|
|
Line 71: |
Line 71: |
| Electronic Distribution for STP | | Electronic Distribution for STP |
| | | |
| G. Powell 4 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - AMENDED NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000498/2017301 AND
| | |
| 05000499/2017301 - March 15, 2017 DISTRIBUTION: K. Kennedy, ORA S.Morris, ORA
| | ML17076A426 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: VGG Yes No Publicly Available Sensitive OFFICE SOE:OB C:OB NAME KClayton VGaddy SIGNATURE /RA/ /RA/ DATE 3/15/2017 3/15/2017 |
| T. Pruett DRP
| |
| R. Lantz, DRP A. Vegel, DRS J. Clark, DRS
| |
| A. Sanchez, DRP
| |
| N. Hernandez, DRP
| |
| N. Taylor, DRP D. Proulx, DRP S. Janicki, DRP
| |
| J. Melfi, DRP
| |
| L. Wright, DRP
| |
| V. Dricks, ORA L. Regner, NRR T. Hipschman, DRS
| |
| M. Herrera, FRMB
| |
| K. Fuller, ORA
| |
| E. Uribe, DRS
| |
| J. Weil, RIV/CAO A. Moreno RIV/CAO J. Bowen, RIV/OEDO
| |
| ACES
| |
| G. Walker, OI
| |
| B. Maier, ORA RidsOeMailCenter Resource
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
| ADAMS ACCESSION NUMBER: ML17076A426 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: VGG Yes No Publicly Available Sensitive OFFICE SOE:OB C:OB NAME KClayton VGaddy SIGNATURE /RA/ /RA/ DATE 3/15/2017 3/15/2017 OFFICIAL RECORD COPY
| |
|
| |
|
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 NOC-AE-240040, Application for Order Consenting to Direct Transfer of Licenses2024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test IR 05000498/20244042024-06-0303 June 2024 Cyber Security Inspection Report 05000498/2024404 (Cover Letter) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc NOC-AE-240040, Operator Licensinq Examination Schedule Revision 32024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 NOC-AE-240040, Annual Dose Report for 20232024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24029A2752024-01-29029 January 2024 Request to Reschedule Evaluated Force-on-Force Drill IR 05000498/20230042024-01-29029 January 2024 Integrated Inspection Report 05000498/2023004 and 05000499/2023004 ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information IR 05000498/20230032023-12-28028 December 2023 Acknowledgment of Reply to a Notice of Violation (NRC Inspection Report 05000498/2023003 and 05000499/2023003) ML23360A1692023-12-26026 December 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the South Texas Project Medical Services Drill Evaluated on August 31, 2023 NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23339A1902023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 ML23324A0102023-11-16016 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A2282023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23298A0002023-11-0101 November 2023 the Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23303A0782023-10-30030 October 2023 Submittal of Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) ML23317A1262023-10-12012 October 2023 South. Texas Project Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 26 ML23279A1382023-10-0505 October 2023 Responses to Requests for Additional Information Related to Application for Order Approving Indirect Transfer of Control of Licenses ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information ML23270B2592023-09-27027 September 2023 Update Foreign Ownership, Control, or Influence ML23263B1132023-09-20020 September 2023 Operator Licensing Examination Schedule Revision 1 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23236A6042023-08-24024 August 2023 Annual Dose Report for 2022 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter ML23229A5892023-08-17017 August 2023 Voluntary Response to Regulatory Issue Summary (RIS) 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23228A2102023-08-15015 August 2023 Closure of Investigation (OI 4-22-19) 2024-08-09
[Table view] Category:License-Operator
MONTHYEARIR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23254A2012023-08-0909 August 2023 07-Public Forms ML23242A0522023-08-0909 August 2023 07-Post Exam Comments ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 ML22293A8202022-10-24024 October 2022 Notification of NRC Initial Operator Licensing Examination 05000498 2023301 05000499 2023301 ML22276A2632022-09-0808 September 2022 Initial Exam 2022-08 Post Exam Comments ML22353A5812022-09-0808 September 2022 Initial Exam 2022-08 Public Documents ML22139A2482022-05-19019 May 2022 Operator Licensing Examination Schedule Revision 1 ML22081A3792022-03-22022 March 2022 Operator Licensing Examination Schedule IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21306A2682021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21246A1292021-07-29029 July 2021 8-STP-2021-07 Final Written Exam ML21265A5052021-07-29029 July 2021 1-STP-2021-07 Es 301-2 Draft Outlines (Combined 4-15-21) ML21265A5082021-07-29029 July 2021 4-STP 2021-07 ES-401-9 Draft Written Exam Comments ML21265A5062021-07-29029 July 2021 2-STP-2021-07 Draft Outline Comments ML21265A5072021-07-29029 July 2021 3-STP-2021-07 Draft Written Exam ML21246A1392021-07-29029 July 2021 10_STP-2021-07 Post Exam Comments ML21246A1302021-07-29029 July 2021 9-STP-2021-07 Final Operating Test ML21265A5102021-07-29029 July 2021 6-STP-2021-07 Draft Operating Test Comments ML21334A2592021-07-29029 July 2021 10_1-STP-2021-07 Post Exam Comments Cover Letter ML21265A5112021-07-29029 July 2021 7-STP-2021-07 Final Outlines ML21265A5092021-07-29029 July 2021 5-STP-2021-07 Draft Operating Test ML21265A5122021-07-29029 July 2021 11-STP-2021-07 Public Forms ML21111A1952021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML20255A2252020-09-11011 September 2020 Notification of NRC Initial Operator Licensing Examination 05000498/2020301; 05000499/2020301 ML20301A3912020-07-29029 July 2020 ST-2020-07 Public Forms ML20282A5342020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A7842020-07-29029 July 2020 ST-2020-07 Draft Op Test ML20282A5332020-07-29029 July 2020 ST-2020-07 Final Written Exams ML23103A0642020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A7852020-07-29029 July 2020 ST-2020-07 Draft Outlines ML20301A3842020-07-29029 July 2020 ST 2020-07 Draft Op Test Comments ML20301A3862020-07-29029 July 2020 ST-2020-07 Draft Written Exam Comments ML20282A7862020-07-29029 July 2020 ST-2020-07 Draft Written Exam ML20301A3852020-07-29029 July 2020 ST-2020-07 Draft Outline Comments ML20282A5172020-07-29029 July 2020 ST-2020-07 Post Exam Comments Analysis ML20282A7872020-07-29029 July 2020 ST-2020-07 Final Outlines ML20079L7832020-03-19019 March 2020 Operator Licensing Examination Schedule NOC-AE-20003719, Operator Licensing Examination Schedule2020-03-19019 March 2020 Operator Licensing Examination Schedule ML19045A3732019-02-12012 February 2019 March 2019 GFE Cover Letter Riv ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18309A3512018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000498/2019301 and 05000499/2019301 NOC-AE-18003562, Operator Licensing Examination Schedule - NRC Form 5362018-04-10010 April 2018 Operator Licensing Examination Schedule - NRC Form 536 ML18100A6652018-04-10010 April 2018 Project Units 1 & 2 - Operator Licensing Exam Schedule, Per NRC Regulatory Issue Summary 2018-02 ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18029A1572018-01-29029 January 2018 Notification of NRC Initial Operator Licensing Examination 05000498/2018301 and 05000499/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 2023-09-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23242A0522023-08-0909 August 2023 07-Post Exam Comments ML23254A2012023-08-0909 August 2023 07-Public Forms ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 ML22293A8202022-10-24024 October 2022 Notification of NRC Initial Operator Licensing Examination 05000498 2023301 05000499 2023301 ML22353A5812022-09-0808 September 2022 Initial Exam 2022-08 Public Documents ML22276A2632022-09-0808 September 2022 Initial Exam 2022-08 Post Exam Comments ML22139A2482022-05-19019 May 2022 Operator Licensing Examination Schedule Revision 1 ML22081A3792022-03-22022 March 2022 Operator Licensing Examination Schedule IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21306A2682021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21246A1392021-07-29029 July 2021 10_STP-2021-07 Post Exam Comments ML21265A5062021-07-29029 July 2021 2-STP-2021-07 Draft Outline Comments ML21246A1302021-07-29029 July 2021 9-STP-2021-07 Final Operating Test ML21246A1292021-07-29029 July 2021 8-STP-2021-07 Final Written Exam ML21334A2592021-07-29029 July 2021 10_1-STP-2021-07 Post Exam Comments Cover Letter ML21265A5102021-07-29029 July 2021 6-STP-2021-07 Draft Operating Test Comments ML21265A5112021-07-29029 July 2021 7-STP-2021-07 Final Outlines ML21265A5092021-07-29029 July 2021 5-STP-2021-07 Draft Operating Test ML21265A5082021-07-29029 July 2021 4-STP 2021-07 ES-401-9 Draft Written Exam Comments ML21265A5072021-07-29029 July 2021 3-STP-2021-07 Draft Written Exam ML21265A5052021-07-29029 July 2021 1-STP-2021-07 Es 301-2 Draft Outlines (Combined 4-15-21) ML21265A5122021-07-29029 July 2021 11-STP-2021-07 Public Forms ML21111A1952021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule ML20255A2252020-09-11011 September 2020 Notification of NRC Initial Operator Licensing Examination 05000498/2020301; 05000499/2020301 ML20301A3912020-07-29029 July 2020 ST-2020-07 Public Forms ML20282A7872020-07-29029 July 2020 ST-2020-07 Final Outlines ML20282A5342020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A5332020-07-29029 July 2020 ST-2020-07 Final Written Exams ML20282A7852020-07-29029 July 2020 ST-2020-07 Draft Outlines ML20282A7842020-07-29029 July 2020 ST-2020-07 Draft Op Test ML20282A7862020-07-29029 July 2020 ST-2020-07 Draft Written Exam ML20301A3862020-07-29029 July 2020 ST-2020-07 Draft Written Exam Comments ML23103A0642020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A5172020-07-29029 July 2020 ST-2020-07 Post Exam Comments Analysis ML20301A3842020-07-29029 July 2020 ST 2020-07 Draft Op Test Comments ML20301A3852020-07-29029 July 2020 ST-2020-07 Draft Outline Comments NOC-AE-20003719, Operator Licensing Examination Schedule2020-03-19019 March 2020 Operator Licensing Examination Schedule ML20079L7832020-03-19019 March 2020 Operator Licensing Examination Schedule ML18309A3512018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000498/2019301 and 05000499/2019301 ML18100A6652018-04-10010 April 2018 Project Units 1 & 2 - Operator Licensing Exam Schedule, Per NRC Regulatory Issue Summary 2018-02 NOC-AE-18003562, Operator Licensing Examination Schedule - NRC Form 5362018-04-10010 April 2018 Operator Licensing Examination Schedule - NRC Form 536 ML18029A1572018-01-29029 January 2018 Notification of NRC Initial Operator Licensing Examination 05000498/2018301 and 05000499/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 IR 05000498/20173012017-12-13013 December 2017 NRC Initial Operator Licensing Examination Report 05000498/2017301 and 05000499/2017301 ML17319A7082017-10-0909 October 2017 09 Draft Written Comments ML17319A7032017-10-0909 October 2017 09 Draft Op Test Comments ML17319A7092017-10-0909 October 2017 09 Draft Written Exam 2023-09-07
[Table view] |
See also: IR 05000498/2017301
Text
March 15, 2017 Mr. G. T. Powell Executive Vice President and CNO
STP Nuclear Operating Company
South Texas Project Electric Generating Station
P.O. Box 289 Wadsworth, TX 77483
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - AMENDED NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION
05000498/2017301 AND 05000499/2017301 Dear Mr. Koehl:
In a telephone conversation on November 16, 2016, between Messrs. T. Hurley, Supervisor for this Initial Licensing Exam, and K. Clayton, Chief Examiner, arrangements were made for the administration of licensing examinations at South Texas Project Electric Generating Station, Units 1 and 2, during the weeks of September 25 and October 9, 2017.
During this telephone conversation, it was agreed that your staff would prepare the
examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.
The NRC program office informed regional NRC staff that Revision 11 of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors," was released on February 15,
2017. The Federal Register Notice that accompanied this release requires that any initial examination administered after August 15, 2017, shall use the most recent revision of this standard to develop and administer the examinations. Based on this change, the NRC staff provided your site updated Revision 11 written examination outlines on March 1, 2017.
Because NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators,"
Revision 3, is not released, the examination will continue to be developed using Revision 2,
Supplement 1, of this catalog. To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by June 26, 2017. The written examination, operating tests, and supporting reference materials with indices identified in Attachment 3 to ES-201 will be due by July 24, 2017.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511
G. Powell 2 We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of August 14, 2017.
To conduct the requested written examinations and operating tests, it will be necessary for your
staff to provide adequate space and accommodations in accordance with ES-402 and to make
the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests, along with any video and audio
recordings of the dynamic operating tests, until the NRC takes its licensing action on all of the applications and any adjudicatory actions on any hearing demands are complete. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if able). Mr. K. Clayton should be contacted to determine the method for submission of the waiver and/or excusal requests. Preliminary reactor operator and senior reactor operator
license applications (OMB approval number 3150-0090) and, medical certifications
(OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the
examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the
first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early in the process as possible (see the 60-day guideline, above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or
as directed when Mr. K. Clayton is contacted to determine the method for submission). The
NRC's final decision on whether to grant a waiver or excusal will be documented on the final
(not preliminary) NRC Form 398 submitted for the applicant and will not be provided until the final application is submitted to the NRC. Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average
400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination or response, including the time for reviewing instructions,
searching existing data sources, gathering and maintaining the data needed, and completing
and reviewing the information collection. You may submit comments on any aspect of the information collection, including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by electronic mail to:
G. Powell 3 INFOCOLLECTS.RESOURCE@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available
electronically for public inspection in the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web Site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Hurley has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact please contact Mr. Clayton at 817-200-1216 or myself at 817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety Docket Nos. 50-498 and 50-499
License Nos. NPF-76 and NPF-80
Electronic Distribution for STP
ML17076A426 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: VGG Yes No Publicly Available Sensitive OFFICE SOE:OB C:OB NAME KClayton VGaddy SIGNATURE /RA/ /RA/ DATE 3/15/2017 3/15/2017