ML14342A873: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION II | |||
245 PEACHTREE CENTER AVENUE NE, SUITE 1200 | |||
ATLANTA, GEORGIA 30303-1257 | |||
Mr. Steven D. Capps | December 4, 2014 | ||
Site Vice President | |||
Duke Energy Corporation | Mr. Steven D. Capps | ||
McGuire Nuclear Station | Site Vice President | ||
MG01VP/12700 Hagers Ferry Road | Duke Energy Corporation | ||
Huntersville, NC 28078 | McGuire Nuclear Station | ||
SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED | MG01VP/12700 Hagers Ferry Road | ||
Huntersville, NC 28078 | |||
Dear Mr. Capps: | |||
In a telephone conversation on November 25, 2014, between Mr. Steven Mosteller, MNS Exam | SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED | ||
Team Lead, and Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for | OPERATOR INITIAL EXAMINATION 05000369/2015301 AND 05000370/2015301 | ||
the administration of licensing examinations at William B. McGuire Nuclear Station. The | |||
operating test is scheduled to be administered during the weeks of April 27 and May 4, 2015. | Dear Mr. Capps: | ||
The written examination is scheduled to be administered the week of May 11, 2015. The on-site | |||
preparatory week is scheduled for the week of March 30, 2015. | In a telephone conversation on November 25, 2014, between Mr. Steven Mosteller, MNS Exam | ||
As agreed during the telephone conversation, your staff will prepare both the operating test and | Team Lead, and Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for | ||
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, | the administration of licensing examinations at William B. McGuire Nuclear Station. The | ||
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory | operating test is scheduled to be administered during the weeks of April 27 and May 4, 2015. | ||
Commission (NRC) Regional office will discuss any changes with your staff that might be | The written examination is scheduled to be administered the week of May 11, 2015. The on-site | ||
necessary before the examinations are administered. Your staff has also agreed to make | preparatory week is scheduled for the week of March 30, 2015. | ||
copies of all examination materials that are necessary for administering the examination. | |||
To meet the above schedule, it will be necessary for your staff to furnish the operating test | As agreed during the telephone conversation, your staff will prepare both the operating test and | ||
outline by February 11, 2015. Mr. Daniel Bacon provided the written examination outline to your | written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, | ||
staff in September, 2014. The operating test, written examination, and the supporting reference | "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory | ||
materials identified in Attachment 3 to ES-201 will be due by March 13, 2015. Pursuant to Title | Commission (NRC) Regional office will discuss any changes with your staff that might be | ||
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized | necessary before the examinations are administered. Your staff has also agreed to make | ||
representative of the facility licensee shall approve the outline, examination, and test before | copies of all examination materials that are necessary for administering the examination. | ||
they are submitted to the NRC for review and approval. All materials shall be complete and | |||
ready-to-use. | To meet the above schedule, it will be necessary for your staff to furnish the operating test | ||
We request that any personal, proprietary, sensitive unclassified, or safeguards information in | outline by February 11, 2015. Mr. Daniel Bacon provided the written examination outline to your | ||
your response be contained in a separate enclosure and appropriately marked. Any delay in | staff in September, 2014. The operating test, written examination, and the supporting reference | ||
receiving the required examination and reference materials, or the submittal of inadequate or | materials identified in Attachment 3 to ES-201 will be due by March 13, 2015. Pursuant to Title | ||
incomplete materials, may cause the examinations to be rescheduled. | 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized | ||
In order to conduct the requested written examinations and operating tests, it will be necessary | representative of the facility licensee shall approve the outline, examination, and test before | ||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | they are submitted to the NRC for review and approval. All materials shall be complete and | ||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | ready-to-use. | ||
We request that any personal, proprietary, sensitive unclassified, or safeguards information in | |||
your response be contained in a separate enclosure and appropriately marked. Any delay in | |||
receiving the required examination and reference materials, or the submittal of inadequate or | |||
incomplete materials, may cause the examinations to be rescheduled. | |||
In order to conduct the requested written examinations and operating tests, it will be necessary | |||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | |||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | |||
S. Capps | S. Capps | ||
your staff should retain the original simulator performance data (e.g., system pressures, | 2 | ||
temperatures, and levels) generated during the dynamic operating tests until the examination | |||
results are final. | your staff should retain the original simulator performance data (e.g., system pressures, | ||
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in | temperatures, and levels) generated during the dynamic operating tests until the examination | ||
effect while the written examinations and operating tests are being administered. | results are final. | ||
To permit timely NRC review and evaluation, your staff should submit preliminary reactor | |||
operator and senior reactor operator license applications, medical certifications, and waiver | Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in | ||
requests (if any) at least 30 days before the first examination date. If the applications are not | effect while the written examinations and operating tests are being administered. | ||
received at least 30 days before the examination date, a postponement may be necessary. | |||
Signed applications certifying that all training has been completed should be submitted at least | To permit timely NRC review and evaluation, your staff should submit preliminary reactor | ||
14 days before the first examination date. | operator and senior reactor operator license applications, medical certifications, and waiver | ||
This letter contains information collections that are subject to the Paperwork Reduction Act | requests (if any) at least 30 days before the first examination date. If the applications are not | ||
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office | received at least 30 days before the examination date, a postponement may be necessary. | ||
of Management and Budget (OMB) under approval number 3150-0018, which expires on | Signed applications certifying that all training has been completed should be submitted at least | ||
April 30, 2016. The public reporting burden for this collection of information is estimated to | 14 days before the first examination date. | ||
average 500 hours per response, including the time for reviewing instructions, gathering and | |||
maintaining the data needed, writing the examinations, and completing and reviewing the | This letter contains information collections that are subject to the Paperwork Reduction Act | ||
collection of information. Send comments on any aspect of this collection of information, | of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office | ||
including suggestions for reducing the burden, to the Information and Records Management | of Management and Budget (OMB) under approval number 3150-0018, which expires on | ||
Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by | April 30, 2016. The public reporting burden for this collection of information is estimated to | ||
Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of | average 500 hours per response, including the time for reviewing instructions, gathering and | ||
Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and | maintaining the data needed, writing the examinations, and completing and reviewing the | ||
Budget, Washington, DC 20503. | collection of information. Send comments on any aspect of this collection of information, | ||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | including suggestions for reducing the burden, to the Information and Records Management | ||
information collection, unless it displays a currently valid OMB control number. | Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will | Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of | ||
be available electronically for public inspection in the NRC Public Document Room, or from | Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and | ||
the Publicly Available Records (PARS) component of the NRCs Agencywide Documents | Budget, Washington, DC 20503. | ||
Access and Management System (ADAMS), accessible from the NRC Web site | |||
at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | ||
Thank you for your cooperation in this matter. Mr. Steven Mosteller has been advised of the | information collection, unless it displays a currently valid OMB control number. | ||
policies and guidelines referenced in this letter. If you have any questions regarding the NRCs | |||
examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518, | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will | ||
(Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail: | be available electronically for public inspection in the NRC Public Document Room, or from | ||
eugene.guthrie@nrc.gov). | the Publicly Available Records (PARS) component of the NRCs Agencywide Documents | ||
Access and Management System (ADAMS), accessible from the NRC Web site | |||
at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Thank you for your cooperation in this matter. Mr. Steven Mosteller has been advised of the | |||
policies and guidelines referenced in this letter. If you have any questions regarding the NRCs | |||
Docket Nos. 50-369 and 50-370 | examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518, | ||
License Nos. NPF-9 and NPF-17 | (Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail: | ||
cc: Distribution via Listserv | eugene.guthrie@nrc.gov). | ||
Sincerely, | |||
/RA/ | |||
Eugene F. Guthrie, Chief | |||
Operations Branch 2 | |||
Division of Reactor Safety | |||
Docket Nos. 50-369 and 50-370 | |||
License Nos. NPF-9 and NPF-17 | |||
cc: Distribution via Listserv | |||
OFFICE | ML14342A873 | ||
SIGNATURE | |||
NAME | SUNSI REVIEW COMPLETE | ||
DATE | FORM 665 ATTACHED | ||
E-MAIL COPY | OFFICE | ||
RII:DRS/OB2 | |||
RII:DRS/OB2 | |||
SIGNATURE | |||
DXB2 | |||
EFG | |||
NAME | |||
DBacon | |||
EGuthrie | |||
DATE | |||
12/ 4/2014 | |||
12/4/2014 | |||
E-MAIL COPY | |||
YES | |||
NO | |||
YES | |||
NO | |||
YES | |||
NO | |||
}} | }} | ||
Latest revision as of 15:30, 10 January 2025
| ML14342A873 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 12/04/2014 |
| From: | Eugene Guthrie Division of Reactor Safety II |
| To: | Capps S Duke Energy Corp |
| References | |
| 50-369/15-301, 50-370/15-301 | |
| Download: ML14342A873 (3) | |
See also: IR 05000369/2015301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
December 4, 2014
Mr. Steven D. Capps
Site Vice President
Duke Energy Corporation
McGuire Nuclear Station
MG01VP/12700 Hagers Ferry Road
Huntersville, NC 28078
SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED
OPERATOR INITIAL EXAMINATION 05000369/2015301 AND 05000370/2015301
Dear Mr. Capps:
In a telephone conversation on November 25, 2014, between Mr. Steven Mosteller, MNS Exam
Team Lead, and Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for
the administration of licensing examinations at William B. McGuire Nuclear Station. The
operating test is scheduled to be administered during the weeks of April 27 and May 4, 2015.
The written examination is scheduled to be administered the week of May 11, 2015. The on-site
preparatory week is scheduled for the week of March 30, 2015.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) Regional office will discuss any changes with your staff that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by February 11, 2015. Mr. Daniel Bacon provided the written examination outline to your
staff in September, 2014. The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by March 13, 2015. Pursuant to Title
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
S. Capps
2
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office
of Management and Budget (OMB) under approval number 3150-0018, which expires on
April 30, 2016. The public reporting burden for this collection of information is estimated to
average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and
maintaining the data needed, writing the examinations, and completing and reviewing the
collection of information. Send comments on any aspect of this collection of information,
including suggestions for reducing the burden, to the Information and Records Management
Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and
Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will
be available electronically for public inspection in the NRC Public Document Room, or from
the Publicly Available Records (PARS) component of the NRCs Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Web site
at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Steven Mosteller has been advised of the
policies and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518,
(Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail:
eugene.guthrie@nrc.gov).
Sincerely,
/RA/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos. 50-369 and 50-370
cc: Distribution via Listserv
SUNSI REVIEW COMPLETE
FORM 665 ATTACHED
OFFICE
RII:DRS/OB2
RII:DRS/OB2
SIGNATURE
DXB2
EFG
NAME
DBacon
EGuthrie
DATE
12/ 4/2014
12/4/2014
E-MAIL COPY
YES
NO
YES
NO
YES
NO