ML17205A112: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = License-Operator, Part 55 Examination Related Material
| document type = License-Operator, Part 55 Examination Related Material
| page count = 1
| page count = 1
}}
=Text=
{{#Wiki_filter:ES-301OperatingTest Quality ChecklistForm ES-301-3Facilitv: PBNPDate of Examination: Mav B - 19,2017Test Number: 2017L General Criterialnitialsab.c#a.ThesamoperatingtestconformswiththeprevrouslyapprovedoutlinchangesareconSIstentwithuirements10cFRmdistributl4f\-{/b.There is no day{o-day repetition between this and other operating tests to be administereddurithis examination/rrThetest shall noticate items from theauditSection D.1.a.cálfr9/dOverlap with the written examination and between different parts of the operating test is withinlimits4TLre.It appears that the operating test will differentiate between competent and less-than-competentaicants at thenated license levelf\-r2. Walk-Throh Criteriaa.Each JPM includes the following, as applicable:initial conditionsinitiating cuesreferences and tools, including associated proceduresreasonable and validated time limits (average time allowed for completion) and specificdesignation if deemed to be time-critical by the facilty licenseeoperationally imporlant specific performance criteria that include:detailed expected actions wth exact criteria and nomenclaturesystem response and other examiner cuesstatements describing important observations to be made by the applicantcriteria for successful completion of the taskidentification of critical steps and their associated performance standardsrestrictions on the sequence of steps, if applicable,/-/b.Ensure that any changes from the previously approved systems and administrative walk{hroughoutlines (Forms ES-301-1 and2) have not caused the test to deviatecriteria (e.9., item distribution, bank use, repetition from the last 2from any ofthe acceptancenations) specifiedNonforms and Form ES-201-2./TL//3. Simulator CriteriaThe assocated simulator operating tests (scenario sets) have beenin accordance wth Form ES-301-4 and ais attached.4rLre / SignDate,t/zx/t ta. Authorb. Facility Reviewe(.)c. NRC Chief Examiner (#)üs\d. NRC Supervisor ,r*\.r"rTJ¿sçco4rs/tl').\-\¿ ) tlNOTE: . The faclity signature is not applicable for NRC-developed tests# lndependentNRC reviewer initial items in Column "c"chief examner concurrencered.
}}
}}

Revision as of 18:29, 26 April 2018

2017 Point Beach Nuclear Plant Initial License Examination Form Es 301-3
ML17205A112
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/23/2017
From: Seymour J L
Operations Branch III
To:
NRC/RGN-III/DRS/OLB
Shared Package
ML16319A344 List:
References
Download: ML17205A112 (1)


Text

{{#Wiki_filter:ES-301OperatingTest Quality ChecklistForm ES-301-3Facilitv: PBNPDate of Examination: Mav B - 19,2017Test Number: 2017L General Criterialnitialsab.c#a.ThesamoperatingtestconformswiththeprevrouslyapprovedoutlinchangesareconSIstentwithuirements10cFRmdistributl4f\-{/b.There is no day{o-day repetition between this and other operating tests to be administereddurithis examination/rrThetest shall noticate items from theauditSection D.1.a.cálfr9/dOverlap with the written examination and between different parts of the operating test is withinlimits4TLre.It appears that the operating test will differentiate between competent and less-than-competentaicants at thenated license levelf\-r2. Walk-Throh Criteriaa.Each JPM includes the following, as applicable:initial conditionsinitiating cuesreferences and tools, including associated proceduresreasonable and validated time limits (average time allowed for completion) and specificdesignation if deemed to be time-critical by the facilty licenseeoperationally imporlant specific performance criteria that include:detailed expected actions wth exact criteria and nomenclaturesystem response and other examiner cuesstatements describing important observations to be made by the applicantcriteria for successful completion of the taskidentification of critical steps and their associated performance standardsrestrictions on the sequence of steps, if applicable,/-/b.Ensure that any changes from the previously approved systems and administrative walk{hroughoutlines (Forms ES-301-1 and2) have not caused the test to deviatecriteria (e.9., item distribution, bank use, repetition from the last 2from any ofthe acceptancenations) specifiedNonforms and Form ES-201-2./TL//3. Simulator CriteriaThe assocated simulator operating tests (scenario sets) have beenin accordance wth Form ES-301-4 and ais attached.4rLre / SignDate,t/zx/t ta. Authorb. Facility Reviewe(.)c. NRC Chief Examiner (#)üs\d. NRC Supervisor ,r*\.r"rTJ¿sçco4rs/tl').\-\¿ ) tlNOTE: . The faclity signature is not applicable for NRC-developed tests# lndependentNRC reviewer initial items in Column "c"chief examner concurrencered. }}