{{#Wiki_filter:PRIDRITY1ACCELERATED
{{#Wiki_filter:PRIDRITY 1 ACCELERATED
RIDSPROCESSING)
RIDS PROCESSING)
REGULATORY
REGULATORY
INFORMATION
INFORMATION
DISTRIBUTION
DISTRIBUTION
SYSTEM(RIDS)ACCESSION
SYSTEM (RIDS)ACCESSION NBR:9409210319
NBR:9409210319
DOC.DATE: 94/09/15 NOTARIZED:
DOC.DATE:
NO FACIL:50-389
94/09/15NOTARIZED:
St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION
NOFACIL:50-389
St.LuciePlant,Unit2,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATION
GOLDBERG,J.H.
GOLDBERG,J.H.
FloridaPower&LightCo.RECIP.NAME
Florida Power&Light Co.RECIP.NAME
RECIPIENT
RECIPIENT AFFILIATION
AFFILIATION
Document Control Branch (Document Control Desk)SUBJECT: Responds to notice of violations
DocumentControlBranch(Document
noted in insp rept 50-389/94-15.Corrective
ControlDesk)SUBJECT:Respondstonoticeofviolations
notedininsprept50-389/94-15.Corrective
actions:plant
actions:plant
shutdown&enteredmode3on940714.DISTRIBUTION'CODE:
shutdown&entered mode 3 on 940714.DISTRIBUTION'CODE:
IE01DCOPIESRECEIVEDLTRENCL0SIZE:TITLE:General(50Dkt)-Insp
IE01D COPIES RECEIVED LTR ENCL 0 SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
Rept/Notice
of Vio ation Response NOTES: DOCKET¹05000389 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/BPD/RAB
ofVioationResponseNOTES:DOCKET¹05000389RECIPIENT
ME~0/<TC F2TEl CENTER 02 NRR/'DRCH/HHFB
IDCODE/NAME
NU DOCS-ABSTRACT
PD2-2PDINTERNAL:
OGC/HDS3 RGN2 FILE 01 EXTERNAL EG&G/BRYCE
ACRSAEOD/BPD/RAB
i J~H NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME NORRIS,J AEOD/DEIB AEOD/SPD/RRAB
ME~0/<TCF2TElCENTER02NRR/'DRCH/HHFB
DEDRO NRR/DORS/OEAB
NUDOCS-ABSTRACT
OGC/HDS3RGN2FILE01EXTERNALEG&G/BRYCE
iJ~HNRCPDRCOPIESLTTRENCLRECIPIENT
IDCODE/NAME
NORRIS,JAEOD/DEIB
AEOD/SPD/RRAB
DEDRONRR/DORS/OEAB
NRR/PMAS/IRCB-E
NRR/PMAS/IRCB-E
OEDIRRES/HFBNOACCOPIESLTTRENCLNOTETOALL"RIDS"RECIPIENTS:
OE DIR RES/HFB NOAC COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:
PLEASEHELPUSTOREDUCEiVASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMPl-37(EXT.504-2083)TOELINIINATE
PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2083)TO ELINIINATE
YOURNAMEFROilDISTRIBUTION
YOUR NAME FROil DISTRIBUTION
LISTSFORDOCI.'MENTS
LISTS FOR DOCI.'MENTS
YOUDON"I'L'ED!
YOU DON"I'L'ED!
TOTALNUMBEROFCOPIESREQUIRED:
TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL
LTTR21ENCL
   
   
FloridaPower8cLightCompany,P.O.Box14000,JunoBeach,FL33408-0420
Florida Power 8c Light Company, P.O.Box 14000, Juno Beach, FL 33408-0420
FPLSEP15199'fL-94-23310CFR2.201U.S.NuclearRegulatory
FPL SEP 1 5 199'f L-94-233 10 CFR 2.201 U.S.Nuclear Regulatory
Commission
Commission
Attn:DocumentControlDeskWashington,
Attn: Document Control Desk Washington, D.C.20555 Re: St.Lucie Unit 2 Docket No.50-389 Reply to Notice of Violation Ins ection Re ort 94-15 Florida Power and Light Company (FPL)has reviewed the subject inspection
D.C.20555Re:St.LucieUnit2DocketNo.50-389ReplytoNoticeofViolation
report and pursuant to 10 CFR 2.201 the response to the~~~~~notice of violation is attached.Very truly yours, J.H.Goldberg President-Nuclear Division JHG/JWH/kw
InsectionReort94-15FloridaPowerandLightCompany(FPL)hasreviewedthesubjectinspection
reportandpursuantto10CFR2.201theresponsetothe~~~~~noticeofviolation
isattached.
Verytrulyyours,J.H.GoldbergPresident
-NuclearDivisionJHG/JWH/kw
Attachment
Attachment
cc:StewartD.Ebneter,RegionalAdministrator,
cc: Stewart D.Ebneter, Regional Administrator, USNRC Region II Senior Resident Inspector, USNRC, St.Lucie Plant DAS/PSL N1196-94 9409210319
USNRCRegionIISeniorResidentInspector,
9409'15 PDR ADOCK 0500038rr'
USNRC,St.LuciePlantDAS/PSLN1196-949409210319
PDR an FPL Group company
9409'15PDRADOCK0500038rr'
Re: St.Lucie Uni 2 Docket No.50-389 Reply to Notice of Violation Zns ection Re ort 94-15 VIOLATION:
PDRanFPLGroupcompany
St.Lucie Unit 2 Technical Specification
Re:St.LucieUni2DocketNo.50-389ReplytoNoticeofViolation
3.3.1, Table 3.3-1, item 12, required, in part, that 4 channels of TCBs be operable in Mode 1.The associated
ZnsectionReort94-15VIOLATION:
LCO action statement required that an inoperable
St.LucieUnit2Technical
channel be placed in the tripped condition within 1 hour;otherwise, the unit was required to be in Mode 3 within 6 hours.Contrary to the above, on July 14, 1994, when Trip Circuit Breaker TCB-5'failed to open when required, was declared inoperable, and the breaker's failure mode prevented placing the affected channel in the tripped condition, the associated
Specification
shutdown to Mode 3 was not performed in the required 6 hours.While the unit was ultimately
3.3.1,Table3.3-1,item12,required,
shut down, entrance into Mode, 3 occurred approximately
inpart,that4channelsofTCBsbeoperableinMode1.Theassociated
7-1/2 hours after declaring the Trip Circuit Breaker inoperable.
LCOactionstatement
Further, the shutdown was premised on a management
requiredthataninoperable
directive, as opposed to a Technical Specif ication requirement.
channelbeplacedinthetrippedcondition
While the licensee interrupted
within1hour;otherwise,
TCB-5's electrical
theunitwasrequiredtobeinMode3within6hours.Contrarytotheabove,onJuly14,1994,whenTripCircuitBreakerTCB-5'failedtoopenwhenrequired,
flow path by opening Trip Circuit Breakers TCB-1, TCB-2, and TCB-6, the subject Technical Specification
wasdeclaredinoperable,
action statement was prescriptive
andthebreaker's
in requiring that either Trip Circuit Breaker TCB-5 be opened or that the unit be shut down.RESPONSE: REASON FOR VIOLATION FPL concurs that a violation existed.The root cause of the violation was personnel error on the part of Operations
failuremodeprevented
placingtheaffectedchannelinthetrippedcondition,
theassociated
shutdowntoMode3wasnotperformed
intherequired6hours.Whiletheunitwasultimately
shutdown,entranceintoMode,3occurredapproximately
7-1/2hoursafterdeclaring
theTripCircuitBreakerinoperable.
Further,theshutdownwaspremisedonamanagement
directive,
asopposedtoaTechnical
Specificationrequirement.
Whilethelicenseeinterrupted
TCB-5'selectrical
flowpathbyopeningTripCircuitBreakersTCB-1,TCB-2,andTCB-6,thesubjectTechnical
Specification
actionstatement
wasprescriptive
inrequiring
thateitherTripCircuitBreakerTCB-5beopenedorthattheunitbeshutdown.RESPONSE:
REASONFORVIOLATION
FPLconcursthataviolation
existed.Therootcauseoftheviolation
waspersonnel
erroronthepartofOperations
Management.
Management.
2.CORRECTIVE
2.CORRECTIVE
STEPSTAKENANDTHERESULTSACHIEVEDTheplantwasshutdownandenteredMode3at11:06a.m.onJuly14,1994.3.CORRECTIVE
STEPS TAKEN AND THE RESULTS ACHIEVED The plant was shutdown and entered Mode 3 at 11:06 a.m.on July 14, 1994.3.CORRECTIVE
STEPSTOAVOIDFURTHERVIOLATIONS
STEPS TO AVOID FURTHER VIOLATIONS
TheSiteVicePresident
The Site Vice President and Plant General Manager have reviewed this event with Operations
andPlantGeneralManagerhavereviewedthiseventwithOperations
Management
Management
andotherkeysitepersonnel.
and other key site personnel.
Theneedforstrictadherence
The need for strict adherence to Technical Specifications
toTechnical
has been emphasized.
Specifications
hasbeenemphasized.
B.Operations
B.Operations
Management
Management
havebe'enmadeawarethatothersourceswithintheNuclearDivisionareavailable
have be'en made aware that other sources within the Nuclear Division are available to aid in their decision making process when events arise that involve complex or previously
toaidintheirdecisionmakingprocesswheneventsarisethatinvolvecomplexorpreviously
unencountered
unencountered
situations.
situations.
4.DATEWHENFULLCOMPLIANCE
4.DATE WHEN FULL COMPLIANCE
WILLBEACHIEVEDFullcompliance
WILL BE ACHIEVED Full compliance
wasachievedwhentheplantenteredMode3at11:06a.m.onJuly14,1994.
was achieved when the plant entered Mode 3 at 11:06 a.m.on July 14, 1994.
}}
}}

Revision as of 16:05, 7 July 2018

Responds to Violation Noted in Insp Rept 50-389/94-15. Corrective Actions:Plant Shutdown & Entered Mode 3 on 940714 & Need Site Vice President & Plant General Manager Reviewed Event W/Operations Mgt & Other Key Site Personnel
ML17228A854
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/15/1994
From: GOLDBERG J H
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-233, NUDOCS 9409210319
Download: ML17228A854 (4)


See also: IR 05000389/1994015

Text

PRIDRITY 1 ACCELERATED

RIDS PROCESSING)

REGULATORY

INFORMATION

DISTRIBUTION

SYSTEM (RIDS)ACCESSION NBR:9409210319

DOC.DATE: 94/09/15 NOTARIZED:

NO FACIL:50-389

St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION

GOLDBERG,J.H.

Florida Power&Light Co.RECIP.NAME

RECIPIENT AFFILIATION

Document Control Branch (Document Control Desk)SUBJECT: Responds to notice of violations

noted in insp rept 50-389/94-15.Corrective

actions:plant

shutdown&entered mode 3 on 940714.DISTRIBUTION'CODE:

IE01D COPIES RECEIVED LTR ENCL 0 SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice

of Vio ation Response NOTES: DOCKET¹05000389 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/BPD/RAB

ME~0/<TC F2TEl CENTER 02 NRR/'DRCH/HHFB

NU DOCS-ABSTRACT

OGC/HDS3 RGN2 FILE 01 EXTERNAL EG&G/BRYCE

i J~H NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME NORRIS,J AEOD/DEIB AEOD/SPD/RRAB

DEDRO NRR/DORS/OEAB

NRR/PMAS/IRCB-E

OE DIR RES/HFB NOAC COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2083)TO ELINIINATE

YOUR NAME FROil DISTRIBUTION

LISTS FOR DOCI.'MENTS

YOU DON"I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL

Florida Power 8c Light Company, P.O.Box 14000, Juno Beach, FL 33408-0420

FPL SEP 1 5 199'f L-94-233 10 CFR 2.201 U.S.Nuclear Regulatory

Commission

Attn: Document Control Desk Washington, D.C.20555 Re: St.Lucie Unit 2 Docket No.50-389 Reply to Notice of Violation Ins ection Re ort 94-15 Florida Power and Light Company (FPL)has reviewed the subject inspection

report and pursuant to 10 CFR 2.201 the response to the~~~~~notice of violation is attached.Very truly yours, J.H.Goldberg President-Nuclear Division JHG/JWH/kw

Attachment

cc: Stewart D.Ebneter, Regional Administrator, USNRC Region II Senior Resident Inspector, USNRC, St.Lucie Plant DAS/PSL N1196-94 9409210319

9409'15 PDR ADOCK 0500038rr'

PDR an FPL Group company

Re: St.Lucie Uni 2 Docket No.50-389 Reply to Notice of Violation Zns ection Re ort 94-15 VIOLATION:

St.Lucie Unit 2 Technical Specification 3.3.1, Table 3.3-1, item 12, required, in part, that 4 channels of TCBs be operable in Mode 1.The associated

LCO action statement required that an inoperable

channel be placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />;otherwise, the unit was required to be in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.Contrary to the above, on July 14, 1994, when Trip Circuit Breaker TCB-5'failed to open when required, was declared inoperable, and the breaker's failure mode prevented placing the affected channel in the tripped condition, the associated

shutdown to Mode 3 was not performed in the required 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.While the unit was ultimately

shut down, entrance into Mode, 3 occurred approximately

7-1/2 hours after declaring the Trip Circuit Breaker inoperable.

Further, the shutdown was premised on a management

directive, as opposed to a Technical Specif ication requirement.

While the licensee interrupted

TCB-5's electrical

flow path by opening Trip Circuit Breakers TCB-1, TCB-2, and TCB-6, the subject Technical Specification

action statement was prescriptive

in requiring that either Trip Circuit Breaker TCB-5 be opened or that the unit be shut down.RESPONSE: REASON FOR VIOLATION FPL concurs that a violation existed.The root cause of the violation was personnel error on the part of Operations

Management.

2.CORRECTIVE

STEPS TAKEN AND THE RESULTS ACHIEVED The plant was shutdown and entered Mode 3 at 11:06 a.m.on July 14, 1994.3.CORRECTIVE

STEPS TO AVOID FURTHER VIOLATIONS

The Site Vice President and Plant General Manager have reviewed this event with Operations

Management

and other key site personnel.

The need for strict adherence to Technical Specifications

has been emphasized.

B.Operations

Management

have be'en made aware that other sources within the Nuclear Division are available to aid in their decision making process when events arise that involve complex or previously

unencountered

situations.

4.DATE WHEN FULL COMPLIANCE

WILL BE ACHIEVED Full compliance

was achieved when the plant entered Mode 3 at 11:06 a.m.on July 14, 1994.