{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
{{#Wiki_filter:LICENSEE:
                                                /spril 16, 2015 LICENSEE:       Pacific Gas and Electric Company FACILITY:       Diablo Canyon Power Plant, Units 1 and 2
FACILITY:  


==SUBJECT:==
==SUBJECT:==
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
/spril 16, 2015 Pacific Gas and Electric Company Diablo Canyon Power Plant, Units 1 and 2


==SUMMARY==
==SUMMARY==
OF DIABLO CANYON POWER PLANT, UNITS 1 AND 2, JULY 14-17, 2014, AUDIT ASSOCIATED WITH LICENSE AMENDMENT REQUEST TO TRANSITION TO THE NATIONAL FIRE PROTECTION ASSOCIATION 805 STANDARD (TAC NOS. MF2333 AND MF2334)
OF DIABLO CANYON POWER PLANT, UNITS 1 AND 2, JULY 14-17, 2014, AUDIT ASSOCIATED WITH LICENSE AMENDMENT REQUEST TO TRANSITION TO THE NATIONAL FIRE PROTECTION ASSOCIATION 805 STANDARD (TAC NOS. MF2333 AND MF2334)
By letter dated June 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13196A139), as supplemented by letter dated October 3, 2013 (ADAMS Accession No. ML13277A457), Pacific Gas and Electric Company (the licensee) submitted a license amendment request (LAR) to transition the Diablo Canyon Power Plant, Units 1 and 2 (DCPP) fire protection licensing basis to Title 1O of the Code of Federal Regulations (10 CFR), Section 50.48(c). Section 50.48(c) of 10 CFR endorses, with exceptions, the National Fire Protection Association (NFPA) Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," 2001 Edition (NFPA 805). The purpose of this summary is to document the results of an audit performed at DCPP associated with this LAR.
By {{letter dated|date=June 26, 2013|text=letter dated June 26, 2013}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13196A139), as supplemented by {{letter dated|date=October 3, 2013|text=letter dated October 3, 2013}} (ADAMS Accession No. ML13277A457), Pacific Gas and Electric Company (the licensee) submitted a license amendment request (LAR) to transition the Diablo Canyon Power Plant, Units 1 and 2 (DCPP) fire protection licensing basis to Title 1 O of the Code of Federal Regulations (10 CFR), Section 50.48(c). Section 50.48(c) of 10 CFR endorses, with exceptions, the National Fire Protection Association (NFPA) Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," 2001 Edition (NFPA 805). The purpose of this summary is to document the results of an audit performed at DCPP associated with this LAR.
A review team consisting of U.S. Nuclear Regulatory Commission (NRG) staff and NRG contractors from the Pacific Northwest National Laboratory (PNNL) and Southwest Research Institute (SwRl)/Center for Nuclear Waste Regulatory Analyses (CNWRA) participated in a regulatory audit of DCPP in accordance with NRG Office of Nuclear Reactor Regulation (NRR),
A review team consisting of U.S. Nuclear Regulatory Commission (NRG) staff and NRG contractors from the Pacific Northwest National Laboratory (PNNL) and Southwest Research Institute (SwRl)/Center for Nuclear Waste Regulatory Analyses (CNWRA) participated in a regulatory audit of DCPP in accordance with NRG Office of Nuclear Reactor Regulation (NRR),
Office Instruction LIC-111, "Regulatory Audits" (ADAMS Accession No. ML082900195), during July 14-17, 2014, in Avila Beach, California. The purpose of the audit was to understand what information the NRG staff needed to support its review of the LAR and to develop requests for additional information (RAls) as needed. The information submitted in support of the LAR is under final review, and the staff will request any additional information needed to support its review in accordance with NRR Office Instruction LIC-101, Revision 4, "License Amendment Review Procedures" (ADAMS Accession No. ML113200053).
Office Instruction LIC-111, "Regulatory Audits" (ADAMS Accession No. ML082900195), during July 14-17, 2014, in Avila Beach, California. The purpose of the audit was to understand what information the NRG staff needed to support its review of the LAR and to develop requests for additional information (RAls) as needed. The information submitted in support of the LAR is under final review, and the staff will request any additional information needed to support its review in accordance with NRR Office Instruction LIC-101, Revision 4, "License Amendment Review Procedures" (ADAMS Accession No. ML113200053).
The audit team consisted of 12 NRG staff, two PNNL staff, and one CNWRA staff. Enclosure 1 provides the schedule of activities during the audit. Enclosure 2 lists NRG staff, PNNL staff, CNWRA staff, and the licensee's staff and contractors that participated in the audit. Enclosure 3 provides a list of attendees at the entrance meeting. Enclosure 4 contains a list of documents reviewed by the team. Enclosure 5 provides a list of attendees at the exit meeting.
The audit team consisted of 12 NRG staff, two PNNL staff, and one CNWRA staff. Enclosure 1 provides the schedule of activities during the audit. Enclosure 2 lists NRG staff, PNNL staff, CNWRA staff, and the licensee's staff and contractors that participated in the audit. Enclosure 3 provides a list of attendees at the entrance meeting. Enclosure 4 contains a list of documents reviewed by the team. Enclosure 5 provides a list of attendees at the exit meeting.
On July 14, 2014, the audit team held an entrance meeting with the DCPP management, staff, contractors, and a few industry representatives. Technical discussions at the audit were focused on five major topical areas: Fire Protection Engineering (FPE), Safe Shutdown/Circuit Analyses (SSD/CA), Fire Probabilistic Risk Assessment (FPRA), Fire Modeling (FM), and fire protection program programmatic review. The audit team participated in site tours, plant
On July 14, 2014, the audit team held an entrance meeting with the DCPP management, staff, contractors, and a few industry representatives. Technical discussions at the audit were focused on five major topical areas: Fire Protection Engineering (FPE), Safe Shutdown/Circuit Analyses (SSD/CA), Fire Probabilistic Risk Assessment (FPRA), Fire Modeling (FM), and fire protection program programmatic review. The audit team participated in site tours, plant walkdowns; technical presentations and briefing, and discussions focusing on the major topical areas. During the audit, team members met in smaller groups according to their area of expertise to focus on the RAls needed in accordance with the areas of the DCPP LAR review.
 
walkdowns; technical presentations and briefing, and discussions focusing on the major topical areas. During the audit, team members met in smaller groups according to their area of expertise to focus on the RAls needed in accordance with the areas of the DCPP LAR review.
The licensee's staff provided plant walkdowns and presentations on FPE, post-fire safe shutdown circuit analysis, FPRA, and FM. NRC and licensee discussions focused on these subjects and on fire protection programmatic review.
The licensee's staff provided plant walkdowns and presentations on FPE, post-fire safe shutdown circuit analysis, FPRA, and FM. NRC and licensee discussions focused on these subjects and on fire protection programmatic review.
At the conclusion of the audit, the NRC's audit team participated in a summary exit meeting with the DCPP staff and management on July 17, 2014.
At the conclusion of the audit, the NRC's audit team participated in a summary exit meeting with the DCPP staff and management on July 17, 2014.
Please direct any inquiries to me at (301) 415-1564 or at Siva.Lingam@nrc.gov.
Please direct any inquiries to me at (301) 415-1564 or at Siva.Lingam@nrc.gov.
Sincerely,
Docket Nos. 50-275 and 50-323  
                                                ~<f*~
Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323


==Enclosures:==
==Enclosures:==
Line 44: Line 42:
: 3. Audit Participants at Entrance Meeting
: 3. Audit Participants at Entrance Meeting
: 4. Audit Documents
: 4. Audit Documents
: 5. Audit Participants at Exit Meeting cc w/enclosures: Distribution via Listserv
: 5. Audit Participants at Exit Meeting cc w/enclosures: Distribution via Listserv Sincerely,
 
~<f*~
Schedule of Activities Monday, July 14, 2014 07:30 a.m. Audit Commencement: NRC Audit Team members met at the Diablo Canyon Learning Services Simulator Building, established computer connections, and began DCPP site document reviews.
Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
08:15 a.m. Introductions to site personnel 9:00 a.m. Audit Entrance meeting: Plant Overview Discussions 9:45 a.m. Virtual Tour 10:45 a.m. Main Control Room (MCR) and Hot-Shutdown Panel (HSDP) Simulator tour Breakout Sessions for: Fire PRA (FPRA), Fire Modeling (FM), Safe Shutdown (SSD), and FPE 12:30 p.m. Presentation: Attachment S Modifications Continued Sessions: FPRA, FM, SSD, and FPE New Breakout Sessions: MCR Abandonment, Nuclear Safety Capability Assessment (NSCA), Multiple Spurious Operations (MSO), Recovery Actions (RAs), Radioactive Release (RR), Non-Power Operations (NPO) 4:45 p.m. Licensee Wrap Up Tuesday, July 15, 2014 8:00 a.m. Plant Tour - [safety briefing, break into three tour groups]
12:30 a.m. Combined FPRA/FM Breakout 1:30 p.m. FM (CFAST) Presentation 3:15 p.m. FPRA Breakout 4:45 p.m. Licensee Wrap Up Wednesday, July 16, 2014 8:30 a.m. Joint FM/PRA Breakout - MCR Abandonment 10:00 a.m. Programmatic Breakout Session 12:30 p.m. Fire PRA and Fire Modeling Breakout Sessions 5:00 p.m. Licensee Wrap Up Enclosure 1


Thursday, July 17, 2014 8:00 a.m. Discussions and Continued Breakouts 10:30 a.m. Combined Group Breakout 11 :00 a.m. FPRA Breakout 2:30 p.m. Audit Exit Meeting
Schedule of Activities Monday, July 14, 2014 07:30 a.m.
08:15 a.m.
9:00 a.m.
9:45 a.m.
10:45 a.m.
12:30 p.m.
4:45 p.m.
Audit Commencement: NRC Audit Team members met at the Diablo Canyon Learning Services Simulator Building, established computer connections, and began DCPP site document reviews.
Introductions to site personnel Audit Entrance meeting: Plant Overview Discussions Virtual Tour Main Control Room (MCR) and Hot-Shutdown Panel (HSDP) Simulator tour Breakout Sessions for: Fire PRA (FPRA), Fire Modeling (FM), Safe Shutdown (SSD), and FPE Presentation: Attachment S Modifications Continued Sessions: FPRA, FM, SSD, and FPE New Breakout Sessions: MCR Abandonment, Nuclear Safety Capability Assessment (NSCA), Multiple Spurious Operations (MSO), Recovery Actions (RAs), Radioactive Release (RR), Non-Power Operations (NPO)
Licensee Wrap Up Tuesday, July 15, 2014 8:00 a.m.
12:30 a.m.
1:30 p.m.
3:15 p.m.
4:45 p.m.
Plant Tour - [safety briefing, break into three tour groups]
Combined FPRA/FM Breakout FM (CFAST) Presentation FPRA Breakout Licensee Wrap Up Wednesday, July 16, 2014 8:30 a.m.
Joint FM/PRA Breakout - MCR Abandonment 10:00 a.m.
Programmatic Breakout Session 12:30 p.m.
Fire PRA and Fire Modeling Breakout Sessions 5:00 p.m.
Licensee Wrap Up Thursday, July 17, 2014 8:00 a.m.
10:30 a.m.
11 :00 a.m.
2:30 p.m.
Discussions and Continued Breakouts Combined Group Breakout FPRA Breakout Audit Exit Meeting  


List of Participants NRC Audit Team
List of Participants NRC Audit Team
* Alex Klein         NRC           Branch Chief
* Alex Klein NRC Branch Chief Hossein Hamzehee NRC Branch Chief Leslie Fields NRC Audit Team Leader Jay Robinson NRC Programmatic Lead Paul Lain NRC Team Technical Lead Harold Barrett NRC Team QA Advisor J. S. Hyslop NRC FPRA Todd Hilsmeier NRC FPRA Garill Coles PNNL FPRA Bernard Litkett NRC SSD/CA Karl Bohlander PNNL SSD/CNFPE Brian Metzger NRC FPE/FM Kaushik Das CNWRA FM John Reynoso NRC RIV Observer
* Hossein Hamzehee   NRC           Branch Chief
* Sarah Obadina NRC NRR Observer DCPPTeam Richardson, Michael Reg. Srvs Lead/Licensing
* Leslie Fields       NRC           Audit Team Leader
* Baker, Steve Engr Audit Lead/Design Engr Hampshire, Dave Engr Lead FPE Hromyak, Dan Engr Sys Engr/FPE
* Jay Robinson       NRC           Programmatic Lead
* Arsene, Alex Engr FPE Baradaran, Rasool PRA Lead/PRA Pyo, John PRA Analyst/PRA Barber, Nathan PRA Analyst/PRA (Seismic)
* Paul Lain           NRC           Team Technical Lead
Shepard, Matt PRA Analyst/PRA lmbaratto, David PRA Analyst/PRA Montoya, Ariel Engr Lead EE Lodolo, Larry Engr SSD/CA Leatham, Russ Engr EE/EE
* Harold Barrett     NRC           Team QA Advisor
* Chitwood, Tony Operations Support/OPS (NPO)
* J. S. Hyslop       NRC           FPRA
Williams, Dave Operations Support/OPS (NPO)
* Todd Hilsmeier     NRC           FPRA
Wernet, Todd Fire Chief Support/OPS (Fire Dept.)
* Garill Coles       PNNL           FPRA
Horstman, Bill Engr Lead CE/Engr (Seismic)  
* Bernard Litkett     NRC           SSD/CA
* Karl Bohlander     PNNL           SSD/CNFPE
* Brian Metzger       NRC           FPE/FM
* Kaushik Das         CNWRA         FM
* John Reynoso       NRC           RIV Observer
* Sarah Obadina       NRC           NRR Observer DCPPTeam
* Richardson, Michael Reg. Srvs     Lead/Licensing
* Baker, Steve       Engr           Audit Lead/Design Engr
* Hampshire, Dave     Engr           Lead FPE
* Hromyak, Dan       Engr           Sys Engr/FPE
* Arsene, Alex       Engr           FPE
* Baradaran, Rasool   PRA           Lead/PRA
* Pyo, John           PRA           Analyst/PRA
* Barber, Nathan     PRA           Analyst/PRA (Seismic)
* Shepard, Matt       PRA           Analyst/PRA
* lmbaratto, David   PRA           Analyst/PRA
* Montoya, Ariel     Engr           Lead EE
* Lodolo, Larry       Engr           SSD/CA
* Leatham, Russ       Engr           EE/EE
* Chitwood, Tony     Operations     Support/OPS (NPO)
* Williams, Dave     Operations     Support/OPS (NPO)
* Wernet, Todd       Fire Chief     Support/OPS (Fire Dept.)
* Horstman, Bill     Engr           Lead CE/Engr (Seismic)
Enclosure 2
 
NRC NFPA-805 Entrance Attendance Form Name Jay Robinson Bernard Litkett Karl Bohlander Sarah Obadina Garill Coles Brian Metzger Todd Hilsmeier Paul Lain Leslie Fields Alex Klein Hossein Hamzehee Bryan Sallee Carl Terry Dan Stermer Jan Nimick Jim Weslch Paula Gerffen Mike Dominguez Todd Wernei Lynn Walter Bob Velasquez Mike Quitter Michael Ginn Tom Baldwin Rasool Boradarn Stephen Baker Mikel Betts Laura Radle Andy Ratchford Lawrence Pulley Michael Richardson NozarJahanson Brewt Weggener Stan Harris Ted Stanton John Pyo Enclosure 3


NRC NFPA-805 Entrance Attendance Form Name                                  Name Jay Robinson                           Todd Wernei Bernard Litkett                       Lynn Walter Karl Bohlander                         Bob Velasquez Sarah Obadina                         Mike Quitter Garill Coles                           Michael Ginn Brian Metzger                         Tom Baldwin Todd Hilsmeier                         Rasool Boradarn Paul Lain                             Stephen Baker Leslie Fields                         Mikel Betts Alex Klein                             Laura Radle Hossein Hamzehee                       Andy Ratchford Bryan Sallee                           Lawrence Pulley Carl Terry                             Michael Richardson Dan Stermer                           NozarJahanson Jan Nimick                             Brewt Weggener Jim Weslch                            Stan Harris Paula Gerffen                          Ted Stanton Mike Dominguez                        John Pyo Enclosure 3
NRC NFPA-805 Entrance Attendance Form Name Jay Robinson Bernard Litkett Karl Bohlander Sarah Obadina Garill Coles Brian Metzger Todd Hilsmeier Paul Lain Leslie Fields Alex Klein Hossein Hamzehee Bryan Sallee Carl Terry Dan Stermer Jan Nimick Jim Weslch Paula Gerffen Mike Dominguez Todd Wernei Lynn Walter Bob Velasquez Mike Quitter Michael Ginn Tom Baldwin Rasool Boradarn Stephen Baker Mikel Betts Laura Radle Andy Ratchford Lawrence Pulley Michael Richardson NozarJahanson Brewt Weggener Stan Harris Ted Stanton John Pyo  


List of Documents Reviewed During the Audit
NRC NFPA-805 Entrance Attendance Form Name Name Jay Robinson Todd Wernei Bernard Litkett Lynn Walter Karl Bohlander Bob Velasquez Sarah Obadina Mike Quitter Garill Coles Michael Ginn Brian Metzger Tom Baldwin Todd Hilsmeier Rasool Boradarn Paul Lain Stephen Baker Leslie Fields Mikel Betts Alex Klein Laura Radle Hossein Hamzehee Andy Ratchford Bryan Sallee Lawrence Pulley Carl Terry Michael Richardson Dan Stermer NozarJahanson Jan Nimick Brewt Weggener Jim Weslch Stan Harris Paula Gerffen Ted Stanton Mike Dominguez John Pyo
* F.3.11 a Revision 0, Fire PRA Single Compartment Analysis for Units 1 and 2 The following appendix and attachments were reviewed:
* Appendix R.33
* Attachment 12
* Attachment 32
* F.3.11b Revision 2-Main Control Room Fire Modeling
* F.3.6 Revision 1-Extent of Thermoplastic Cables Employed at DCPP
* DCPP white paper related to compensatory measures
* F.3.11 c Revision 1-Fire PRA Multi Compartment Analysis for Units 1 and 2
* EPM-DP-FP-01 Revision 3-Detailed Fire Modeling
* F.3.11d Revision 0-Fire-lnduced Failure for Structural Steel in Units 1 and 2
* F.3.15 Revision 1-Uncertainty and Sensitivity Analysis
* R2044-311-001 Revision 3-Verification and Validation of Fire Modeling Tools and Approaches for Use in NFPA 805 and Fire PRA Applications Enclosure 4


NRC NFPA-805 Exit Attendance Form Name                              Name Jennifer Molina                  Alex Klein Steve Baker                      Hossein Hamzehee Rasool Baradaran                  J. S. Hyslop Matthew Shepard                  Paul Lain David lmbaratto                  Brian Metzger Mikel Betts                      Jay Robinson Nathan Barber                    Harry Barrett John Pyo                          Leslie Fields Bill Keulen                      Bernard Litkett Robert Oldenkamy                  Todd Hilsmeier Wayne Ginter                      Kaushik Das Barry Allen                      Karl Bohlander Jeff Summy                        Sarah Obadina Lou Fusco                        Garill Coles Todd Wernet                      Tom Baldwin Alex Arsene                      Glenn Goelzer David Hampshire                  Paul Bemis Fred Mowrer                      Andy Ratchford Ray Dyer                          John Lote Mark Crompton                    Phillippe Soenen Ted Stanton                      Ken Schrader Stan Harris                      J. D. Wilcox Dean Overland                    Robert Waltos Larry Parker David Nelson Madsen Paul Ouellette David Williams A J. Chitwood Michael Richardson Travis Weber Daniel Funk Enclosure 5
List of Documents Reviewed During the Audit F.3.11 a Revision 0, Fire PRA Single Compartment Analysis for Units 1 and 2 The following appendix and attachments were reviewed:
Appendix R.33
* 2
* 2 F.3.11b Revision 2-Main Control Room Fire Modeling F.3.6 Revision 1-Extent of Thermoplastic Cables Employed at DCPP DCPP white paper related to compensatory measures F.3.11 c Revision 1-Fire PRA Multi Compartment Analysis for Units 1 and 2 EPM-DP-FP-01 Revision 3-Detailed Fire Modeling F.3.11d Revision 0-Fire-lnduced Failure for Structural Steel in Units 1 and 2 F.3.15 Revision 1-Uncertainty and Sensitivity Analysis R2044-311-001 Revision 3-Verification and Validation of Fire Modeling Tools and Approaches for Use in NFPA 805 and Fire PRA Applications


walkdowns; technical presentations and briefing, and discussions focusing on the major topical areas. During the audit, team members met in smaller groups according to their area of expertise to focus on the RAls needed in accordance with the areas of the DCPP LAR review.
NRC NFPA-805 Exit Attendance Form Name Name Jennifer Molina Alex Klein Steve Baker Hossein Hamzehee Rasool Baradaran J. S. Hyslop Matthew Shepard Paul Lain David lmbaratto Brian Metzger Mikel Betts Jay Robinson Nathan Barber Harry Barrett John Pyo Leslie Fields Bill Keulen Bernard Litkett Robert Oldenkamy Todd Hilsmeier Wayne Ginter Kaushik Das Barry Allen Karl Bohlander Jeff Summy Sarah Obadina Lou Fusco Garill Coles Todd Wernet Tom Baldwin Alex Arsene Glenn Goelzer David Hampshire Paul Bemis Fred Mowrer Andy Ratchford Ray Dyer John Lote Mark Crompton Phillippe Soenen Ted Stanton Ken Schrader Stan Harris J. D. Wilcox Dean Overland Robert Waltos Larry Parker David Nelson Madsen Paul Ouellette David Williams A J. Chitwood Michael Richardson Travis Weber Daniel Funk walkdowns; technical presentations and briefing, and discussions focusing on the major topical areas. During the audit, team members met in smaller groups according to their area of expertise to focus on the RAls needed in accordance with the areas of the DCPP LAR review.
The licensee's staff provided plant walkdowns and presentations on FPE, post-fire safe shutdown circuit analysis, FPRA, and FM. NRC and licensee discussions focused on these subjects and on fire protection programmatic review.
The licensee's staff provided plant walkdowns and presentations on FPE, post-fire safe shutdown circuit analysis, FPRA, and FM. NRC and licensee discussions focused on these subjects and on fire protection programmatic review.
At the conclusion of the audit, the NRC's audit team participated in a summary exit meeting with the DCPP staff and management on July 17, 2014.
At the conclusion of the audit, the NRC's audit team participated in a summary exit meeting with the DCPP staff and management on July 17, 2014.
Please direct any inquiries to me at (301) 415-1564 or at Siva.Linqam@nrc.gov.
Please direct any inquiries to me at (301) 415-1564 or at Siva.Linqam@nrc.gov.
Sincerely, IRA/
Docket Nos. 50-275 and 50-323  
Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323


==Enclosures:==
==Enclosures:==
: 1. Audit Schedule
: 1. Audit Schedule
: 2. Audit Participants
: 2. Audit Participants Sincerely, IRA/
Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
: 3. Audit Participants at Entrance Meeting
: 3. Audit Participants at Entrance Meeting
: 4. Audit Documents
: 4. Audit Documents
: 5. Audit Participants at Exit Meeting cc w/enclosures: Distribution via Listserv DISTRIBUTION:
: 5. Audit Participants at Exit Meeting cc w/enclosures: Distribution via Listserv DISTRIBUTION:
PUBLIC                                             RidsNrrPMDiabloCanyon Resource LPL4-1 R/F                                         RidsRgn4MailCenter Resource RidsAcrsAcnw_MailCTR Resource                     LFields, NRR RidsNrrDorllpl4-1 Resource                         JRobinson, NRR RidsNrrDraAfpb Resource                            BMiller, NRR RidsNrrDraApla Resource                            Plain, NRR RidsNrrDssStsb Resource                            DFrumkin, NRR RidsNrrLAJBurkhardt Resource                      RGallucci, NRR ADAMS Access1on No.: ML15092A079                     *b1y memoran d um OFFICE     N RR/DORULPL4-1 /PM         NRR/DORULPL4-1/LA             NRR/DRA/AFPB/BC*
PUBLIC LPL4-1 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorllpl4-1 Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMDiabloCanyon Resource RidsRgn4MailCenter Resource LFields, NRR JRobinson, NRR BMiller, NRR Plain, NRR DFrumkin, NRR RGallucci, NRR ADAMS A ccess1on N o.: ML15092A079  
NAME       Slingam                     JBurkhardt                   AKlein DATE       4/6/15                       4/6/15                       3/26/15 OFFICE     NRR/DRA/APLA/BC*             NRR/DORULPL4-1/BC             NRR/DORULPL4-1/PM NAME       HHamzehee                   MMarkley                     Slingam DATE       3/26/15                     4/16/15                       4/16/15 OFFICIAL RECORD COPY}}
*b 1y memoran d um OFFICE N RR/DORULPL4-1 /PM NRR/DORULPL4-1/LA NRR/DRA/ AFPB/BC*
NAME Slingam JBurkhardt AKlein DATE 4/6/15 4/6/15 3/26/15 OFFICE NRR/DRA/APLA/BC*
NRR/DORULPL4-1/BC NRR/DORULPL4-1/PM NAME HHamzehee MMarkley Slingam DATE 3/26/15 4/16/15 4/16/15 OFFICIAL RECORD COPY}}

Latest revision as of 13:32, 10 January 2025

July 14-17, 2014 - Summary of Diablo Canyon, Units 1 and 2, Audit to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition)
ML15092A079
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/16/2015
From: Siva Lingam
Plant Licensing Branch IV
To:
Lingam S
References
TAC MF2333, TAC MF2334
Download: ML15092A079 (10)


Text

LICENSEE:

FACILITY:

SUBJECT:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

/spril 16, 2015 Pacific Gas and Electric Company Diablo Canyon Power Plant, Units 1 and 2

SUMMARY

OF DIABLO CANYON POWER PLANT, UNITS 1 AND 2, JULY 14-17, 2014, AUDIT ASSOCIATED WITH LICENSE AMENDMENT REQUEST TO TRANSITION TO THE NATIONAL FIRE PROTECTION ASSOCIATION 805 STANDARD (TAC NOS. MF2333 AND MF2334)

By letter dated June 26, 2013Property "Letter" (as page type) with input value "DCL-13-065, LAR-13-03 - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process. (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13196A139), as supplemented by letter dated October 3, 2013 (ADAMS Accession No. ML13277A457), Pacific Gas and Electric Company (the licensee) submitted a license amendment request (LAR) to transition the Diablo Canyon Power Plant, Units 1 and 2 (DCPP) fire protection licensing basis to Title 1 O of the Code of Federal Regulations (10 CFR), Section 50.48(c). Section 50.48(c) of 10 CFR endorses, with exceptions, the National Fire Protection Association (NFPA) Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," 2001 Edition (NFPA 805). The purpose of this summary is to document the results of an audit performed at DCPP associated with this LAR.

A review team consisting of U.S. Nuclear Regulatory Commission (NRG) staff and NRG contractors from the Pacific Northwest National Laboratory (PNNL) and Southwest Research Institute (SwRl)/Center for Nuclear Waste Regulatory Analyses (CNWRA) participated in a regulatory audit of DCPP in accordance with NRG Office of Nuclear Reactor Regulation (NRR),

Office Instruction LIC-111, "Regulatory Audits" (ADAMS Accession No. ML082900195), during July 14-17, 2014, in Avila Beach, California. The purpose of the audit was to understand what information the NRG staff needed to support its review of the LAR and to develop requests for additional information (RAls) as needed. The information submitted in support of the LAR is under final review, and the staff will request any additional information needed to support its review in accordance with NRR Office Instruction LIC-101, Revision 4, "License Amendment Review Procedures" (ADAMS Accession No. ML113200053).

The audit team consisted of 12 NRG staff, two PNNL staff, and one CNWRA staff. Enclosure 1 provides the schedule of activities during the audit. Enclosure 2 lists NRG staff, PNNL staff, CNWRA staff, and the licensee's staff and contractors that participated in the audit. Enclosure 3 provides a list of attendees at the entrance meeting. Enclosure 4 contains a list of documents reviewed by the team. Enclosure 5 provides a list of attendees at the exit meeting.

On July 14, 2014, the audit team held an entrance meeting with the DCPP management, staff, contractors, and a few industry representatives. Technical discussions at the audit were focused on five major topical areas: Fire Protection Engineering (FPE), Safe Shutdown/Circuit Analyses (SSD/CA), Fire Probabilistic Risk Assessment (FPRA), Fire Modeling (FM), and fire protection program programmatic review. The audit team participated in site tours, plant walkdowns; technical presentations and briefing, and discussions focusing on the major topical areas. During the audit, team members met in smaller groups according to their area of expertise to focus on the RAls needed in accordance with the areas of the DCPP LAR review.

The licensee's staff provided plant walkdowns and presentations on FPE, post-fire safe shutdown circuit analysis, FPRA, and FM. NRC and licensee discussions focused on these subjects and on fire protection programmatic review.

At the conclusion of the audit, the NRC's audit team participated in a summary exit meeting with the DCPP staff and management on July 17, 2014.

Please direct any inquiries to me at (301) 415-1564 or at Siva.Lingam@nrc.gov.

Docket Nos. 50-275 and 50-323

Enclosures:

1. Audit Schedule
2. Audit Participants
3. Audit Participants at Entrance Meeting
4. Audit Documents
5. Audit Participants at Exit Meeting cc w/enclosures: Distribution via Listserv Sincerely,

~<f*~

Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Schedule of Activities Monday, July 14, 2014 07:30 a.m.

08:15 a.m.

9:00 a.m.

9:45 a.m.

10:45 a.m.

12:30 p.m.

4:45 p.m.

Audit Commencement: NRC Audit Team members met at the Diablo Canyon Learning Services Simulator Building, established computer connections, and began DCPP site document reviews.

Introductions to site personnel Audit Entrance meeting: Plant Overview Discussions Virtual Tour Main Control Room (MCR) and Hot-Shutdown Panel (HSDP) Simulator tour Breakout Sessions for: Fire PRA (FPRA), Fire Modeling (FM), Safe Shutdown (SSD), and FPE Presentation: Attachment S Modifications Continued Sessions: FPRA, FM, SSD, and FPE New Breakout Sessions: MCR Abandonment, Nuclear Safety Capability Assessment (NSCA), Multiple Spurious Operations (MSO), Recovery Actions (RAs), Radioactive Release (RR), Non-Power Operations (NPO)

Licensee Wrap Up Tuesday, July 15, 2014 8:00 a.m.

12:30 a.m.

1:30 p.m.

3:15 p.m.

4:45 p.m.

Plant Tour - [safety briefing, break into three tour groups]

Combined FPRA/FM Breakout FM (CFAST) Presentation FPRA Breakout Licensee Wrap Up Wednesday, July 16, 2014 8:30 a.m.

Joint FM/PRA Breakout - MCR Abandonment 10:00 a.m.

Programmatic Breakout Session 12:30 p.m.

Fire PRA and Fire Modeling Breakout Sessions 5:00 p.m.

Licensee Wrap Up Thursday, July 17, 2014 8:00 a.m.

10:30 a.m.

11 :00 a.m.

2:30 p.m.

Discussions and Continued Breakouts Combined Group Breakout FPRA Breakout Audit Exit Meeting

List of Participants NRC Audit Team

  • Sarah Obadina NRC NRR Observer DCPPTeam Richardson, Michael Reg. Srvs Lead/Licensing
  • Baker, Steve Engr Audit Lead/Design Engr Hampshire, Dave Engr Lead FPE Hromyak, Dan Engr Sys Engr/FPE
  • Arsene, Alex Engr FPE Baradaran, Rasool PRA Lead/PRA Pyo, John PRA Analyst/PRA Barber, Nathan PRA Analyst/PRA (Seismic)

Shepard, Matt PRA Analyst/PRA lmbaratto, David PRA Analyst/PRA Montoya, Ariel Engr Lead EE Lodolo, Larry Engr SSD/CA Leatham, Russ Engr EE/EE

  • Chitwood, Tony Operations Support/OPS (NPO)

Williams, Dave Operations Support/OPS (NPO)

Wernet, Todd Fire Chief Support/OPS (Fire Dept.)

Horstman, Bill Engr Lead CE/Engr (Seismic)

NRC NFPA-805 Entrance Attendance Form Name Jay Robinson Bernard Litkett Karl Bohlander Sarah Obadina Garill Coles Brian Metzger Todd Hilsmeier Paul Lain Leslie Fields Alex Klein Hossein Hamzehee Bryan Sallee Carl Terry Dan Stermer Jan Nimick Jim Weslch Paula Gerffen Mike Dominguez Todd Wernei Lynn Walter Bob Velasquez Mike Quitter Michael Ginn Tom Baldwin Rasool Boradarn Stephen Baker Mikel Betts Laura Radle Andy Ratchford Lawrence Pulley Michael Richardson NozarJahanson Brewt Weggener Stan Harris Ted Stanton John Pyo

NRC NFPA-805 Entrance Attendance Form Name Name Jay Robinson Todd Wernei Bernard Litkett Lynn Walter Karl Bohlander Bob Velasquez Sarah Obadina Mike Quitter Garill Coles Michael Ginn Brian Metzger Tom Baldwin Todd Hilsmeier Rasool Boradarn Paul Lain Stephen Baker Leslie Fields Mikel Betts Alex Klein Laura Radle Hossein Hamzehee Andy Ratchford Bryan Sallee Lawrence Pulley Carl Terry Michael Richardson Dan Stermer NozarJahanson Jan Nimick Brewt Weggener Jim Weslch Stan Harris Paula Gerffen Ted Stanton Mike Dominguez John Pyo

List of Documents Reviewed During the Audit F.3.11 a Revision 0, Fire PRA Single Compartment Analysis for Units 1 and 2 The following appendix and attachments were reviewed:

Appendix R.33

  • 2
  • 2 F.3.11b Revision 2-Main Control Room Fire Modeling F.3.6 Revision 1-Extent of Thermoplastic Cables Employed at DCPP DCPP white paper related to compensatory measures F.3.11 c Revision 1-Fire PRA Multi Compartment Analysis for Units 1 and 2 EPM-DP-FP-01 Revision 3-Detailed Fire Modeling F.3.11d Revision 0-Fire-lnduced Failure for Structural Steel in Units 1 and 2 F.3.15 Revision 1-Uncertainty and Sensitivity Analysis R2044-311-001 Revision 3-Verification and Validation of Fire Modeling Tools and Approaches for Use in NFPA 805 and Fire PRA Applications

NRC NFPA-805 Exit Attendance Form Name Name Jennifer Molina Alex Klein Steve Baker Hossein Hamzehee Rasool Baradaran J. S. Hyslop Matthew Shepard Paul Lain David lmbaratto Brian Metzger Mikel Betts Jay Robinson Nathan Barber Harry Barrett John Pyo Leslie Fields Bill Keulen Bernard Litkett Robert Oldenkamy Todd Hilsmeier Wayne Ginter Kaushik Das Barry Allen Karl Bohlander Jeff Summy Sarah Obadina Lou Fusco Garill Coles Todd Wernet Tom Baldwin Alex Arsene Glenn Goelzer David Hampshire Paul Bemis Fred Mowrer Andy Ratchford Ray Dyer John Lote Mark Crompton Phillippe Soenen Ted Stanton Ken Schrader Stan Harris J. D. Wilcox Dean Overland Robert Waltos Larry Parker David Nelson Madsen Paul Ouellette David Williams A J. Chitwood Michael Richardson Travis Weber Daniel Funk walkdowns; technical presentations and briefing, and discussions focusing on the major topical areas. During the audit, team members met in smaller groups according to their area of expertise to focus on the RAls needed in accordance with the areas of the DCPP LAR review.

The licensee's staff provided plant walkdowns and presentations on FPE, post-fire safe shutdown circuit analysis, FPRA, and FM. NRC and licensee discussions focused on these subjects and on fire protection programmatic review.

At the conclusion of the audit, the NRC's audit team participated in a summary exit meeting with the DCPP staff and management on July 17, 2014.

Please direct any inquiries to me at (301) 415-1564 or at Siva.Linqam@nrc.gov.

Docket Nos. 50-275 and 50-323

Enclosures:

1. Audit Schedule
2. Audit Participants Sincerely, IRA/

Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

3. Audit Participants at Entrance Meeting
4. Audit Documents
5. Audit Participants at Exit Meeting cc w/enclosures: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL4-1 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorllpl4-1 Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMDiabloCanyon Resource RidsRgn4MailCenter Resource LFields, NRR JRobinson, NRR BMiller, NRR Plain, NRR DFrumkin, NRR RGallucci, NRR ADAMS A ccess1on N o.: ML15092A079

  • b 1y memoran d um OFFICE N RR/DORULPL4-1 /PM NRR/DORULPL4-1/LA NRR/DRA/ AFPB/BC*

NAME Slingam JBurkhardt AKlein DATE 4/6/15 4/6/15 3/26/15 OFFICE NRR/DRA/APLA/BC*

NRR/DORULPL4-1/BC NRR/DORULPL4-1/PM NAME HHamzehee MMarkley Slingam DATE 3/26/15 4/16/15 4/16/15 OFFICIAL RECORD COPY