ML15231A837: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 9: Line 9:
| docket = 05000346
| docket = 05000346
| license number =  
| license number =  
| contact person = Reeser D W
| contact person = Reeser D
| package number = ML15217A099
| package number = ML15217A099
| document type = License-Operator, Part 55 Examination Related Material
| document type = License-Operator, Part 55 Examination Related Material
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In
{{#Wiki_filter:NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/15/15 thru 6/26/15 __
-Plant Systems Outline Form ES-301-2 Facility:         Davis Besse Date of Examination:
Exam Level: RO SRO(I) SRO(U)
__6/15/15 thru 6/26/15
Operating Test No.: __ DB NRC 2015__
__ Exam Level: RO   SRO(I)     SRO(U)         Operating Test No.:
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
__ DB NRC 2015__ Control Room Systems
System / JPM Title Type Code*
@ (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U) System / JPM Title Type Code*
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)
                      (JPM New)
(JPM New)
N, A, S 1 S2 - (004) / Recover from Letdown Isolation on Hi gh Temp                       (JPM 017)
N, A, S 1
D, S 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open
S2 - (004) / Recover from Letdown Isolation on High Temp (JPM 017)
)        (JPM New)
D, S 2
N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path  
S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open)
- Trip Reactor)
(JPM New)
                      (JPM 020)
N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path - Trip Reactor)
D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak
(JPM 020)
)          (JPM New)
D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak)
N, A, S, EN 5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate (JPM 017)
(JPM New)
D, S 6 S7 - (016) / Exchange RC Flow Inputs from RPS Ch1 to RPS Ch2 (JPM 048)
N, A, S, EN 5
D, S 7 S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start
S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate (JPM 017)
)          (JPM 162)
D, S 6
D, A, S, L 8 In-Plant Systems
S7 - (016) / Exchange RC Flow Inputs from RPS Ch1 to RPS Ch2 (JPM 048)
@ (3 for RO); (3 for SRO
D, S 7
-I); (3 or 2 for SRO
S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start)
-U) P1 - (004) / Perform Att
(JPM 162)
. 5 of Control Room Evacuation
D, A, S, L 8
 
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
DB-OP-02508, CTRM Evacuation (JPM 048) D, E, R 2 P2 - (064) / Restore EDG to supply 4160 Essential Bus
P1 - (004) / Perform Att. 5 of Control Room Evacuation DB-OP-02508, CTRM Evacuation (JPM 048)
 
D, E, R 2
DB-OP-02538, Loss of D2P and DBP (JPM 079)
P2 - (064) / Restore EDG to supply 4160 Essential Bus DB-OP-02538, Loss of D2P and DBP (JPM 079)
D, E 6 P3 - (078) / Bypass and isolate the in service air dryers DB-OP-02528, IA Malfunctions           (JPM 078)
D, E 6
D, E 8 @ All RO and SRO control room (and in
P3 - (078) / Bypass and isolate the in service air dryers DB-OP-02528, IA Malfunctions (JPM 078)
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
D, E 8
*Type Codes Criteria for RO
All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.  
/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1}}
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3     / / > 1 (control room system)
    (randomly selected)}}

Latest revision as of 09:23, 10 January 2025

2015 Davis-Besse Nuclear Power Station Initial License Examination ES-301-2 RO Systems Outline
ML15231A837
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/06/2015
From:
NRC/RGN-III
To:
FirstEnergy Nuclear Operating Co
Reeser D
Shared Package
ML15217A099 List:
References
Download: ML15231A837 (1)


Text

NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/15/15 thru 6/26/15 __

Exam Level: RO SRO(I) SRO(U)

Operating Test No.: __ DB NRC 2015__

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)

System / JPM Title Type Code*

Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)

(JPM New)

N, A, S 1

S2 - (004) / Recover from Letdown Isolation on High Temp (JPM 017)

D, S 2

S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open)

(JPM New)

N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path - Trip Reactor)

(JPM 020)

D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak)

(JPM New)

N, A, S, EN 5

S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate (JPM 017)

D, S 6

S7 - (016) / Exchange RC Flow Inputs from RPS Ch1 to RPS Ch2 (JPM 048)

D, S 7

S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start)

(JPM 162)

D, A, S, L 8

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1 - (004) / Perform Att. 5 of Control Room Evacuation DB-OP-02508, CTRM Evacuation (JPM 048)

D, E, R 2

P2 - (064) / Restore EDG to supply 4160 Essential Bus DB-OP-02538, Loss of D2P and DBP (JPM 079)

D, E 6

P3 - (078) / Bypass and isolate the in service air dryers DB-OP-02528, IA Malfunctions (JPM 078)

D, E 8

All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1