E2, ZUA1661 (4KV Bus E2 Motor Overload alarm)
Special Instructions
    1.    Throttle El1 -FO03B and El1 -F048B to achieve system flow of 6000 gpm with both
          valves indicating dual position.
    2.    Insert malfunction RP004F (or transfer RPS Bus B to alternate).
    3.    Perform actions to restore systems lost as desired. The 1/2 scram may be reset, but
          DO NOT reset PCIS logic.
    4.    Loss of RPS MG Set B results in closure of the RHR Outboard Valve (El 1-F008)
          and the injection valve (El 1-FO15B) with resultant RHR Pump trip.
 
                Shutdown Cooling Restoration With RHR Pump Overload.
SAFETY CONSIDERATIONS:
      None
EVALUATOR NOTES: (Do not read to trainee)
      1. The applicable procedure section WILL NOT be provided to the trainee.
      2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,
          Appendix E, or similar to the trainee.
                        Read the following to trainee.
TASK CONDITIONS:
  1. RHR Loop B was operating in Shutdown Cooling when a trip of RPS MG Set B resulted
      in a Group 8 isolation and a loss of Shutdown Cooling.
  2    RPS Bus B has been transferred to Alternate Power.
  3. RHR Loop B flow was 6000 gpm prior to the RPS MG Set B trip.
  3. The shift superintendent has directed a reactor water level band of +200" to +220".
INITIATING CUE:
      You are directed to restart RHR Shutdown Cooling using RHR Loop B per AOP-1 5.0
      step 3.2.8, and inform the Unit SCO when Shutdown cooling has been restored.
33Bld                                          Page 3                                  REV. 0
 
                Shutdown Cooling Restoration With RHR Pump Overload.
                                PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in the Comments.
Step 1 - Obtain a current revision of AOP-15.0.
                    Current Revision of AOP-15.0 obtained.
                                                                              SAT/UNSAT*
Step 2 - Restore and maintain reactor water level 200-220".
              Reactorwater level is 200-220" as indicatedon B21-LI-NO27A or B.
                                                                            SAT/U NSAT*
Step 3 - Reduce reactor pressure below 125 psig per GP-05
              Reactorpressure is below 125 psig.
                                                                            SAT/UNSAT*
Step 4 - Ensure RPS is energized.
              RPS Buses A and B are energized.
                                                                              SAT/U NSAT*
33Bld                                          Page 4                              REV. 0
 
                Shutdown Cooling Restoration With RHR Pump Overload.
Step 5 - Reset the group 8 isolation.
              Isolation Reset Groups 1,2,3,6,8 pushbutton, A71-S33 is depressed.
            ,t*                                        ** CRITICAL STEP  ** SAT/UNSAT*
                                              lo"If -f 4&#xfd;w, C&#xfd;
.PROMPT:; Irequeteds Unit SCOQinfor              examneethat p    coldo      dindown      ,
            aeNOTaIPnoHPiTii
Step 6 - Close Loop B Outboard Injection Valve, El1-FO17B. (/
              E 11-FO1 7B indicates full cloi
                                                                      - ,      _        I
                                                        -,t,499    T-9EP " SAT/UNSAT*
            /7
          &#xfd;-tt-              A
                /C~,6  rr44  -,l
                                                            4            -Cr-
Step 7 - Open Loop B Inboard Injection Valve El1-FO15B.
              EII-FO15B indicatesfull open.
                                                        ** CRITICAL STEP  ** SAT/UNSAT*
Step 8 - Open RHR Shutdown Cooling Outboard Isolation Valve El 1-F008.
              El 1-F008 indicates full open.
                                                        ** CRITICAL STEP  ** SATIUNSAT*
                                                                                    REV. 0
                                                Page 5                              REV. 0
    3B1d
33B1d                                          Page 5
 
                      Shutdown Cooling Restoration With RHR Pump Overload.
Step 9 - Open RHR Shutdown Cooling Inboard Isolation Valve E 1l-F009.
                    El 1-F009 indicates full open.
                                                                                                          SATIUNSAT*
Step 10 - Start an RHR Pump in the loop being used for shutdown cooling.
                    RHR Pump 2B or 2D is running.
                                                                          ** CRITICAL STEP            **  SAT/UNSAT*
NOTE                hf Et-rFO-1B11 hs beerhr16"e to6e'stablish ppprboximately, 6090 'gploo
                                      B iid~45 siarted,,,
                                it RHR~~Puh~ip                    itate Trigge' l)~l ~xup~a
                        nh:Pm            0)        tad                            i    tdpd        at
                                          ++        ...  .... .*    ~~~~~~~~r
                                                                    .....  . .. , [s  i++...    :;!i    'J '
                                                                                                                        I.
  .POMPT Tfljm
    4&I
              &#xfd;:i Ifireqesed        AO      bepitl devc showstarget: on phase
                          BE4)~j~:or RHRepm P(2asapibl.
                                                                                                g tbeaeo
                                                                                              Jyt4        <Vt* RHR~&#xfd;
      .....
          ...
                  PQE:4(4<0,W
                <<4tsi
                  ifig4~~~Ui ~oo~la
                            t
                            >examin66  il            lC
                                                                lam cnweg hr~~dh~r
                                            cotc7ndhvyou s atu.ngth________
                                        hat~~~~~
                                          ~~~~~                                nohrprt&dth                  nPOt
                                    beakrt~beckrd~~
                                    pumpmotr
                                                                                                                        I
Step 11 - Slowly throttle open Loop B Outboard Injection Valve Ell -F01 7B to re-establish
                  RHR loop conditions prior to the event.
                    ElI-FO17B throttled open to establish RHR Loop flow of >4150 gpm.
                                                                          ** CRITICAL STEP ** SAT/UNSAT*
  &#xa3;7      /4t&A1A.                  /Z        A-    4                                        /  e-
                                                                                                                REV. 0
                                                          Page 6                                                REV. 0
  3B1d
3B3ld                                                    Page 6
 
              Shutdown Cooling Restoration With RHR Pump Overload.
Step 12 - Refer to APP for RHR Pump (B or D) overload
            Refers to APP for RHR Pump (B or D) overload
                                      A -o03-                            SAT/U NSAT*
q7
Step 13- Start redundant RHR Pump (B or D)
            RHR Loop B Pump (B or D) without overload is running.
                                                      ** CRITICAL STEP ** SAT/UNSAT*
Step 14 - Stop RHR Pump (B or D) with overload alarm.
            RHR Pump with overload alarm (B or D) is off.
                                                      ** CRITICAL STEP ** SAT/UNSAT*
Step 15 - Fully open Loop B Outboard Injection Valve El 1-F017B.
              E1I-FOI7B indicates full open.
                                                                          SAT/UNSAT*
33Bld                                      Page 7                              REV. 0
 
                  Shutdown Cooling Restoration With RHR Pump Overload.
K->
    Step 16 - Ensure Reactor Head Vent Valves, B21-F003 and B21-F004 are Open.
                Reactor Head Vent Valves, B21-F003 and B21-F004 are Open.
                                                                              SAT/UNSAT*
    Step 17 - Inform Unit SCO RHR shutdown cooling has been re-established per AOP-1 5.0.
                  Unit SCO informed RHR shutdown cooling has been re-establishedper AOP
                  15.0.
                                                                              SATIUNSAT*
    TERMINATING C.UE::. WhenHRsh*ui!sfi td'6n
                                          ioo      ing has been re-establiseprA-5O
    * Comments required for any step evaluated as UNSAT.
    33Bld                                      Page 8                                  REV. 0
 
                  Shutdown Cooling Restoration With RHR Pump Overload.
RELATED TASKS:
      2050166B401, Respond To A Loss Of Shutdown Cooling Per AOP-1 5
K/A REFERENCE AND IMPORTANCE RATING:
      295021 AA1.02          3.5/3.5
      Ability to operate and/or monitor RHR/shutdown cooling as it applies to loss of shutdown
      cooling.
REFERENCES:
      AOP-1 5.0
      APP A-4, UA-16, UA-18
TOOLS AND EQUIPMENT:
      None.
SAFETY FUNCTION (from NUREG 1123, Rev 2.):
        4 - Heat Removal From Reactor Core (Shutdown Cooling System)
REASON FOR REVISION:
        New JPM.
                                                                                          REV. 0
                                              Page 9
33Bldd
  3B1                                      Page 9                                        REV. 0
 
                Shutdown Cooling Restoration With RHR Pump Overload.
                  Time Required for Completion:          10    Minutes (approximate).
                            APPLICABLE METHOD OF TESTING
Performance:      Simulate      4                Actual    -                Unit:    2
Setting:    Control Room          -              Simulator      ( Not applicable to In-Plant JPMs)
Time Critical:            Yes                          No    4                Time Limit        N/A
Alternate Path:          Yes    4                    No
                                          EVALUATION
Trainee: _                                          SSN:
JPM:            Pass                Fail  __
Remedial Training Required: Yes            -    No
Did Trainee Verify Procedure as Authorized Copy?: Yes                      No
(Each Student should verify one JPM per evaluation set.)
Comments:
Comments reviewed with Student
Evaluator Signature:                                                Date:
33B1d                                              Page 10                                          REV. 0
 
TASK CONDITIONS:
  1. RHR Loop B was operating in Shutdown Cooling when a trip of RPS MG
      Set B resulted in a Group 8 isolation and a loss of Shutdown Cooling.
  2  RPS Bus B has been transferred to Alternate Power.
  3. RHR Loop B flow was 6000 gpm prior to the RPS MG Set B trip.
  3. The shift superintendent has directed a reactor water level band of +200" to
      +220".
INITIATING CUE:
    You are directed to restart RHR Shutdown Cooling using RHR Loop B per
    AOP-1 5.0 step 3.2.8, and inform the Unit SCO when Shutdown cooling has
    been restored.
 
                    CAROLINA POWER & LIGHT COMPANY
                        BRUNSWICK TRAINING SECTION
                          JOB PERFORMANCE MEASURE
                                CONTROL ROOM
                                                                  mmlmm--&#xfd;%
                            BNP-03-Ble
TITLE:  Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%
REVISION NO:        3
RECOMMENDED BY:
                    Instructor/Developer                      DATE
CONCURRENCE BY:
                    Line Superintendent/Supervisor            DATE
APPROVED BY:
                    Superintendent/Supervisor Training        DATE
 
              Vent the Drywell per OP-lO w/ Stack Rad Monitor Increase >50%
SIMULATOR SETUP:
A.    Initial Conditions:
      1.      Recommended Initial Conditions
              IC            11
              Rx. Pwr.      100%
              Core Age      BOC
      2.      Required Plant Conditions
              Drywell Pressure above 0.5 psig SLOWLY rising or stable, AND below 1.8 psig.
B.      Malfunctions
              None required
C.      Overrides
              Meters
  Event    Panel      Tag                  Title                Value    Activate  Deactivate
                                                              (ramp rate) Time (sec) Time (sec)
                  I
  El      XU-3    GSB02G15        Main Stack Radiation        13/5 min    0 SEC      N/A
Trigger I Q6225LGT CAC-V23 Green Lamp = False
D.      Special Instructions
        Secure Drywell Coolers 2C and 2D Fans 1 and 2 and allow drywell pressure to rise to
        &#x17d;0.6 psig as indicated on CAC-PI-2685-1 on XU-51, then restart Drywell Coolers 2D Fan
        2 and allow Drywell pressure to stabilize. Override Drywell Cooler 2C Fans 1 and 2 and
        Drywell Cooler 2D Fan 1 control switches OFF.
33B1e                                            Page 2 of 12                                  REV. 3
 
            Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%
SAFETY CONSIDERATIONS:
      NONE
EVALUATOR NOTES: (Do not read to trainee)
      1.    The applicable procedure section WILL be provided to the trainee, once it is
            demonstrated he/she knows the correct procedure.
        2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained in
            NUREG 1021, Appendix E, or similar to the trainee.
                        Read the following to trainee.
TASK CONDITIONS:
      1.  Drywell pressure is above normal due to a partial loss of Drywell Cooling.
      2.  AOP-14.0 has been entered.
      3.  Standby Gas Treatment System is in the Standby Alignment.
      4.  The plant stack radiation monitor is in service and CAC-CS-5519, CAC Purge Vent
          Isolation Override is in OFF.        .    ,-rj--              '.
                                                  t4D
INITIATING CUE:
  The Unit SCO directs you to vent the Drywell via Standby Gas Treatment, and to inform him
  when drywell pressure has been reduced below 0.5 psig.
33B1e                                        Page 3 of 12                              REV. 3
 
                Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%
                                      PERFORMANCE CHECKLIST
    NOTE: Sequence is assumed unless denoted in the Comments.
    Step 1 - Obtain current revision of OP-10, Section 8.2 and verify if applicable.
                    Currentrevision of OP-10, Section 8.2 is obtainedand verified as required.
                                                                                SAT/UNSAT*
    Step 2 - Record D12-RR-R600B, STACK RAD MONITOR, digital point display.
                    Value for D12-RR-R600B recorded in OP-IO.
                                                                                  SAT/UNSAT*
    Step 3 - Add 0.17 to the value to obtain the logarithmic equivalent of a 50% increase in stack
              radiation monitor reading and record result.
I -I
                    Value recorded in OP-10 of initial reading + 0. 17 (1.23).
                                                                                SAT/UNSAT*
                                                              I.
                                                                            >/
    NOTEK>        *I ep  of Section 8.2.2S i*no applicble*    ;**>***;          :?        *i
    Step 4 - Monitor Stack Rad Monitor, D12-RM-R600B, for increase in activity during venting.
                    D 12-RM-R600B periodically monitored.
                                                                                  SAT/UNSAT*
    331le                                        Page 4 of 12                                  REV. 3
 
          Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%
Step 5 - CLOSE REACTOR BUILDING SBGT TRAIN 2A INLET VALVE, VA-2D-BFV-RB.
              VA-2D-BFV-RB indicates fully closed.
                                                ** CRITICAL STEP ** SAT/UNSAr*
Step 6 - CLOSE REACTOR BUILDING SBGT 2B INLET VALVE, VA-2H-BFV-RB.
              VA-2H-BFV-RB indicates fully closed.
                                                ** CRITICAL STEP ** SAT/U NSAT*
Step 7 - OPEN SBGT DW SUCT DAMPER, VA-2F-BFV-RB.
              VA-2F-BFV-RB, indicates open.
                                                ** CRITICAL STEP ** SAT/UNSAT*
    NT        Steps 10 nd'f6&sect;&#xfd;
                            11hofoSeto 827a:    not apIiab1e
Step 8 - OPEN DW PURGE EXH VALVE, CAC-V9.
              CAC-V9 indicates full open.
                                                ** CRITICAL STEP ** SAT/U NSAT*
33Ble                                  Page 5 of 12                            REV. 3
 
          Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%
Step 9 - OPEN DW PURGE EXH VALVE, CAC-V23.
            CAC-V23 indicates full open.
                                                ** CRITICAL STEP ** SAT/UNSAT*
Step 10- OPEN DW HEAD PURGE
            CA C-V49 indicates full open.
                                                                      SAT/U NSAT*
Step 11 - OPEN DW HEAD PURGE EXH VLV, CAC-V50.
            CAC-V50 indicates full open.
                                                                      SAT/UNSAT*
                  c-Ur~a~CA-
Step 12 - Monitor Main Stack Rad Monitor and determine reading has risen by >50%.
            Determines Main Stack Rad Monitorreading has risen by >. 17 (50%).
                                                                      SAT/UNSAT*
3B3le                                    Page 6 of 12                            REV. 3
 
          Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%
Step 13- CLOSE DW PURGE EXH VLV, CAC-V23.
            CAC-V23 indicates full closed.
  /11
                                                ** CRITICAL STEP ** SAT/UNSAT*
                      CO,cn-,
ct%4s-      6{tt
                    flAitr,      o 4 Ct*
Step 14 - CLOSE DRYWELL PURGE EXH VALVE, CAC-V9.
            CAC-V9 indicates full closed.
                                                ** CRITICAL STEP ** SATIU NSAT*
    NT:      EtrStp1ORSe:i6o hsJMi                    rtclOL ifopnd
Step 15 - ENSURE DW HEAD PURGE EXH VLV, CAC-V49, IS CLOSED.
            CAC-V49 indicates full closed.
                                                ** CRITICAL STEP ** SATIUNSAr
3Ble                                    Page 7 of 12                            REV. 3
 
          Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%
Step 16 - ENSURE DW HEAD PURGE EXH VLV, CAC-V50, IS CLOSED.
              CAC-V50 indicates full closed.
                                                  ** CRITICAL STEP ** SAT/U NSAT*
Step 17 - CLOSE SBGT DW SUCT DAMPER, VA-2F-BFV-RB.
              VA-2F-BFV-RB indicates full closed.
                                                  ** CRITICAL STEP ** SAT/U NSAT*
                                I..r w6r ae / FlC4-.-,
                                                                      01*00
          0~l                                                ............
                                                            ~.
                                                          K                      2<
              T'9 ar  T'cii~
                      ON
Step 18 - OPEN SBGT TRAIN 2B REACTOR BUILDING SUCTION VALVE, VA-2H-BFV-RB.
              VA-2H-BFV-RB indicates full open.
                                                                        SAT/U NSAT*
Step 19 - OPEN SBGT TRAIN 2A REACTOR BUILDING SUCTION VALVE, VA-2D-BFV-RB.
              VA-2D-BFV-RB indicates full open.
                                                                        SAT/UNSAT*
33B1e                                    Page 8 of 12                              REV. 3
 
          Vent the Drywell per OP-10 w/Stack Rad Monitor Increase >50%
Step 20 - CONFIRM ALL SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKERS
          are closed.
              All Suppression Chamberto Drywell vacuum breakers verified closed.
                                                                          SAT/U NSAT*
Step 21 - Inform Unit SCO venting, is secured due to increase of 50% in Main Stack Rad
          Monitor reading.
              Unit SCO is informed venting is secured due to increase of 50% in
              Main Stack Rad Monitorreading.
                                                                          SAT/UNSAT*
                          tary &#xfd;conaqinme
                        PriiM'&#xfd;                        her'g0      u1
* Comments required for any step evaluated as UNSAT.
33B1e                                    Page 9 of 12                                REV. 3
 
            Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%
                                    LIST OF REFERENCES
RELATED TASKS:
      261 008 B1 01, Perform Normal Primary Containment Venting.
KIA REFERENCE AND IMPORTANCE RATING:
      261000 A4.04 3.3/3.4
      Ability to manually operate and monitor Primary Containment Pressure.
REFERENCES:
      20P-10, Sect. 8.2 Rev 59
TOOLS AND EQUIPMENT:
      None
SAFETY FUNCTION (from NUREG 1123, Rev 2):
        Safety Function 9, Radioactivity Release
REASON FOR REVISION:
        Bank JPM. Minor changes.
33Ble                                    Page 10 of 12                    REV. 3
 
            Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%
Time Required for Completion:          10    Minutes (approximate).
                            APPLICABLE METHOD OF TESTING
Performance:        Simulate                      Actual  V/
                                                                                    Unit:    2
Setting:      Control Room                        Simulator-" (Not applicable to In-Plant JPMs)
Time Critical:            Yes                          No  I/              Time Limit        N/A
Alternate Path:            Yes        4/
                                                        No
                                            EVALUATION
Trainee:                                              SSN:
JPM:              Pass                  Fail
Remedial Training Required: Yes                    No
Did Trainee Verify Procedure as Authorized Copy?: Yes                      No
(Each Student should verify one JPM per evaluation set)
Comments:
Comments reviewed with Student
Evaluator Signature:                                                Date:
33B1e                                          Page 11 of 12                                    REV. 3
 
TASK CONDITIONS:
    1.  Drywell pressure is above normal due to a partial loss of Drywell Cooling.
    2.  AOP-14.0 has been entered.
    3.  Standby Gas Treatment System is in the Standby Alignment.
    4.  The plant stack radiation monitor is in service and CAC-CS-5519, CAC Purge Vent
          Isolation Override is in OFF.
INITIATING CUE:
  The Unit SCO directs you to vent the Drywell via Standby Gas Treatment, and to inform him
  when drywell pressure has been reduced below 0.5 psig.
 
                      CAROLINA POWER & LIGHT COMPANY
                                                                              v\
                        BRUNSWICK TRAINING SECTION
                          JOB PERFORMANCE MEASURE
                                CONTROL ROOM
                              BNP-03-Blf
TITLE:  Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan
REVISION NO:        0
RECOMMENDED BY:
                      Instructor/Developer                      DATE
CONCURRENCE BY:
                      Line Superintendent/Supervisor            DATE
APPROVED BY:
                      Superintendent/Supervisor Training        DATE
 
        Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan
Simulator Setup:
    IC-ll
Triggers
    El - Trips CREV Train A
    E2 - Trips CREV Train B
    E3 - Overrides Emerg Air Fan Fail To Run alarm
Malfunctions
    None
Overrides
      El - CREV Train A Switch in STBY
      E2 - CREV Train B Switch in STBY
      E3 - Alarm UA-14 2-2 ON
3Blf                                      Page 2 of 9                              Rev. 0
 
          Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan
SAFETY CONSIDERATIONS:
      None
EVALUATOR NOTES: (Do not read to examinee)
1. The applicable procedure section WILL be provided to the examinee.
2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained in NUREG 1021,
    Appendix E, or similar to the examinee.
                      Read the following to examinee.
TASK CONDITIONS:
        jat-  0>U.*&      &#xa3;&W4YSL
    1. Unit Two is operating at power. Unit One is in MODE 5.
    2. The Control Building Emergency Recirculation System is in standby.
    3. A fuel handling accident has occurred on Unit One.
                  /
    4. The Unit SCO has entered AOP-05.0 and EOP-04-RRCP.
    5. This JPM is time critical.                                      d,
                                                                          ,.P,,L.,=c
INITIATING CUE:                              ,ZK4s      72t*    .t
      You are directed to perform the actions for manual startup of the Control Building
      Emergency Recirculation System Per the Hard Card and inform the Unit SCO when the
      actions are complete.
33B1f                                      Page 3 of 9                                  Rev. 0
 
        Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan
                                PERFORMANCE CHECKLIST
NOTE: Sequence is assumed unless denoted in the Comments.
Step 1 -Obtain hard card S/1067.
              Hard card S/1067 obtained.
                                                                          SAT/UNSAT*
Step 2 - PLACE CB Emergency Recirculation Fan, 2A(B)-ERF-CB in ON.
              2A(B)-ERF-CB control switch placed to ON.
                                                        ** CRITICAL STEP ** SAT/UNSAT*
Step 3 - ENSURE Control Room Normal Makeup Damper, 2L-D-CB, Closes.
              2L-D-CB, Control Room Normal Makeup Damper verified closed.
                                                                    SAT/UNSAT*
Step 4 - ENSURE Control Building Emergency Recirculation Damper, VA-2J-D-CB, Opens.
              VA-2J-D-CB, ControlBuilding Emergency Recirculation Damper verified OPEN.
                                                                          SAT/UNSAT*
3Blf                                          Page 4 of 9                              Rev. 0
 
        Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan
Step 5 - Recognize loss of running CREV Fan an start      e CREV not previously started.
            One CREV Train (A ore B) is in opera
                                                  ** CRITICAL S 'EP ** SAT/UNSAT*
Step 6 - STOP Control Building Washroom Exhaust Fan, 2D-EF-CB, and ENSURE
        associated damper closes.
            2D-EF-CB, ControlBuilding Washroom Exhaust Fan, stopped and associated
            damper verified closed.
                                                  ** CRITICAL STEP ** SAT/UNSAT*
Step 7 - STOP Control Building Mechanical Equipment Room Vent Fans, 2F-SF-CB and
        2E-EF-CB, and ENSURE associated Supply and Exhaust Dampers CLOSE.
            2F-SF-CB and 2E-EF-CB, Control Building Mechanical Equipment Room Vent
            Fans stopped and associatedSupply and Exhaust Dampers verified closed.
                                                  ** CRITICAL STEP ** SAT/UNSAT*
33B1f                                    Page 5 of 9                                  Rev. 0
 
        Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan
Step 8 - STOP Cable Spread Room 2 Vent Fans, 2A-SF-CB and 2A-EF-CB, and ENSURE
        associated Supply and Exhaust Dampers CLOSE.
              2A-SF-CB and 2A-EF-CB, Cable Spread Room 2 Vent Fans stopped and
              associatedSupply and Exhaust Dampers verified closed.
                                                        ** CRITICAL STEP ** SAT/UNSAT*
PROMPT: When requested to STOP (Unit One) CabledSpead Ro6om j6nt                  Fans isitiate
            bat'chfi'Ie)u'nit'one'cable spread fanshudw
Step 9 - Request Unit 1 STOP Cable Spread Room I Vent Fans, 1A-SF-CB and 1A-EF-CB,
          and ENSURE associated Supply and Exhaust Dampers CLOSE.
              IA-SF-CB and IA-EF-CB, Cable Spread Room I Vent Fans stopped and
              associatedSupply and Exhaust Dampers verified closed.
                                    1/1//-icC    5777-05  14                SAT/UNSAT*
                                                    &2i Fotz      J7D 0?'O
Step 10 - Inform Unit SCO that actions for manual startup of the Control Building Emergency
            Recirculation System are complete.
              Unit SCO notified.
                                                                              SAT/UNSAT*
TERMINATINGCue: Wen the;ontrol Buiding Emegency ecirculation System has been
                          sared a'nd isolated perthe har'd        this JPM is comrn ete.-          iN
  .  Comments required for any step evaluated as UNSAT.
3Blf                                          Page 6 of 9                                      Rev. 0
 
          Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan
RELATED TASKS:
      288202B101, Start the Control Building ventilation System per OP-37
K/A REFERENCE AND IMPORTANCE RATING:
      290003 A4.01      3.2/3.2
      Ability to use procedures to manually initiate Control Building HVAC.
REFERENCES:
      Hard Card S/1067
TOOLS AND EQUIPMENT:
      None
SAFETY FUNCTION (from NUREG 1123, Rev. 2)
      9, Radioactivity Release
REASON FOR REVISION:
        New JPM.
33Blf                                      Page 7 of 9                              Rev. 0
 
          Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan
                                        LIST OF REFERENCES
Time Required for Completion: 10          Minutes (approximate).
                              APPLICABLE METHOD OF TESTING
Performance:        Simulate                -      Actual    "                      Unit:    0
Setting:      Control Room                      Simulator    " (Not applicable to In-Plant JPMs)
Time Critical:            Yes    "                    No                    Time Limit      20 min
Alternate Path:            Yes    V                    No
                                          EVALUATION
Examinee:                                                SSN:
JPM:              Pass                Fail
Remedial Training Required: Yes                    No
Did Examinee Verify Procedure?          Yes      __      No
(Each Student should verify one JPM per evaluation set)
Comments:
Comments reviewed with Student
Evaluator Signature:                                                  Date:
33Blf                                            Page 8 of 9                                        Rev. 0
 
TASK CONDITIONS:
                            C4 2      S
      tc 4,le
  1. Unit Two is operating at power. Unit One is in MODE 5.
  2. The Control Building Emergency Recirculation System is in standby.
  3. A fuel handling accident has occurred on Unit One.
  4. The Unit SCO has entered AOP-05.0 and EOP-04-RRCP.
  5. This JPM is time critical.
INITIATING CUE:
    You are directed to perform the actions for manual startup of the Control Building
    Emergency Recirculation System Per the Hard Card and inform the Unit SCO when the
    actions are complete.
 
                    CAROLINA POWER & LIGHT COMPANY
                        BRUNSWICK TRAINING SECTION
                          JOB PERFORMANCE MEASURE
                                  CONTROL ROOM
                        BNP-03-Blg
              CoePromnePrmtr                hc      aulAR    A
LESSON TITLE: Core Performance Parameter Check - Manual APRM GAF
              Adjustment Required
REVISION NO:        0
RECOMMENDED BY:
                    Instructor/Developer                  DATE
CONCURRENCE BY:
                    Line Superintendent/Supervisor        DATE
APPROVED BY:
                    Superintendent/Supervisor Training    DATE
 
    Core Performance Parameter Check - Manual APRM GAF Adjustment Required
SIMULATOR SETUP:
A.    Initial Conditions:
      1.    Recommended Initial Conditions
            IC 11 (UNIT1)
B.    Malfunctions
      None
C.    Overrides
      None
D.    Special Instructions
      1. Ensure Process Computer is operating properly.
      2. At the NUMAC adjust the gain for APRM 1 so APRM 1 GAF (PPC 820) is 1.02.
      3. Obtain an updated Core Performance Log to provide to the examinee.
33Blg                                    Page 2 of 15                            REV. 0
 
  Core Performance Parameter Check - Manual APRM GAF Adjustment Required
SAFETY CONSIDERATIONS:
    1.  NONE.
EVALUATOR NOTES: (Do not read to examinee)
    1. The applicable procedure sections WILL be provided to the examinee.
    2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained in
        NUREG 1021, Appendix E, or similar to the examinee.
    3. This JPM will be administered on the Simulator.
    4. Performance means Frequency A (every 24 hrs when >25% RTP) is required.
                          Read the following to examine9e.
                              C-0&#xfd; TADCl \orX y
TASK CONDITIONS:
                          (  44&#xfd;)
          The CODSR requires performance of 1PT-01.11        Core Performance Parameter
          Check on Unit 1.
    2.    All applicable prerequisites of I PT-01.11 are met.
    3.    Ifindependent verification is required, assume the verification is complete as
          applicE ble.
INITIATIN4G CUE
                  @
  The Uni tSCO directs you to perform 1PT-01.11 and inform the SCO of the results upon
  complet ion.
  >0        koua'&#xfd;CA-a        1-14&#xfd;CA1o.      &#xfd;-;
3Blg                                        Page 3 of 15                                  REV. 0
 
      Core Performance Parameter Check- Manual APRM GAF Adjustment Required
                                    PERFORMANCE CHECKLIST
  NOTE: Sequence is assumed unless denoted in the Comments.
  Step 1 - Obtain current revision of 1PT-01.11 and verify if applicable.
                Current revision of IPT-01. 11 obtainedand verified as required.
                References Section 7.1
                                                                                          SATIU NSAT*
  PROMPT          ncce examineeOdemonstratesjthat he/she can demandizaCorelPerormanceLog*
                usiethro  u butth
              II nrovdehedore          rem*idd&      obtane boam Deoa
                                                          teeormanceo        sprinthJP
                                                                                            a
                                                                                                    .f..
                                                                                                      .  I
                                                                                                      li
      NOE      An eit of      processh:compupeyc~ye                pre-ranmngj
                  ~~~~~omue;display:        d~~i~t~bu              ot1    d~tip    4  rsigte
                    id~i
                        a,re:Many mnethd tocl uio<dtalJ
                      "-r
I
                                A
                      "plydepressth    r~          Ba lbhc sbtky    9KM~ MRt            U      st
  Step 2 - Obtain an edit of the process computer core performance program.
                Core PerformanceLog obtained from process computer.
            ,0 t7~leozth&#xfd;/&-0. /0c                                                      SAT/UNSAT*
                &Yr    r4e      1?                  Az 2A.-
  33Blg                                      Page 4 of 15                                      REV. 0
 
      Core Performance Parameter Check - Manual APRM GAF Adjustment Required
  Step 3 - Verify, using the Failed Sensor List, failed inputs have correct substitute values.
                  _De*rjte *es-ne-faieds sensors-exist-a      at this step is marked as N/A.
                                              0                                        SAT/UNSAT*
  Step 4 - Locate WTFLAG on the Core Performance Log and proceed with step 7.1.5.
                  WTFLAG determined to equal 2, proceeds to Step 7.1.5 of IPT-01. 11.
                                                                                        SAT/UNSAT*
  Step 5 - Determine if criteria listed in Section 6.1 of 1PT-1.11 are met.
                  Checks core performance log and verifies value for CMFLCPR *1.00.
                                                                                        SATIU NSAT*
                  Checks core performance log and verifies value for CMAPRA T *51.00.
                                                                                        SAT/UNSAT*
14
  33Blg                                        Page 5 of 15                                    REV. 0
 
  Core Performance Parameter Check- Manual APRM GAF Adjustment Required
Step 6 - Determine if the acceptance criteria listed in Section 6.2 of 1PT-01.11 are satisfied.
              Determines APRMS 2, 3, and 4 are within limits and APRM I is above the limit.
                                                            "**CRITICAL STEP ** SAT/UNSAT*
Step 7 - Obtain current revision of I OP-09 and verify if applicable.
              Currentrevision of IOP-09 obtainedand verified as required. References
              Section 8.1.2.
                                                                                  SAT/UNSAT*
Step 8 - OBTAIN Unit SCO permission to adjust the APRM GAFs.
              ObtainsSCO permission.
3Blg                                      Page 6 of 15                                    REV. 0
 
      Core Performance Parameter Check - Manual APRM GAF Adjustment Required
  -Step 9 - OBTAIN Display 820 at the PPC.*
                PPCScreen 820 is displayed.
                                                                                  SATIUNSAT*
  Step 10 - Review heat balance substituted values and failed sensors for impact on APRM I
              gain adjustment.
                Determines no substitute values and no failed sensors.
                                                                                  SAT/UNSAT*
  Step 11 - Ensure APRM 1 keylock is in OPER.
                Checks APRM keylock in OPER.
                                                                                  SAT/UNSAT*
3/4
  Step 12 - Ensure APRM 1 heading indicates OPERATE.
                Checks APRM 1 headershows OPERATE.
                                                                                  SAT/UNSAT*
  Step 13 - OBTAIN value oU1.C51R1066.
                Obtains UIC51R1066 from PPC Screen 820 or Core PerformanceLog.
                                                                                  SAT/U NSAT*
  3Blg                                    Page 7 of 15                                REV. 0
 
      Core Performance Parameter Check- Manual APRM GAF Adjustment Required
  Step 14- PLACE the APRM-to be adjusted in BYPASS.
              PlacesAPRM I in bypass at P603.
                                                                                SAT/UNSAT*
  Step 15 - CONFIRM BYP is indicated for the selected APRM channel at Panel P608.
              Observe BYP (BYPASS) heading in inverse video for APRM 1.
                                                                                SAT/UNSAT*
  Step 16 - PRESS ETC soft key to obtain ENTER SET MODE soft key.
              Obtains the ENTER SET MODE soft key.
                                                            "**CRITICAL STEP ** SAT/UNSAT*
  Step 17 - PRESS ENTER SET MODE soft key.
              Presses ENTER SET MODE soft key.
                                                            ** CRITICAL STEP ** SAT/UNSAT*
            fl          seond exir~befrethe pasodicete &(ENT"s&#xfd;'~edi
  PRoMPT.*    i r,eueste, d irect tbe traihee tq take any actions needed tq eor~tih~~ft
I                                                                                            II
  33Blg                                    Page 8 of 15                              REV. 0
 
    Core Performance Parameter Check - Manual APRM GAF Adjustment Required
                                                                                    P  '
Step 18 - ENTER password "1 2 3 4" AND PRESS ENT.
                Using the data keypad enters 1234 and presses ENT before 10 seconds expire.
                                                                  "**CRITICAL STEP ** SAT/UNSAT*
Step 19 - SELECT APRM GAIN using cursor keys.
                Using the cursorkeypad selects APRM GAIN.
                                                                                      SATIUNSAT*
Step 20 - PRESS SET PARAMETERS soft key.
                Presses SET PARAMETERS soft key.
                                                                  ** CRITICAL STEP ** SAT/UNSAT*
Step 21 - CONFIRM APRM indicates SET PARAMETERS: APRM GAIN display.
                Observes SET PARAMETERS: APRM GAIN displayed.
                                                                                      SAT/UNSAT*
      NOT;* i' ;    ;LeEE1!
                        ST ea*:a6d!RIGN
                                ar~      cuso
                                              a e*esaeueolselec
                                      ..,,$,curso  gjVlp crso*&#xfd;      11th
                                                                          *e; ESIREQ GAIN
                                                                          cnan1,            1n.. t&:l *
                                                                                            dgit
                                                                                          u u~*:
                                                                                      u -es
          a p.........                        g<,p                                    i
33B1g                                            Page 9 of 15                              REV. 0
 
    Core Performance Parameter Check - Manual APRM GAF Adjustment Required
Step22 : ADJUST the DESIRED APRM GAIN so that the PROJECTED FLUX (%) is &#x17d;
        U1 C51 RI 066 value previously obtained.
            Using the cursorkeypad selects and changes the DESIRED APRM GAIN until
            PROJECTED FLUX (%) is &#x17d; UIC51R1066 value obtained in Step 9.
                                                      ** CRITICAL STEP ** SATIUNSAT*
Step 23 - PRESS ACCEPT soft key.
            PressesACCEPT soft key.
                                                      "**CRITICAL STEP ** SAT/UNSAT*
Step 24 - CONFIRM the "PRESENT" APRM GAIN changes to equal the "DESIRED" APRM
          GAIN AND the PROJECTED AGAF equals 1.000.
            Confirms "PRESENT"and "DESIRED"APRMGAIN equal and PROJECTED
            AGAF is *<1.000.
                                                                          SAT/UNSAT*
Step 25- PRESS EXIT soft key.
            Presses EXIT soft key.
                                                                          SATIU NSAT*
Step 26 - PRESS EXIT SET MODE soft key.
            Presses EXIT SETMODE soft key.
                                                                          SAT/UNSAT*
33Blg                                  Page 10 of 15                          REV. 0
 
        Core Performance Parameter Check - Manual APRM GAF Adjustment Required
    Step 27 - PRESS YES soft key.
                Presses Yes soft key.
                                                                                SAT/UNSAT*
      Ii POMP:  Ifor    exmndthat"ante 'operator: wi corn pete Attac hmpn,  4H$ 9M  M'ii
I.
    Step 28 - CONFIRM APRM display header shows OPERATE.
                  Confirms APRM display headerindicates OPERATE.
                                                                                SAT/UNSAT*
    Step 29 - Verify APRM GAF * 1.00 on Attachment 3 of IOP-09.
                  Confirms APRM 1 AGAF *<1.00 using PPC 820 screen or by obtaininga new
                  Core Performance Log.
                                                                                SAT/U NSAT*
    Step 30 - REMOVE APRM from BYPASS.
                  Removes APRM I from bypass at P603.
                                                                                SAT/UNSAT*
    PROMPT:                                  roter operatoqiltaseh gi
                    Infrmthb6 ex'amine6: athatb                              a~rTtXK
Ih
                                          tcninue with, OPT-OIAI2
                                      PPiadJA                                              U
6.
    33B1g                                    Page 11 of 15                            REV. 0
 
    Core Performance Parameter Check - Manual APRM GAF Adjustment Required
  Step 31 - Determine if CMFLPD is *<1.00.
                  Checks core performance log and verifies value for CMFLPD is *<1.00.
                                                                                                                  SAT/UNSAT*
          ~f~The Follw~ing Stepr&#xfd;isiely~alreadyipprorrne~adi
        NOTE:                                                                                      Oyqietb  Mld  IITi      -j,
                                                                                                                                    t      i
                                        ' R........
                                    comD~~eu              aiaiIM
  Step 32 - Verify acceptance criteria listed in Section 6.0 met satisfactorily.
                Acceptance criteria determined to be satisfactory.
                                                                                                                  SAT/U NSAr*
            *Q
                PROMP*::*
                    ~~h'
                                    cn*eq ~          ta~        :~  *1sop
                                                                      J.          mSte*etez        az
                                                                                                      -anditsfat_0    110mii* 1N511ii]
  Step 33 - Notify Unit SCO that I PT-01.11 is completed SAT.
                  Supervisor notified.
                                                                                                                SAT/U NSAT*
6
                c
              aIetac
                ~~~a  p p q
                              c. teI
                            :q j e    51v
                                                    n
                                                .,''E1*011i    Wi"S    I hee
                                                                            Ino* 1.~
                                                                                  rGm!!
                                                                          ...........
                                                                                      e dthes,'ue
                                                                                          !e.....  ....
                                                                                                            s ;apiispis acpto, y
                                                                                                          .....
                                                                                                          W            ............    .
                                                                                                                                          i1
  * Comments required for any step evaluated as UNSAT.
                            Ox94X-
                                                                          t
                                                                                      /400
                      1016&#xfd;A                          lc),&#xfd;        ",f
  3Blg                                                Page 12 of 15        f                                                        REV. 0
 
    Core Performance Parameter Check - Manual APRM GAF Adjustment Required
                                    LIST OF REFERENCES
RELATED TASKS:
      2152098401: Operate the PRNMS per OP-9.
KIA REFERENCE AND IMPORTANCE RATING:
      215005 A1.07      (3.0/3.4)
REFERENCES:
      1PT-01.11
      1OP-09
TOOLS AND EQUIPMENT:
      None.
SAFETY FUNCTION (from NUREG 1123, Rev 2):
      7 - Instrumentation (APRM System)
REASON FOR REVISION:
        Bank JPM. Modified to provide enhanced examiner notes. Changed from alternate
        path to not alternate path.
33Blg                                    Page 13 of 15                            REV. 0
 
    Core Performance Parameter Check - Manual APRM GAF Adjustment Required
Time Required for Completion:        15    Minutes (approximate).
                            APPLICABLE METHOD OF TESTING
Performance:        Simulate                      Actual    4                    Unit:
Setting:      Control Room        __              Simulator 4  (Not applicable to In-Plant JPMs)
Time Critical:            Yes                          No  4            Time Limit      N/A
Alternate Path:            Yes                        No    4
                                          EVALUATION
Trainee:                                            SSN:
JPM:              Pass                Fail
Remedial Training Required: Yes                    No
Did Trainee Verify Procedure as Authorized Copy?: Yes                    No
(Each Student should verify one JPM per evaluation set)
Comments:
Comments reviewed with Student
Evaluator Signature:                                              Date:
33B1g                                          Page,14 of 15                                      REV. 0
 
\- /
    TASK CONDITIONS:
          1. The CODSR requires performance of 1PT-01.11 Core Performance Parameter Check
            on Unit 1.
          2. All applicable prerequisites of I PT-01.11 are met.
          3. If independent verification is required, assume the verification is complete as
            applicable.
    INITIATING CUE:
      The Unit SCO directs you to perform 1PT-01.11 and inform him of the results upon
        completion.
 
/          BRUNSWICK-1            TWK-0305  03JAN28-1(        3_25 19977 MWD/MTU          TRIGR=PPXSU      REV=JUN01    C
                                    CORE PERFORMANCE LOG ---              LONG EDIT    (PAGE 2)
                      *****  CONTROL ROD POSITIONS AND CALIBRATED LPRM READINGS                          *****
              02      06      10        14      18        22      26        30    34        38    42      46      50
        51                                                                                                                51
        47                    --    21  ..        -. 33    ..        -.  37  -.    .-- 28 -..        .- 16            47
                                    46                59                57            56              34
                                    68                79                69            80              51
        43                    --    48  --      36 46    --      16 48    --    36 48 -..        .-  39            43
        39          18  -..    ..  37    . .    --  46  ..        --  51        -.- 41        --    28            39
                    37              67                65                75            65              57
                    56              87                65                60            75              82
        35    --    40 --      36 48    --      08 38    --      24 36      --  08 43            36 48                35
        31    --    23        --    46          --    52          --    50  -..    ..  50  -.      .-- 37  -..    .. 31
                                                                                                                                "* OTHER FA]
                    41              65                74                67            75              56                    "* SENSOR DT
                    57              66                54                52            60              70
        27    --    47        16 41              24 34              08 34    --  24 37    --    16 50    -..    .. 27
                                                                                                                                SENSOR    S9
        23    --  21  -.      .-- 41 ..          --  48  ..        .-- 51  -.    .-- 45  ..      -- 33        --  23    1PPXDUI1    E
                    39              66                66                73            65              58                  1PPXDUM2    E
                    57              78                57                54            65              79
        19    --  45  --    36 43 --          08 36    --        24 35    --    08 40    --    36 49                19
        15              -.      .-- 30  ..        -. 41            --    46  ..    -- 37          -.- 21            15
                                    60                67                65            66              45
                                      85                78                66            87              68
        11              -..      .- 60    --      36 43              16 41    --    36 50    --.    .- 51              11
        07      D                        - ..      ..- 21  -..      ..  24  -..    .. 1i8                            07
                  C                                    39                41            37
                B                                      58                57            56
        03      A                                --    45  -.  .      .--48  -..    .--42                              03
              02      06    10        14      18      22        26        30    34      38    42        46    50
  CONTROL ROD SYMMETRY      : EIGHT-FOLD                CONTROL ROD SEQUENCE : A-2                  CONTROL ROD DENSITY : 0.0791
 
BRUNSWIC(    -        WK-0305 03JAN28-10.53.25                          19977 MWD/MTU                TRIG(          &#x17d;PXSU    REV=JUN01                          (
                                CORE PERFORMANCE LOG ---                        LONG EDIT
          B1CT4 BOC TO EOFPC-2026MWD/MT ODYNB POW DEP MCPR
    CALCULATION TYPE : NORMAL                                    CONVERGENCE : TIGHT                        SYMMETRY        : FULL
    CTP CALCULATION          : HEAT BALANCE                                                                CYCLE :            14
STATE CONDITIONS                FLOW RATES                      CORE PARAMETERS              NUCLEAR LIMITS                      LOCATION
GMWE    919.61                WT                    78.1        CMEQ    0.2466          P-PCS                        1.94    41-20-09
CMWT 2738.4 (93.7%)            WTSUB              76.58          CAEQ    0.1543          FCBB                        2.443
PR      1044.9 PSIA            WTFLAG                      2    CAQA    0.1432          CMPF                        2.835    39-14-06
DHS      20.60                WFW                11.83          CAVF    0.4846          CMFLCPR                    0.934    29-24
WT        78.10(101.4%)        WD                33.69 CAPD            55.2607              P=1.468 F=1.260
CRD    0.0791                                                  RWL    187.1008          CMAPRAT                    0.928    41-18-08
CYCEXP        0 MWD/MTU            ERATIO 0.96 CDLP                      19.0616              P=1.000 F=1.000
MEASURED/CALCULATED            LPRM READINGS DPCC 24.7085                                  CMFLPD                      0.867    39-14-06
AVG:    0.00%        MAX:        0.00%                          KEFF    1.0016          CMFLEX                      0.777    11-48-06
LOCATION                    1        2              3        4      5      6      7              8              9    10    11    12
AXIAL REL POWER          0.54    1.22          1.37          1.43 1.40 1.32 1.19 0.98 0.89 0.75 0.60 0.31
REGION REL POWER        0.92    1.02          0.93          1.02 1.16 1.03 0.92 1.02 0.92
RING REL POWER          0.83    1.23          1.15          1.13 1.12 1.09 0.70
APRM GAFS                1.03    1.00          1.00          1.00
                        ****** THE 10 MOST LIMITING BUNDLES ******
FLCPR    LOC    CPR    LIMIT APRAT                        LOC    APLHGR    LIMITI FLPD                          LOC      LPD  LIMIT
                                                                        10.41  11.22
0.934  29-24    1.573    1.468        0.928            41-18-08 10.41        11.24 0.867                  39-14-06        11.62  13.40
  0.934  39-14    1.573    1.468        0.926            35-12-08                          0.864            41-42-05        11.58  13.40
  0.928  31-22    1.582    1,468        0.917            43-18-08 10.09        11.00 0.860                  41-16-08        11.53  13.40
  0.922  31-28    1.593    1.468        0.914            35-10-08 10.05        10.99 0.859                  37-12-08        11.51  13.40
  0.921  37-24    1.594    1.468        0.911            43-20-08 10.29        11.29 0.846                  35-14-08        11.33  13.40
  0.921  33-24    1.594    1.468        0.907            33-10-08 10.15        11.19 0.845                  39-18-08        11.32  13.40
  0.921  27-22    1.595    1.468        0.869            39-14-07      8.05    9.27 0.831                  43-16-07        11.14  13.40
  0.920  29-20    1.596    1.468      0.866            41-16-08      8.03    9.27 0.831                  37-10-07      11.13  13.40
  0.919  29-16    1.598    1.468      0.865            37-12-08      8.02    9.27 0.830                  39-44-05      11.12  13.40
  0.916  39-18  1.602    1.468      00.857            41-42-05 8.16          9.52 0.829                  43-40-05        11.12  13.40
  # ASSYS W LIMITS > 1                I FLCPR                      0 1 APRAT                0      1 FLPD                    0
                        ********* NUCLEAR LIMITS BY REGION *********
                            7                                        8                                          9
                0.919        13-40                          0.909      23-38                0.922                  39-40
                0.862      13-40-05                        0.824    29-46-05              0.864                41-42-05
                0.912      17-42-08                        0.899    33-44-08              0.917                35-42-08
                ----------.------------------------------                          +----------------------------
                            4                                        5                                          6
                0.911        15-30                          0.934      29-24                0.921                  37-24      * MFLCPR *
                0.817      07-30-05                        0.739    31-22-11              0.825                45-24-05 * MFLPD *
                0.903      09-20-08                        0.813    33-26-14              0.911                43-20-08 * MAPRAT *
                                  --------------------------                                                                          *----------------------------
                            1                                        2                                          3
                0.927        13-14                          0.919      29-16                0.934                  39-14
                0.862      13-14-06                        0.817    29-08-05              0.867                39-14-06
                0.921      17-12-08                        0.907    33-10-08              0.928                41-18-08
}}

Latest revision as of 12:10, 23 March 2020

February 50-325/2003-301 Exam Draft JPMs & Outlines
ML030840286
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/09/2002
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Keenan J
Carolina Power & Light Co
References
-RFPFR, 50-324/03-301, 50-325/03-301
Download: ML030840286 (208)


See also: IR 05000325/2003301

Text

Draft Submittal

(Pink Paper)

BRUNSWICK EXAM

50-2003-301

50-325 & 50-324

FEBRUARY 10 - 14 & 19, 2003

(A 1. Administrative Questions/JPMs

&' 2. In-plant JPMs /

t' 3. Control Room JPMs (simulator JPMs) /

eb 4 . Administrative Topics Outline ES-301-1 -'

V'5. Control Room Systems and Facility Walk-Through V

Test Outline ES-301-2

Administrative Topics Outline

RO

Administrative Subject/Description Method of evaluation

Topic

A.1 GEN JPM

2.1.33 Complete Jet Pump Operability per OPT-1 3.1

(3.4) Note: Data will indicate a failed Jet Pump. The RO

should understandthe TS implications (and safety

implications) of the failed pump.

A.1 GEN Questions:

2.1.33/2.1.25 1. Fuel Loading has just been completed. The Night

(2.6/2.8) Orders specify completing Control Rod Operability on

your shift. The Reactor Engineer needs to use the

fuel bridge over the Reactor Cavity the whole shift to

make a final core loading verification. Can these jobs

be performed simultaneously? If not, what would

prevent it?

2. Given a copy of the Generator Loading Curve

determine the maximum MVARs with the Gross

Generation at [xxx MW].

A.2 GEN JPM

2.2.14/2.2.11 Given an approved Temporary Change (TC) make

(2.5) the necessary changes to the applicable drawings.

A.3 GEN Questions:

2.3.10 1. You have just been notified by the Refuel Floor

(2.9) SRO that a spent fuel element has just dropped into

the Fuel Pool and he is evacuating the Reactor

Building. What actions must you take to protect

yourself from any ensuing radiation?

2. If these actions are taken within 10 minutes, what is

your stay time in the control room. Cite your

references.

A.4 GEN JPM

2.1.17 Given information from the SRO regarding

Emergency Classification and PAGs, complete all

required notification(s)

Administrative Topics Outline

SRO

Administrative Subject/Description Method of evaluation

Topic

A.1 GEN JPM

2.2.32/2.2.27 Using a prepared, partial view of the newly refueled

(3.5) core and Core Loading Plan, determine if the core

loading has been done correctly.

Note: One bundle will be oriented 180 degrees out of

normal.

A.1 GEN JPM

2.1.33/2.2.12 Complete Jet Pump Operability per OPT-13.1

(4.0) Note: Data will indicate a failed Jet Pump. The SRO

should understandthe TS implications (and safety

implications)of the failed pump.

A.2 GEN JPM

2.2.14/2.2.11 Given an approved Temporary Change (TC)

(3.0) complete SRO responsibilities for installation per

OOLP-22.

A.3 GEN JPM

2.3.6 Given data provided by the on-shift Chemistry

(3.1) Technician, issue a Liquid Radwaste Discharge per

OOP-06.4

A.4 GEN JPM

2.4.40 You are in Steam Cooling OEOP-01-STCP at Step

(4.0) 018. TSC has not yet been activated. Given the

following release data [Table of stack gas and Met

data] determine the Emergency Classification and

Protective Action Guidelines to be given to the State

of North Carolina.

B.1 Control Room Systems

System/JPM Title Type Safety

Code Function

(202001) Reactor Recirculation Pump Start [With a malfunction (D)(A)(S) I

(TBD)]

(204000) Reduce RPV water level using RWCU to Radwaste (N)(S) 2

(239001) Emergency equalization around MSIVs using Hard Card (D)(S) 3

(203000) Initiate Shutdown Cooling [Min flow valve fails open] (M)(A)(S) 4

(L)

(223001) Vent the Drywell per OP-10 wiStack Rad Monitor (D)(A)(S) 5

Increases >50%

(290003) Place Control Room HVAC in Filtered Recirculation Mode (N)(S) 9

(205005) Core Performance Parameter Check- manual APRM GAF (D)(A)(S) 7

Adjustment Required

Facility Walk-Through

System/JPM Title Type Safety

Code Function

(217000) Start RCIC from remote S/D Panel (D)(R) 2

(264000) Manually start an EDG locally-local manual start using (D) 6

prelube start control

(234000) Complete Refuel Interlocks Checks on Refuel Bridge (M)(R) 8

(Partial)

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

ADMIN

LESSON TITLE: Evaluate Jet Pump Performance Per PT-13.1.

4(zcý,j P

REVISION NO: 0

RECOMMENDED BY: DATE

Instructor/Developer

CONCURRENCEBY: DATE

Line Superintendent/Supervisor

APPROVED BY: DATE

Superintendent/Supervisor Training

Evaluate Jet Pump Performance Per PT-1 3.1.

Special Instructions

Transfer the following data onto a current revision of PT-i 3.1:

Reactor power level 96.6%

Recirc Pump A speed 88%

Recirc Pump B speed 88%

Recirc Pump A Flow 52 gpm X 1000

Recirc Pump B Flow 43 gpm X 1000

Jet Pump Loop A 30 mlbm/hr

Jet Pump Loop B 39 mlbm/hr

Attachment 2, Work Sheet 1

Loop A Loop B

JP 1 -30% JP-11 - 40%

JP-2 - 32% JP-12 -42%

JP-3 - 31% JP-13 - 39%

JP-4 - 33% JP-14 - 43%

JP-5 - 32% JP-15 -40%

JP-16 - 38%

JP-6 - 33%

JP-17 - 39%

JP-7 - 31%

JP-8 - 32% JP-18 -38%

JP-9 - 25% JP-19 - 39%

JP-10 - 21% JP-20 - 42%

NOTE: Average of Loop A is 30.0%, Loop B is 40%

Page 2 of 9 REV. 0

3A1-1

Evaluate Jet Pump Performance Per PT-13.1.

SAFETY CONSIDERATIONS

None

EVALUATOR NOTES: (Do not read to trainee)

1. The applicable procedure section WILL be provided to the trainee.

2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the trainee.

Read the following to trainee.

TASK CONDITIONS:

1. Unit Two (2) is operating at power.

2. OPT-13.1, Reactor Recirculation Jet Pump Operability is being performed.

3. Another operator has recorded data required for the PT in Section 7.3, and on

to be

Attachment 2, Test Information Work Sheet 1. Attachment 2, Work Sheet 2 is not

used.

INITIATING CUE:

acceptance

You are directed to evaluate the data for Jet Pump performance, determine if

criteria is met, and inform the Unit SCO of the results.

£1 cn**- "R'E 0

.. .D..,,n ,-nO REV. 0

3A1 -1 age u

  • Evaluate Jet Pump Performance Per PT-13.1.

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

Step 1 - Obtain a current revision of OPT-13.1 and 20P-02.

Current Revision of OPT-13.1 and 20P-02 obtained and verified, if applicable.

SATIU NSAT*

Step 2 - Confirm Recirc Pump A flow is within the band of the established curves.

Figure 4.1.

Determine Recirc Pump A flow is NOT within the band of 20P-02,

    • CRITICAL STEP ** SATIUNSAT*

curves.

Step 3 - Confirm Recirc Pump B flow is within the band of the established

4.2.

Determine Recirc Pump A flow is within the band of 20P-02, Figure

SAT/U NSAT*

Step 4 - Confirm Jet Pump loop A flow is within the band of the established curves.

Determine Jet Pump Loop A flow is NOT within the band of 20P-02, Figure 5.1.

    • CRITICAL STEP ** SATIUNSAT*

Page 4 of 9 REV. 0

3A1-1

Evaluate Jet Pump Performance Per PT-13.1.

Step 5 - Confirm Jet Pump loop B flow is within the band of the established curves.

Determine Jet Pump Loop A flow is within the band of 20P-02, Figure 5.2.

SATIU NSAT*

Step 6 - Calculate average jet pump % psid for each loop.

Determines Loop A average is 30% and Loop B average is 40%.

SATIUNSAT*

Step 7 - Compare the % psid for each jet pump and calculated average jet pump % psid for

each loop with the established curves (20P-02, Figures 6.1 through 6.10).

Determinejet pump 10 falls outside the established curve in 20P-02, Figure 6.5

(all otherjet pumps within limits)

    • CRITICAL STEP ** SAT/UNSAT*

Step 8 - Inform Unit SCO that jet pump 10 fails to meet acceptance criteria.

Unit SCO informed jet pump 10 fails to meet acceptance criteria.

SAT/UNSAT*

Page 5 of 9 REV. 0

WA-1

Evaluate Jet Pump Performance Per PT-1 3.1.

<NTtTefolwn is~pplia1

ltpý SRO eainetrY tjK

be

Step 9 - Determine that LCO 3.4.2 is not met, condition A applies, requiring the unit to

placed in Mode 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and Mode 4 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

Determines that LCO 3.4.2 is not met, condition A applies, requiring the unit to

be placed in Mode 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and Mode 4 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

    • CRITICAL STEP ** SAT/UNSAT*
  • Comments required for any step evaluated as UNSAT.

Page 6 of 9 REV. 0

3A1-1

Evaluate Jet Pump Performance Per PT-1 3.1.

RELATED TASKS:

202001 B201, Perform Reactor Recirculation Jet Pump Operability Test Per PT-1 3.1

K/A REFERENCE AND IMPORTANCE RATING:

GEN 2.1.33 3.4/4.0

GEN 2.2.12 3.0/3.4

REFERENCES:

OPT-1 3.1

20P-02

TOOLS AND EQUIPMENT:

Calculator.

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

Admin Al - Conduct Of Operations

REASON FOR REVISION:

New JPM.

Page 7 of 9 REV. 0

WA-1

Evaluate Jet Pump Performance Per PT-13.1.

Time Required for Completion: 15 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate Actual 4 Unit: 2

Setting: Control Room Simulator ( Not applicable to In-Plant JPMs

Time Critical: Yes No 4 Time Limit N/A

Alternate Path: Yes No 4

EVALUATION

Trainee: SSN:

JPM: Pass Fail

Remedial Training Required: Yes No

Did Trainee Verify Procedure as Authorized Copy?: Yes No

(Each Student should verify one JPM per evaluation set.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

3A1-1 Page 8 of 9 REV. 0

TASK CONDITIONS:

1. Unit Two (2) is operating at power.

2. OPT-13.1, Reactor Recirculation Jet Pump Operability is being performed.

3. Another operator has recorded data required for the PT in Section 7.3, and on

Attachment 2, Test Information Work Sheet 1. Attachment 2, Work Sheet 2 is not to be

used.

INITIATING CUE:

You are directed to evaluate the data for Jet Pump performance, determine if acceptance

criteria is met, and inform the Unit SCO of the results.

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

K BPERFORMANCE MEASURE

IN-PLANT

LOT-OJT-JP-301 -A.1.2 RO

LOT-OJT-JP-301-A .1.2 RO

LESSON TITLE: Evaluate Overtime Eligibility.

REVISION NO: 0

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:

Line Superintendent/Supervisor DATE

APPROVED BY:

Superintendent/Supervisor Training DATE

Evaluate Overtime Eligibility.

SAFETY CONSIDERATIONS:

None.

EVALUATOR NOTES: (Do not read to trainee)

1. When requested, provide the copy of procedure OAP-001.

2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the trainee.

Read the following to trainee.

TASK CONDITIONS:

1. A startup of Unit 1 is planned for the following shift. One Reactor Operator must be held

over three hours for startup

2. The following is the work history (excluding shift turnover time) of the available reactor

operators on shift (hours reflect those worked PRIOR to the 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> holdover). A break

of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> occurred between all work periods. All operators began their shift

schedule at the same time each day.

REV. 0

Page 2

LOT-OJT-JP-201 -COI

LOT-OJT-JP-201-C01 Page 2 REV. 0

Evaluate Overtime Eligibility.

DAY 1 2 3 4 5 6 7 8

(Today)

Operator

  1. 1 0 4 12 10 10 14 10 11

Operator

  1. 2 0 12 10 12 3 12 8 13

Operator

  1. 3 0 0 12 12 12 8 8 14

Operator

  1. 4 0 8 12 10 10 8 10 11

Operator

  1. 5 0 0 12 14 12 10 13 10

INITIATING CUE:

Evaluate the work history for all 5 operators. Determine which operator(s), if any, can

be held over for three hours without prior overtime approval, and determine which

operators CANNOT be held over for three hours without prior overtime approval. Also

identify any deviations to OAP-001 that may have already occurred between Day I and

Day 7.

NOTE: A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> has occurred between all work periods.

LOT-OJT-JP-201-C01 Page 3 REV. 0

Evaluate Overtime Eligibility.

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

Step 1 - Obtain a current revision of OAP-001.

Current Revision of OAP-001 obtained and verified via NRCS, if applicable.

SAT/U NSAT*

Step 2 - Determine Operator #1 would exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7 day period and would

require overtime authorization.

Determined that Operator#1 would exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7 day period.

    • CRITICAL STEP ** SAT/UNSAT*

Step 3 - - Determine Operator #2 would exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7 day period and would

require overtime authorization.

Determinedthat Operator#2 would exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7 day period.

    • CRITICAL STEP **SAT/UNSAT*

Step 4 - Determine Operator #3 would exceed 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> strait and 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

period (today) and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in a.48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period between days 7 and 8 and

would require overtime authorization.

Determined that Operator#3 would exceed 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> strait 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

period (today) and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in a.48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period between days 7 and 8 and

would require overtime authorization.

    • CRITICAL STEP ** SAT/UNSAT*

LOT-OJT-JP-201-C01 Page 4 REV. 0

Evaluate Overtime Eligibility.

Step 5 - Determine Operator #4 would not exceed any overtime restrictions and could

be held over for the 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

Determinedthat Operator#4 would not exceed any overtime restrictionsand

could be held over for the 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

SAT/UNSAT*

Step 6 - Determine Operator #5 would exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in a 48 period and would exceed

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7 day period

Determined that Operator#5 would exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7 day period and would

exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period.

    • CRITICAL STEP ** SAT/UNSAT*

Examiner Prompt:

IF asked, provide copy of approved Attachment 1 for operator # 5.

Step 7 - Determine that Operator # 5 exceeded 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period between

days 4 and 5.

Determinedthat Operator # 5 exceeded 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period between

days 4 and 5.

    • CRITICAL STEP ** SAT/UNSAT*

TERMINATING CUE: When the examinee has evaluated overtime restriction s, this JPM i

complete.

  • Comments required for any step evaluated as UNSAT.

REV. 0

Page 5

LOT-OJT-JP-201 -001

LOT-OJT-JP-201-C01 Page 5 REV. 0

Evaluate Overtime Eligibility.

RELATED TASKS:

Conduct shift turnover and relief

K/A REFERENCE AND IMPORTANCE RATING:

GEN 2.1.5

REFERENCES:

OAP-001, Rev 9

TOOLS AND EQUIPMENT:

None.

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

A.1 - Conduct Of Operations

REASON FOR REVISION:

New JPM for NRC exam.

LOT-OJT-JP-201-C01 Page 6 REV. 0

Evaluate Overtime Eligibility.

Time Required for Completion: 10 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate 4 Actual Unit:

Setting: Control Room 4 Simulator __ (Not applicable to In-Plant JPMs)

Time Critical: Yes No 4 Time Limit N/A

Alternate Path: Yes __ No 4

EVALUATION

Trainee:_ SSN:

JPM: Pass Fail __

Remedial Training Required: Yes - No

Did Trainee Verify Procedure using NRCS?: Yes __ No

(EACH STUDENT SHOULD VERIFY ONE JPM PER EVALUATION SET USING NRCS.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

LOT-OJT-JP-201-C01 Page 7 REV. 0

APPLICANT HANDOUT

TASK CONDITIONS:

1. A startup of Unit 1 is planned for the following shift. One Reactor Operator must be held

over three hours for startup

2. The following is the work history (excluding shift turnover time) of the available reactor

operators on shift (hours reflect those worked PRIOR to the 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> holdover). A break

of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> occurred between all work periods. All operators began their shift

schedule at the same time each day.

DAY 1 2 3 4 5 6 7 8

(Today)

Operator

  1. 1 0 4 12 10 10 14 10 11

Operator

  1. 2 0 12 10 12 3 12 8 13

Operator

  1. 3 0 0 12 12 12 8 8 14

Operator

  1. 4 0 8 12 10 10 8 10 11

Operator

  1. 5 0 0 12 14 12 10 13 10

INITIATING CUE:

Evaluate the work history for all 5 operators. Determine which operator(s), if any, can

be held over for three hours without prior overtime approval, and determine which

operators CANNOT be held over for three hours without prior overtime approval. Also

identify any deviations to OAP-001 that may have already occurred between Day 1 and

Day 7.

NOTE: A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> has occurred between all work periods.

LOT-OJT-JP-201-C01 Page 8 REV. 0

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

ADMIN

BNP-03-AI-2

LESSON TITLE: Evaluate Partial View Of Core For Correct Core Loading.

J

KV

Ox

REVISION NO: 0

V'

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:

Line Superintendent/Supervisor DATE

APPROVED BY: UAII

Superintendent/Supervisor Training DAIE

Superintendent/Supervisor Training

Evaluate Partial View Of Core For Correct Core Loading.

SPECIAL INSTRUCTIONS

Prepare a picture of a partial core (4 cells - 16 Bundles).

Ensure I bundle is rotated 1800.

Ensure each bundle has a different serial number on the bail handle.

Prepare a core loading sequence sheet for the 16 bundles.

Ensure 2 of the bundles are in the incorrect location (but properly oriented).

SAFETY CONSIDERATIONS:

None

EVALUATOR NOTES: (Do not read to trainee)

1. The applicable procedure section WILL be provided to the trainee.

2. If this is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the trainee.

3. Provide examinee with copy of prepared partial core view, prepared core load sequence

sheets, and reactor vessel core map (ENP-24.12, Figure 1).

Read the following to trainee.

TASK CONDITIONS:

1. Unit 2 is in Mode 5. Core reload has just been completed.

2. You have a partial view of the reloaded core, along with the Core Component

Sequence Sheets for those bundles, and Figure 1 from ENP-24.12, Reactor Vessel

Core Map.

INITIATING CUE:

You are directed by the Shift Superintendent to evaluate the partial core loading for core

verification and inform the Shift Superintendent of the results.

3A1ls Page 2 of 7 REV. 0

Evaluate Partial View Of Core For Correct Core Loading.

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

Step 1 - Evaluate partial Core View, Core Component Sequence Sheets for those bundles,

and Figure 1 from ENP-24.12, Reactor Vessel Core Map.

PartialCore View, Core Component Sequence Sheets for those bundles, and

Figure 1 from ENP-24.12, Reactor Vessel Core Map evaluated.

SAT/UNSAT*

NOTE: It is,critical that the examinee identifies the two bundles incorreclyjIaddItiNO

critical the examinee ideintifies 'the locations are swa~pppd.

Step 2 - Identify that bundle LYJ568 (Step 5 of the Core Component Sequence Sheets) is

specified for location 9-10 but bundle LYJ468 is loaded in that location.

Identify that bundle LYJ568 (Step 5 of the Core Component Sequence Sheets) is

not loaded in the correct location.

    • CRITICAL STEP ** SAT/UNSAT*

Step 3 - Identify that bundle LYJ468 (Step 10 of the Core Component Sequence Sheets) is

specified for location 13-10 but bundle LYJ568 is loaded in that location.

Identify that bundle LYJ468 (Step 10 of the Core Component Sequence Sheets)

is not loaded in the correct location.

    • CRITICAL STEP ** SAT/UNSAT*

WA s Page 3 of 7 REV. 0

Evaluate Partial View Of Core For Correct Core Loading.

Step 3 - Identify that bundle LYJ549 (Step 19 of the Core Component Sequence Sheets) is

loaded in the incorrect orientation and that the Fastener location should be

Southeast (as specified on the Core Component Sequence Sheets and not

Northwest as shown in the partial core view (or that the bundle is rotated 1800).

Identify that bundle LYJ549 (Step 19 of the Core Component Sequence Sheets)

is loaded in the incorrect orientation.

    • CRITICAL STEP ** SAT/UNSAT*

NOTE: All other bundles are correctly, loaded; however whoever loaded these 16 b6ndlelds

will burl y lose 'his/her SROi ice'ns eg

Step 4 - Identifies all other bundles are correctly loaded.

Identifies all other bundles are correctly loaded.

SAT/U NSAT*

Step 5 - Inform Shift Superintendent of results of partial core verification.

Shift Superintendentinformed of results of partialcore verification.

SAT/U NSAT*

I TERMINATING CUE: When evaluation;of the partial core load has been competed; tnisJI-'M

I ~ ~~~is

complete. ___ _____ ____ _____ _____ ____

a

  • Comments required for any step evaluated as UNSAT.

3A1 s Page 4 of 7 REV. 0

Evaluate Partial View Of Core For Correct Core Loading.

RELATED TASKS:

None

K/A REFERENCE AND IMPORTANCE RATING:

GEN 2.2.32 3.5

REFERENCES:

ENP-24.12

ENP-24.13

FH-11

TOOLS AND EQUIPMENT:

None

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

Admin Section Al

REASON FOR REVISION:

New JPM.

3Als Page 5 of 7 REV. 0

Evaluate Partial View Of Core For Correct Core Loading.

Time Required for Completion: 20 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate 4 Actual Unit: 2

Setting: Control Room Simulator ( Not applicable to In-Plant JPMs)

Time Critical: Yes No 4 Time Limit N/A

Alternate Path: Yes No 4

EVALUATION

Trainee: SSN:

JPM: Pass Fail

Remedial Training Required: Yes No

Did Trainee Verify Procedure as Authorized Copy?: Yes No

(Each Student should verify one JPM per evaluation set.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

3Als Page 6 of 7 REV. 0

'C1ý

TASK CONDITIONS:

1. Unit 2 is in Mode 5. Core reload has just been completed.

2. You have a partial view of the reloaded core, along with the Core Component

Sequence Sheets for those bundles, and Figure 1 from ENP-24.12, Reactor Vessel

Core Map.

INITIATING CUE:

You are directed by the Shift Superintendent to evaluate the partial core loading for core

verification and inform the Shift Superintendent of the results.

K-,

9113 15North

12

10

n  % J %

6

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

ADMIN

BNP-03-A1-2

LESSON TITLE: Evaluate Partial View Of Core For Correct Core Loading.

REVISION NO: 0

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:.

Line Superintendent/Supervisor DATE

APPROVED BY:-

Superintendent/Supervisor Training DATE

Evaluate Partial View Of Core For Correct Core Loadinq.

SPECIAL INSTRUCTIONS

Prepare a picture of a partial core (4 cells - 16 Bundles).

Ensure 1 bundle is rotated 1800.

Ensure each bundle has a different serial number on the bail handle.

Prepare a core loading sequence sheet for the 16 bundles.

Ensure 2 of the bundles are in the incorrect location (but properly oriented).

SAFETY CONSIDERATIONS:

None

EVALUATOR NOTES: (Do not read to trainee)

1. The applicable procedure section WILL be provided to the trainee.

2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the trainee.

3. Provide examinee with copy of prepared partial core view, prepared core load sequence

sheets, and reactor vessel core map (ENP-24.12, Figure 1).

Read the following to trainee.

TASK CONDITIONS:

1. Unit 2 is in Mode 5. Core reload has just been completed.

2. You have a partial view of the reloaded core, along with the Core Component

Sequence Sheets for those bundles, and Figure 1 from ENP-24.12, Reactor Vessel

Core Map.

INITIATING CUE:

You are directed by the Shift Superintendent to evaluate the partial core loading for core

verification and inform the Shift Superintendent of the results.

3A1ls Page 2 of 7 REV. 0

Evaluate Partial View Of Core For Correct Core Loadina.

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

Step 1 - Evaluate partial Core View, Core Component Sequence Sheets for those bundles,

and Figure 1 from ENP-24.12, Reactor Vessel Core Map.

PartialCore View, Core Component Sequence Sheets for those bundles, and

Figure 1 from ENP-24.12, Reactor Vessel Core Map evaluated.

SAT/UNSAT*

!NTE it is critical that the examinee idnftifies the two bundles indorrdctlv Idaddd. It is NOT

critical the examinee ienti~fie's-the locationsaesw d

Step 2 - Identify that bundle LYJ568 (Step 5 of the Core Component Sequence Sheets) is

specified for location 9-10 but bundle LYJ468 is loaded in that location.

Identify that bundle L YJ568 (Step 5 of the Core Component Sequence Sheets) is

not loaded in the correct location.

    • CRITICAL STEP ** SAT/UNSAT*

Step 3 - Identify that bundle LYJ468 (Step 10 of the Core Component Sequence Sheets) is

specified for location 13-10 but bundle LYJ568 is loaded in that location.

Identify that bundle L YJ468 (Step 10 of the Core Component Sequence Sheets)

is not loaded in the correct location.

    • CRITICAL STEP ** SAT/UNSAT*

WA s Page 3 of 7 REV. 0

Evaluate Partial View Of Core For Correct Core LoadinQ.

Step 3 - Identify that bundle LYJ549 (Step 19 of the Core Component Sequence Sheets) is

loaded in the incorrect orientation and that the Fastener location should be

Southeast (as specified on the Core Component Sequence Sheets and not

Northwest as shown in the partial core view (or that the bundle is rotated 1800).

Identify that bundle L YJ549 (Step 19 of the Core Component Sequence Sheets)

is loaded in the incorrectorientation.

    • CRITICAL STEP ** SAT/UNSAT*

NOM All other brtlyloaded; however whoever loaded these 16 bundles will

.,sunl lose, hislher SRO license.ýý:

Step 4 - Identifies all other bundles are correctly loaded.

Identifies all other bundles are correctly loaded.

SAT/UNSAT*

Step 5 - Inform Shift Superintendent of results of partial core verification.

Shift Superintendentinformed of results of partialcore verification.

SAT/UNSAT*

-I

I

ITERMINATIN9 CUE: When evaluationof the partial core load has been competed, this JPM

is compnlete

l,,

  • Comments required for any step evaluated as UNSAT.

3Als Page 4 of 7 REV. 0

Evaluate Partial View Of Core For Correct Core Loadini.

RELATED TASKS:

None

K/A REFERENCE AND IMPORTANCE RATING:

GEN 2.2.32 3.5

REFERENCES:

ENP-24.12

ENP-24.13

FH-11

TOOLS AND EQUIPMENT:

None

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

Admin Section Al

REASON FOR REVISION:

New JPM.

3A1 s Page 5 of 7 REV. 0

Evaluate Partial View Of Core For Correct Core Loading.

Time Required for Completion: 20 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate V. Actual Unit: 2..t

Setting: Control Room - Simulator-. ( Not applicable to In-Plant JPMs)

Time Critical: Yes - No V Time Limit _N/A__

Alternate Path: Yes - No V

EMALUATION

Trainee: SSN:

JPM: Pass __ Fail

Remedial Training Required: Yes - No

Did Trainee Verify Procedure as Authorized Copy?: Yes __ No

(Each Student should verify one JPM per evaluation set.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date: -

Page 6 of 7 REV. 0

3Als

TASK CONDITIONS:

1. Unit 2 is in Mode 5. Core reload has just been completed.

2. You have a partial view of the reloaded core, along with the Core Component

Sequence Sheets for those bundles, and Figure 1 from ENP-24.12, Reactor Vessel

Core Map.

INITIATING CUE:

You are directed by the Shift Superintendent to evaluate the partial core loading for core

verification and inform the Shift Superintendent of the results.

1"', fL

OL

  • Ll II

WN

( (

Core Component Sequence Sheet FORM OENP-24.12-3 (8/02)

ISSUE NO.

PAGE OF

PREPARED BY: DATE:

UNIT .* REVIEWED BY: DATE:

NMC APPROVAL: DATE:

UNIT SRO APPROVAL: DATE:

MOVEMENT SRM COUNTS

STEP # COMPONENT FROM COORDINATE FASTENER TO COORDINATE FASTENER COMPLETE A B C D COMMENTS

LOCATION LOCATION INIT/DATE

+/-Lj LN'XST I SFP P-LD SE Core 15- SE

Is L:1L413 sF? Cs fq4 N' cort k-'6 -W

16 u'N-ag41 £.EtAŽ* F.J9 1 oe 9-% ,jCF ___

1-1 _____16 SrF EL4C3 Sw coft fl-( SWw __

1$ &DS .Core WU12 ANJASET 8:16 NIAA. _

\'ý L-isSM a SF? SbMAI SE cov ))-2 & E

%O- L'1rI1It§SF %6.A2 NW Cott 0i - ro_ ŽŽX

0 %N__ _

NOTE: An * in COMMENTS indicates that proper blade guide seating must be verified at the fuel support piece by camera before OR coupling or insertion.

NOTE: "Repeatbacks" per AP-050, Site Command, Control, and Communications Manual are required.

0ENP-24.12 Rev. 23 Page 31 of 56

( ( (

Core Component Sequence Sheet FORM OENP-24.12-3 (8/02)

ISSUE NO.

PAGE OF

PREPARED BY: DATE:

UNIT a. REVIEWED BY: DATE:

NMC APPROVAL:. DATE:

UNIT SRO APPROVAL: DATE:

MOVEMENT SRM COUNTS

STEP # COMPONENT FROM COORDINATE FASTENER TO COORDINATE FASTENER COMPLETE COMMENTS

LOCATION LOCATION INIT/DATE

I Y3119-ri sr-? jAS NeCo 912,

Cl "E. _____

2, LYTS.. !S F? ESFA SN Co. W-fo Sw

L1

D%G Cort Iill

L.-y 395 SF? ESD2I sE

N?1 SF P

ct

A 30

\- 12,

WUA

SE

S LV'SSgI rSP EIS EI WVCae 5-10 NW

G L"I5Sazti r-9 ESD.* "s,S .r 13"-I 5k ,F

2 3BG Cor kIps- AA

A32, Jrt __A

_s_

L~zsj

L--1oj -sfr- G,&E S s__1ESOr s-i2, SE

0 ILY-TH (.9 SEP  %(iAq NVJ -Ate 13-1O Nw

I 14LNTH3 SF? I %AS tiGME ICrel 132S r-3 G I_______ __

Ix. Ly "o3 SF? 9-SE3 SW Cot, I ,S-6 SW I ___,_

13 'S A ISf?9

N%1oe~i~ A34M I 1fA _ _ _ _ _ _

NOTE: An * in COMMENTS indicates that proper blade guide seating must be verified at the fuel support piece by camera before CR coupling or insertion.

NOTE: "Repeatbacks" per AP-050, Site Command, Control, and Communications Manual are required.

OENP-24.12 I Rev. 23 Page 31 of 56

FIGURE 1

Page 1 of 1

Reactor Vessel Core Map

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51

18-51 22-51 26-51 30-51 34-51

-*- North

14-47 18-47 22-47 26847 30-47 34-47 38-47 42-47

10-47

06-43 10-43 114-43 1 8-43 j22-43 0 4 32-3

-43 38-43 142-431 46-43.

10-39 14-39 18-39 22-39 26-39 30-39 34-39 38-39 42-39 46-39

06-39

02-35 06-35 10-35 14-3,9 18-35 22-35 26-35 30-35 34-351T38-35 142-35 46-35 50-35

02-31 06-31 10.31 14-31 18-31 22-31 26-31 30-31 34-31 j38-31 42-31 46-3I 50-31

02-27 06-27 10-27 14-27 18-271 22-27 26-27 30-27 34-271 38-27 42-27 46-27 50-27

02-23 06 23 10-23 14-23 18-23 22-23 26-23 30233- 2I823 42-23 40-23 50-23

02-19 06.19 10-19 14-IS 18-19 22-19 26-19 30-19 34-19 38-19 42-19 46-19 50-19

14415 18-15 22-15 26-15 30-15 34-15 a1542-15 46-15

06-IS 10-15

G6-11 10-I1 14-1l 18-lI 22-12-11 30-11 134-111 38-11 42If4-l

10-07114-07 18-07 22-07 26-07 30-07 34-07 38-07 42-07

18-03 22-03 26-03 30-03 34-03

N IRMs IRM A - 12-41 IRM E - 28-25 SRM A- 12-33

IRM 8 - 36-41 IRM F - 20-25 SRM B - 28-41

IRM C - 20-33 IRM G - 36-09 SRM C - 36-25

A SRMs

IRM 0 - 28-33 IRM H - 12-09 SRM D - 20-17

LPRM 04-21 LPRM 12-37 LPRM 20-29 LPRM 28-21 LPRM 36-13 LPRM 44-13

LPPM 04-29 LPRM 12-45 LPRM 20-37 LPRM 28-29 LPRM 36-21 LPRM 44-21

LPRM 20-45 LPRM 28-37 LPRM 36-29 LPRM 44-29

LPRM 04-37 LPRM 20-05

LPRM 20-13 LPRM 28-05 LPRM 28-45 LPRM 36-37 LPRM 44-37

LPRM 12-13

LPRM 20-21 LPRM 28-13 LPRM 36-05 LPRM 36-45 LPRM 44-45

LPRM 12-21

LPRM 12-29

OENP-24.12 Rev. 23 Page 20 of 56

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

ADMIN

BNP-03-A2

LESSON TITLE: Evaluate Proposed Temporary Change.

REVISION NO: 0

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:

Line Superintendent/Supervisor DATE

APPROVED BY: L)AI

Training

Superintendent/Supervisor Training DATE

Superintendent/Supervisor

Evaluate Proposed Temporary Change.

Special Instructions

Obtain copies of prints D-02549, Sheet IB, 2-FP-05924, Sheet 2, LL-09243, Sheet 15 and

LL09244, Sheet 15

On D-02549, change V35 and V36 to show closed, and denote valves closed per EC TC

03-001.

On 2-FP-9524, Sheet 2, draw cloud around G41-N005 connections 1NC and 1C, denote

leads lifted per EC TC 03-001.

On 2-FP-9524, Sheet 2, draw cloud around G41-N005 connections 2NC and 2C, denote

leads lifted per EC TC 03-001.

On LL-09243, Sheet 15, draw jumper from terminals 2-H02/CC5 to 2-H02/AA11. Denote

jumper installed per TC EC 03-001.

Denote

On LL-09244, Sheet 15, draw jumper from terminals 2-H02/CC17 to 2-H02/BB14.

jumper installed per TC EC 03-001.

Mark up EGR-NGGC-005, Form 2 to reflect temporary changes.

Page 2 of 9 REV. 0

03-A2

Evaluate Proposed Temporary Change.

SAFETY CONSIDERATIONS:

None.

EVALUATOR NOTES: (Do not read to trainee)

1. The applicable procedure section WILL NOT be provided to the trainee.

2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the trainee.

3. This JPM may be administered in any setting.

Read the following to trainee.

TASK CONDITIONS:

1. Unit Two (2) Fuel Pool Cooling Skimmer Surge Tank low level alarm switch 2-G41-LSL

N005 has failed. The shelf condition of this level switch is closed. This failed level

switch has resulted in Annunciator A-4 6-7 (Fuel Pool Cooling Alarm) being sealed in on

Panel P603.

2. The failed level switch is obsolete. A temporary change has been developed in

accordance with EGR-NGGC-0005 to abandon this level switch in place until a suitable

replacement can be located and installed.

3. This temporary change is to valve out the failed level switch and lift leads and/or jumper

the level switch contacts. This temporary change will defeat the level switch input to

Annunciator A-4 6-7 (a multiple input Annunciator). This temporary change will also

defeat low level indicating lights located on local panels 2-G41 P001 and 2-G41-P002.

The low level trip function for the Fuel Pool Cooling Pumps will not be affected.

4. A Temporary Change Log form (EGR-NGGC-0005, Form 2) has been prepared

indicating a description of this temporary change and the Priority 0 drawings affected.

The Priority 0 drawings referenced have been marked up to reflect the temporary

change.

03-A2 Page 3 of 9 REV. 0

Evaluate Proposed Temporary Change.

INITIATING CUE:

You are directed by the WCC SRO to review the marked up Priority 0 drawings identified

on the Temporary Change Log Form 2 and ensure the changes reflected on the identified

Priority 0 drawings meet the intent of the temporary change, and inform the WCC SRO of

the results of your evaluation.

03-A2 Page 4 of 9 REV. 0

Evaluate Proposed Temporary Change.

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

Step 1 - Review Temporary Change Log, Form 2 and evaluate drawings listed as Priority 0 on

the Log.

Reviews Temporary Change Log, Form 2 and evaluate drawings listed as

Priority0 on the Log.

SAT/UNSAT*

Step 2 - Determine jumper installed from terminals 2-H02/CC5 to 2-H02/AA1 1 on drawing LL

09243, Sheet is for level switch N006, not N005 and should not be installed.

Determinesjumper should not be installed from terminals 2-H02/CC5 to 2

H02/AA 11 on LL-09243, Sheet 15.

    • CRITICAL STEP ** SAT/UNSAT*

Step 3 - Determine jumper installed from terminals 2-H02/CC1 7 to 2-H02/BB23 on drawing

LL-09244, Sheet is for level switch N006, not N005 and should not be installed.

Determinesjumper should not be installed from terminals 2-H02/CC17 to 2

H02/BB23 on LL-09244, Sheet 15.

    • CRITICAL STEP ** SAT/UNSAT*

03-A2 Page 5 of 9 REV. 0

Evaluate Proposed Temporary Change.

Step 4 - Determine other drawing changes meet the intent of the TC.

Determines other drawing changes meet the intent of the TC.

    • CRITICAL STEP ** SAT/UNSAT*

Step 5 - Inform WCC SRO of results.

WCC SRO informed of results.

SAT/UNSAT*

TERMINATING CUE: This box will tell the evaluator when the JPM iscomplete Obased on : I

student perfrmane)>I

  • Comments required for any step evaluated as UNSAT.

03-A2 Page 6 of 9 REV. 0

Evaluate Proposed Temporary Change.

RELATED TASKS:

200 665 B5 04, Perform AO Actions For A Loss Of Division I DC Panels Per AOP-39.0

K/A REFERENCE AND IMPORTANCE RATING:

295004 AA1.01 3.3/3.4

Ability to operate D.C. electrical distribution systems as it applies to Partial Loss of D.C.

power.

REFERENCES:

AOP-39.0, Revision 11

Loss of DC Power

TOOLS AND EQUIPMENT:

Plant Page.

Keys.

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

6 - Electrical (DC Electrical Distribution)

REASON FOR REVISION:

Renamed from AOR to AOT, changed format to WORD from WP 5.1, updated for

procedure revision, changed to support either unit, removed record of revision page.

03-A2 Page 7 of 9 REV. 0

Evaluate Proposed Temporary Change.

Time Required for Completion: 15 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate 4 Actual Unit: 2

Setting: Control Room Simulator ( Not applicable to In-Plant JPMs)

Time Critical: Yes No 4 Time Limit N/A

Alternate Path: Yes No 4

EVALUATION

Trainee: SSN:

JPM: Pass Fail

Remedial Training Required: Yes No

Did Trainee Verify Procedure as Authorized Copy?: Yes - No

(Each Student should verify one JPM per evaluation set.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

03-A2 Page 8 of 9 REV. 0

TASK CONDITIONS:

1. Unit Two (2) Fuel Pool Cooling Skimmer Surge Tank low level alarm switch 2-G41-LSL

N005 has failed. The shelf condition of this level switch is closed. This failed level

switch has resulted in annunciator A-4 6-7 (Fuel Pool Cooling Alarm) being sealed in on

Panel P603.

2. The failed level switch is obsolete. A temporary change has been developed in

accordance with EGR-NGGC-0005 to abandon this level switch in place until a suitable

replacement can be located and installed.

3. This temporary change is to valve out the failed level switch and lift leads and/or jumper

the level switch contacts. This temporary change will defeat the level switch input to

annunciator A-4 6-7 (a multiple input annunciator). This temporary change will also

defeat low level indicating lights located on local panels 2-G41 P001 and 2-G41-P002.

The low level trip function for the Fuel Pool Cooling Pumps will not be affected.

4. A Temporary Change Log form (EGR-NGGC-0005, Form 2) has been prepared

indicating a description of this temporary change and the Priority 0 drawings affected.

The Priority 0 drawings referenced have been marked up to reflect the temporary

change.

INITIATING CUE:

You are directed by the WCC SRO to review the marked up Priority 0 drawings identified

on the Temporary Change Log Form 2 and ensure the changes reflected on the identified

Priority 0 drawings meet the intent of the temporary change, and inform the WCC SRO of

the results of your evaluation.

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

ADMIN

BNP-03-A2

LESSON TITLE: Evaluate Proposed Temporary Change.

REVISION NO: 0

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:.

Line Superintendent/Supervisor DATE

APPROVED BY:

Superintendent/Supervisor Training DATE

Evaluate Proposed Temporary Chanqe.

Special Instructions

Obtain copies of prints D-02549, Sheet 1B, 2-FP-05924, Sheet 2, LL-09243, Sheet 15 and

LL09244, Sheet 15

On D-02549, change V35 and V36 to show closed, and denote valves closed per EC TC

03-001.

On 2-FP-9524, Sheet 2, draw cloud around G41 -NO05 connections 1 NC and 1C, denote

leads lifted per EC TC 03-001.

On 2-FP-9524, Sheet 2, draw cloud around G41 -NO05 connections 2NC and 2C, denote

leads lifted per EC TC 03-001.

On LL-09243, Sheet 15, draw jumper from terminals 2-H02/CC5 to 2-H02/AA11. Denote

jumper installed per TC EC 03-001.

On LL-09244, Sheet 15, draw jumper from terminals 2-H02/CC17 to 2-H02/B814. Denote

jumper installed per TC EC 03-001.

Mark up EGR-NGGC-005, Form 2 to reflect temporary changes.

- 03-A2 Page 2 of 9 REV. 0

Evaluate Prooosed Temoorarv Chanae.

SAFETY CONSIDERATIONS:

None.

EVALUATOR NOTES: (Do not read to trainee)

1. The applicable procedure section WILL NOT be provided to the trainee.

2. If this is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the trainee.

3. This JPM may be administered in any setting.

Read the following to trainee.

TASK CONDITIONS:

1. Unit Two (2) Fuel Pool Cooling Skimmer Surge Tank low level alarm switch 2-G41-LSL

N005 has failed. The shelf condition of this level switch is closed. This failed level

switch has resulted in Annunciator A-4 6-7 (Fuel Pool Cooling Alarm) being sealed in on

Panel P603.

2. The failed level switch is obsolete. A temporary change has been developed in

accordance with EGR-NGGC-0005 to abandon this level switch in place until a suitable

replacement can be located and installed.

3. This temporary change is to valve out the failed level switch and lift leads and/or jumper

the level switch contacts. This temporary change will defeat the level switch input to

Annunciator A-4 6-7 (a multiple input Annunciator). This t 'r change will also

defeat low level indicating lights located on local panels 2- 41-eO1 and 2-G41-P002.

The low level trip function for the Fuel Pool Cooling Pumps not be affected.

4. A Temporary Change Log form (EGR-NGGC-0005, Form 2) has been prepared

indicating a description of this temporary change and the Priority 0 drawings affected.

The Priority 0 drawings referenced have been marked up to reflect the temporary

change.

03-A2 Page 3 of 9 REV. 0

Evaluate Proposed Temporary Change.

INITIATING CUE:

You are directed by the WCC SRO to review the marked up Priority 0 drawings identified

on the Temporary Change Log Form 2 and ensure the changes reflected on the identified

Priority 0 drawings meet the intent of the temporary change, and inform the WCC SRO of

the results of your evaluation.

03-A2 Page 4 of 9 REV. 0

Evaluate Pronosed Temporarv Chanqe.

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

Step 1 - Review Temporary Change Log, Form 2 and evaluate drawings listed as Priority 0 on

the Log.

Reviews Temporary Change Log, Form 2 and evaluate drawingslisted as

Priority0 on the Log.

SAT/U NSAT*

Step 2 - Determine jumper installed from terminals 2-H02/CC5 to 2-H02/AA1 1 on drawing LL

09243, Sheet is for level switch N006, not N005 and should not be installed.

Determinesjumper should not be installedfrom terminals2-H02/CC5 to 2

H02/AA 11 on LL-09243, Sheet 15.

    • CRITICAL STEP ** SAT/UNSAT*

Step 3 - Determine jumper installed from terminals 2-H02/CC17 to 2-H02/BB23 on drawing

LL-09244, Sheet is for level switch N006, not N005 and should not be installed.

Determines jumper should not be installed from terminals2-H02/CC17 to 2

H02/BB23 on LL-09244, Sheet 15.

    • CRITICAL STEP ** SAT/UNSAT*

03-A2 Page 5 of 9 REV., 0

Evaluate Proposed Temporary Change.

Step 4 - Determine other drawing changes meet the intent of the TC.

Determines other drawing changes meet the intent of the TC.

    • CRITICAL STEP ** SAT/UNSAT*

Step 5 - Inform WCC SRO of results.

WCC SRO informed of results.

SAT/UNSAT*

  • Comments required for any step evaluated as UNSAT.

Page 6 of 9 REV. 0

  • .* 03-A2

Evaluate Proposed Temporary Change.

RELATED TASKS:

200 665 B5 04, Perform AO Actions For A Loss Of Division I DC Panels Per AOP-39.0

K/A REFERENCE AND IMPORTANCE RATING:

295004 AA1.01 3.3/3.4

Ability to operate D.C. electrical distribution systems as it applies to Partial Loss of D.C.

power.

REFERENCES:

AOP-39.0, Revision 11

Loss of DC Power

TOOLS AND EQUIPMENT:

Plant Page.

Keys.

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

6 - Electrical (DC Electrical Distribution)

REASON FOR REVISION:

Renamed from AOR to AOT, changed format to WORD from WP 5.1, updated for

procedure revision, changed to support either unit, removed record of revision page.

03-A2 Page 7 of 9 REV. 0

C C (

FORM 2

Sheet 1 of 1

Temporary Change Log

EC#T'C 03-O00 Rev# 0 Title:Ot.So .It I-G4l-LSL-NO0SoResponsibleEngineer(Ext.): výA.zow SOA (z.2.2&0)

NOTE: Accepting change indicates that affected Priority 0 drawings have been annotated and procedures have been revised.

Change Accepted by: / Approved Plant Condition

(fln~r~tinng\ Print n~rmp Sianntuire Date

TAGGING INSTALLATION RESTORATION

TAG # DESCRIPTION POSITION/CONDITION FOR PERFORMED & VERIFIED RESTORED RESTORED/TAG VERIFIED

TEMPORARY CHANGE TAG INSTALLED () POSITION/ REMOVED ()

CONDITION

BY DATE BY DATE BY DATE BY DATE

"2. a.-GHI-N3L C\oseA

2,- G341 - LS L-H -

4 TtC1% n&1 t4 C.ci11 +0

Priority 0 drawings affected: 0-0.S9' 3~ F Si24-~ Drawing annotated by/date: Drawing annotations removed by/date:

LL-OSZM~i\-S, LL-O92A4j-IS

Procedures Affected: Procedures revised by/date: Procedures revised by/date:

FORM EGR-NGGC-0005-2-16

(*) These columns are required only for those systems requiring independent verification or functional testing as required by site procedures,

('*) Transmit original Temporary Change log to Document Services upon Temporary Change removal (restoration) acceptance for storage in the EC Master File.

Temporary Change Removal Accepted by(**): /

(Operations) Print name Signature Date

EGR-NGGC-0005 I Rev. 18 Page 130 of 133I

C C C

D-02549 SHT IB, COORDINATE D3

( ( (

F- - -- -- -- -- - - - - - - - - - - - - - - - -

LSL

LEADS LIFTED PER

EC TC 03-001 U 2(,. G45LOCAL

G41 -N005

2-FP-05924, SHT 2, COORDINATE C13

( C C

r -~1

LEADS LIFTED PER

I (

EC TC 03-001

LSL

SURGE TANK LOW LEVEL

LOCAL

G41-N005

2-FP-05924, SHT 2, COORDINATE K3

Evaluate Prooosed Temoorarv Chanae.

Time Required for Completion: 7§ Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate s/ Actual Unit: 2_

Setting: Control Room Simulator. (Not applicable to In-Plant JPMs)

Time Critical: Yes No V Time Limit N/A

Alternate Path: Yes No

EVALUATION

Trainee: SSN:

JPM: Pass __ Fail

Remedial Training Required: Yes - No __

Did Trainee Verify Procedure as Authorized Copy?: Yes __ No

(Each Student should verify one JPM per evaluation set.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:-

03-A2 Page 8 of 9 REV. 0

( ( ( 1

_1 ISlA*I

02-CC

25

116

JUMPER PER LS 2-G41 -N006

EC TC 03-001 "*

2H02-AA1 1

2H02-AA12

LL-09243 SHT 15

( ( (

2

SIB

[FP-05924-1]

2-H02

CC1l,

25

/

JUMPER PER /ts

EC TC 03-001 -- G41-N006

[FP-05924-1]

2-H02

BB23

2-H02

BB24

LL-09244 SHT 15

TASK CONDITIONS:

1. Unit Two (2) Fuel Pool Cooling Skimmer Surge Tank low level alarm switch 2-G41-LSL

N005 has failed. The shelf condition of this level switch is closed. This failed level

switch has resulted in annunciator A-4 6-7 (Fuel Pool Cooling Alarm) being sealed in on

Panel P603.

2. The failed level switch is obsolete. A temporary change has been developed in

accordance with EGR-NGGC-0005 to abandon this level switch in place until a suitable

replacement can be located and installed.

3. This temporary change is to valve out the failed level switch and lift leads and/or jumper

the level switch contacts. This temporary change will defeat the level switch input to

annunciator A-4 6-7 (a multiple input annunciator). This temporary change will also

defeat low level indicating lights located on local panels 2-G41 P001 and 2-G41 -P002.

The low level trip function for the Fuel Pool Cooling Pumps will not be affected.

4. A Temporary Change Log form (EGR-NGGC-0005, Form 2) has been prepared

indicating a description of this temporary change and the Priority 0 drawings affected.

The Priority 0 drawings referenced have been marked up to reflect the temporary

change.

INITIATING CUE:

You are directed by the WCC SRO to review the marked up Priority 0 drawings identified

on the Temporary Change Log Form 2 and ensure the changes reflected on the identified

Priority 0 drawings meet the intent of the temporary change, and inform the WCC SRO of

the results of your evaluation.

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

ADMIN

BNP-03-A3-SRO

LESSON TITLE: Evaluate Liquid Discharge Release Permit.

<2

REVISION NO: 0

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:,

Line Superintendent/Supervisor DATE

APPROVED BY:

Superintendent/Supervisor Training DATE

Evaluate Liquid Discharge Release Permit.

Special Instructions

Prepare a Liquid Release Permit, OP-06.4, Attachment 4. Complete Part I, Part IIand Part

III up to the Unit SCO approval line.

Ensure required recirc time and sample taken time is filled in prior to the actual time

required by OP-06.4.

The remainder of the data should be correct.

Fill out OE&RC-2009, Attachment 2, Part I. Ensure sample time matches time specified in

the OP-06.4, Attachment 4.

Obtain a copy of an E&RC Pre-Release Permit.

An actual release may be obtained from the E&RC counting room to aid in filling out the

required data.

3A3s Page 2 of 8 REV. 0

Evaluate Liquid Discharge Release Permit.

SAFETY CONSIDERATIONS:

None.

EVALUATOR NOTES: (Do not read to trainee)

1. The applicable procedure section WILL be provided to the trainee.

2. If this is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the trainee.

3. Provide examinee with prepared copy of 0OP-06.4, Attachment 4, OE&RC-2009,

Attachment 2, and the E&RC Pre-Release Permit.

Read the following to trainee.

TASK CONDITIONS:

1. The Unit 1 Salt Water Release Tank is nearing capacity, and is scheduled to be

released.

2. A Radioactive Liquid Release Permit has been prepared in accordance with OOP-06.4.

  • r

3. A Pre-Release""Permit has been prepared by' E&RC in accordance with E&RC-2009.

CUE:

INITIATING

You are directed by the Shift Superintendent to review the Radioactive Liquid Release

Permit, and the Pre-Release Permit, and determine if the Unit 1 Salt Water Release Tank

can be released per the supporting documentation, and inform the Shift Superintendent of

the results of your review.

3A3s Page 3 of 8 REV. 0

Evaluate Liquid Discharge Release Permit.

4/

PERFORMANCE CHECKLIST

V

NOTE: Sequence is assumed unless denoted in the Comments.

I The examiner should have a copv of OOP-06.4, Section 5.70to provide to the

I -,examinee if re*uested, or allow examinee access to the entire procedure.

Step 1 - Obtain a current revision of OOP-06.4.

Current Revision of OOP-06.4 obtained and verified, if applicable.

SAT/UNSAT*

Step 2 - Determine Volume of U/1 SWRT at level of 79% is correct as specified on the

Radioactive Liquid Release Permit.

Determinedthat volume of U/1 SWRT of 28637.5 gallons is correct as specified

on the Radioactive Liquid Release Permit.

SAT/UNSAT*

Step 3 - Determine required Recirculation time for a U/1 SWRT at a tank level of 79% is

correct as specified on the Radioactive Liquid Release Permit.

Determinedthat requiredRecirculation time for the U/1 SWRT at a tank level of

79% of 316 minutes is correct as specified on the Radioactive Liquid Release

Permit.

SAT/U NSAT*

3A3s Page 4 of 8 REV. 0

Evaluate Liquid Discharge Release Permit.

Step 4 - Determine with a Start Recirculation time of 0040, the required Recirc completion

time should be 0556 (not 0546) and that the sample taken time must be after 0556

(not 0553) as specified on the Radioactive Liquid Release Permit.

Determines requirements for Recirculationtime and/or sample time per COP

06.4 have not been satisfied, and that the release should not be approved.

    • CRITICAL STEP ** SAT/UNSAT*

Step 5 - Informs Shift Superintendent that the Release Permit may not be approved.

Shift Superintendentinformed that the Release Permit may not be approved.

SAT/UNSAT*

* :ll

I1: I CUE: When the Radioactive iquid Release Permit has been ev'aluated as

unsatisfactor this JPM is*complete. j
  • Comments required for any step evaluated as UNSAT.

3A3s Page 5 of 8 REV. 0

Evaluate Liquid Discharge Release Permit.

RELATED TASKS:

341012B302, Review Radioactive Waste Discharge/Release Permits Per E&RC-2009 prior

To Approval.

K/A REFERENCE AND IMPORTANCE RATING:

GEN 2.3.6 3.1

REFERENCES:

OOP-06.4

OE&RC-2009

BSEP Radioactive Liquid Release Permit 02-0044

TOOLS AND EQUIPMENT:

None.

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

Admin A3

REASON FOR REVISION:

New JPM.

3A3s Page 6 of 8 REV. 0

Evaluate Liauid Discharae Release Permit.

K-?

Time Required for Completion: 15 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate VC Actual - Unit:

Setting: Control Room - Simulator-_ ( Not applicable to In-Plant JPMs)

Time Critical: Yes - No V Time Limit N/A

Alternate Path: Yes - No

EVALUATIOlN

Trainee: SSN:

JPM: Pass Fail __

Remedial Training Required: Yes - No

Did Trainee Verify Procedure as Authorized Copy?: Yes __ No,

(Each Student should verify one JPM per evaluation set.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

3A3s Page 7 of 8 REV. 0

TASK CONDITIONS:

1. The Unit 1 Salt Water Release Tank is nearing capacity, and is scheduled to be

released.

2. A Radioactive Liquid Release Permit has been prepared in accordance with OOP-06.4.

3. A Pre-Release Permit has been prepared by E&RC in accordance with E&RC-2009.

INITIATING CUE: ($' E ..

You are directed by the Shift Superintendent to review the Radioactive Liquid Release

Permit, and the Pre-Release Permit, and determine if the Unit 1 Salt Water Release Tank

can be released per the supporting documentation, and inform the Shift Superintendent of

the results of your review.

ATTACHMENT 4

Page 1 of 6

BSEP Radioactive Liquid Release Permit

Release# 03-000l

D ate - o ay

BSEP RADIOACTIVE LIQUID RELEASE PERMIT

PART I. TANK DATA

A. Tank to be released U It SW -RT

B. Tank to be released will be recirculated and sampled as in accordance with

section S',-] of OOP-06.4.

6. Level "-7 1  % Volume A*2 (o37". gallons.

1. *Batch Release Tank Volumes

NOTE: Attachment 3 of OE&RC-2009, Radioactive Effluent Releases and

Reports, lists abnormal release volumes for miscellaneous tanks.

WSTs = 208.4 gallons/% level

FDSTs = 209.4 gallons/% level

DDTs = 10.9 gallons/% level

U/1 SWRT = 362.5 gallons/percent

D. Required Recirculation Time 4 min / % Level X -1 cl  % Level =

3a1 _ Min

E. Start Recirculation Date/Time Tocka 00 4cj

Required recirc time completed Date/Time "rTooy' O-SLA

Sample Taken Date/Time "TS)-Ay.L OS-S

(After required recirc time)

F. Source of water U1 o,,ck U., Cirt *.JcAer ?%+5

G. Treatment prior to release k". n

H. *Has the tank to be released been subjected to PH adjustments due to NAOH

or H2S04? Yes No X

  • Reference procedure E&RC-2009.

OOP-06.4 I Rev. 35 Page 84 of 1011

ATTACHMENT 4

Page 2 of 6

BSEP Radioactive Liquid Release Permit

1. Tank to be released will be discharged in accordance with Section ,. of

OOP-06.4.

J. Part I completed Date/Time "T'oJ,,&

Radv ste Operator (signature)

PART II. RADIATION MONITOR STATUS

A. Monitor is being used for discharge (General Electric D1 2-RM-K604)

Yes X No

(If monitor is NOT being used, list special instructions in Part Iil. See

ODCMS 7.3.1 for additional sampling requirements.)

B. Monitor Hi-Hi setpoint is at \.oo

- E-0cps.

_

(If monitor is NOT being used, set monitor Hi-Hi setpoint to maximum to prevent

spurious trip during release.)

C. Monitor Hi-Hi setpoint set between background and maximum monitor setpoint

(E&RC-2009). Yes ffi No

D. Monitor indication prior to release (chart) 2 00 cps.

(Circle one used) Unit 1/E

E. CONFIRM Radwaste effluent isolation valves are closed.

1-D12-V27A Position .ose cL 2-D12-V27B Position C- %o-s e 4,

Unit 1 Unit 2

OOP-06.4 I Rev. 35 Page 85 of 101I

ATTACHMENT 4

Page 3 of 6

BSEP Radioactive Liquid Release Permit

Pad I1l. APPROVAL FOR USE

A. Both unit Reactor Operators have been informed of release and are aware of

Circulating Water/Service Water Pump requirements.

Unit I RO

Signat&r

Unit 2 RO

Signatlue

B. 1. Liquid Radwaste effluent flow measurement device operable (if inoperable,

ODCMS 7.3.1 Required Compensatory Measure C1, requires the flow rate

be estimated at least once/4 hours during actual releases.)

Yes X/_ No

2. Liquid Radwaste radioactivity effluent monitor operable (if inoperable,

reference ODCMS 7.3.1)

Yes __ No

C. Special instructions for release: N)0 A9-

D. Approval to release:

Unit SCO Date/Time

Key(s) _ Received by

Radwaste Operator (signature)

IOOP-06.4 I Rev. 35 Page 86 of 101

ATTACHMENT 4

Page 4 of 6

BSEP Radioactive Liquid Release Permit

Part IV. RELEASE DATE

A. Maximum permissible release rate gpm

B. Special instructions in Part III understood

Radwaste Operator (signature)

C. Release times:

Start (Date/Time) Stop (Date/Time) Time Interval

minutes

minutes

minutes

Total release time: minutes

NOTE: Post-Trip and DDT Flushes go to the Floor Drains or the Oily Drain

Collector Tank. Flush water flows through the radiation monitor and flow

totalizer, while the 1-D12-V27A and 2-D12-V27B are closed. If a Post-Trip or

DDT flush is performed, then the number of gallons of flush water should be

logged below as this water is not released. If a post trip or DDT flush is not

performed, N/A this reading.

D. Flow rate instrument verification in accordance with ODCMS TR 7.3.1.2

Flow Totalizer

2-G16-FIQ-3497

(Discharge via

2-G16-F187)

Release Zero Set

Flush to ODCT or Floor Drains gallons.

Release Final Reading

OOP-06.4 Rev. 35 Page 87 of 1011

ATTACHMENT 4

Page 5 of 6

BSEP Radioactive Liquid Release Permit

E. Flow rate instrument verification (in accordance with TR 7.3.1.2).

Flow rates (recorder) 2-G16-FR-R039

Start GPM Stop GPM

NOTE: Reference

operable. of Part F7.3.1

CompletionODCMS is NOTRequired Compensatory

required Measure C1.

if the 2-G 16-FIT-NO57 is

F. Flow estimate using tank level indicator.

Formula: (Start % - Stop % = Difference % X Gallons/% =

Gallons from tank decrease total release time = GPM)

Start % - Stop % = Difference  %

Difference %X *Gallons/% =

(From line above) (Gal. from tank decrease)

Gallons from tank decrease _-- Total release time = GPM

(From line above) (In minutes)

G. Monitor Flush:

Flow Totalizer

(Discharge via

2-G16-F187)

Flush Start

Flush Total

Difference

  • Gallons/% obtained from E&RC-2009.

IOOP-06.4 Rev. 35 Page 88 of 101l

ATTACHMENT 4

Page 6 of 6

BSEP Radioactive Liquid Release Permit

Post-flush readings (chart) CPS Unit I / Unit 2

(Circle one used)

Comments:

H. Release completed Date Time

Radwaste Operator (signature)

Part V. Review

A. Key(s) returned to Main Control Room

Initials

B. Radiation monitor channel check in accordance with ODCMS 7.3.1, and

TR 7.3.1.1.

NOTE: Use same monitor as used in Part II. D.

Highest reading during release (chart) CPS

Average reading during release (chart) CPS

C. Monitor Hi and Hi-Hi setpoints set above background reading.

Initials

Unit SCO (signature) Date

OOP-06.4 Rev. 35 Page 89 of 101

c

Continuous

ATTACHMENT 2

Page 1 of 1

Routine Release Sample Data Sheet

Circle one: FDSTA FDSTB WSTA WSTB

DDT A DDT BERT

I. TO BE COMPLETED BY E&C

Liquid radwaste monitor in service: Yes No*

SDCP Release in Progress Yes**- No X*_

Sample location: I-Svfl.-JV1Date: ToAc&'s Time: 0S53

Sample by: 0 1A,

drý-O-Psý E&C or OPS*

Release Permit Number (03-0001 -pH 9. 0

O3OOO1-3001 Detector '- RW Bkg 2- 0 0

File #

Unit 1 Unit_2 TotalI# Pumps

  1. Circ Pumps #Circ Pumps Ciro (o
  1. Serv Pumps #Serv Pumps Serv H

Release Rate .,

Calculation: E& ýTechnician E&C Technician*

II. REFER TO PART III OF THE ATTACHED BSEP RADIOACTIVE LIQUID

RELEASE PERMIT FOR SPECIAL INSTRUCTIONS.

Reviewed Prior to Release

Shift Superintendent / Date

Ill. POSTRELEASE REVIEW

Reviewed by:

E&C Technician Date

  • Two independent samples, and verification thereof, are required when radwaste

effluent monitor is declared inoperative and two technically qualified E&C personnel are

required to verify and sign the release rate calculations.

    • If SDCP Release is in Progress, subtract two Service Pumps from total service pumps

used in the release.

OE&RC-2009 Rev. 20 Page 39 of 50

CAROLINA POWER AND LIGHT COMPANY PAGE I

BRUNSWICK STEAM ELECTRIC PLANT

LIQUID RADIOACTIVE WASTE RELEASE PERMIT NUMBER: 03-0001

PRE-RELEASE PERMIT DATE: TODAY 08:00:00

PART I: PRE-RELEASE DATA:

RELEASE POINT: SALT WATER TANK U I WASTE SAMPLE PERMIT: 03-0001

PERMIT REQUESTED BY: KAB

PERMIT TIME: TODAY/0800 SAMPLE PH 8.0

RAD MONITOR NUMBER: D12-RM-K604 RAD MONITOR BACKGRD: 3.000E+02 CPS

  1. CIRC WATER PUMPS: 6.0 RAD MONITOR EFF: 1.251E+07
  1. SERVICE WATER PUMPS: 4.0 DILUTION FACTOR: 1.547E-01

PART II: PRE-RELEASE CALCULATIONS

TOTAL ACTIVITY: 1.677E-06 CI TOTAL GAMMA ACTIVITY: 1,547E-8 UCIIML

TOTAL CONC/EC: 5.000E-02 RELEASE VOLUME: 2.864E+04 GAL

MAX MONITOR SETPOINT: 1.348E+04 CPS MAX RELEASE RATE: 2.27 IE+06 GPM

PART HI: SPECIAL INSTRUCTIONS

PRE-RELEASE COMPLIANCE CHECK PASSES

PRE-RELEASE ADMIN LIMIT PASSES

CAROLINA POWER AND LIGHT COMPANY PAGE 2

BRUNSWICK STEAM ELECTRIC PLANT

LIQUID RADIOACTIVE WASTE RELEASE PERMIT NUMBER: 03-0001

PRE-RELEASE PERMIT DATE: TODAY 08:00:00

PRE-DILUTION DATA

NUCLIDES (UCI/ML) EC (UCIIML)

1-131 1.547E-08 1.000E-06

CAROLINA POWER AND LIGHT COMPANY PAGE 3

BRUNSWICK STEAM ELECTRIC PLANT

LIQUID RADIOACTIVE WASTE RELEASE PERMIT NUMBER: 03-0001

PRE-RELEASE PERMIT DATE: TODAY 08:00:00

CUMULATIVE DOSE REPORT FROM THE PRE-RELEASE CALCULATIONS

CRITICAL AGE: ADULT

CONTROLLING LOCATION FOR LIQUID RELEASES: SW SECTOR AT 0.1 MILES

DOSE CALCULATIONS (MREM)

BONE LIVER TOT-BODY THYROID KIDNEY LUNG GI-LLI

FROM

THIS

RELEASE 2.29E-09 3-28E-09 1.88E-09 1.07E-06 5.62E-09 0.OOE+00 8.65E-10


WEEK

PRIOR TO

RELEASE 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00


I----------------------------------------------------------------------------------------------------

WEEK

AFTER

RELEASE 2.29E-09 3.28E-09 1.88E-09 1.07E-06 5.62E-09 0.OQE+00 8.65E-10


ADMIN

WEEKLY

LIMIT 3.85E-01 3.85E-01 1.15E-01 3.85E-01 3.85E-01 3.85E-01 3.85E-01


----------------------------------------------------------

PERCENT

WEEKLY

LIMIT 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%



MONTH

PRIOR TO

RELEASE 0.OOE+00 0.OOE+00 0.OOE+00 0.OOE+00 0.OOE+00 0.OOE+00 0.00E+00


MONTH

AFTER

RELEASE 2.29E-09 3.28E-09 1.88E-09 1.07E-06 5.62E-09 0.OOE+00 8.65E-10


ADMIN

MONTHLY

LIMIT 1.67E+00 1.67E+00 5.00E-01 1.67E+00 1.67E+00 1.67E+00 1.67E+00


PERCENT

MONTHLY

LIMIT 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%


------------------------------------------------------

CAROLINA POWER AND LIGHT COMPANY PAGE 4

BRUNSWICK STEAM ELECTRIC PLANT

LIQUID RADIOACTIVE WASTE RELEASE PERMIT NUMBER: 03-0001

PRE-RELEASE PERMIT DATE: TODAY 08:00:00

CUMULATIVE DOSE REPORT FROM THE PRE-RELEASE CALCULATIONS

CRITICAL AGE: ADULT

CONTROLLING LOCATION FOR LIQUID RELEASES: SW SECTOR AT 0.1 MILES

DOSE CALCULATIONS (MREM)

BONE LIVER TOT-BODY THYROID KIDNEY LUNG GI-LLI

QUARTER

PRIOR TO

RELEASE 0.00E+00 0.OOE+00 0.00E+00 0.OOE+00 0.00E+00 0.00E+00 0.00E+00

QUARTER

AFTER

RELEASE 2.29E-09 3.28E-09 1.88E-09 1.07E-06 5.62E-09 0.00E+00 8.65E-10

ODCMS

QUARTER

LIMIT 1.00E+01 1.00E+01 3.00E+00 1.00E+01 1.00E+01 1.00E+01 1.00E+01

PERCENT

QUARTER

LIMIT 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

YEAR

PRIOR TO

RELEASE 0.OOE+00 0.00E+00 0.00E+00 0.OOE+00 0.OOE+00 0.00E+00 0.00E+OO

YEAR

AFTER

RELEASE 2.29E-09 3.28E-09 1.88E-09 1.07E-06 5.62E-09 0.00E+00 8.65E-10

ODCMS

ANNUAL

LIMIT 2.OOE+01 2.00E+01 6.OOE+00 2.OOE01 2.OOE+01 2.OOE+01 2.00E+01

PERCENT

ANNUAL

LIMIT 0.000% 0.000% 0.000% 0.000% 0000% 0.000% 0.000%

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

ADMIN

BNP-03-A4-SRO

LESSON TITLE: Determine Off-Site Release Per PEP-03.4.7 And Recommend

Protective Actions.

1)

\leJ

REVISION NO: 0

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:

Line Superintendent/Supervisor DATE

APPROVED BY:

Superintendent/Supervisor Training DATE

<-V

Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.

SAFETY CONSIDERATIONS:

None.

EVALUATOR NOTES: (Do not read to trainee)

1. The applicable procedure section WILL be provided to the trainee.

2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the trainee.

3. This JPM may be performed in any location with a computer loaded with the CPL

Dose program.

4. Transfer data from attachment 2 of this JPM handwritten onto an actual attachment

from PEP-03.4.7.

5. The release at the site boundary should be approximately 6.38 E+01 mrem TEDE

and 1.99 E+02 mrem CDE. Slight variances may be expected due to time data is

entered in relation to Reactor shutdown. (Dose requires declaration of Site Area

Emergency, however General Emergency EALs have been exceeded)

3A4s Page 2 REV. 0

Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions. \

TACOt frnK~rk1r~nkIC.

Read the following to trainee. y

RLng

V/

I I'&*

".J.J1 l II

flIJflI 'J*. A-.  !

1. A General Emergency has been declared due to a steam line break ex4ets-in the

Turbine Building on Unit/. One set of MSIVs has failed to close and there are

indications of fuel failure.

2. The operating crew is currently executing the Radioactivity Release Control EOP, and

Steam Cooling Procedure due to loss of all RPV injection sources. RPV level has been

below TAF for 15 minutes and below LL4 for 5 minutes.

3. Drywell High Range Radiation Monitors are reading 10,000 R/Hr at the 50' elevation,

and 2000 R/Hr at the 20' elevation.

4. The Unit ?"reactor initially failed to scram, but was successfully scrammed 15 minutes

ago. 4-

5. Attachment 2 of PEP-3.4.7 has been filled out for data entry.

INITIATING CUE:

You are directed by the Shift Superintendent (SEC) to:

1. Perform an initial dose calculation per PEP 03.4.7, Automation of Off-Site Dose

Projection procedure. You are to determine the EAL classification for the radiation

release for execution of the Radiation Release Control EOP.

2. Determine required Protective Action Recommendations per OPEP-02.6.28 for the

emergency in progress.

You are to inform the Shift Superintendent (SEC) of the results of your assessments.

3A4s Page 3 REV. 0

Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.

ATTACHMENT 2

Data Sheet for Dose Protection Inputs

CHARACTERISTIC TIME

Main Stack Release Rate (pCi/Sec) 2.4e6

Flow Rate (CFM) 40000

Turbine Building #1 Release Rate (pCi/Sec) 5.2E6

  1. 1 Flow Rate (CFM) 15000
  1. 2 Release Rate (pCi/See) 5.2E6
  1. 2 Flow Rate (CFM) 15000

Reactor Building Release Rate (CPM) 3.5E2

Flow Rate (CFM) 0

Torus Vent Release Rate (liCUSec) 0

1

Core Uncovered Time (1) lost (2) Returned

Effective Filtration Yes / No Yes

Release Height Ground Yes

Elevated Yes

Release Duration Anticipated Length of Time 1 Hours

Shutdown Date

Time

Met Data Wind Speed Upper 5 MPH

Lower 4 MPH

Met Data Direction Upper 77 DEG

Lower 75 DEG

Stability Class B

Seabreeze Yes / No No

3A4s Page 4 REV. 0

Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

LA)'

Step 1 - Obtain a current revision of PEP-03.4.7.

Current Revision ofPEP-03.4.7 obtained.

SAT/UNSAT*

Step 2 - Access the Dose Projection program.

Dose ProjectionProgram accessed.

SAT/UNSAT*

Step 3 - Enter data from PEP-03.4.7 attachment into the dose projection program.

Data correctly entered into the dose projectionprogram.

4svfelAf 4immttS5 SAT/UNSAT*

Step 4 - Determine highest off-site dose is approximately 6.38E+01 TEDE and 1.99E+2 CDE

both at the site boundary.

,,Deteraud that projected dose at site boundary is364mrem TEDE and

C 29+02 mrem CDE

    • CRITICAL STEP ** SATIUNSAT*

3A4s Page 5 REV. 0

Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.

NOT'E: The EAL for the release (Site Area Emergency) is on bottom right of last display

(results display, of Dose 'prograim and on last age of printout. The examinee' ma

use this to determlne the EAL f*r the release, for the'

or may determine the EAL(EAL

rees per.OPEP-02.1,:Attachment1, Secion.

04.01MOi

Step 5 - Determine projected dose at the site boundary meets the EAL for a Site Area

Emergency.

Determine projected dose at the site boundary meets the EAL for a Site Area

Emergency.

    • CRITICAL STEP ** SAT/UNSAT*

.01 .... .. .............

...

NOTE.!i;ýý: :3The EAL for the release isia Site Area Emergency. However, since a General,

.......

.. ..

c has been decl*e*n.d, Protebtive Action Recommendat1ons (PAR) are6....

quired e PEP02628 Sncerelease does not exceed E EAL, the Guidance

in Attahrent 2 does not need to be modified.

I

Step 6 - Refer to OPEP-02.6.28 Determine with current met data that OPEP-02.6.28 requires

a PAR to evacuate zones A,B,C,D,E and shelter zones F,G,H,K.

Determines with current met data that OPEP-02.6.28requires a PAR to evacuate

zones A,BC,D,E and shelterzones FG,HK.

    • CRITICAL STEP ** SAT/UNSAT*

Step 7 - Notifies Shift Superintendent of results.

Shift Superintendent notified of off-site dose projection results.

SAT/UNSAT*

3A4s Page 6 REV. 0

Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.

TCUE: When the offsite dose projection has been performedand lines6 2&113/

of.the Emr gency.NotificI.atio.n fdrrn are filled Iin this.JPM s, c...o mplete. I -

  • Comments required for any step evaluated as UNSAT.

3A4s Page 7 REV. 0

Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.

RELATED TASKS:

344 058 B3 02

K/A REFERENCE AND IMPORTANCE RATING:

GEN 2.4.40 4.0

REFERENCES:

OPEP-03.4.7

OPEP-02.1

OPEP-02.6.28

TOOLS AND EQUIPMENT:

Computer loaded with CPL Dose.

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

Administrative - Emergency Plan

REASON FOR REVISION:

New JPM.

3A4s Page 8 REV. 0

Determine Off-Site Release Per PEP-03.4.7 And Recommend Protective Actions.

Time Required for Completion: 15 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate Actual 4 - Unit: 2 4 j29"

Setting: Control Room Simulator ( Not applicable to In-Plant JPMs)

Time Critical: Yes No 4 Time Limit N/A

Alternate Path: Yes No 4

EVALUATION

Trainee: SSN:

JPM: Pass Fail

Remedial Training Required: Yes No

Did Trainee Verify Procedure?: Yes __ No

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

3A4s Page 9 REV. 0

TASK CONDITIONS:

1. A General Emergency has been declared due to a steam line break exists in the

Turbine Building on Unit 2. One set of MSIVs has failed to close and there are

indications of fuel failure.

2. The operating crew is currently executing the Radioactivity Release Control EOP, and

Steam Cooling Procedure due to loss of all RPV injection sources. RPV level has been

below TAF for 15 minutes and below LL4 for 5 minutes.

3. Drywell High Range Radiation Monitors are reading 10,000 R/Hr at the 50' elevation,

and 2000 R/Hr at the 20' elevation.

4. The Unit 2 reactor initially failed to scram, but was successfully scrammed 15 minutes

ago.

5. Attachment 2 of PEP-3.4.7 has been filled out for data entry.

INITIATING CUE:

You are directed by the Shift Superintendent (SEC) to:

1. Perform an initial dose calculation per PEP 03.4.7, Automation of Off-Site Dose

Projection procedure. You are to determine the EAL classification for the radiation

release for execution of the Radiation Release Control EOP.

2. Determine required Protective Action Recommendations per OPEP-02.6.28 for the

emergency in progress.

You are to inform the Shift Superintendent (SEC) of the results of your assessments.

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

IN-PLANT

LESSON TITLE: Start RCIC From The Remote Shutdown Panel.

REVISION NO: 0

RECOMMENDED BY

Instructor/Developer DATE

CONCURRENCE BY'

Line Superintendent/Supervisor DATE

APPROVED BY:

Superintendent/Supervisor Training DATE

Start RCIC From The Remote Shutdown Panel.

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

Step 1 - Obtain a current revision of AOP-32.0.

Current Revision of AOP-32.0 obtained.

SAT/UNSAT*

Controller, E51-FIC-3325, is out.

Step 2 - Station 1, Verify yellow ALM light on RCIC Flow verified out

Yellow ALM light on RCIC Flow Controller, E51-FIC-3325,

SAT/UNSAT*

RCI

i a~umd t b. t~ tbrr~l tanby foti8

algnment91111 JFAt$ýjstfit4+ P

NOT:~

Page 3 of 12 REV. 0

3B2a

Start RCIC From The Remote Shutdown Panel.

Step 3 - Station 2, verify open or open RCIC CST Suction Valve E51-FOIO, at MCC 1(2)XBD,

Compt B38, Row C2.

E51-FOIO is verified open.

SAT/UNSAT*

Step 4 - Station 2, verify closed or close RCIC Supp Pool Suction Valve E51-F031, at MCC

I(2)XBD, Compt B45, Row GI.

E51-F031 is verified closed.

SAT/U NSAT*

Step 5 - Station 2, verify closed or close RCIC Supp Pool Suction Valve E51-F029, at MCC

1(2)XBD, Compt B46, Row G2.

E51-F029 is verified closed.

SAT/UNSAT*

3132a Page 4 of 12 REV. 0

Start ROIC From The Remote Shutdown Panel.

Fm I

/u1' 01N

r

i~~nea~epabsb~~~t't .pen ihitrefgt n1# 9 fl i& U

I

Step 6 - Station 2, verify open or open RCIC Cooling Water Valve E51-F046, at MCC

1(2)XBD, Compt B39, Row D1.

E51-F046 is opened at the MCC.

    • CRITICAL STEP ** SAT/UNSAT*

Step 7 - Station 2, verify open or open RCIC Pump Discharge Valve E51-F012, at MCC

I(2)XBD, Compt B40, Row D2.

E51-F046 is verified open.

SAT/UNSAT*

Page 5 of 12 REV. 0

3132a

Start RCIC From The Remote Shutdown Panel.

r,. I

t E5týH e. RMr

PRQMPT:* W17h;6fl

..

Nkeefnfr

.. .. . ... .

exacesinealtsiafc t F01n r8lighte is#d ofgrde lidI~th*&?4

Whn ekrnnepac. ioi:viM

I

Step 8 - Station 2, verify open or open RCIC Injection Valve E51-F013, at MCC 1(2)XBD,

Compt B41, Row El.

E51-FO13 is opened at the MCC.

    • CRITICAL STEP ** SAT/UNSAT*

~~~~~~~I1i" RCIbroerccneeracmprptp

Step 9 - Station 2, Start the RCIC barometric condenser vacuum pump, at MCC 1(2)XBD,

Compt B35, Row BI.

RCIC barometric condenser vacuum pump is running.

    • CRITICAL STEP ** SAT/UNSAT*

3132a Page 6 of 12 REV. 0

Start RCIC From The Remote Shutdown Panel.

Step 10 -Station 2, verify open or open RCIC Turbine Trip and Throttle Valve E51-V8, at MCC

I(2)XBD, Compt B37, Row C1.

E51-V8 is verified open.

SAT/UNSAT*

Step 11 -Station 2, verify open or open RCIC Steam Supply Outboard Isolation Valve E51-

F008, at MCC I(2)XBD, Compt B43, Row Fl.

E51-F008 is verified open.

SAT/UNSAT*

Step 12 -Station 3, verify open or open RCIC Steam Supply Inboard Isolation Valve E51-

F007, at MCC 1(2)XC, Compt DS4, Row D3.

E51-FO07 is verified open.

SAT/UNSAT

3B2a Page 7 of 12 REV. 0

Start RCIC From The Remote Shutdown Panel.

Step 13 -Station 2, verify open or open RCIC Turbine Steam Supply Valve E51-F045, at MCC

I(2)XBD, Compt B44, Row F2.

E51-F045 is opened at the MCC.

    • CRITICAL STEP ** SATIUNSAT*

KP ra 'R -- lo~ ~sindictedoh E5{FJC-ý3325,iindic~d

u6~~d;If inicateRCIO

!ROMPT atei9"'Ogt

0..1 P

Step 14 -Station 1, Verify RCIC flow corresponds to ROIC Flow Controller, E51-FIC-3325,

setting.

RCIC flow corresponds to RCIC Flow Controller,E51-FIC-3325,setting.

SAT/UNSAT

3132a Page 8 of 12 REV. 0

Start RCIC From The Remote Shutdown Panel.

- PROMPT When askd

Zt<Ua &n* on~ide ranieinforrn exami'n~ee athtem~te

levei instrumenf reactor level indicates

  • shdtdown panq! +(0u- O!thes;*B1§tak

186!ipcdsand

S I> K R 04.............. t K2 ....... ,i

Step 15 -Station 1, Adjust RCIC Flow Controller, E51 -FIC-3325, to maintain reactor vessel

level between 170" and 200".

RCIC setpoint tape maintainedat 400 gpm, or adjusted to *<500 gpm.

SAT/U NSAT*

Step 16 -Inform Unit SCO that RCIC is injectiong to the reactor vessel and level is being

maintained 170: to 200".

Unit SCO informed.

SATIU NSAT*

iiCTERMINATING~

... . . CUr*nR!@1a

. .. ý ....@

~ t.~*p!*

. . ....... *l

  • Comments required for any step evaluated as UNSAT.

3B2a Page 9 of 12 REV. 0

Start RCIC From The Remote Shutdown Panel.

RELATED TASKS:

200204B401, Perform The Station 1 Actions For Shutdown Outside The Control Room Per

AOP-32.0

K/A REFERENCE AND IMPORTANCE RATING:

295016 AAI.06 4.0/4.1

REFERENCES:

AOP-32.0

TOOLS AND EQUIPMENT:

None.

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

2 - Inventory Control (Reactor Core Isolation Cooling)

REASON FOR REVISION:

Bank JPM. Converted to WORD and updated for latest procedure revision.

3132a Page 10 of 12 REV. 0

Start RCIC From The Remote Shutdown Panel.

Time Required for Completion: 15 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate 4 Actual Unit: 0

Setting: Control Room Simulator (Not applicable to In-Plant JPMs)

Time Critical: Yes No 4 Time Limit N/A

Alternate Path: Yes No 4

EVALUATION

Trainee: SSN:

JPM: Pass Fail

Remedial Training Required: Yes No

Did Trainee Verify Procedure as Authorized Copy?: Yes No

(Each Student should verify one JPM per evaluation set.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

3132a Page 11 of 12 REV. 0

TASK CONDITIONS:

1. The Shift Superintendent has directed entry into AOP-32.0 and evacuation of the

Control Room.

2. All immediate actions of AOP-32.0 are complete.

3. Remote shutdown equipment has been distributed and communications between

remote shutdown stations is established.

4. All Normal/Local switches listed in AOP-32.0 have been placed in Local.

5. This task will be performed on Unit . (Specified by the examiner)

INITIATING CUE:

You are directed by the Unit SCO to perform ALL operator actions, including Remote

Shutdown Panel actions (Stations 1, 2, & 3) requred to start RCIC for reactor vessel

injection to maintain reactor vessel injection +170-200". You are to inform the Unit SCO

when reactor vessel level is >170", or reactor vessel level is rising toward 170".

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

IN-PLANT

BNP-03-B2b

LESSON TITLE: Local Manual Start Of A DG Using Prelube Start Control.

REVISION NO: 0

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:

Line Superintendent/Supervisor DATE

APPROVED BY:

Superintendent/Supervisor Training DATE

Local Manual Start Of A DG Using Prelube Start Control.

SAFETY CONSIDERATIONS:

Use caution in the vicinity of operating equipment.

Use caution in vicinity of energized electrical equipment.

Hearing Protection required in the Diesel Building.

EVALUATOR NOTES: (Do not read to trainee)

1. The applicable procedure section WILL be provided to the trainee.

2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the trainee.

3. This JPM may be performed on any of four Diesel Generators (ensure DG is in standby

alignment, not running or under clearance).

Read the following to trainee.

TASK CONDITIONS:

1. All applicable prerequisites as listed in OP-39, Section 4.0 are met.

2. Diesel Generators are in the standby mode in accordance with OP-39, Section 5.1.

3. Diesel Generator # is to be started.

4.

5. The Diesel Generator will be tied and loaded from the Control Room per OP-50.1.

INITIATING CUE:

You are directed by the Unit SCO to perform a local manual start of Diesel Generator

per OP-39, Section 5.4. You are to inform the Control Room when the Diesel Generator Fis

ready for electrical operation per OP-50.1.

3132b Page 2 of 10 REV. 0

Local Manual Start Of A DG Using Prelube Start Control.

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

Step 1 - Obtain a current revision of OOP-39, Section 5.4.

Current Revision of OOP-39, Section 5.4 obtained and verified, if applicable.

SAT/UNSAT*

Step 2 - Confirm the diesel Generator auxiliary systems are operable by observing the

following conditions locally.

PROMPT: Ifretjtested, ipdicate each re~dinlg/indication fqr tF~e following :St6ess:! "as-seerg' f

a. Starting air pressure is between 240-260 psig as indicated by DG-PI

6514-1 (2, 3, 4)

Startingairpressure is observed to be between 240-260 psig as

indicated by DG-PI-6514-1 (2, 3, 4).

SAT/U NSAT*

b. Starting air Receivers A & B pressures are between 325-350 psig as

indicated by DG-PI-1690 and 1692 (1674 and 1677,1663 and 1666, 787

and 788)

Starting air Receivers A & B pressuresare observed to be between

325-350 psig as indicatedby DG-PI-1690 and 1692 (1674 and 1677,

1663 and 1666, 787 and 788).

SAT/UNSAT*

3132b Page 3 of 10 REV. 0

Local Manual Start Of A DG Using Prelube Start Control.

c. Engine control air pressure is between 90-125 psig as indicated by DG-PI

1686 (1680,1660,1252).

Engine control airpressure is observed to be between 90-125 psig as

indicatedby DG-PI-1686 (1680, 1660, 1252).

SAT/UNSAT*

d. Jacket Water Expansion Tank level is between A and % full in sight glass.

Jacket Water Expansion Tank level is observed to be between $ and

3/4 full in sight glass.

SAT/UNSAT*

e. Jacket Water Heater Pump is in operation.

Jacket Water Heater Pump observed to be in operation.

SAT/UNSAT*

f. Jacket Water Heater temperature out is between 1500 to 1600 as

indicated by MUD-TI-2117 (4144, 2171, 2198).

Jacket Water Heatertemperatureout is observed to be between 1500

to 160 0 as indicatedby MUD-TI-2117 (4144, 2171, 2198).

SAT/UNSAT*

3132b Page 4 of 10 REV. 0

Local Manual Start Of A DG Using Prelube Start Control.

g. Lube Oil Filter Pump is in operation.

Lube Oil FilterPump observed to be in operation.

SAT/UNSAT*

h. Lube oil bypass filter temperature is between 1300 to 1600 as indicated by

MUD-TI-2117 (4144, 2171, 2198).

Lube oil bypass filter temperature is observed to be between 1300 to

1600as indicated by MUD-TI-2117 (4144, 2171, 2198).

SAT/U NSAT*

Governor oil level is at or above the high level mark.

Governor oil level is observed to be at or above the high level mark.

SAT/UNSAT*

iNOT: ... h c* .epae nLCL IULmd fr oto om pnlX- ny

3132b Page 5 of 10 REV. 0

Local Manual Start Of A DG Using Prelube Start Control.

Step 3 - Request control room place the DG in the Local Manual mode.

DG is in the Local Manual Mode.

SAT/U NSAT*

PROM

NOTE:Whenthe

~ d~pre~sing

PROMPTl"

restrt Nis derse! hi6axlais~~

examWhe

4

stat sor&bd)ittedlydb

Y&/U,

jaclbt aterpurp~$&hi~6~

blwr auosttAAl1nin3(

th Prestart are lhted in OP-A9,~ecItio .. ;Ses4atruht

i~~~rse~~trPB-'ifrquested, ater'0--dd

eod.,At~~~~

n

20secondidct

j

I

fndcaiond 1Tddh~ "tg b ~ indica ion; o dylbt6p

in di MO rMiki $KII7A " .0

Step 4 Der,"essa

- PRETAR puhbttnlctedon loal Engt66;f6ýineCotrol Panel" o

PRE TARTipused~hatbutobsq depressed., ings

CRITICAL STEPl

laSAINST

  • o

NOTEi;*, i;****;** **ii*ii!*vnl a*!!*

The following i( ii i*i~l

alarm **!~lmsl!!oae

located oh~iconfrol

  • iin i!*** room*ii!ia~l;!

o~~i iro!  !! ¸*!*U2i!!

  • i * * *ii!*

IO

Aea.RMT -p,rgo xi ,mat9l'y 10 ýs~eco nds, f'rom n thetmtheniesasnfrexpne

s~~~~~t~~

tthe DG.nin.t i .....ha bee receive in.. th cotol.om.

PRO~~~~~U~ %ýl1 [eustdidida~t>erSvice' Wter rsuqo WP-5d~~

l riaell pprox 04W at-l01445 risig A

3B2b Page 6 of 10 REV. 0

Local Manual Start Of A DG Using Prelube Start Control.

Step 5 - Ensure Service Water Pressure SW-PI-153-1 (2, 3, 4) on Engine Control Panel is 40

50 psig, by adjusting Jacket Water Cooler Service Water Outlet Valve 2-SW-V206

(V207, V208, V209), to maintain pressure.

Service Water Pressure SW-PI-153-1 (2, 3, 4) on Engine Control Panelis

observed to be 40-50 psig.

SAT/UNSAT*

Ipor~

PROMP.

PROMPT~ or66tidri,with that'.;6bot~erP~ tr

~ xaiminee or,, monitor-diesel !generator 6p rati6r:Jnp"t'.

Intdrdertrwill

I

Step 6 - Inform the control room that the diesel generator is ready for electrical operation per

OP-50.1.

Control room informed that the diesel generatoris ready for electricaloperation

per OP-50. 1.

SAT/U NSAT*

elrica~ýop erati1Rn4h'id

for

It~~~~I 1 ~ I ~~ I It MR-crplt m

  • Comments required for any step evaluated as UNSAT.

3132b Page 7 of 10 REV. 0

Local Manual Start Of A DG Using Prelube Start Control.

RELATED TASKS:

264004B204, Perform DG Monthly Load Test Per PT-1 2.2A-D

K/A REFERENCE AND IMPORTANCE RATING:

264000 A1.03 2.9/2.9.

REFERENCES:

OP-39

TOOLS AND EQUIPMENT:

None.

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

6 - Electrical (Emergency Generators)

REASON FOR REVISION:

Bank JPM. Revised from WP to WORD.

3132b Page 8 of 10 REV. 0

Local Manual Start Of A DG Using Prelube Start Control.

Time Required for Completion: 10 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate 4 Actual Unit:

Setting: Control Room Simulator ( Not applicable to In-Plant JPMs)

Time Critical: Yes No 4 Time Limit N/A

Alternate Path: Yes No 4

EVALUATION

Trainee: SSN:

JPM: Pass Fail

Remedial Training Required: Yes No

Did Trainee Verify Procedure as Authorized Copy?: Yes No

(Each Student should verify one JPM per evaluation set.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

3132b Page 9 of 10 REV. 0

TASK CONDITIONS:

1. All applicable prerequisites as listed in OP-39, Section 4.0 are met.

2. Diesel Generators are in the standby mode in accordance with OP-39, Section 5.1.

3. Diesel Generator # is to be started.

4. The Diesel Generator will be tied and loaded from the Control Room per OP-50.1.

INITIATING CUE:

You are directed by the Unit SCO to perform a local manual start of Diesel Generator

per OP-39, Section 5.4. You are to inform the Control Room when the Diesel Generato'ris

ready for electrical operation per OP-50.1.

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

IN-PLANT

LESSON TITLE: Fire Water Injection Using The Motor Driven Fire Pump.

REVISION NO: 0

RECOMMENDED BY:

Instructor/Developer UDAI

CONCURRENCE BY:

Line Superintendent/Siu ervisor DATE

APPROVED BY:

Superintendent/Supervisor Training DATE

Fire Water Injection Using The Motor Driven Fire Pump.

SAFETY CONSIDERATIONS:

Use caution in the vicinity of operating equipment.

Use caution in vicinity of energized electrical equipment.

EVALUATOR NOTES: (Do not read to trainee)

1. The applicable procedure section WILL be provided to the trainee.

2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the trainee.

Read the following to trainee.

TASK CONDITIONS:

1. Unit One is in accident conditions, and is executing EOP-01-RVCP due to low reactor

water level. Reactor water level is below Top of Active Fuel. EOP-01-RVCP directs

aligning all available alternate coolant injection per EOP-01-LEP-01. Reactor pressure

is 10 psig.

2. Off-Site Power is unavailable to either unit. DG2 is tripped, and Bus E2 is de

energized, and cannot be energized by cross-tie. Buses El, E3, and E4 are energized

by their respective DGs. Buses E5 and E6 have been cross-tied.

3. The Diesel Driven Fire Pump is unavailable.

4. The Motor Driven Fire Pump is aligned to its normal power supply. The Motor Driven

Fire Pump cannot be started from the control room.

5. Fire protection tank level is normal. A radwaste operator is available to control and

monitor fire protection tank level.

6. RHR Loop B injection flow path is available.

3132c Page 2 of 9 REV. 0

Fire Water Injection Using The Motor Driven Fire Pump.

INITIATING CUE:

You are directed by the Unit CO to transfer the Motor Driven Fire Pump to its alternate

power supply, start the Motor Driven Fire Pump locally, and perform the AO actions for

aligning Fire Protection Injection per EOP-01-LEP-01, Section 6, and inform the CO when

your actions are complete.

S3132c Page 3 of 9 REV. 0

Fire Water Injection Using The Motor Driven Fire Pump.

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

,NOTE: Jý,Ste ipL~O to' strtte ir umI(8

wtuto durihgd~~9P

excto9tee,-1)aei

edure.D ste;ps mare NOT, requed to Pe,

aetei,

OT!rmedi be) ,erm0e- dJ,~

li*ý ,i ý, 0,I

Step 1 - Obtain a current revision of EOP-01-LEP-01 and OP-41.

Current Revision of EOP-O1-LEP-01 and OP--41.

SAT/U NSAT*

Step 2 - Shift the Motor Driven Fire Pump to the alternate supply as follows:

a. Disengage position pin from position plate.

Positionpin is disengaged.

    • CRITICAL STEP ** SAT/UNSAT*

b. Place Transfer switch located on front of 2-FP-P2-XFER-SW cabinet to position

A.

Transferswitch located on front of 2-FP-P2-XFER-SWcabinet placed to

position A.

    • CRITICAL STEP ** SAT/UNSAT*

3132c Page 4 of 9 REV. 0

Fire Water Injection Using The Motor Driven Fire Pump.

c. Ensure position pin engages position plate.

Position pin engaged.

SATIUNSAT*

I

I

PRMT fearnif1e4-can~taQctscontro ppmnrf~tstarthp' Motor-,Driven, ir~ Pup.nfr

ea~ithe upwlht titfo the cotro room an0stoclysatd I

Step 3 - Momentarily depress the local start push button for the Motor Driven Fire Pump.

Motor Driven Fire Pump is running.

    • CRITICAL STEP ** SAT/UNSAT*

i . .... .... . . . . . .. ... ... ... . ... . ... . .. .. . .. . .. .

Step 4 - Unlock and open Fire Protection (Well Water) to Service Water Flush Supply Shutoff

Valve 2-FP-PIV20.

    • CRITICAL STEP ** SAT/UNSAT*

NOTE4disdipnct

El {O7 witcli~ n te 23 elvation of:the" abe fspre"'ae

3132c Page 5 of 9 REV. 0

Fire Water Injection Using The Motor Driven Fire Pump.

Step 5 - Place the El1-F073 disconnect switch to On at Node L1G in the cable spread area.

Ell-F073 disconnect switch is in On at Node LIG in the cable spread area.

    • CRITICAL STEP ** SAT/UNSAr*

PRMP:When ::Xaminqeeinforscoto ro.1i t~thpffe El1F7 d"sA (ýs"0;-.ý

inforrningeqasý tat,Eli haT1F73dic nnewthi n

Step 6 - Open RHR Service Water Header Flush Valve, SW-V140 (located 50' elevation

behind B & D RHRSW booster pumps)

SW-V140 is manually opened.

    • CRITICAL STEP ** SAT/UNSAT*

Step 7 - Open Well Water Flush To Service Water Shutoff Valve, WW-V203 (located 50'

elevation behind B & D RHRSW booster pumps)

WW-V203 is manually opened.

    • CRITICAL STEP ** SAT/UNSAT*

Step 8 - Inform CO local actions are complete to inject fire water to the reactor.

CO informed actions for fire water injection are complete.

TTERMINATINGC

I K

s boxit

dtuden~ pedtorM8n~

the v o when...heP..m.eado

I

  • Comments required for any step evaluated as UNSAT.

3132c Page 6 of 9 REV. 0

Fire Water Injection Using The Motor Driven Fire Pump.

RELATED TASKS:

200075B504, Perform Alternate Coolant Injection With Fire Water Per LEP-0O

K/A REFERENCE AND IMPORTANCE RATING:

286000 A1.05 3.2/3.2

REFERENCES:

OP-41

EOP-01-LEP-01

TOOLS AND EQUIPMENT:

None.

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

8 - Fire Protection

REASON FOR REVISION:

New JPM.

3132c Page 7 of 9 REV. 0

Fire Water Injection Using The Motor Driven Fire Pump.

Time Required for Completion: 20 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate 4 Actual Unit:

Setting: Control Room Simulator ( Not applicable to In-Plant JPMs)

Time Critical: Yes No 4 Time Limit N/A

Alternate Path: Yes No 4

EVALUATION

Trainee: SSN:

JPM: Pass Fail

Remedial Training Required: Yes No

Did Trainee Verify Procedure as Authorized Copy?: Yes No

(Each Student should verify one JPM per evaluation set.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

3132c Page 8 of 9 REV. 0

TASK CONDITIONS:

1. Unit One is in accident conditions, and is executing EOP-01-RVCP due to low reactor

water level. Reactor water level is below Top of Active Fuel. EOP-01-RVCP directs

aligning all available alternate coolant injection per EOP-01-LEP-01. Reactor pressure

is 10 psig.

2. Off-Site Power is unavailable to either unit. DG2 is tripped, and Bus E2 is de

energized, and cannot be energized by cross-tie. Buses El, E3, and E4 are energized

by their respective DGs. Buses E5 and E6 have been cross-tied.

3. The Diesel Driven Fire Pump is unavailable.

4. The Motor Driven Fire Pump is aligned to its normal power supply. The Motor Driven

Fire Pump cannot be started from the control room.

5. Fire protection tank level is normal. A radwaste operator is available to control and

monitor fire protection tank level.

6. RHR Loop B injection flow path is available.

INITIATING CUE:

You are directed by the Unit CO to transfer the Motor Driven Fire Pump to its alternate

power supply, start the Motor Driven Fire Pump locally, and perform the AO actions for

aligning Fire Protection Injection per EOP-01-LEP-01, Section 6, and inform the CO when

your actions are complete.

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

SIMULATOR

LESSON TITLE: Recirculation Pump Start - Recirculation Pump Speed Control Failure.

REVISION NO: 0

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:

Line Superintendent/Supervisor DATE

APPROVED BY:

Superintendent/Supervisor Training DATE

Recirculation Pump Start - Recirculation Pump Speed Control Failure.

SIMULATOR SETUP (Recommended)

IC-11 BOC

Rx Pwr 100%

Core Age BOC

Triggers

TRUE

El - Auto initiated, Recirc B Runback Reset Push Button =

Malfunctions

None

Overrides

El - Recirc B Flow Control 1.0 over 60 seconds

Remote

None

Special Instructions

rods on ENP-24.

Reduce core flow to ENP-24 limit, drive 1st 3 sets of

and reduce

Secure Recirc Pump B, place seal staging valve (V17) to Manual/Open,

controller output to approx. 16%.

flow >23,500 gpm. Ensure

Ensure core flow >30.8 and <45 mlbm/hr, and Recirc A pump

Recirc A pump flow is reduced to 23.500

scram avoidance region will not be entered when

gpm.

Page 2 of 15 REV. 0

3B13a

Recirculation Pump Start - Recirculation Pump Speed Control Failure.

SAFETY CONSIDERATIONS:

None.

EVALUATOR NOTES: (Do not read to trainee)

1. The applicable procedure section WILL be provided to the trainee. Evaluator should

provide copy of OP-02, Sections 5.2 and 8.2 completed up to the steps specified in the

task conditions.

2. If this is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the trainee.

3. Steps in 20P-02 to place APRMs to setup are not applicable in the simulator due to

simulator configuration with Unit One PRNM.

Read the following to trainee.

TASK CONDITIONS:

3/4

1. Recirculation Pump 2B has tripped. The cause of the trip has been corrected.

2. Recirculation Pump 2A is in operation.

3. RWCU is in normal operation per 20P-14.

4. An off-going operator has completed steps in 20P-02, Section 8.2, up to step 8.2.2.4,

and Section 5.2, up to step 5.2.2.22.

5. Another operator is available to make log entries as required.

INITIATING CUE:

You are directed to continue the startup of Recirculation Pump 2B and inform the Unit SCO

when 20P-02 Sections 5.2 and 8.2 are complete.

  • ._ 313B1a Page 3 of 15 REV. 0

Recirculation Pump Start - Recirculation Pump Speed Control Failure.

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in Uie Comments.

Step I - Obtain a current revision of 20P-02, Sections 5.2 and 8.2.

Current Revision of 20P-02, Sections 5.2 and 8.2 obtained and verified, if

applicable.

SAT/UNSAT*

Step 2 - Ensure temperature differential between the reactor coolant within the dome and

bottom head drain is less than 145°F as follows:

a. Determine reactor pressure, convert to psia by adding 14.7 and use steam tables

to convert reactor pressure to temperature.

Reactor temperature in the dome determined by converting psig to psia and

using steam tables.

K SAT/UNSAT*

33Bla Page 4 of 15 REV. 0

Recirculation Pump Start - Recirculation Pump Speed Control Failure.

b. Determine bottom head drain temperature using G31-TI-R607 Point 5 (Panel

H12-P603),, or 12-TR-R018 Channel 153.

Bottom head rain Lemperature using G31-TI-R607 Point 5 is determined.

//

L 7`cMýSATIU NSAT*

c. Determine temperature difference and record time.

Temperature differential determined and time recorded in OP-02.

SAT/UNSAT*

PROM P lowexamiy. reduce*s noftheopaer*in R*dal tour ecirddifntl temperaingk Rcirr

NOT:* Sterps23....

....... and 24 of* 20P-02 Section 5.2.2 aret not= aplil'=cab .......

e* >49K;.

Step 3 - Slowly, reduce speed of the operating Reactor Recirculation Pump using Recirc

Pump 2A Speed Control potentiometer until loop flow is less than or equal to 50%

(23,000 gpm) of rated loop flow.

Recirc loop 2A flow is _<23,500 gpm on B32-FR-R614 or B32-R613.

    • CRITICAL STEP ** SAT/UNSAT*

33B1a Page 5 of 15 REV. 0

Recirculation Pump Start - Recirculation Pump Speed Control Failure.

Step 4 - Within 30 minutes prior to startup of the second pump, ensure temperature

differential between operating loop and idle loop is less than or equal to 50°F and

that operating loop flow is less than or equal to 23,500 gpm as follows:

a. Operating loop temperature (B32-TR-R650) or process computer (B055-B058)

Loop 2A temperature recorded in 20P-02 using B32-TR-R650 or B055-B056.

SAT/UNSAT*

b. Idle loop temperature (B32-TR-R650) or process computer (B055-B058)

Loop 2B temperature recorded in 20P-02 using B32-TR-R650 or B057-B058.

SAT/U NSAT*

c. Determine differential temperature, record results and time in 20P-02

Differential temperature determined and recorded,along with time in 20P-02.

SAT/UNSA'*

I PROMPT:

If ex~rninee r~quetsnth

lobo.r~r

inihe~~~~~M4

idiiutorcrdifetalem

CO aetyIs~onlt

rtrendie

I

[I . ... ...

6h~s6', bpi.,I - Ort

NOTE: * , savaiab and should be Msqo

4flowrec*tery ,Bj21RR6l

5MENNEN f

-o!e n

33B1a Page 6 of 15 REV. 0

Recirculation Pump Start - Recirculation Pump Speed Control Failure.

e . Operating loop flow rate on B32-FR-R614, if available, or flow indicator B32

R613 is less than or equal to 23,500 gpm (50% of rated loop flow) and time

recorded in 20P-02

Loop 2A flow rate from B32-FR-R614 and time recoded in 20P-02.

SAT/UNSAT*

. me I

I~-ýpAA*

I~ ~~ ~~~~~~~ s;!;* *i i i~

.......* ***l; * i+ ; ; ..,'.*; ..

.... ... i *? w  ; i ! *** 'ItiF*!

  • i! 1.*;*

. 1**1*~*

i!*

j . i 11i

i z*~ i *

~ ~~~~~~~~. .........................

l;~

  • f~2

~~ ~ NOE

~ f2PO~Scin522i

A~~~~~~~~~~~~

Step 5 - Ensure Pump 2B discharge valve B32-F031B is closed,

~ ~ 1 ntaplicable'

rei6inakia!6ilerpevdwe~edica~evle

sc~~&

I

Pump 2B discharge valve B32-FO31B is full closed.

    • CRITICAL STEP ** SAT/UNSAT*

NOTE Ste 29o§0-2 ection S22"is no :a pplcbe

Step 6 - Ensure 30 minutes has not elapsed since temperature differentials and flow rate were

determined.

30 minutes has not elapsed since temperature differentials and flow rate were

determined

SATIUNSAT*

33B1a Page 7 of 15 REV. 0

Recirculation Pump Start - Recirculation Pump Speed Control Failure.

Step 7 - Start MG Set 2B drive motor and ensure the following:

MG Set 2B drive motor is started

    • CRITICAL STEP ** SAT/UNSAT*

a. MG Set B drive motor breaker closes.

Ensures MG Set 2B drive motor closes.

SAT/U NSAT*

b. MG Set B accelerates to speed.

Ensures MG 2B acceleratesto speed.

SAT/U NSAT*

c. Approximately 6 seconds after the drive motor breaker closes, the generator field

breaker closes and starts the Reactor Recirculation Pump.

Ensures MG 2B field breaker closes and RecirculationPump 2B starts.

SAT/U NSAT*

I NOTE: B32lowthe discharge byass

Sthrough ve

sincehe discharge valv is closed

.lW

. ........

33Bla Page 8 of 15 REV. 0

Recirculation Pump Start - Recirculation Pump Speed Control Failure.

d. Recirc Pump 2B discharge flow B32-R613 indicates flow.

Ensures Recirc Pump 2B discharge flow B32-R613 indicates flow.

SAT/U NSAT*

reqe t anthe idvdua !torecorld timiiýfetheMG ýSet 2B ýdr~iv'e mtr

I .....PRMPT:ilf:ý,6¶rnipJ & db o Ieit*h, rdpo.. l e.... i*... .... .I

Step 8 - If in Modes or 2 and the reactor is critical, perform the following:

a. Using 2 second jogs and 10 second rest times for the first minute, jog open

Pump 2B discharge valve B32-FO31B.

B32-FO31B is opened using 2 secondjogs and 10 second rest times for the

first minute (5 totaejogs).

    • CRITICAL STEP ** SAT/UNSAT*

b. Fully open Pump 2B discharge valve B32-F031B.

B32-FO31B is fully opened.

    • CRITICAL STEP ** SAT/UNSAT*

NOTE:n35 6;20P-2, Sectio5.2.2 are r;ot applaIe

331 a Page 9 of 15 REV. 0

Recirculation Pump Start - Recirculation Pump Speed Control Failure.

Step 9 - Place the control switch for Seal Staging Valve B32-V17 to AUTO and ensure the

valve remains open.

B32-V17 open with the control switch in AUTO.

SATIUNSAT*

Step 10 - Reset Recirculation runback in accordance with Section 8.3.

Recognizes runback must be reset and obtains copy of 20P-02, Section 8.3.

tI *7 SAT/UNSAT*

Step 11 - Adjust the potentiometer on Recirc Pump 2B Speed Control lowering the speed

demand signal until speed signal shows a slight decrease in pump speed.

Recirc B Speed Control is lowered to achieve a slight decrease in pump speed.

I/o,*t- C4. SAT/UNSAT*

  • NOTEj:AWhe6n',IheýýRuflback Re~set :O'hýbuitton":forReio typ2 icersed thsed

de WIn ead~ga jIrrp3i0

ýilbegin :to irncrqgase, pe reactor', `4m ~a6

sec&~~~d~eri6Q~

PupspM(-dpoes

th.co uei nimdae pao cino O-3O

Locking...

!

Z7 44'%6" AZfl"ccjitJ "40Ae1--/O-O

REV. 0

Page 10 of 15 REV. 0

11 3Bla

3B3la Page 10 of 15

Recirculation Pump Start - Recirculation Pump Speed Control Failure.

PROMPT,: I examinet ICas6sistance in resetting the runa*c ,

Step 12 - Reset the Recirculation runback for Reactor Recirculation Pump 2B as follows:

a Depress the Reciro Runback Reset push button for Recirculation Pump 2B.

Recirc Runback Reset pushbutton for Pump 2B is depressed.

    • CRITICAL STEP ** SAT/UNSAT*

b Ensure reactor power and flow are stabilized.

Recognize increasingspeed on Recirc Pump 2B and lock the scoop tube prior

to exceeding maximum pump speed mismatch.

    • CRITICAL STEP ** SATIUNSAT*

II

ei cndtaineq se AO.When examin k

I

PROMPT" when informed as SC ofthe failure infor examinee thatanothe e'ratorWi

eter aan nnounbe AOPnO3 L >1

33B1a Page 11 of 15 REV. 0

Recirculation Pump Start - Recirculation Pump Speed Control Failure.

Step 13 - Inform SCO of speed control failure.

SCO informed of speed control failure.

SAT/UNSAT

6

IS.

TEMNTN

.. .t

CU:hen the scoop tube is locked for Reciro MG

-

.;

.'

..

.

... et 2B, this JPMis

  • m

I

  • Comments required for any step evaluated as UNSAT.

33Bla Page 12 of 15 REV. 0

Recirculation Pump Start - Recirculation Pump Speed Control Failure.

RELATED TASKS:

202004B1301, Startup A Reactor Recirculation Pump Per OP-02

2020155B401, Respond To A Recirc Flow Control Failure Increasing Per AOP-03.0

K/A REFERENCE AND IMPORTANCE RATING:

202001 A4.01 3.7/3.7

Ability to manually operate and/or monitor in the control room: Recirculation pumps

REFERENCES:

20P-02

TOOLS AND EQUIPMENT:

Steam Tables

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

1 - Reactivity Control (Recirculation System)

REASON FOR REVISION:

Bank JPM LOR-SIM-JP-002-A07. Renamed from LOR to LOT, changed format to WORD

from WP 5.1, updated for procedure revision.

3Bla Page 13 of 15 REV. 0

Recirculation Pump Start - Recirculation Pump Speed Control Failure.

Time Required for Completion: 20 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate Actual 4 Unit: 2

Setting: Co ntrol Room Simulator 4 ( Not applicable to In-Plant JPMs)

Time Critical: Yes No 4 Time Limit N/A K

Alternate Path: Yes 4 No

EVALUATION

Trainee: SSN:

JPM: Pass Fail

Remedial Training Required: Yes No

Did Trainee Verify Procedure as Authorized Copy?: Yes No

(Each Student should verify one JPM per evaluation set.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

33B1a Page 14 of 15 REV. 0

TASK CONDITIONS:

1. Recirculation Pump 2B has tripped. The cause of the trip has been corrected.

2. Recirculation Pump 2A is in operation.

3. RWCU is in normal operation per 20P-14.

4. An off-going operator has completed steps in 20P-02, Section 8.2, up to step 8.2.2.4,

and Section 5.2, up to step 5.2.2.22.

5. Another operator is available to make log entries as required.

INITIATING CUE:

You are directed to continue the start'up of Recirculation Pump 2B and inform the Unit SCO

when 20P-02 Sections 5.2 and 8.2 are complete.

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

SIMULATOR

BNP-03-Bl b

LESSON TITLE: Reduce RPV Water Level Using RWCU To Radwaste.

REVISION NO: 0

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:

Line Superintendent/Supervisor DATE

APPROVED BY:

Superintendent/Supervisor Training DATE

Reduce RPV Water Level Using RWCU To Radwaste.

SIMULATOR SETUP

IC-03 BOC

Rx Pwr 0%

Core Age BOC

Triggers

None

Malfunctions

None

Overrides

None

Remote

None

Special Instructions

Secure RWCU reject flow by closing G31 -F033 and G31 -F034.

Raise RPV level to approximately 195". Ensure alarm A7 2-2 is sealed in.

Ensure both RWCU Filter Demins are in service.

331lb Page 2 of 9 REV. 0

Reduce RPV Water Level Usina RWCU To Radwaste.

SAFETY CONSIDERATIONS:

None.

EVALUATOR NOTES: (Do not read to trainee)

1. The applicable procedure section WILL NOT be provided to the trainee.

2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the trainee.

3. There is no direct procedural guidance for this JPM. It is considered within the operator's

capability to control RPV water level using CRD and RWCU as directed by General

Operating Procedures.

Read the following to trainee.

TASK CONDITIONS:

1. Unit Two is in Mode 2, performing a reactor startup per GP-02.

2. RPV level band is 182" to 192" as indicated on C32-LI-NO04A/B/C.

3. CRD is operating for control rod withdrawal.

4. RWCU is in operation. RWCU was aligned for reject to the main condenser, but that

flow path has been secured for maintenance to repair a small leak in the header

downstream of G31 -F034, Reject To Condenser.

5. Reactor Level Hi/Lo has alarmed since securing the RWCU reject flow path.

6.ý tl-vfl-V Lt £t Wof

INITIATING CUE: /o

You are directed by the Unit SCO establish a RWCU reject to Radwaste in accordance

with GP-02, Step 5.3.4, and lower RPV water level to <192" as indicated on narrow range

instruments C32-LI-NO04A/B/C. You are to inform the Unit SCO when the Reactor Hi/Lo

Level alarm is clear.

331lb Page 3 of 9 REV. 0

Reduce RPV Water Level Usincg RWCU To Radwaste

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

I'T The folowing actions are directed by GP-02. There are no specific instructions in

OP-14 (Reactor Water Cleanup Operatinq Procedure) that applV for current plant I

conditions. The operator is expected to be able to control RPV level usinq CRD and I

RWOU reject during execution of General Operating Procedures. I

PROMPT, When notified of reject operation to Radwaste, as Radwvaste CO, inform examinee

that Vou have aliqned the reject flow path to the Waste Collictor Tank. Report

Waste CollectorTank level is 20% and sufficient capacitv exiSts or approximately

20,000 gallons of reject flow.

Step 1 - Obtain current revision of GP-02.

Currentrevision of GP-02 is obtained.

SAT/UNSAT*

1/2->

Step 2 - Notify Radwaste of intention to reject to Radwaste, and coordinate to ensure

Radwaste can accept the reject flow.

Radwaste notified of reject to Radwaste.

SAT/UNSAT*

Step 3 - Open Reject To Radwaste Viv, G31 -F035.

Reject To Radwaste VIv, G31-F035 is open.

    • CRITICAL STEP ** SAT/UNSAT*

331lb Page 4 of 9 REV. 0

Reduce RPV Water Level Usinq RWCU To Radwaste.

Step 4 - Throttle open RWCU Reject Flow Control VIv, G31 -F033 to achieve a lowering RPV

water level.

G31-F033 is opened to achieve a lowering reactorwater trend.

    • CRITICAL STEP ** SAT/UNSAT*

EBpodMEI If asked, as Radwaste CO, Irep6rtWater C ollector Tank level, rising.

NO I e operator may (but is not r.euired to) reduce CR0 flcw rate to the RPV to aid in I

reducinq RPV level to the desired band. Ifthe operat6r rdduces CRD flow rate, ORD I

parameters should be maintainedlper 0 Section 6.0. ko-I

NOIE The operator should monitor Reqen HX Outlet, Point 2, and/or Filter Inlet Point 3, on

G31-TI-R607, to ensure Non-Reqen heat exchanqers outlet temperature remains I

below 1300F, but with RPV temperature,<2120F, this limitation will not be exceeded.

Step 5 - Monitor Regen HX Outlet, Point 2, and/or Filter Inlet, Point 3, on G31 -TI-R607, to

ensure Non-Regen heat exchangers outlet temperature remains below 1300F.

Operatormonitors Regen HX Outlet, Point2, and/or Filter Inlet, Point 3, on G31

TI-R607, to ensure Non-Regen heat exchangers outlet temperature remains

below 1300F.

SAT/UNSAT*

33Blb Page 5 of 9 REV. 0

Reduce RPV Water Level Using RWCU To Radwaste.

Step 6 - Lower RPV water level at or below 192" as indicated by C32-LI-NO04A/B/C.

RPV water level indicatesat or below 192" as indicatedby C32-LI-NOO4A/B/C

and ReactorLevel Hi/Lo alarm is clear.

    • CRITICAL STEP ** SAT/UNSAT*

Step 7 - Inform Unit SCO that RPV water level is in the required band.

Unit SCO informed RPV water level is in the requiredband.

SAT/UNSAT*

I

fTRMINATING CUE: When RPVwatrf 6ýev ,idicates! 192" on narrow range indicators

II ' NOO4A/B/C, this JPM s complete. _ 1

  • Comments required for any step evaluated as UNSAT.

33Blb Page 6 of 9 REV. 0

Reduce RPV Water Level Usina RWCU To Radwaste.

RELATED TASKS:

204002B1301, Place The RWCU System In Service With The Reactor Not In Cold

Shutdown Per OP-14.

K/A REFERENCE AND IMPORTANCE RATING:

204000, A4.08 3.4/3.4

REFERENCES:

20P-14

GP-02

TOOLS AND EQUIPMENT:

None.

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

2 - Inventory Control (Reactor Water Cleanup)

REASON FOR REVISION:

New JPM.

3B3lb Page 7 of 9 REV. 0

Reduce RPV Water Level Using RWCU To Radwaste.

Time Required for Completion: 15 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate - Actual ' Unit: 2__

Setting: Control Room - Simulator 4/ (Not applicable to In-Plant JPMs)

Time Critical: Yes No Vt Time Limit N/A

Alternate Path: Yes - No ,

EVALUATIOlN

Trainee:. SSN:

JPM: Pass __ Fail

Remedial Training Required: Yes - No __

Did Trainee Verify Procedure as Authorized Copy?: Yes __ No

(Each Student should verify one JPM per evaluation set.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

33Blb Page 8 of 9 REV. 0

TASK CONDITIONS:

1. Unit Two is in Mode 2, performing a reactor startup per GP-02.

2. RPV level band is 182" to 192" as indicated on C32-LI-NO04A/B/C.

3. CRD is operating for control rod withdrawal.

4. RWCU is in operation. RWCU was aligned for reject to the main condenser, but that

flow path has been secured for maintenance to repair a leak in the header downstream

of G31-F034, Reject To Condenser.

5. Reactor Level Hi/Lo has alarmed since securing the RWCU reject flow path.

INITIATING CUE:

You are directed by the Unit SCO establish a RWCU reject to Radwaste in accordance

with GP-02, Step 5.3.4, and lower RPV water level to <192" as indicated on narrow range

instruments C32-LI-NO04A/B/C. You are to inform the Unit SCO when the Reactor Hi/Lo

Level alarm is clear.

'C

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

CONTROL ROOM

F

BNP- 03-A'Ic

I

LESSON TITLE: Emergency Equalization Around MSIV's - Using the Hard Card

REVISION NO: I

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:

Line Superintendent/Supervisor DATE

APPROVED BY:

Superintendentlsupervlsor I raining UAIL

DATE

Superintendent/Supervisor Training

Emergency Equalization Around MSIV's - Using the Hard Card

SIMULATOR SETUP:

A. Initial Conditions:

1. Recommended Initial Conditions

IC 11

Rx. Pwr. 100%

Core Age BOL

2. Required Plant Conditions

MSIVs closed with control switches in open, condenser vacuum < 10", no other

group 1 conditions present.

B. Malfunctions

A small steam leak in the drywell or secondary containment

C. Overrides

None

D. Special Instructions

Perform a MANUAL Scram carry out initial operator actions. Close the MSIVs. Ensure

condenser vacuum drops to <10". After this is done place the MSIV control switches to

OPEN.

3Alc Page 2 REV. 1

Emergency Equalization Around MSIV's - Using the Hard Card

SAFETY CONSIDERATIONS:

1. NONE.

EVALUATOR NOTES: (Do not read to examinee)

1. The applicable procedure section WILL NOT be provided to the examinee (Hard Card

from P601).

2. If this is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the examinee.

Read the following to trainee.

TASK CONDITIONS:

1. A scram and Group 1 Isolation have occurred.

2. No fuel failure or steam line breaks have occurred.

3. The Main Condenser is available as a heat sink.

4. The SRO has anticipated that Emergency Depressurization may become required.

INITIATING CUE:

You are directed to perform the control operator actions associated with Emergency

Equalization around the MSIV's, and open MSIVs when pressure is <200 psid, using the

Hard Card. You are to inform the Unit SCO when the Hard Card actions are complete.

3A1lc Page 3 REV. I

Emergency Equalization Around MSIV's - Using the Hard Card

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

Step I - Obtain "Hard Card" for MSIV equalization

"HardCard"obtained for MSIV equalization.

SAT/UNSAT*

Step 2 - Request the condenser vacuum bypass switches in bypass position.

Vacuum bypass switches placed in bypass

    • CRITICAL STEP** SAT/UNSAT*

Step 3 - Place all MSIV switches in the CLOSE position.

All MSIV switches in CLOSE position (B21-FO22A, B, C & D, B21-FO28A, B, C &

D).

    • CRITICAL STEP** SAT/UNSAT*
  1. x-c* oer

Y

(-x-e,

K

"

A-4Z4/

"//I

/, 4fTIL

  1. 1Ic Page 4 REV. 1

6 6t :- .

Emerqency Equalization Around MSIV's - Using the Hard Card

Step 4 - Reset Group 1 Isolation.

Resets Group l Isolation reset switches, A 72-S32 and S33, on P601, are

depressed and White lights are ON.

    • CRITICAL STEP ** SAT/UNSAT*

Step 5 - Open Outboard MSIV's.

Outboard MSIV switches: B21-FO28A, B21-F028B, B21-F028C, B21-FO28D

placed in OPEN and MSIVs are OPEN.

    • CRITICAL STEP ** SAT/UNSAT*

Step 6 - Open MS-F020.

MSL Drain Isolation Valve MS-F020 open.

SAT/UNSAT*

Step 7 - Open B21-F019.

MSL Outboarddrain Isolation Valve B217F019 open.

    • CRITICAL STEP ** SAT/UNSAT*

3A1lc Page 5 REV. 1

Emergency Equalization Around MSIV's - Using the Hard Card

Step 8 - Close MS-V28

Steam supply to MSR's, SJAE's, RFP's, MS-V28 indicates full closed.

SAT/UNSAT*

Step 9 - Close MVD-F021.

Common drain line orifice Bypass Valve to condenser, MVD-F021 closed.

SATIUNSAT*

Step 10 - Open B21-F016.

MSL Inboarddrain Isolation Valve, B21-F016 open.

    • CRITICAL STEP** SAT/UNSAT*

Step 11- Open MS-F038 A, B, C, D-ae- dr t

9---e-, ,

At least one MSL orifices bypass valve: MS-F038A, B, C, or D open to increase

steam line pressure.

    • CRITICAL STEP ** SAT/UNSAT*

Zf 4-ow ~" 4 Arcc#

3Alc Page 6 REV. I

Emergency Equalization Around MSIV's - Using the Hard Card

K-

Step 12 - Ensure steam line pressure is increasing downstream of Outboard MSIVs.

Steam line pressure rising as indicated on Main Steam PressureA/B indications

on XU-1.

SAT/UNSAT*

Step 13- Close MS-V46, V47, V48, V49 and V35.

MSL drain valves MS-V46, MS-V47, MS-V48, & MS-V49 and V35 are closed.

SAT/UNSAT*

1/2>

Step 14 - When less than 200 psid across the valve, open Inboard MSIVs.

Inboard MSIVs B21-FO22A, B, C & D are open.

    • CRITICAL STEP ** SAT/U NSAT*

Step 15- Open MVD-F021.

MVD-F021 indicatesopen.

SAT/U NSAT*

3A1lc Page 7 REV. 1

Emergency Equalization Around MSIV's - Using the Hard Card

MNOTE:iWhe re5Jstd6 oeMV-9uing Remt Funcýtion !MS" VMSO5.

45kOM.4 inflhl RIN4

1> Kv

gntinet1VA56bi.

~

Step 16 - Request AO open MVD-V5005.

MVD-V5005 is open

SAT/UNSAT*

Step 17 - Open MS-V46, V47, V48, V49 and V35.

MS-V46, V47, V48, V49 and V35 are opened.

SAT/UNSAT*

Step 18 - Ensure open MS-V43, MS-V44, MS-V45, MS-V37/39, MS-V411NV42, MS-V36.

MS-V43, MS-V44, MS-V45, MS-V37/39, MS-V41NV4Z MS- V36 are open.

SAT/UNSAT*

3Al c Page 8 REV. I

Emergency Equalization Around MSIV's - Using the Hard Card

oeigM.V....

0?,i~~,J crt6I.0f4~bih6ndenserivacuumidrw

(trie6W~sasadSAE$ t,rt&&f< Y 1/2

Step 19 - Open MS-V28.

MS-V28 is open.

    • CRITICAL STEP ** SAT/UNSAT*

Step 20 - Notify Unit SCO that MSIVs are open and to continue with pressure control as

directed by the EOPs.

Supervisor notified MSIVs have been opened per the Hard Card.

SAT/UNSAT*

WW

  • Comments required for any step evaluated as UNSAT.

3A1lc Page 9 REV. 1

Emergency Equalization Around MSIV's - Using the Hard Card

LIST OF REFERENCES

RELATED TASKS:

239 201 B4 01

Equalize Around And Open Main Steam Isolation Valves Per Hot Startup OP-25.

K/A REFERENCE AND IMPORTANCE RATING:

239001 A4.01 4.2/4.0

Ability to manually operate and or monitor in the Control Room: MSIVs

REFERENCES:

EOP-01 -RVCP, Reactor Vessel Control Procedure

Hard Card for MSIV equalization and reopening (S/1032)

TOOLS AND EQUIPMENT:

None

SAFETY FUNCTION

3 - Reactor Pressure Control (Main and Reheat Steam System)

REASON FOR REVISION:

Bank JPM LOT-SIM-JP-025-AO1. Updated to current revision of procedure (addition of

MVD-V5005).

3Alc Page 10 REV. 1

Emergency Equalization Around MSIV's - Using the Hard Card

Time Required for Completion: 15 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate Actual 4 Unit: 2

Setting: Control Room Simulator 4 (Not applicable to In-Plant JPMs)

Time Critical: Yes No 4 Time Limit N/A

Alternate Path: Yes No 4

EVALUATION

Trainee: SSN:

JPM: Pass Fail

Remedial Training Required: Yes No

Did Trainee Verify Procedure?: Yes No

( Each Student should verify one JPM per evaluation set.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

I 3Alc Page 11 REV. I

K.

TASK CONDITIONS:

1. A scram and Group 1 Isolation have occurred.

2. No fuel failure or steam line breaks have occurred.

3. The Main Condenser is available as a heat sink.

4. The SRO has anticipated that Emergency Depressurization may become required.

INITIATING CUE:

You are directed to perform the control operator actions associated with Emergency

Equalization around the MSIV's, and open MSIVs when pressure is <200 psid, using the

Hard Card. You are to inform the Unit SCO when the Hard Card actions are complete.

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

SIMULATOR

mmmm--%

BNP-03-Bld

LESSON TITLE: Shutdown Cooling Restoration With RHR Pump Overload.

REVISION NO: 0

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:

Line Superintendent/Supervisor DATE

APPROVED BY:

Superintendent/Supervisor Training DATE

SIMULATOR SETUP

IC-01

Malfunctions

RP004F, RPS MG Set B Trip

Overrides

El, ZA447 (RHR Pump B Overload alarm)

El, ZUA1861 (4KV Bus E4 Motor Overload alarm)

E2, ZA467 (RHR Pump D Overload alarm)

E2, ZUA1661 (4KV Bus E2 Motor Overload alarm)

Special Instructions

1. Throttle El1 -FO03B and El1 -F048B to achieve system flow of 6000 gpm with both

valves indicating dual position.

2. Insert malfunction RP004F (or transfer RPS Bus B to alternate).

3. Perform actions to restore systems lost as desired. The 1/2 scram may be reset, but

DO NOT reset PCIS logic.

4. Loss of RPS MG Set B results in closure of the RHR Outboard Valve (El 1-F008)

and the injection valve (El 1-FO15B) with resultant RHR Pump trip.

Shutdown Cooling Restoration With RHR Pump Overload.

SAFETY CONSIDERATIONS:

None

EVALUATOR NOTES: (Do not read to trainee)

1. The applicable procedure section WILL NOT be provided to the trainee.

2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained NUREG 1021,

Appendix E, or similar to the trainee.

Read the following to trainee.

TASK CONDITIONS:

1. RHR Loop B was operating in Shutdown Cooling when a trip of RPS MG Set B resulted

in a Group 8 isolation and a loss of Shutdown Cooling.

2 RPS Bus B has been transferred to Alternate Power.

3. RHR Loop B flow was 6000 gpm prior to the RPS MG Set B trip.

3. The shift superintendent has directed a reactor water level band of +200" to +220".

INITIATING CUE:

You are directed to restart RHR Shutdown Cooling using RHR Loop B per AOP-1 5.0

step 3.2.8, and inform the Unit SCO when Shutdown cooling has been restored.

33Bld Page 3 REV. 0

Shutdown Cooling Restoration With RHR Pump Overload.

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

Step 1 - Obtain a current revision of AOP-15.0.

Current Revision of AOP-15.0 obtained.

SAT/UNSAT*

Step 2 - Restore and maintain reactor water level 200-220".

Reactorwater level is 200-220" as indicatedon B21-LI-NO27A or B.

SAT/U NSAT*

Step 3 - Reduce reactor pressure below 125 psig per GP-05

Reactorpressure is below 125 psig.

SAT/UNSAT*

Step 4 - Ensure RPS is energized.

RPS Buses A and B are energized.

SAT/U NSAT*

33Bld Page 4 REV. 0

Shutdown Cooling Restoration With RHR Pump Overload.

Step 5 - Reset the group 8 isolation.

Isolation Reset Groups 1,2,3,6,8 pushbutton, A71-S33 is depressed.

,t* ** CRITICAL STEP ** SAT/UNSAT*

lo"If -f 4ýw, Cý

.PROMPT:; Irequeteds Unit SCOQinfor examneethat p coldo dindown ,

aeNOTaIPnoHPiTii

Step 6 - Close Loop B Outboard Injection Valve, El1-FO17B. (/

E 11-FO1 7B indicates full cloi

- , _ I

-,t,499 T-9EP " SAT/UNSAT*

/7

ý-tt- A

/C~,6 rr44 -,l

4 -Cr-

Step 7 - Open Loop B Inboard Injection Valve El1-FO15B.

EII-FO15B indicatesfull open.

    • CRITICAL STEP ** SAT/UNSAT*

Step 8 - Open RHR Shutdown Cooling Outboard Isolation Valve El 1-F008.

El 1-F008 indicates full open.

    • CRITICAL STEP ** SATIUNSAT*

REV. 0

Page 5 REV. 0

3B1d

33B1d Page 5

Shutdown Cooling Restoration With RHR Pump Overload.

Step 9 - Open RHR Shutdown Cooling Inboard Isolation Valve E 1l-F009.

El 1-F009 indicates full open.

SATIUNSAT*

Step 10 - Start an RHR Pump in the loop being used for shutdown cooling.

RHR Pump 2B or 2D is running.

    • CRITICAL STEP ** SAT/UNSAT*

NOTE hf Et-rFO-1B11 hs beerhr16"e to6e'stablish ppprboximately, 6090 'gploo

B iid~45 siarted,,,

it RHR~~Puh~ip itate Trigge' l)~l ~xup~a

nh:Pm 0) tad i tdpd at

++ ... .... .* ~~~~~~~~r

..... . .. , [s i++...  :;!i 'J '

I.

.POMPT Tfljm

4&I

ý:i Ifireqesed AO bepitl devc showstarget: on phase

BE4)~j~:or RHRepm P(2asapibl.

g tbeaeo

Jyt4 <Vt* RHR~ý

.....

...

PQE:4(4<0,W

<<4tsi

ifig4~~~Ui ~oo~la

t

>examin66 il lC

lam cnweg hr~~dh~r

cotc7ndhvyou s atu.ngth________

hat~~~~~

~~~~~ nohrprt&dth nPOt

beakrt~beckrd~~

pumpmotr

I

Step 11 - Slowly throttle open Loop B Outboard Injection Valve Ell -F01 7B to re-establish

RHR loop conditions prior to the event.

ElI-FO17B throttled open to establish RHR Loop flow of >4150 gpm.

    • CRITICAL STEP ** SAT/UNSAT*

£7 /4t&A1A. /Z A- 4 / e-

REV. 0

Page 6 REV. 0

3B1d

3B3ld Page 6

Shutdown Cooling Restoration With RHR Pump Overload.

Step 12 - Refer to APP for RHR Pump (B or D) overload

Refers to APP for RHR Pump (B or D) overload

A -o03- SAT/U NSAT*

q7

Step 13- Start redundant RHR Pump (B or D)

RHR Loop B Pump (B or D) without overload is running.

    • CRITICAL STEP ** SAT/UNSAT*

Step 14 - Stop RHR Pump (B or D) with overload alarm.

RHR Pump with overload alarm (B or D) is off.

    • CRITICAL STEP ** SAT/UNSAT*

Step 15 - Fully open Loop B Outboard Injection Valve El 1-F017B.

E1I-FOI7B indicates full open.

SAT/UNSAT*

33Bld Page 7 REV. 0

Shutdown Cooling Restoration With RHR Pump Overload.

K->

Step 16 - Ensure Reactor Head Vent Valves, B21-F003 and B21-F004 are Open.

Reactor Head Vent Valves, B21-F003 and B21-F004 are Open.

SAT/UNSAT*

Step 17 - Inform Unit SCO RHR shutdown cooling has been re-established per AOP-1 5.0.

Unit SCO informed RHR shutdown cooling has been re-establishedper AOP

15.0.

SATIUNSAT*

TERMINATING C.UE::. WhenHRsh*ui!sfi td'6n

ioo ing has been re-establiseprA-5O

  • Comments required for any step evaluated as UNSAT.

33Bld Page 8 REV. 0

Shutdown Cooling Restoration With RHR Pump Overload.

RELATED TASKS:

2050166B401, Respond To A Loss Of Shutdown Cooling Per AOP-1 5

K/A REFERENCE AND IMPORTANCE RATING:

295021 AA1.02 3.5/3.5

Ability to operate and/or monitor RHR/shutdown cooling as it applies to loss of shutdown

cooling.

REFERENCES:

AOP-1 5.0

APP A-4, UA-16, UA-18

TOOLS AND EQUIPMENT:

None.

SAFETY FUNCTION (from NUREG 1123, Rev 2.):

4 - Heat Removal From Reactor Core (Shutdown Cooling System)

REASON FOR REVISION:

New JPM.

REV. 0

Page 9

33Bldd

3B1 Page 9 REV. 0

Shutdown Cooling Restoration With RHR Pump Overload.

Time Required for Completion: 10 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate 4 Actual - Unit: 2

Setting: Control Room - Simulator ( Not applicable to In-Plant JPMs)

Time Critical: Yes No 4 Time Limit N/A

Alternate Path: Yes 4 No

EVALUATION

Trainee: _ SSN:

JPM: Pass Fail __

Remedial Training Required: Yes - No

Did Trainee Verify Procedure as Authorized Copy?: Yes No

(Each Student should verify one JPM per evaluation set.)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

33B1d Page 10 REV. 0

TASK CONDITIONS:

1. RHR Loop B was operating in Shutdown Cooling when a trip of RPS MG

Set B resulted in a Group 8 isolation and a loss of Shutdown Cooling.

2 RPS Bus B has been transferred to Alternate Power.

3. RHR Loop B flow was 6000 gpm prior to the RPS MG Set B trip.

3. The shift superintendent has directed a reactor water level band of +200" to

+220".

INITIATING CUE:

You are directed to restart RHR Shutdown Cooling using RHR Loop B per

AOP-1 5.0 step 3.2.8, and inform the Unit SCO when Shutdown cooling has

been restored.

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

CONTROL ROOM

mmlmm--ý%

BNP-03-Ble

TITLE: Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%

REVISION NO: 3

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:

Line Superintendent/Supervisor DATE

APPROVED BY:

Superintendent/Supervisor Training DATE

Vent the Drywell per OP-lO w/ Stack Rad Monitor Increase >50%

SIMULATOR SETUP:

A. Initial Conditions:

1. Recommended Initial Conditions

IC 11

Rx. Pwr. 100%

Core Age BOC

2. Required Plant Conditions

Drywell Pressure above 0.5 psig SLOWLY rising or stable, AND below 1.8 psig.

B. Malfunctions

None required

C. Overrides

Meters

Event Panel Tag Title Value Activate Deactivate

(ramp rate) Time (sec) Time (sec)

I

El XU-3 GSB02G15 Main Stack Radiation 13/5 min 0 SEC N/A

Trigger I Q6225LGT CAC-V23 Green Lamp = False

D. Special Instructions

Secure Drywell Coolers 2C and 2D Fans 1 and 2 and allow drywell pressure to rise to

Ž0.6 psig as indicated on CAC-PI-2685-1 on XU-51, then restart Drywell Coolers 2D Fan

2 and allow Drywell pressure to stabilize. Override Drywell Cooler 2C Fans 1 and 2 and

Drywell Cooler 2D Fan 1 control switches OFF.

33B1e Page 2 of 12 REV. 3

Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%

SAFETY CONSIDERATIONS:

NONE

EVALUATOR NOTES: (Do not read to trainee)

1. The applicable procedure section WILL be provided to the trainee, once it is

demonstrated he/she knows the correct procedure.

2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained in

NUREG 1021, Appendix E, or similar to the trainee.

Read the following to trainee.

TASK CONDITIONS:

1. Drywell pressure is above normal due to a partial loss of Drywell Cooling.

2. AOP-14.0 has been entered.

3. Standby Gas Treatment System is in the Standby Alignment.

4. The plant stack radiation monitor is in service and CAC-CS-5519, CAC Purge Vent

Isolation Override is in OFF. . ,-rj-- '.

t4D

INITIATING CUE:

The Unit SCO directs you to vent the Drywell via Standby Gas Treatment, and to inform him

when drywell pressure has been reduced below 0.5 psig.

33B1e Page 3 of 12 REV. 3

Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

Step 1 - Obtain current revision of OP-10, Section 8.2 and verify if applicable.

Currentrevision of OP-10, Section 8.2 is obtainedand verified as required.

SAT/UNSAT*

Step 2 - Record D12-RR-R600B, STACK RAD MONITOR, digital point display.

Value for D12-RR-R600B recorded in OP-IO.

SAT/UNSAT*

Step 3 - Add 0.17 to the value to obtain the logarithmic equivalent of a 50% increase in stack

radiation monitor reading and record result.

I -I

Value recorded in OP-10 of initial reading + 0. 17 (1.23).

SAT/UNSAT*

I.

>/

NOTEK> *I ep of Section 8.2.2S i*no applicble*  ;**>***;  :? *i

Step 4 - Monitor Stack Rad Monitor, D12-RM-R600B, for increase in activity during venting.

D 12-RM-R600B periodically monitored.

SAT/UNSAT*

331le Page 4 of 12 REV. 3

Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%

Step 5 - CLOSE REACTOR BUILDING SBGT TRAIN 2A INLET VALVE, VA-2D-BFV-RB.

VA-2D-BFV-RB indicates fully closed.

    • CRITICAL STEP ** SAT/UNSAr*

Step 6 - CLOSE REACTOR BUILDING SBGT 2B INLET VALVE, VA-2H-BFV-RB.

VA-2H-BFV-RB indicates fully closed.

    • CRITICAL STEP ** SAT/U NSAT*

Step 7 - OPEN SBGT DW SUCT DAMPER, VA-2F-BFV-RB.

VA-2F-BFV-RB, indicates open.

    • CRITICAL STEP ** SAT/UNSAT*

NT Steps 10 nd'f6§ý

11hofoSeto 827a: not apIiab1e

Step 8 - OPEN DW PURGE EXH VALVE, CAC-V9.

CAC-V9 indicates full open.

    • CRITICAL STEP ** SAT/U NSAT*

33Ble Page 5 of 12 REV. 3

Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%

Step 9 - OPEN DW PURGE EXH VALVE, CAC-V23.

CAC-V23 indicates full open.

    • CRITICAL STEP ** SAT/UNSAT*

Step 10- OPEN DW HEAD PURGE

CA C-V49 indicates full open.

SAT/U NSAT*

Step 11 - OPEN DW HEAD PURGE EXH VLV, CAC-V50.

CAC-V50 indicates full open.

SAT/UNSAT*

c-Ur~a~CA-

Step 12 - Monitor Main Stack Rad Monitor and determine reading has risen by >50%.

Determines Main Stack Rad Monitorreading has risen by >. 17 (50%).

SAT/UNSAT*

3B3le Page 6 of 12 REV. 3

Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%

Step 13- CLOSE DW PURGE EXH VLV, CAC-V23.

CAC-V23 indicates full closed.

/11

    • CRITICAL STEP ** SAT/UNSAT*

CO,cn-,

ct%4s- 6{tt

flAitr, o 4 Ct*

Step 14 - CLOSE DRYWELL PURGE EXH VALVE, CAC-V9.

CAC-V9 indicates full closed.

    • CRITICAL STEP ** SATIU NSAT*

NT: EtrStp1ORSe:i6o hsJMi rtclOL ifopnd

Step 15 - ENSURE DW HEAD PURGE EXH VLV, CAC-V49, IS CLOSED.

CAC-V49 indicates full closed.

    • CRITICAL STEP ** SATIUNSAr

3Ble Page 7 of 12 REV. 3

Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%

Step 16 - ENSURE DW HEAD PURGE EXH VLV, CAC-V50, IS CLOSED.

CAC-V50 indicates full closed.

    • CRITICAL STEP ** SAT/U NSAT*

Step 17 - CLOSE SBGT DW SUCT DAMPER, VA-2F-BFV-RB.

VA-2F-BFV-RB indicates full closed.

    • CRITICAL STEP ** SAT/U NSAT*

I..r w6r ae / FlC4-.-,

01*00

0~l ............

~.

K 2<

T'9 ar T'cii~

ON

Step 18 - OPEN SBGT TRAIN 2B REACTOR BUILDING SUCTION VALVE, VA-2H-BFV-RB.

VA-2H-BFV-RB indicates full open.

SAT/U NSAT*

Step 19 - OPEN SBGT TRAIN 2A REACTOR BUILDING SUCTION VALVE, VA-2D-BFV-RB.

VA-2D-BFV-RB indicates full open.

SAT/UNSAT*

33B1e Page 8 of 12 REV. 3

Vent the Drywell per OP-10 w/Stack Rad Monitor Increase >50%

Step 20 - CONFIRM ALL SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKERS

are closed.

All Suppression Chamberto Drywell vacuum breakers verified closed.

SAT/U NSAT*

Step 21 - Inform Unit SCO venting, is secured due to increase of 50% in Main Stack Rad

Monitor reading.

Unit SCO is informed venting is secured due to increase of 50% in

Main Stack Rad Monitorreading.

SAT/UNSAT*

tary ýconaqinme

PriiM'ý her'g0 u1

  • Comments required for any step evaluated as UNSAT.

33B1e Page 9 of 12 REV. 3

Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%

LIST OF REFERENCES

RELATED TASKS:

261 008 B1 01, Perform Normal Primary Containment Venting.

KIA REFERENCE AND IMPORTANCE RATING:

261000 A4.04 3.3/3.4

Ability to manually operate and monitor Primary Containment Pressure.

REFERENCES:

20P-10, Sect. 8.2 Rev 59

TOOLS AND EQUIPMENT:

None

SAFETY FUNCTION (from NUREG 1123, Rev 2):

Safety Function 9, Radioactivity Release

REASON FOR REVISION:

Bank JPM. Minor changes.

33Ble Page 10 of 12 REV. 3

Vent the Drywell per OP-10 w/ Stack Rad Monitor Increase >50%

Time Required for Completion: 10 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate Actual V/

Unit: 2

Setting: Control Room Simulator-" (Not applicable to In-Plant JPMs)

Time Critical: Yes No I/ Time Limit N/A

Alternate Path: Yes 4/

No

EVALUATION

Trainee: SSN:

JPM: Pass Fail

Remedial Training Required: Yes No

Did Trainee Verify Procedure as Authorized Copy?: Yes No

(Each Student should verify one JPM per evaluation set)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

33B1e Page 11 of 12 REV. 3

TASK CONDITIONS:

1. Drywell pressure is above normal due to a partial loss of Drywell Cooling.

2. AOP-14.0 has been entered.

3. Standby Gas Treatment System is in the Standby Alignment.

4. The plant stack radiation monitor is in service and CAC-CS-5519, CAC Purge Vent

Isolation Override is in OFF.

INITIATING CUE:

The Unit SCO directs you to vent the Drywell via Standby Gas Treatment, and to inform him

when drywell pressure has been reduced below 0.5 psig.

CAROLINA POWER & LIGHT COMPANY

v\

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

CONTROL ROOM

BNP-03-Blf

TITLE: Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan

REVISION NO: 0

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:

Line Superintendent/Supervisor DATE

APPROVED BY:

Superintendent/Supervisor Training DATE

Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan

Simulator Setup:

IC-ll

Triggers

El - Trips CREV Train A

E2 - Trips CREV Train B

E3 - Overrides Emerg Air Fan Fail To Run alarm

Malfunctions

None

Overrides

El - CREV Train A Switch in STBY

E2 - CREV Train B Switch in STBY

E3 - Alarm UA-14 2-2 ON

3Blf Page 2 of 9 Rev. 0

Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan

SAFETY CONSIDERATIONS:

None

EVALUATOR NOTES: (Do not read to examinee)

1. The applicable procedure section WILL be provided to the examinee.

2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained in NUREG 1021,

Appendix E, or similar to the examinee.

Read the following to examinee.

TASK CONDITIONS:

jat- 0>U.*& £&W4YSL

1. Unit Two is operating at power. Unit One is in MODE 5.

2. The Control Building Emergency Recirculation System is in standby.

3. A fuel handling accident has occurred on Unit One.

/

4. The Unit SCO has entered AOP-05.0 and EOP-04-RRCP.

5. This JPM is time critical. d,

,.P,,L.,=c

INITIATING CUE: ,ZK4s 72t* .t

You are directed to perform the actions for manual startup of the Control Building

Emergency Recirculation System Per the Hard Card and inform the Unit SCO when the

actions are complete.

33B1f Page 3 of 9 Rev. 0

Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

Step 1 -Obtain hard card S/1067.

Hard card S/1067 obtained.

SAT/UNSAT*

Step 2 - PLACE CB Emergency Recirculation Fan, 2A(B)-ERF-CB in ON.

2A(B)-ERF-CB control switch placed to ON.

    • CRITICAL STEP ** SAT/UNSAT*

Step 3 - ENSURE Control Room Normal Makeup Damper, 2L-D-CB, Closes.

2L-D-CB, Control Room Normal Makeup Damper verified closed.

SAT/UNSAT*

Step 4 - ENSURE Control Building Emergency Recirculation Damper, VA-2J-D-CB, Opens.

VA-2J-D-CB, ControlBuilding Emergency Recirculation Damper verified OPEN.

SAT/UNSAT*

3Blf Page 4 of 9 Rev. 0

Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan

Step 5 - Recognize loss of running CREV Fan an start e CREV not previously started.

One CREV Train (A ore B) is in opera

    • CRITICAL S 'EP ** SAT/UNSAT*

Step 6 - STOP Control Building Washroom Exhaust Fan, 2D-EF-CB, and ENSURE

associated damper closes.

2D-EF-CB, ControlBuilding Washroom Exhaust Fan, stopped and associated

damper verified closed.

    • CRITICAL STEP ** SAT/UNSAT*

Step 7 - STOP Control Building Mechanical Equipment Room Vent Fans, 2F-SF-CB and

2E-EF-CB, and ENSURE associated Supply and Exhaust Dampers CLOSE.

2F-SF-CB and 2E-EF-CB, Control Building Mechanical Equipment Room Vent

Fans stopped and associatedSupply and Exhaust Dampers verified closed.

    • CRITICAL STEP ** SAT/UNSAT*

33B1f Page 5 of 9 Rev. 0

Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan

Step 8 - STOP Cable Spread Room 2 Vent Fans, 2A-SF-CB and 2A-EF-CB, and ENSURE

associated Supply and Exhaust Dampers CLOSE.

2A-SF-CB and 2A-EF-CB, Cable Spread Room 2 Vent Fans stopped and

associatedSupply and Exhaust Dampers verified closed.

    • CRITICAL STEP ** SAT/UNSAT*

PROMPT: When requested to STOP (Unit One) CabledSpead Ro6om j6nt Fans isitiate

bat'chfi'Ie)u'nit'one'cable spread fanshudw

Step 9 - Request Unit 1 STOP Cable Spread Room I Vent Fans, 1A-SF-CB and 1A-EF-CB,

and ENSURE associated Supply and Exhaust Dampers CLOSE.

IA-SF-CB and IA-EF-CB, Cable Spread Room I Vent Fans stopped and

associatedSupply and Exhaust Dampers verified closed.

1/1//-icC 5777-05 14 SAT/UNSAT*

&2i Fotz J7D 0?'O

Step 10 - Inform Unit SCO that actions for manual startup of the Control Building Emergency

Recirculation System are complete.

Unit SCO notified.

SAT/UNSAT*

TERMINATINGCue: Wen the;ontrol Buiding Emegency ecirculation System has been

sared a'nd isolated perthe har'd this JPM is comrn ete.- iN

. Comments required for any step evaluated as UNSAT.

3Blf Page 6 of 9 Rev. 0

Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan

RELATED TASKS:

288202B101, Start the Control Building ventilation System per OP-37

K/A REFERENCE AND IMPORTANCE RATING:

290003 A4.01 3.2/3.2

Ability to use procedures to manually initiate Control Building HVAC.

REFERENCES:

Hard Card S/1067

TOOLS AND EQUIPMENT:

None

SAFETY FUNCTION (from NUREG 1123, Rev. 2)

9, Radioactivity Release

REASON FOR REVISION:

New JPM.

33Blf Page 7 of 9 Rev. 0

Manual Startup of Control Building Emergency Ventilation - Trip Of One Fan

LIST OF REFERENCES

Time Required for Completion: 10 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate - Actual " Unit: 0

Setting: Control Room Simulator " (Not applicable to In-Plant JPMs)

Time Critical: Yes " No Time Limit 20 min

Alternate Path: Yes V No

EVALUATION

Examinee: SSN:

JPM: Pass Fail

Remedial Training Required: Yes No

Did Examinee Verify Procedure? Yes __ No

(Each Student should verify one JPM per evaluation set)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

33Blf Page 8 of 9 Rev. 0

TASK CONDITIONS:

C4 2 S

tc 4,le

1. Unit Two is operating at power. Unit One is in MODE 5.

2. The Control Building Emergency Recirculation System is in standby.

3. A fuel handling accident has occurred on Unit One.

4. The Unit SCO has entered AOP-05.0 and EOP-04-RRCP.

5. This JPM is time critical.

INITIATING CUE:

You are directed to perform the actions for manual startup of the Control Building

Emergency Recirculation System Per the Hard Card and inform the Unit SCO when the

actions are complete.

CAROLINA POWER & LIGHT COMPANY

BRUNSWICK TRAINING SECTION

JOB PERFORMANCE MEASURE

CONTROL ROOM

BNP-03-Blg

CoePromnePrmtr hc aulAR A

LESSON TITLE: Core Performance Parameter Check - Manual APRM GAF

Adjustment Required

REVISION NO: 0

RECOMMENDED BY:

Instructor/Developer DATE

CONCURRENCE BY:

Line Superintendent/Supervisor DATE

APPROVED BY:

Superintendent/Supervisor Training DATE

Core Performance Parameter Check - Manual APRM GAF Adjustment Required

SIMULATOR SETUP:

A. Initial Conditions:

1. Recommended Initial Conditions

IC 11 (UNIT1)

B. Malfunctions

None

C. Overrides

None

D. Special Instructions

1. Ensure Process Computer is operating properly.

2. At the NUMAC adjust the gain for APRM 1 so APRM 1 GAF (PPC 820) is 1.02.

3. Obtain an updated Core Performance Log to provide to the examinee.

33Blg Page 2 of 15 REV. 0

Core Performance Parameter Check - Manual APRM GAF Adjustment Required

SAFETY CONSIDERATIONS:

1. NONE.

EVALUATOR NOTES: (Do not read to examinee)

1. The applicable procedure sections WILL be provided to the examinee.

2. Ifthis is the first JPM of the JPM set, read the JPM briefing contained in

NUREG 1021, Appendix E, or similar to the examinee.

3. This JPM will be administered on the Simulator.

4. Performance means Frequency A (every 24 hrs when >25% RTP) is required.

Read the following to examine9e.

C-0ý TADCl \orX y

TASK CONDITIONS:

( 44ý)

The CODSR requires performance of 1PT-01.11 Core Performance Parameter

Check on Unit 1.

2. All applicable prerequisites of I PT-01.11 are met.

3. Ifindependent verification is required, assume the verification is complete as

applicE ble.

INITIATIN4G CUE

@

The Uni tSCO directs you to perform 1PT-01.11 and inform the SCO of the results upon

complet ion.

>0 koua'ýCA-a 1-14ýCA1o. ý-;

3Blg Page 3 of 15 REV. 0

Core Performance Parameter Check- Manual APRM GAF Adjustment Required

PERFORMANCE CHECKLIST

NOTE: Sequence is assumed unless denoted in the Comments.

Step 1 - Obtain current revision of 1PT-01.11 and verify if applicable.

Current revision of IPT-01. 11 obtainedand verified as required.

References Section 7.1

SATIU NSAT*

PROMPT ncce examineeOdemonstratesjthat he/she can demandizaCorelPerormanceLog*

usiethro u butth

II nrovdehedore rem*idd& obtane boam Deoa

teeormanceo sprinthJP

a

.f..

. I

li

NOE An eit of processh:compupeyc~ye pre-ranmngj

~~~~~omue;display: d~~i~t~bu ot1 d~tip 4 rsigte

id~i

a,re:Many mnethd tocl uio<dtalJ

"-r

I

A

"plydepressth r~ Ba lbhc sbtky 9KM~ MRt U st

Step 2 - Obtain an edit of the process computer core performance program.

Core PerformanceLog obtained from process computer.

,0 t7~leozthý/&-0. /0c SAT/UNSAT*

&Yr r4e 1? Az 2A.-

33Blg Page 4 of 15 REV. 0

Core Performance Parameter Check - Manual APRM GAF Adjustment Required

Step 3 - Verify, using the Failed Sensor List, failed inputs have correct substitute values.

_De*rjte *es-ne-faieds sensors-exist-a at this step is marked as N/A.

0 SAT/UNSAT*

Step 4 - Locate WTFLAG on the Core Performance Log and proceed with step 7.1.5.

WTFLAG determined to equal 2, proceeds to Step 7.1.5 of IPT-01. 11.

SAT/UNSAT*

Step 5 - Determine if criteria listed in Section 6.1 of 1PT-1.11 are met.

Checks core performance log and verifies value for CMFLCPR *1.00.

SATIU NSAT*

Checks core performance log and verifies value for CMAPRA T *51.00.

SAT/UNSAT*

14

33Blg Page 5 of 15 REV. 0

Core Performance Parameter Check- Manual APRM GAF Adjustment Required

Step 6 - Determine if the acceptance criteria listed in Section 6.2 of 1PT-01.11 are satisfied.

Determines APRMS 2, 3, and 4 are within limits and APRM I is above the limit.

"**CRITICAL STEP ** SAT/UNSAT*

Step 7 - Obtain current revision of I OP-09 and verify if applicable.

Currentrevision of IOP-09 obtainedand verified as required. References

Section 8.1.2.

SAT/UNSAT*

Step 8 - OBTAIN Unit SCO permission to adjust the APRM GAFs.

ObtainsSCO permission.

3Blg Page 6 of 15 REV. 0

Core Performance Parameter Check - Manual APRM GAF Adjustment Required

-Step 9 - OBTAIN Display 820 at the PPC.*

PPCScreen 820 is displayed.

SATIUNSAT*

Step 10 - Review heat balance substituted values and failed sensors for impact on APRM I

gain adjustment.

Determines no substitute values and no failed sensors.

SAT/UNSAT*

Step 11 - Ensure APRM 1 keylock is in OPER.

Checks APRM keylock in OPER.

SAT/UNSAT*

3/4

Step 12 - Ensure APRM 1 heading indicates OPERATE.

Checks APRM 1 headershows OPERATE.

SAT/UNSAT*

Step 13 - OBTAIN value oU1.C51R1066.

Obtains UIC51R1066 from PPC Screen 820 or Core PerformanceLog.

SAT/U NSAT*

3Blg Page 7 of 15 REV. 0

Core Performance Parameter Check- Manual APRM GAF Adjustment Required

Step 14- PLACE the APRM-to be adjusted in BYPASS.

PlacesAPRM I in bypass at P603.

SAT/UNSAT*

Step 15 - CONFIRM BYP is indicated for the selected APRM channel at Panel P608.

Observe BYP (BYPASS) heading in inverse video for APRM 1.

SAT/UNSAT*

Step 16 - PRESS ETC soft key to obtain ENTER SET MODE soft key.

Obtains the ENTER SET MODE soft key.

"**CRITICAL STEP ** SAT/UNSAT*

Step 17 - PRESS ENTER SET MODE soft key.

Presses ENTER SET MODE soft key.

    • CRITICAL STEP ** SAT/UNSAT*

fl seond exir~befrethe pasodicete &(ENT"sý'~edi

PRoMPT.* i r,eueste, d irect tbe traihee tq take any actions needed tq eor~tih~~ft

I II

33Blg Page 8 of 15 REV. 0

Core Performance Parameter Check - Manual APRM GAF Adjustment Required

P '

Step 18 - ENTER password "1 2 3 4" AND PRESS ENT.

Using the data keypad enters 1234 and presses ENT before 10 seconds expire.

"**CRITICAL STEP ** SAT/UNSAT*

Step 19 - SELECT APRM GAIN using cursor keys.

Using the cursorkeypad selects APRM GAIN.

SATIUNSAT*

Step 20 - PRESS SET PARAMETERS soft key.

Presses SET PARAMETERS soft key.

    • CRITICAL STEP ** SAT/UNSAT*

Step 21 - CONFIRM APRM indicates SET PARAMETERS: APRM GAIN display.

Observes SET PARAMETERS: APRM GAIN displayed.

SAT/UNSAT*

NOT;* i' ; ;LeEE1!

ST ea*:a6d!RIGN

ar~ cuso

a e*esaeueolselec

..,,$,curso gjVlp crso*ý 11th

  • e; ESIREQ GAIN

cnan1, 1n.. t&:l *

dgit

u u~*:

u -es

a p......... g<,p i

33B1g Page 9 of 15 REV. 0

Core Performance Parameter Check - Manual APRM GAF Adjustment Required

Step22 : ADJUST the DESIRED APRM GAIN so that the PROJECTED FLUX (%) is Ž

U1 C51 RI 066 value previously obtained.

Using the cursorkeypad selects and changes the DESIRED APRM GAIN until

PROJECTED FLUX (%) is Ž UIC51R1066 value obtained in Step 9.

    • CRITICAL STEP ** SATIUNSAT*

Step 23 - PRESS ACCEPT soft key.

PressesACCEPT soft key.

"**CRITICAL STEP ** SAT/UNSAT*

Step 24 - CONFIRM the "PRESENT" APRM GAIN changes to equal the "DESIRED" APRM

GAIN AND the PROJECTED AGAF equals 1.000.

Confirms "PRESENT"and "DESIRED"APRMGAIN equal and PROJECTED

AGAF is *<1.000.

SAT/UNSAT*

Step 25- PRESS EXIT soft key.

Presses EXIT soft key.

SATIU NSAT*

Step 26 - PRESS EXIT SET MODE soft key.

Presses EXIT SETMODE soft key.

SAT/UNSAT*

33Blg Page 10 of 15 REV. 0

Core Performance Parameter Check - Manual APRM GAF Adjustment Required

Step 27 - PRESS YES soft key.

Presses Yes soft key.

SAT/UNSAT*

Ii POMP: Ifor exmndthat"ante 'operator: wi corn pete Attac hmpn, 4H$ 9M M'ii

I.

Step 28 - CONFIRM APRM display header shows OPERATE.

Confirms APRM display headerindicates OPERATE.

SAT/UNSAT*

Step 29 - Verify APRM GAF * 1.00 on Attachment 3 of IOP-09.

Confirms APRM 1 AGAF *<1.00 using PPC 820 screen or by obtaininga new

Core Performance Log.

SAT/U NSAT*

Step 30 - REMOVE APRM from BYPASS.

Removes APRM I from bypass at P603.

SAT/UNSAT*

PROMPT: roter operatoqiltaseh gi

Infrmthb6 ex'amine6: athatb a~rTtXK

Ih

tcninue with, OPT-OIAI2

PPiadJA U

6.

33B1g Page 11 of 15 REV. 0

Core Performance Parameter Check - Manual APRM GAF Adjustment Required

Step 31 - Determine if CMFLPD is *<1.00.

Checks core performance log and verifies value for CMFLPD is *<1.00.

SAT/UNSAT*

~f~The Follw~ing Steprýisiely~alreadyipprorrne~adi

NOTE: Oyqietb Mld IITi -j,

t i

' R........

comD~~eu aiaiIM

Step 32 - Verify acceptance criteria listed in Section 6.0 met satisfactorily.

Acceptance criteria determined to be satisfactory.

SAT/U NSAr*

  • Q

PROMP*::*

~~h'

cn*eq ~ ta~  :~ *1sop

J. mSte*etez az

-anditsfat_0 110mii* 1N511ii]

Step 33 - Notify Unit SCO that I PT-01.11 is completed SAT.

Supervisor notified.

SAT/U NSAT*

6

c

aIetac

~~~a p p q

c. teI

q j e 51v

n

.,E1*011i Wi"S I hee

Ino* 1.~

rGm!!

...........

e dthes,'ue

!e..... ....

s ;apiispis acpto, y

.....

W ............ .

i1

  • Comments required for any step evaluated as UNSAT.

Ox94X-

t

/400

1016ýA lc),ý ",f

3Blg Page 12 of 15 f REV. 0

Core Performance Parameter Check - Manual APRM GAF Adjustment Required

LIST OF REFERENCES

RELATED TASKS:

2152098401: Operate the PRNMS per OP-9.

KIA REFERENCE AND IMPORTANCE RATING:

215005 A1.07 (3.0/3.4)

REFERENCES:

1PT-01.11

1OP-09

TOOLS AND EQUIPMENT:

None.

SAFETY FUNCTION (from NUREG 1123, Rev 2):

7 - Instrumentation (APRM System)

REASON FOR REVISION:

Bank JPM. Modified to provide enhanced examiner notes. Changed from alternate

path to not alternate path.

33Blg Page 13 of 15 REV. 0

Core Performance Parameter Check - Manual APRM GAF Adjustment Required

Time Required for Completion: 15 Minutes (approximate).

APPLICABLE METHOD OF TESTING

Performance: Simulate Actual 4 Unit:

Setting: Control Room __ Simulator 4 (Not applicable to In-Plant JPMs)

Time Critical: Yes No 4 Time Limit N/A

Alternate Path: Yes No 4

EVALUATION

Trainee: SSN:

JPM: Pass Fail

Remedial Training Required: Yes No

Did Trainee Verify Procedure as Authorized Copy?: Yes No

(Each Student should verify one JPM per evaluation set)

Comments:

Comments reviewed with Student

Evaluator Signature: Date:

33B1g Page,14 of 15 REV. 0

\- /

TASK CONDITIONS:

1. The CODSR requires performance of 1PT-01.11 Core Performance Parameter Check

on Unit 1.

2. All applicable prerequisites of I PT-01.11 are met.

3. If independent verification is required, assume the verification is complete as

applicable.

INITIATING CUE:

The Unit SCO directs you to perform 1PT-01.11 and inform him of the results upon

completion.

/ BRUNSWICK-1 TWK-0305 03JAN28-1( 3_25 19977 MWD/MTU TRIGR=PPXSU REV=JUN01 C

CORE PERFORMANCE LOG --- LONG EDIT (PAGE 2)

02 06 10 14 18 22 26 30 34 38 42 46 50

51 51

47 -- 21 .. -. 33 .. -. 37 -. .-- 28 -.. .- 16 47

46 59 57 56 34

68 79 69 80 51

43 -- 48 -- 36 46 -- 16 48 -- 36 48 -.. .- 39 43

39 18 -.. .. 37 . . -- 46 .. -- 51 -.- 41 -- 28 39

37 67 65 75 65 57

56 87 65 60 75 82

35 -- 40 -- 36 48 -- 08 38 -- 24 36 -- 08 43 36 48 35

31 -- 23 -- 46 -- 52 -- 50 -.. .. 50 -. .-- 37 -.. .. 31

"* OTHER FA]

41 65 74 67 75 56 "* SENSOR DT

57 66 54 52 60 70

27 -- 47 16 41 24 34 08 34 -- 24 37 -- 16 50 -.. .. 27

SENSOR S9

23 -- 21 -. .-- 41 .. -- 48 .. .-- 51 -. .-- 45 .. -- 33 -- 23 1PPXDUI1 E

39 66 66 73 65 58 1PPXDUM2 E

57 78 57 54 65 79

19 -- 45 -- 36 43 -- 08 36 -- 24 35 -- 08 40 -- 36 49 19

15 -. .-- 30 .. -. 41 -- 46 .. -- 37 -.- 21 15

60 67 65 66 45

85 78 66 87 68

11 -.. .- 60 -- 36 43 16 41 -- 36 50 --. .- 51 11

07 D - .. ..- 21 -.. .. 24 -.. .. 1i8 07

C 39 41 37

B 58 57 56

03 A -- 45 -. . .--48 -.. .--42 03

02 06 10 14 18 22 26 30 34 38 42 46 50

CONTROL ROD SYMMETRY  : EIGHT-FOLD CONTROL ROD SEQUENCE : A-2 CONTROL ROD DENSITY : 0.0791

BRUNSWIC( - WK-0305 03JAN28-10.53.25 19977 MWD/MTU TRIG( ŽPXSU REV=JUN01 (

CORE PERFORMANCE LOG --- LONG EDIT

B1CT4 BOC TO EOFPC-2026MWD/MT ODYNB POW DEP MCPR

CALCULATION TYPE : NORMAL CONVERGENCE : TIGHT SYMMETRY  : FULL

CTP CALCULATION  : HEAT BALANCE CYCLE : 14

STATE CONDITIONS FLOW RATES CORE PARAMETERS NUCLEAR LIMITS LOCATION

GMWE 919.61 WT 78.1 CMEQ 0.2466 P-PCS 1.94 41-20-09

CMWT 2738.4 (93.7%) WTSUB 76.58 CAEQ 0.1543 FCBB 2.443

PR 1044.9 PSIA WTFLAG 2 CAQA 0.1432 CMPF 2.835 39-14-06

DHS 20.60 WFW 11.83 CAVF 0.4846 CMFLCPR 0.934 29-24

WT 78.10(101.4%) WD 33.69 CAPD 55.2607 P=1.468 F=1.260

CRD 0.0791 RWL 187.1008 CMAPRAT 0.928 41-18-08

CYCEXP 0 MWD/MTU ERATIO 0.96 CDLP 19.0616 P=1.000 F=1.000

MEASURED/CALCULATED LPRM READINGS DPCC 24.7085 CMFLPD 0.867 39-14-06

AVG: 0.00% MAX: 0.00% KEFF 1.0016 CMFLEX 0.777 11-48-06

LOCATION 1 2 3 4 5 6 7 8 9 10 11 12

AXIAL REL POWER 0.54 1.22 1.37 1.43 1.40 1.32 1.19 0.98 0.89 0.75 0.60 0.31

REGION REL POWER 0.92 1.02 0.93 1.02 1.16 1.03 0.92 1.02 0.92

RING REL POWER 0.83 1.23 1.15 1.13 1.12 1.09 0.70

APRM GAFS 1.03 1.00 1.00 1.00

            • THE 10 MOST LIMITING BUNDLES ******

FLCPR LOC CPR LIMIT APRAT LOC APLHGR LIMITI FLPD LOC LPD LIMIT

10.41 11.22

0.934 29-24 1.573 1.468 0.928 41-18-08 10.41 11.24 0.867 39-14-06 11.62 13.40

0.934 39-14 1.573 1.468 0.926 35-12-08 0.864 41-42-05 11.58 13.40

0.928 31-22 1.582 1,468 0.917 43-18-08 10.09 11.00 0.860 41-16-08 11.53 13.40

0.922 31-28 1.593 1.468 0.914 35-10-08 10.05 10.99 0.859 37-12-08 11.51 13.40

0.921 37-24 1.594 1.468 0.911 43-20-08 10.29 11.29 0.846 35-14-08 11.33 13.40

0.921 33-24 1.594 1.468 0.907 33-10-08 10.15 11.19 0.845 39-18-08 11.32 13.40

0.921 27-22 1.595 1.468 0.869 39-14-07 8.05 9.27 0.831 43-16-07 11.14 13.40

0.920 29-20 1.596 1.468 0.866 41-16-08 8.03 9.27 0.831 37-10-07 11.13 13.40

0.919 29-16 1.598 1.468 0.865 37-12-08 8.02 9.27 0.830 39-44-05 11.12 13.40

0.916 39-18 1.602 1.468 00.857 41-42-05 8.16 9.52 0.829 43-40-05 11.12 13.40

  1. ASSYS W LIMITS > 1 I FLCPR 0 1 APRAT 0 1 FLPD 0
                  • NUCLEAR LIMITS BY REGION *********

7 8 9

0.919 13-40 0.909 23-38 0.922 39-40

0.862 13-40-05 0.824 29-46-05 0.864 41-42-05

0.912 17-42-08 0.899 33-44-08 0.917 35-42-08


.------------------------------ +----------------------------

4 5 6

0.911 15-30 0.934 29-24 0.921 37-24 * MFLCPR *

0.817 07-30-05 0.739 31-22-11 0.825 45-24-05 * MFLPD *

0.903 09-20-08 0.813 33-26-14 0.911 43-20-08 * MAPRAT *


*----------------------------

1 2 3

0.927 13-14 0.919 29-16 0.934 39-14

0.862 13-14-06 0.817 29-08-05 0.867 39-14-06

0.921 17-12-08 0.907 33-10-08 0.928 41-18-08