| number = ML16211A184
| number = ML16211A184
| issue date = 07/28/2016
| issue date = 07/28/2016
| title = Arkansas Nuclear One - NRC Inspection Report 05000313/2016002 and 05000368/2016002, April 1, 2016 through June 30, 2016
| title = NRC Inspection Report 05000313/2016002 and 05000368/2016002, April 1, 2016 Through June 30, 2016
| author name = O'Keefe N F
| author name = O'Keefe N
| author affiliation = NRC/RGN-IV/DRP/RPB-E
| author affiliation = NRC/RGN-IV/DRP/RPB-E
| addressee name = Warren C
| addressee name = Warren C
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:July 28, 2016
[[Issue date::July 28, 2016]]


Clay Warren, Acting Site Vice President Arkansas Nuclear One Entergy Operations, Inc. 1448 SR 333 Russellville, AR 72802-0967
==SUBJECT:==
ARKANSAS NUCLEAR ONE - NRC INSPECTION REPORT 05000313/2016002 and 05000368/2016002


SUBJECT: ARKANSAS NUCLEAR ONE - NRC INSPECTION REPORT 05000313/2016002 and 05000368/2016002
==Dear Mr. Warren:==
On June 30, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Arkansas Nuclear One facility, Units 1 and 2. On July 5, 2016, the NRC inspectors discussed the results of this inspection with Mr. J. Browning and other members of your staff.
 
Inspectors documented the results of this inspection in the enclosed inspection report.
 
NRC inspectors documented two findings of very low safety significance (Green) in this report.


==Dear Mr. Warren:==
These findings did not involve a violation of NRC requirements. Further, inspectors documented a licensee-identified violation which was determined to be of very low safety significance in this report. The NRC is treating these violations as non-cited violations (NCVs)
On June 30, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Arkansas Nuclear One facility, Units 1 and 2. On July 5, 2016, the NRC inspectors discussed the results of this inspection with Mr. J. Browning and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report. NRC inspectors documented two findings of very low safety significance (Green) in this report. These findings did not involve a violation of NRC requirements. Further, inspectors documented a licensee-identified violation which was determined to be of very low safety significance in this report. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the NRC Enforcement Policy. If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at Arkansas Nuclear One. If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at Arkansas Nuclear One. On June 30, 2016, the NRC completed a quarterly performance review of Arkansas Nuclear One. The NRC determined that continued plant operation was acceptable and oversight in the Multiple/Repetitive Degraded Cornerstone of the Reactor Oversight Process Action Matrix remained appropriate. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
consistent with Section 2.3.2.a of the NRC Enforcement Policy.


Sincerely,/RA/ Neil O'Keefe, Branch Chief Project Branch E Division of Reactor Projects Docket Nos. 50-313 and 50-368 License Nos. DRP-51 and NPF-6
If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at Arkansas Nuclear One.


===Enclosure:===
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at Arkansas Nuclear One.
Inspection Report 05000313/2016002 and 05000368/2016002 w/


===Attachment:===
On June 30, 2016, the NRC completed a quarterly performance review of Arkansas Nuclear One. The NRC determined that continued plant operation was acceptable and oversight in the Multiple/Repetitive Degraded Cornerstone of the Reactor Oversight Process Action Matrix remained appropriate. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Supplemental Information In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/ Neil O'Keefe, Branch Chief Project Branch E Division of Reactor Projects Docket Nos. 50-313 and 50-368 License Nos. DRP-51 and NPF-6  
Sincerely,
/RA/
Neil OKeefe, Branch Chief Project Branch E Division of Reactor Projects Docket Nos. 50-313 and 50-368 License Nos. DRP-51 and NPF-6  


===Enclosure:===
===Enclosure:===
Inspection Report 05000313/2016002 and 05000368/2016002 w/  
Inspection Report 05000313/2016002 and 05000368/2016002 w/ Attachment: Supplemental Information In a
 
REGION IV==
Docket:
05000313; 05000368 License:
DPR-51; NPF-6 Report:
05000313/2016002; 05000368/2016002 Licensee:
Entergy Operations, Inc.
 
Facility:
Arkansas Nuclear One, Units 1 and 2 Location:
Junction of Highway 64 West and Highway 333 South Russellville, Arkansas Dates:
April 1 through June 30, 2016 Inspectors: B. Tindell, Senior Resident Inspector A. Barrett, Resident Inspector M. Tobin, Resident Inspector Approved By:
Neil OKeefe Chief, Project Branch E Division of Reactor Projects


===Attachment:===
- 2 -  
Supplemental Information DISTRIBUTION: See next page ORIGINAL RECORD COPY ADAMS ACCESSION NUMBER: SUNSI Review By: NFO ADAMS Yes No Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE SRI:DRP/E RI:DRP/E RI:DRP/E DRS/EB1 DRS/EB2 DRS/OB NAME BTindell ABarrett MTobin TRFarnholtz GWerner VGaddy SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ DATE 07/26/16 7/27/16 7/26/16 7/26/16 07/26/16 7/27/16 OFFICE DRS/PSB2 DRS/IPST BC/DRP/E NAME HGepford THipschman NO'Keefe SIGNATURE /RA/ /RA/ /RA/ DATE 7/26/16 7/25/16 7/27/16 Letter to Clay Warren from Neil O'Keefe dated July 28, 2016 SUBJECT: ARKANSAS NUCLEAR ONE - NRC INTEGRATED INSPECTION REPORT 05000313/2016002 and 05000368/2016002 DISTRIBUTION: Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) Senior Resident Inspector (Brian.Tindell@nrc.gov) Resident Inspector (Margaret.Tobin@nrc.gov) Resident Inspector (Andy.Barrett@nrc.gov) Branch Chief, DRP/E (Neil.OKeefe@nrc.gov) Senior Project Engineer, DRP/E (John.Dixon@nrc.gov) Project Engineer, DRP/E (Brian.Correll@nrc.gov) Project Engineer, DRP/E (Jackson.Choate@nrc.gov) Administrative Assistant (Mary.Bennett@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (Stephen.Koenick@nrc.gov) Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket: 05000313; 05000368 License: DPR-51; NPF-6 Report: 05000313/2016002; 05000368/2016002 Licensee: Entergy Operations, Inc. Facility: Arkansas Nuclear One, Units 1 and 2 Location: Junction of Highway 64 West and Highway 333 South Russellville, Arkansas Dates: April 1 through June 30, 2016 Inspectors: B. Tindell, Senior Resident Inspector A. Barrett, Resident Inspector M. Tobin, Resident Inspector Approved By: Neil O'Keefe Chief, Project Branch E Division of Reactor Projects


=SUMMARY=
=SUMMARY=
IR 05000313/2016002; 05000368/2016002; 04/01/2016 - 06/30/2016; Arkansas Nuclear One, Units 1 and 2, Integrated Inspection Report; Maintenance Effectiveness, Problem Identification and Resolution. The inspection activities described in this report were performed between April 1 and June 30, 2016, by the resident inspectors at Arkansas Nuclear One. Two findings of very low safety significance (Green) are documented in this report. None of these findings involved violations of NRC requirements. Additionally, NRC inspectors documented a licensee-identified violation of very low safety significance. The significance of inspection findings is indicated by their color (Green, White, Yellow, or Red), which is determined using Inspection Manual Chapter 0609, "Significance Determination Process.Their cross-cutting aspects are determined using Inspection Manual Chapter 0310, "Aspects within the Cross-Cutting Areas.Violations of NRC requirements are dispositioned in accordance with the NRC Enforcement Policy. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process."
IR 05000313/2016002; 05000368/2016002; 04/01/2016 - 06/30/2016; Arkansas Nuclear One,  
 
Units 1 and 2, Integrated Inspection Report; Maintenance Effectiveness, Problem Identification and Resolution.
 
The inspection activities described in this report were performed between April 1 and June 30, 2016, by the resident inspectors at Arkansas Nuclear One. Two findings of very low safety significance (Green) are documented in this report. None of these findings involved violations of NRC requirements. Additionally, NRC inspectors documented a licensee-identified violation of very low safety significance. The significance of inspection findings is indicated by their color (Green, White, Yellow, or Red), which is determined using Inspection Manual Chapter 0609, Significance Determination Process. Their cross-cutting aspects are determined using Inspection Manual Chapter 0310, Aspects within the Cross-Cutting Areas.
 
Violations of NRC requirements are dispositioned in accordance with the NRC Enforcement Policy. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process.


===Cornerstone: Initiating Events===
===Cornerstone: Initiating Events===
*
: '''Green.'''
: '''Green.'''
The inspectors identified a finding for the failure to incorporate vendor instructions in a work order. Specifically, the licensee exceeded the vendor specified torque values and performed the work with the component in service, contrary to vendor cautions, breaking the glass, wetting the auxiliary feedwater pump, and necessitating the unplanned shutdown of the main feedwater pump. The licensee replaced the ruptured sight glass and repaired and tested the wetted components. The licensee documented the issue in Condition Report CR-ANO-2-2015-04832. The failure to incorporate vendor instructions in a work order is a performance deficiency. The finding is more than minor because it adversely affected the procedure quality attribute of the mitigating systems cornerstone and adversely affected the cornerstone objective to ensure the reliability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, the performance deficiency resulted in the Unit 2 auxiliary feedwater pump and main feedwater pump B being rendered unavailable. The inspectors evaluated the finding with NRC Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated June 19, 2012, Exhibit 2, "Mitigating Systems Screening Questions.The inspectors determined that the finding required a detailed risk evaluation because the finding involved an actual loss of function of auxiliary feedwater and one train of main feedwater, designated as having high safety significance in accordance with the licensee's maintenance rule program, for greater than 24 hours. A senior reactor analyst performed a detailed risk evaluation and determined that the increase in core damage frequency was 1.3E-7/year (Green). The analyst assumed that all feedwater pumps were available until the time of the leak and that any increase in core damage frequency resulted from the unavailability of the pumps after the leak. The emergency feedwater system remained available to mitigate the increase in core damage frequency of this finding. The inspectors determined this finding has a cross-cutting aspect in the human performance area of Work Management because the primary cause of the performance deficiency involved the failure to identify and manage risk commensurate to the work and the need for coordination with different groups or job activities (Section 1R12). [H.5]  
The inspectors identified a finding for the failure to incorporate vendor instructions in a work order. Specifically, the licensee exceeded the vendor specified torque values and performed the work with the component in service, contrary to vendor cautions, breaking the glass, wetting the auxiliary feedwater pump, and necessitating the unplanned shutdown of the main feedwater pump. The licensee replaced the ruptured sight glass and repaired and tested the wetted components. The licensee documented the issue in Condition Report CR-ANO-2-2015-04832.
 
The failure to incorporate vendor instructions in a work order is a performance deficiency.
 
The finding is more than minor because it adversely affected the procedure quality attribute of the mitigating systems cornerstone and adversely affected the cornerstone objective to ensure the reliability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, the performance deficiency resulted in the Unit 2 auxiliary feedwater pump and main feedwater pump B being rendered unavailable.
 
The inspectors evaluated the finding with NRC Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012,
Exhibit 2, Mitigating Systems Screening Questions. The inspectors determined that the finding required a detailed risk evaluation because the finding involved an actual loss of function of auxiliary feedwater and one train of main feedwater, designated as having high safety significance in accordance with the licensees maintenance rule program, for greater than 24 hours. A senior reactor analyst performed a detailed risk evaluation and determined that the increase in core damage frequency was 1.3E-7/year (Green). The analyst assumed that all feedwater pumps were available until the time of the leak and that any increase in core damage frequency resulted from the unavailability of the pumps after the leak. The emergency feedwater system remained available to mitigate the increase in core damage frequency of this finding. The inspectors determined this finding has a cross-cutting aspect in the human performance area of Work Management because the primary cause of the performance deficiency involved the failure to identify and manage risk commensurate to the work and the need for coordination with different groups or job activities (Section 1R12).
 
[H.5]  


===Cornerstone: Mitigating Systems===
===Cornerstone: Mitigating Systems===
*
: '''Green.'''
: '''Green.'''
The inspectors documented a self-revealing finding for failure to clean the main feedwater turbine lube oil reservoir. Specifically, the main feedwater turbine lube oil reservoir had not been cleaned since 2006, causing clogged filters and low main feedwater turbine bearing oil pressure on February 5, 2016. The licensee entered this finding into their corrective action program as Condition Report CR-ANO-2-2016-00470 and implemented the necessary preventive maintenance. The failure to perform preventive maintenance to ensure cleanliness on the main feedwater pump turbine bearing oil reservoir as required by the preventive maintenance program is a performance deficiency. The performance deficiency is more than minor because it impacted the equipment performance attribute and adversely affected the initiating events cornerstone objective to limit the likelihood of events that upset plant stability and challenged critical safety functions during shutdown as well as power operations.
The inspectors documented a self-revealing finding for failure to clean the main feedwater turbine lube oil reservoir. Specifically, the main feedwater turbine lube oil reservoir had not been cleaned since 2006, causing clogged filters and low main feedwater turbine bearing oil pressure on February 5, 2016. The licensee entered this finding into their corrective action program as Condition Report CR-ANO-2-2016-00470 and implemented the necessary preventive maintenance.
 
The failure to perform preventive maintenance to ensure cleanliness on the main feedwater pump turbine bearing oil reservoir as required by the preventive maintenance program is a performance deficiency. The performance deficiency is more than minor because it impacted the equipment performance attribute and adversely affected the initiating events cornerstone objective to limit the likelihood of events that upset plant stability and challenged critical safety functions during shutdown as well as power operations.
 
Specifically, the performance deficiency resulted in operators lowering reactor power and rendered a main feedwater pump unavailable. Using NRC Inspection Manual Chapter 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, the inspectors screened the finding as having very low safety significance because the finding affected a transient initiator but did not result in a reactor trip. The inspectors determined that this finding did not have a cross-cutting aspect because the most significant contributor did not reflect current licensee performance. Specifically, the maintenance strategy changed in 2009 (Section 4OA2.2).
 
===Licensee-Identified Violations===
A violation of very low safety significance that was identified by the licensee has been reviewed by the inspectors. Corrective actions taken or planned by the licensee have been entered into the licensees corrective action program. This violation and associated corrective action tracking numbers are listed in Section 4OA7 of this report.


Specifically, the performance deficiency resulted in operators lowering reactor power and rendered a main feedwater pump unavailable. Using NRC Inspection Manual Chapter 0609 Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated June 19, 2012, the inspectors screened the finding as having very low safety significance because the finding affected a transient initiator but did not result in a reactor trip. The inspectors determined that this finding did not have a cross-cutting aspect because the most significant contributor did not reflect current licensee performance. Specifically, the maintenance strategy changed in 2009 (Section 4OA2.2).
=PLANT STATUS=


===  Licensee-Identified Violations===
Unit 1 operated at 100 percent power for the entire inspection period.
A violation of very low safety significance that was identified by the licensee has been reviewed by the inspectors. Corrective actions taken or planned by the licensee have been entered into the licensee's corrective action program. This violation and associated corrective action tracking numbers are listed in Section 4OA7 of this report.


==PLANT STATUS==
Unit 2 began the period at 100 percent power. On May 26, 2016, operators reduced power to approximately 10 percent reactor power and removed the main turbine from service to repair an electrohydraulic control fluid leak associated with the turbine controls. On May 27, 2016, the plant returned to 100 percent power and remained at 100 percent power through the end of the inspection period.
Unit 1 operated at 100 percent power for the entire inspection period. Unit 2 began the period at 100 percent power. On May 26, 2016, operators reduced power to approximately 10 percent reactor power and removed the main turbine from service to repair an electrohydraulic control fluid leak associated with the turbine controls. On May 27, 2016, the plant returned to 100 percent power and remained at 100 percent power through the end of the inspection period.


=REPORT DETAILS=
REPORT DETAILS


==REACTOR SAFETY==
==REACTOR SAFETY==
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity {{a|1R04}}
{{a|1R04}}
 
==1R04 Equipment Alignment==
==1R04 Equipment Alignment==
{{IP sample|IP=IP 71111.04}}
{{IP sample|IP=IP 71111.04}}
===.1 Partial Walkdown===
===.1 Partial Walkdown===
====a. Inspection Scope====
The inspectors performed partial system walk-downs of the following risk-significant systems:
* June 9, 2016, Units 1 and 2, alternate ac diesel generator jacket waterJune 24, 2016, Unit 2, emergency diesel generator B electrical lineup
* June 28, 2016, Unit 2, turbine driven emergency feedwater valve lineup
The inspectors reviewed the licensees procedures and system design information to determine the correct lineup for the systems. They visually verified that critical portions of the systems were correctly aligned for the existing plant configuration.


====a. Inspection Scope====
These activities constituted three partial system walk-down samples as defined in Inspection Procedure 71111.04.
The inspectors performed partial system walk-downs of the following risk-significant systems:  June 9, 2016, Units 1 and 2, alternate ac diesel generator jacket waterJune 24, 2016, Unit 2, emergency diesel generator B electrical lineup    June 28, 2016, Unit 2, turbine driven emergency feedwater valve lineup  The inspectors reviewed the licensee's procedures and system design information to determine the correct lineup for the systems. They visually verified that critical portions of the systems were correctly aligned for the existing plant configuration. These activities constituted three partial system walk-down samples as defined in Inspection Procedure 71111.04.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R05}}
{{a|1R05}}
 
==1R05 Fire Protection==
==1R05 Fire Protection==
{{IP sample|IP=IP 71111.05}}
{{IP sample|IP=IP 71111.05}}
===.1 Quarterly Inspection===
===.1 Quarterly Inspection===
====a. Inspection Scope====
The inspectors evaluated the licensees fire protection program for operational status and material condition. The inspectors focused their inspection on four plant areas important to safety:
* June 9, 2016, Units 1 and 2, Fire Zone NA, alternate ac diesel generator building
* June 23, 2016, Unit 2, Fire Zone 2154-E, control element drive mechanism room
* June 24, 2016, Unit 2, Fire Zone 2094-Q, emergency diesel generator B
* June 28, 2016, Unit 1, Fire Zone 97-R, cable spreading room


====a. Inspection Scope====
For each area, the inspectors evaluated the fire plan against defined hazards and defense-in-depth features in the licensees fire protection program. The inspectors evaluated control of transient combustibles and ignition sources, fire detection and suppression systems, manual firefighting equipment and capability, passive fire protection features, and compensatory measures for degraded conditions.
The inspectors evaluated the licensee's fire protection program for operational status and material condition. The inspectors focused their inspection on four plant areas important to safety:
 
June 9, 2016, Units 1 and 2, Fire Zone NA, alternate ac diesel generator building  June 23, 2016, Unit 2, Fire Zone 2154-E, control element drive mechanism room  June 24, 2016, Unit 2, Fire Zone 2094-Q, emergency diesel generator B  June 28, 2016, Unit 1, Fire Zone 97-R, cable spreading room  For each area, the inspectors evaluated the fire plan against defined hazards and defense-in-depth features in the licensee's fire protection program. The inspectors evaluated control of transient combustibles and ignition sources, fire detection and suppression systems, manual firefighting equipment and capability, passive fire protection features, and compensatory measures for degraded conditions. These activities constituted four quarterly inspection samples, as defined in Inspection Procedure 71111.05.
These activities constituted four quarterly inspection samples, as defined in Inspection Procedure 71111.05.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R06}}
{{a|1R06}}
 
==1R06 Flood Protection Measures==
==1R06 Flood Protection Measures==
{{IP sample|IP=IP 71111.06}}
{{IP sample|IP=IP 71111.06}}


====a. Inspection Scope====
====a. Inspection Scope====
On May 16, 2016, the inspectors completed an inspection of the station's ability to mitigate flooding due to internal causes. After reviewing the licensee's flooding analysis, the inspectors chose the Units 1 and 2 diesel fuel oil storage vault, which contains risk-significant structures, systems, and components (SSCs) susceptible to flooding. The inspectors reviewed plant design features and licensee procedures for coping with internal flooding. The inspectors walked down the selected areas to inspect the design features, including the material condition of seals, drains, and flood barriers. The inspectors evaluated whether operator actions credited for flood mitigation could be successfully accomplished. These activities constitute completion of one flood protection measures sample, as defined in Inspection Procedure 71111.06.
On May 16, 2016, the inspectors completed an inspection of the stations ability to mitigate flooding due to internal causes. After reviewing the licensees flooding analysis, the inspectors chose the Units 1 and 2 diesel fuel oil storage vault, which contains risk-significant structures, systems, and components (SSCs) susceptible to flooding.
 
The inspectors reviewed plant design features and licensee procedures for coping with internal flooding. The inspectors walked down the selected areas to inspect the design features, including the material condition of seals, drains, and flood barriers. The inspectors evaluated whether operator actions credited for flood mitigation could be successfully accomplished.
 
These activities constitute completion of one flood protection measures sample, as defined in Inspection Procedure 71111.06.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R11}}
{{a|1R11}}
 
==1R11 Licensed Operator Requalification Program and Licensed Operator Performance==
==1R11 Licensed Operator Requalification Program and Licensed Operator Performance==
{{IP sample|IP=IP 71111.11}}
{{IP sample|IP=IP 71111.11}}
===.1 Review of Licensed Operator Requalification===
===.1 Review of Licensed Operator Requalification===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors observed simulator testing and training for licensed operators. The inspectors assessed the performance of the operators and the evaluators' critique of their performance. The inspectors also assessed the modeling and performance of the simulator during the requalification activities.
The inspectors observed simulator testing and training for licensed operators. The inspectors assessed the performance of the operators and the evaluators critique of their performance. The inspectors also assessed the modeling and performance of the simulator during the requalification activities.
* May 17, 2016, Unit 1, evaluated simulator scenario performed by operating crew
* May 18, 2016, Unit 2, simulator training for operating crew


May 17, 2016, Unit 1, evaluated simulator scenario performed by operating crew  May 18, 2016, Unit 2, simulator training for operating crew  These activities constitute completion of two quarterly licensed operator requalification program samples, as defined in Inspection Procedure 71111.11.
These activities constitute completion of two quarterly licensed operator requalification program samples, as defined in Inspection Procedure 71111.11.


====b. Findings====
====b. Findings====
Line 111: Line 169:


===.2 Review of Licensed Operator Performance===
===.2 Review of Licensed Operator Performance===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors observed the performance of on-shift licensed operators in the Units 1 and 2 main control rooms. At the time of the observations, the plants were in a period of heightened activity and risk. The inspectors observed the operators' performance of the following activities:   May 26, 2016, Unit 2, control room observation of operators connecting the main turbine to the grid June 29, 2016, Unit 1, control room observation of emergency diesel generator monthly surveillance   In addition, the inspectors assessed the operators' adherence to plant procedures, including the conduct of operations procedure and other operations department policies.
The inspectors observed the performance of on-shift licensed operators in the Units 1 and 2 main control rooms. At the time of the observations, the plants were in a period of heightened activity and risk. The inspectors observed the operators performance of the following activities:
* May 26, 2016, Unit 2, control room observation of operators connecting the main turbine to the grid
* June 29, 2016, Unit 1, control room observation of emergency diesel generator monthly surveillance In addition, the inspectors assessed the operators adherence to plant procedures, including the conduct of operations procedure and other operations department policies.


These activities constitute completion of two quarterly licensed operator performance samples, as defined in Inspection Procedure 71111.11.
These activities constitute completion of two quarterly licensed operator performance samples, as defined in Inspection Procedure 71111.11.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R12}}
{{a|1R12}}
 
==1R12 Maintenance Effectiveness==
==1R12 Maintenance Effectiveness==
{{IP sample|IP=IP 71111.12}}
{{IP sample|IP=IP 71111.12}}


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed one instance of degraded performance or condition of SSCs:   June 6, 2016, Unit 2, main feedwater seal cooling sight glass failure The inspectors reviewed the extent of condition of possible common cause SSC failures and evaluated the adequacy of the licensee's corrective actions. The inspectors reviewed the licensee's work practices to evaluate whether these may have played a role in the degradation of the SSCs. The inspectors assessed the licensee's characterization of the degradation in accordance with 10 CFR 50.65 (the maintenance rule), and verified that the licensee was appropriately tracking degraded performance and conditions in accordance with the maintenance rule.
The inspectors reviewed one instance of degraded performance or condition of SSCs:
* June 6, 2016, Unit 2, main feedwater seal cooling sight glass failure  
 
The inspectors reviewed the extent of condition of possible common cause SSC failures and evaluated the adequacy of the licensees corrective actions. The inspectors reviewed the licensees work practices to evaluate whether these may have played a role in the degradation of the SSCs. The inspectors assessed the licensees characterization of the degradation in accordance with 10 CFR 50.65 (the maintenance rule), and verified that the licensee was appropriately tracking degraded performance and conditions in accordance with the maintenance rule.


These activities constituted completion of one maintenance effectiveness sample, as defined in Inspection Procedure 71111.12.
These activities constituted completion of one maintenance effectiveness sample, as defined in Inspection Procedure 71111.12.


====b. Findings====
====b. Findings====
=====Introduction.=====
=====Introduction.=====
The inspectors identified a Green finding for the failure to incorporate vendor instructions in a work order. Specifically, the licensee exceeded the vendor specified torque values and performed the work with the component in service, contrary to vendor cautions, breaking the glass, wetting the auxiliary feedwater pump, and necessitating the unplanned shutdown of the main feedwater pump.  
The inspectors identified a Green finding for the failure to incorporate vendor instructions in a work order. Specifically, the licensee exceeded the vendor specified torque values and performed the work with the component in service, contrary to vendor cautions, breaking the glass, wetting the auxiliary feedwater pump, and necessitating the unplanned shutdown of the main feedwater pump.


=====Description.=====
=====Description.=====
Line 138: Line 199:
The licensee documented the sight glass rupture in Condition Report CR-ANO-2-2015-04832, replaced the sight glass, and restarted the main feedwater pump 43 hours after the event. The spray from the sight glass wetted the non-safety but risk-significant Unit 2 auxiliary feedwater pump. Operators disabled the auxiliary feedwater pump until the motor dried and maintenance personnel tested the motor insulation satisfactorily, 57 hours after the event.
The licensee documented the sight glass rupture in Condition Report CR-ANO-2-2015-04832, replaced the sight glass, and restarted the main feedwater pump 43 hours after the event. The spray from the sight glass wetted the non-safety but risk-significant Unit 2 auxiliary feedwater pump. Operators disabled the auxiliary feedwater pump until the motor dried and maintenance personnel tested the motor insulation satisfactorily, 57 hours after the event.


The licensee subsequently discovered that the component database listed the incorrect model for the sight glass, as documented in Condition Report CR-ANO-2-2015-04859. The incorrect model information led planners to specify excessive torque values, which contributed to the sight glass rupture. The torque applied was 62 ft-lbs, while Vendor Drawing M-2001-1 specified 6 ft-lbs as the maximum torque for the sight glass fasteners. Procedure EN-WM-105, "Planning," Revision 16, Step 5.3[1]d(1), required planners to utilize vendor manuals to get an understanding of the equipment, its function, and operational characteristics. The inspectors reviewed Vendor Manual TD0010010, "Installation, Operating, and Maintenance Instructions for Jacoby-Tarbox Full-View Sight Flow Indicators," Revision 1. The vendor manual cautioned users several times to take the sight glass out of service before tightening fasteners because glass is brittle and could fail catastrophically. The inspectors concluded that the licensee failed to consider and incorporate the vendor manual's instructions, which contributed to the sight glass failure, tripping main feedwater pump B, and wetting the auxiliary feedwater pump.  
The licensee subsequently discovered that the component database listed the incorrect model for the sight glass, as documented in Condition Report CR-ANO-2-2015-04859.
 
The incorrect model information led planners to specify excessive torque values, which contributed to the sight glass rupture. The torque applied was 62 ft-lbs, while Vendor Drawing M-2001-1 specified 6 ft-lbs as the maximum torque for the sight glass fasteners.
 
Procedure EN-WM-105, Planning, Revision 16, Step 5.3[1]d(1), required planners to utilize vendor manuals to get an understanding of the equipment, its function, and operational characteristics. The inspectors reviewed Vendor Manual TD0010010, Installation, Operating, and Maintenance Instructions for Jacoby-Tarbox Full-View Sight Flow Indicators, Revision 1. The vendor manual cautioned users several times to take the sight glass out of service before tightening fasteners because glass is brittle and could fail catastrophically. The inspectors concluded that the licensee failed to consider and incorporate the vendor manuals instructions, which contributed to the sight glass failure, tripping main feedwater pump B, and wetting the auxiliary feedwater pump.


=====Analysis.=====
=====Analysis.=====
The failure to incorporate vendor instructions in a work order is a performance deficiency. The finding is more than minor because it adversely affected the procedure quality attribute of the mitigating systems cornerstone and adversely affected the cornerstone objective to ensure the reliability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, the performance deficiency resulted in the Unit 2 auxiliary feedwater pump and main feedwater pump B being rendered unavailable. The inspectors evaluated the finding with NRC Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated June 19, 2012, Exhibit 2, "Mitigating Systems Screening Questions.The inspectors determined that the finding required a detailed risk evaluation because the finding represented an actual loss of function of auxiliary feedwater and one train of main feedwater, designated as having high safety significance in accordance with the licensee's maintenance rule program, for greater than 24 hours.
The failure to incorporate vendor instructions in a work order is a performance deficiency. The finding is more than minor because it adversely affected the procedure quality attribute of the mitigating systems cornerstone and adversely affected the cornerstone objective to ensure the reliability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, the performance deficiency resulted in the Unit 2 auxiliary feedwater pump and main feedwater pump B being rendered unavailable. The inspectors evaluated the finding with NRC Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions. The inspectors determined that the finding required a detailed risk evaluation because the finding represented an actual loss of function of auxiliary feedwater and one train of main feedwater, designated as having high safety significance in accordance with the licensees maintenance rule program, for greater than 24 hours.


A senior reactor analyst performed a detailed risk evaluation and determined that the increase in core damage frequency was 1.3E-7/year (Green). The analyst assumed that all feedwater pumps were available until the time of the leak and that any increase in core damage frequency resulted from the unavailability of the pumps after the leak. The auxiliary feedwater pump and a main feedwater pump were assumed to be out of service concurrently for 43 hours. The auxiliary feedwater pump was then assumed to be out of service for an additional 14 hours beyond that. The analyst used Version 8.26 of the SPAR model for Arkansas Nuclear One, Unit 2, using SAPHIRE Version 8.1.4 to estimate the results. The dominant core damage sequences were losses of safety-related electrical bus 2A3 and losses of motor control centers 2B5 and 2B6. The emergency feedwater system remained available to mitigate the increase in core damage frequency of this finding.
A senior reactor analyst performed a detailed risk evaluation and determined that the increase in core damage frequency was 1.3E-7/year (Green). The analyst assumed that all feedwater pumps were available until the time of the leak and that any increase in core damage frequency resulted from the unavailability of the pumps after the leak. The auxiliary feedwater pump and a main feedwater pump were assumed to be out of service concurrently for 43 hours. The auxiliary feedwater pump was then assumed to be out of service for an additional 14 hours beyond that. The analyst used Version 8.26 of the SPAR model for Arkansas Nuclear One, Unit 2, using SAPHIRE Version 8.1.4 to estimate the results. The dominant core damage sequences were losses of safety-related electrical bus 2A3 and losses of motor control centers 2B5 and 2B6. The emergency feedwater system remained available to mitigate the increase in core damage frequency of this finding.


The inspectors determined this finding has a cross-cutting aspect in the human performance area of H.5, Work Management, because the primary cause of the performance deficiency involved the failure to identify and manage risk commensurate to the work and the need for coordination with different groups or job activities.  
The inspectors determined this finding has a cross-cutting aspect in the human performance area of H.5, Work Management, because the primary cause of the performance deficiency involved the failure to identify and manage risk commensurate to the work and the need for coordination with different groups or job activities.


=====Enforcement.=====
=====Enforcement.=====
This finding did not involve enforcement action because no regulatory requirements were violated. The licensee documented the issue in Condition Report CR-ANO-2-2015-04832. The licensee replaced the ruptured sight glass and repaired and tested the wetted components. FIN 05000368/2016002-01 "Failure to Incorporate Vendor Guidance in Work Order."
This finding did not involve enforcement action because no regulatory requirements were violated. The licensee documented the issue in Condition Report CR-ANO-2-2015-04832. The licensee replaced the ruptured sight glass and repaired and tested the wetted components. FIN 05000368/2016002-01 Failure to Incorporate Vendor Guidance in Work Order.
{{a|1R13}}
{{a|1R13}}
==1R13 Maintenance Risk Assessments and Emergent Work Control==
==1R13 Maintenance Risk Assessments and Emergent Work Control==
{{IP sample|IP=IP 71111.13}}
{{IP sample|IP=IP 71111.13}}


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed two risk assessments performed by the licensee prior to changes in plant configuration and the risk management actions taken by the licensee in response to elevated risk:   May 2, 2016, Units 1 and 2, diesel driven fire pump out of service June 10, 2016, Unit 2, emergency diesel generator B out of service The inspectors verified that these risk assessments were performed timely and in accordance with the requirements of 10 CFR 50.65 (the maintenance rule) and plant procedures. The inspectors reviewed the accuracy and completeness of the licensee's risk assessments and verified that the licensee implemented appropriate risk management actions based on the result of the assessments. Additionally, on May 26, 2016, the inspectors observed portions of one emergent work activity, a Unit 2 reactor power reduction and main turbine shutdown for repair of an electrohydraulic control fluid leak, that had the potential to cause an initiating event or to affect the functional capability of mitigating systems. The inspectors verified that the licensee appropriately developed and followed a work plan for these activities. The inspectors verified that the licensee took precautions to minimize the impact of the work activities on unaffected SSCs. These activities constitute completion of three maintenance risk assessments and emergent work control inspection samples, as defined in Inspection Procedure 71111.13.
The inspectors reviewed two risk assessments performed by the licensee prior to changes in plant configuration and the risk management actions taken by the licensee in response to elevated risk:
* May 2, 2016, Units 1 and 2, diesel driven fire pump out of service
* June 10, 2016, Unit 2, emergency diesel generator B out of service  
 
The inspectors verified that these risk assessments were performed timely and in accordance with the requirements of 10 CFR 50.65 (the maintenance rule) and plant procedures. The inspectors reviewed the accuracy and completeness of the licensees risk assessments and verified that the licensee implemented appropriate risk management actions based on the result of the assessments.
 
Additionally, on May 26, 2016, the inspectors observed portions of one emergent work activity, a Unit 2 reactor power reduction and main turbine shutdown for repair of an electrohydraulic control fluid leak, that had the potential to cause an initiating event or to affect the functional capability of mitigating systems.
 
The inspectors verified that the licensee appropriately developed and followed a work plan for these activities. The inspectors verified that the licensee took precautions to minimize the impact of the work activities on unaffected SSCs.
 
These activities constitute completion of three maintenance risk assessments and emergent work control inspection samples, as defined in Inspection Procedure 71111.13.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R15}}
{{a|1R15}}
 
==1R15 Operability Determinations and Functionality Assessments==
==1R15 Operability Determinations and Functionality Assessments==
{{IP sample|IP=IP 71111.15}}
{{IP sample|IP=IP 71111.15}}


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed six operability determinations that the licensee performed for degraded or nonconforming SSCs:   April 11, 2016, Unit 1, operability determination for a service water leak through a pipe wall   April 19, 2016, Units 1 and 2, operability determination for degraded breaker clips on ABB K-line breakers   April 26, 2016, Unit 2, operability determination of degraded caulk seals on the containment roof   April 26, 2016, Unit 2, operability determination of boric acid wastage on a pressurizer valve hanger   May 12, 2016, Unit 2, operability determination of missing service water strainer bolts   May 20, 2016, Unit 2, operability determination of check valve leakage affecting safety injection tank level The inspectors reviewed the timeliness and technical adequacy of the licensee's evaluations. Where the licensee determined the degraded SSC to be operable, the inspectors verified that the licensee's compensatory measures were appropriate to provide reasonable assurance of operability. The inspectors verified that the licensee had considered the effect of other degraded conditions on the operability of the degraded SSC. These activities constitute completion of six operability and functionality review samples, as defined in Inspection Procedure 71111.15.
The inspectors reviewed six operability determinations that the licensee performed for degraded or nonconforming SSCs:
* April 11, 2016, Unit 1, operability determination for a service water leak through a pipe wall
* April 19, 2016, Units 1 and 2, operability determination for degraded breaker clips on ABB K-line breakers
* April 26, 2016, Unit 2, operability determination of degraded caulk seals on the containment roof
* April 26, 2016, Unit 2, operability determination of boric acid wastage on a pressurizer valve hanger
* May 12, 2016, Unit 2, operability determination of missing service water strainer bolts
* May 20, 2016, Unit 2, operability determination of check valve leakage affecting safety injection tank level  
 
The inspectors reviewed the timeliness and technical adequacy of the licensees evaluations. Where the licensee determined the degraded SSC to be operable, the inspectors verified that the licensees compensatory measures were appropriate to provide reasonable assurance of operability. The inspectors verified that the licensee had considered the effect of other degraded conditions on the operability of the degraded SSC.
 
These activities constitute completion of six operability and functionality review samples, as defined in Inspection Procedure 71111.15.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R19}}
{{a|1R19}}
 
==1R19 Post-Maintenance Testing==
==1R19 Post-Maintenance Testing==
{{IP sample|IP=IP 71111.19}}
{{IP sample|IP=IP 71111.19}}


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed two post-maintenance testing activities that affected risk-significant SSCs:   April 15, 2016, Unit 1, electric fire pump test following rewind of motor June 10, 2016, Unit 2, emergency diesel generator B following overhaul The inspectors reviewed licensing- and design-basis documents for the SSCs and the maintenance and post-maintenance test procedures. The inspectors observed the performance of the post-maintenance tests to verify that the licensee performed the tests in accordance with approved procedures, satisfied the established acceptance criteria, and restored the operability of the affected SSCs.
The inspectors reviewed two post-maintenance testing activities that affected risk-significant SSCs:
* April 15, 2016, Unit 1, electric fire pump test following rewind of motor
* June 10, 2016, Unit 2, emergency diesel generator B following overhaul  
 
The inspectors reviewed licensing-and design-basis documents for the SSCs and the maintenance and post-maintenance test procedures. The inspectors observed the performance of the post-maintenance tests to verify that the licensee performed the tests in accordance with approved procedures, satisfied the established acceptance criteria, and restored the operability of the affected SSCs.


These activities constitute completion of two post-maintenance testing inspection samples, as defined in Inspection Procedure 71111.19.
These activities constitute completion of two post-maintenance testing inspection samples, as defined in Inspection Procedure 71111.19.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R22}}
{{a|1R22}}
 
==1R22 Surveillance Testing==
==1R22 Surveillance Testing==
{{IP sample|IP=IP 71111.22}}
{{IP sample|IP=IP 71111.22}}


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors observed five risk-significant surveillance tests and reviewed test results to verify that these tests adequately demonstrated that the SSCs were capable of performing their safety functions: Reactor coolant system leak detection tests:   June 2, 2016, Unit 1, reactor coolant system leakage detection June 3, 2016, Unit 2, reactor coolant system leakage detection Other surveillance tests:   April 21, 2016, Unit 2, waste control operator daily technical specification surveillances   April 24, 2016, Units 1 and 2, alternate ac diesel generator   April 26, 2016, Units 1 and 2, emergency cooling pond volume measurement The inspectors verified that these tests met technical specification requirements, that the licensee performed the tests in accordance with their procedures, and that the results of the test satisfied appropriate acceptance criteria. The inspectors verified that the licensee restored the operability of the affected SSCs following testing. These activities constitute completion of five surveillance testing inspection samples, as defined in Inspection Procedure 71111.22.
The inspectors observed five risk-significant surveillance tests and reviewed test results to verify that these tests adequately demonstrated that the SSCs were capable of performing their safety functions:  
 
Reactor coolant system leak detection tests:
* June 2, 2016, Unit 1, reactor coolant system leakage detection
* June 3, 2016, Unit 2, reactor coolant system leakage detection  
 
Other surveillance tests:
* April 21, 2016, Unit 2, waste control operator daily technical specification surveillances
* April 24, 2016, Units 1 and 2, alternate ac diesel generator
* April 26, 2016, Units 1 and 2, emergency cooling pond volume measurement The inspectors verified that these tests met technical specification requirements, that the licensee performed the tests in accordance with their procedures, and that the results of the test satisfied appropriate acceptance criteria. The inspectors verified that the licensee restored the operability of the affected SSCs following testing.
 
These activities constitute completion of five surveillance testing inspection samples, as defined in Inspection Procedure 71111.22.


====c. Findings====
====c. Findings====
Line 189: Line 290:


==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity, Emergency Preparedness, Public Radiation Safety, Occupational Radiation Safety, and Security
Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity, Emergency Preparedness, Public Radiation Safety, Occupational Radiation Safety, and Security
{{a|4OA1}}
{{a|4OA1}}
==4OA1 Performance Indicator Verification==
==4OA1 Performance Indicator Verification==
{{IP sample|IP=IP 71151}}
{{IP sample|IP=IP 71151}}
===.1 Safety System Functional Failures (MS05)===
===.1 Safety System Functional Failures (MS05)===
====a. Inspection Scope====
For the period of April 1, 2015, through March 31, 2016, the inspectors reviewed licensee event reports (LERs), maintenance rule evaluations, and other records that could indicate whether safety system functional failures had occurred. The inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, and NUREG-1022, Event Reporting Guidelines: 10 CFR 50.72 and 50.73, Revision 3, to determine the accuracy of the data reported.


====a. Inspection Scope====
These activities constituted verification of the safety system functional failures performance indicator for Units 1 and 2, as defined in Inspection Procedure 71151.
For the period of April 1, 2015, through March 31, 2016, the inspectors reviewed licensee event reports (LERs), maintenance rule evaluations, and other records that could indicate whether safety system functional failures had occurred. The inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, and NUREG-1022, "Event Reporting Guidelines: 10 CFR 50.72 and 50.73," Revision 3, to determine the accuracy of the data reported. These activities constituted verification of the safety system functional failures performance indicator for Units 1 and 2, as defined in Inspection Procedure 71151.


====b. Findings====
====b. Findings====
Line 202: Line 306:


===.2 Reactor Coolant System Specific Activity (BI01)===
===.2 Reactor Coolant System Specific Activity (BI01)===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the licensee's reactor coolant system chemistry sample analyses for the period of April 1, 2015, through March 31, 2016, to verify the accuracy and completeness of the reported data. The inspectors observed a chemistry technician obtain and analyze a reactor coolant system sample on April 11, 2016. The inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, to determine the accuracy of the reported data.
The inspectors reviewed the licensees reactor coolant system chemistry sample analyses for the period of April 1, 2015, through March 31, 2016, to verify the accuracy and completeness of the reported data. The inspectors observed a chemistry technician obtain and analyze a reactor coolant system sample on April 11, 2016. The inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, to determine the accuracy of the reported data.


These activities constituted verification of the reactor coolant system specific activity performance indicator for Units 1 and 2, as defined in Inspection Procedure 71151.
These activities constituted verification of the reactor coolant system specific activity performance indicator for Units 1 and 2, as defined in Inspection Procedure 71151.
Line 212: Line 315:


===.3 Reactor Coolant System Total Leakage (BI02)===
===.3 Reactor Coolant System Total Leakage (BI02)===
====a. Inspection Scope====
The inspectors reviewed the licensees records of reactor coolant system total leakage for the period of April 1, 2015, through March 31, 2016, to verify the accuracy and completeness of the reported data. The inspectors observed the performance of the Units 1 and 2 RCS leak detection surveillance procedures on April 1, 2016. The inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, to determine the accuracy of the reported data.


====a. Inspection Scope====
These activities constituted verification of the reactor coolant system leakage performance indicator for Units 1 and 2, as defined in Inspection Procedure 71151.
The inspectors reviewed the licensee's records of reactor coolant system total leakage for the period of April 1, 2015, through March 31, 2016, to verify the accuracy and completeness of the reported data. The inspectors observed the performance of the Units 1 and 2 RCS leak detection surveillance procedures on April 1, 2016. The inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, to determine the accuracy of the reported data. These activities constituted verification of the reactor coolant system leakage performance indicator for Units 1 and 2, as defined in Inspection Procedure 71151.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|4OA2}}
{{a|4OA2}}
 
==4OA2 Problem Identification and Resolution==
==4OA2 Problem Identification and Resolution==
{{IP sample|IP=IP 71152}}
{{IP sample|IP=IP 71152}}
===.1 Routine Review===
===.1 Routine Review===
====a. Inspection Scope====
====a. Inspection Scope====
Throughout the inspection period, the inspectors performed daily reviews of items entered into the licensee's corrective action program and periodically attended the licensee's condition report screening meetings. The inspectors verified that licensee personnel were identifying problems at an appropriate threshold and entering these problems into the corrective action program for resolution. The inspectors verified that the licensee developed and implemented corrective actions commensurate with the significance of the problems identified. The inspectors also reviewed the licensee's problem identification and resolution activities during the performance of the other inspection activities documented in this report.
Throughout the inspection period, the inspectors performed daily reviews of items entered into the licensees corrective action program and periodically attended the licensees condition report screening meetings. The inspectors verified that licensee personnel were identifying problems at an appropriate threshold and entering these problems into the corrective action program for resolution. The inspectors verified that the licensee developed and implemented corrective actions commensurate with the significance of the problems identified. The inspectors also reviewed the licensees problem identification and resolution activities during the performance of the other inspection activities documented in this report.


====b. Findings====
====b. Findings====
Line 230: Line 334:


===.2 Annual Follow-up of Selected Issues===
===.2 Annual Follow-up of Selected Issues===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors selected three issues for an in-depth follow-up:
The inspectors selected three issues for an in-depth follow-up:
On April 26, 2016, the inspectors reviewed the licensee's evaluation for the November 12, 2015, Unit 2 reactor coolant system leak during post maintenance testing of the loop drain valves. The licensee isolated the leak by closing the upstream loop drain valve. (CR-ANO-2-2015-04744)   On June 21, 2016, the inspectors reviewed the licensee's evaluation for the leakage from the Unit 2 safety injection tanks to the containment through the bonnet seal of high pressure safety injection check valve 2SI-13D. The licensee repaired the valve by cutting it out and replacing it. (CR-ANO-2-2016-00587)   On June 20, 2016, the inspectors reviewed the licensee's evaluation for the February 5, 2016, Unit 2 power reduction and trip of a main feedwater pump due to low lube oil pressure. The licensee restored lube oil pressure by removing the failed O-ring material from the lube oil pressure control valves. (CR-ANO-2-2016-00470) The inspectors assessed the licensee's problem identification threshold, cause analyses, extent of condition reviews, and compensatory actions. The inspectors verified that the licensee appropriately prioritized the corrective actions and that these actions were adequate to correct the condition. These activities constitute completion of three annual follow-up samples as defined in Inspection Procedure 71152.
* On April 26, 2016, the inspectors reviewed the licensees evaluation for the November 12, 2015, Unit 2 reactor coolant system leak during post maintenance testing of the loop drain valves. The licensee isolated the leak by closing the upstream loop drain valve. (CR-ANO-2-2015-04744)
* On June 21, 2016, the inspectors reviewed the licensees evaluation for the leakage from the Unit 2 safety injection tanks to the containment through the bonnet seal of high pressure safety injection check valve 2SI-13D. The licensee repaired the valve by cutting it out and replacing it. (CR-ANO-2-2016-00587)
* On June 20, 2016, the inspectors reviewed the licensees evaluation for the February 5, 2016, Unit 2 power reduction and trip of a main feedwater pump due to low lube oil pressure. The licensee restored lube oil pressure by removing the failed O-ring material from the lube oil pressure control valves. (CR-ANO-2-2016-00470)  
 
The inspectors assessed the licensees problem identification threshold, cause analyses, extent of condition reviews, and compensatory actions. The inspectors verified that the licensee appropriately prioritized the corrective actions and that these actions were adequate to correct the condition.
 
These activities constitute completion of three annual follow-up samples as defined in Inspection Procedure 71152.


====b. Findings====
====b. Findings====
=====Introduction.=====
=====Introduction.=====
The inspectors documented a self-revealing Green finding for the failure to periodically clean the main feedwater turbine lube oil reservoir. Specifically, the main feedwater turbine lube oil reservoir had not been cleaned since 2006, causing clogged filters and low main feedwater turbine bearing oil pressure.
The inspectors documented a self-revealing Green finding for the failure to periodically clean the main feedwater turbine lube oil reservoir. Specifically, the main feedwater turbine lube oil reservoir had not been cleaned since 2006, causing clogged filters and low main feedwater turbine bearing oil pressure.


=====Description.=====
=====Description.=====
On February 5, 2016, the Unit 2 control room received an alarm for low main feedwater pump turbine bearing oil pressure. Operators identified that the in-service lube oil filter had high differential pressure and shifted lube oil filters to place a clean one into service. When this did not restore pressure, operators attempted to adjust the turbine bearing oil pressure control valve to restore normal pressure. When this was unsuccessful, operators lowered reactor power to 70 percent and removed the main feedwater pump from service. The licensee disassembled the pressure regulating valves and discovered pieces of a failed O-ring lodged inside the pressure regulating valves, which had blocked oil flow. The licensee removed the pieces of O-ring, which corrected the low turbine bearing oil pressure. The licensee restarted the main feedwater pump, and restored the plant to full power on February 10, 2016. The licensee documented the low feedwater pump turbine bearing oil pressure issue in Condition Report CR-ANO-2-2016-00470 and conducted a root cause evaluation for the issue. The licensee identified that there was there was no longer a process for maintaining cleanliness of the main feedwater pump turbine lube oil reservoir. In the past, the main feedwater pump turbine bearing oil filters did not normally clog or need cleaning at power. However, Unit 2 operators needed to clean filters several times online since the last refueling outage ended in November 2015. The licensee determined that the turbine bearing oil reservoir had not been cleaned since 2006, allowing dirt, water, and debris to accumulate. Entergy Procedure EN-DC-153, "Preventive Maintenance Component Classification," Revision 13, outlined the components that should have preventive maintenance scheduled. The preventive maintenance for cleaning the lube oil reservoir should have been classified as essential in accordance with Procedure EN-DC-153, but the maintenance had not been performed since 2006. Maintenance personnel changed the maintenance that included reservoir cleaning in 2007 to inactive status without documenting a technical basis, and in 2009 the licensee reclassified the maintenance as non-critical, contrary to Procedure EN-DC-153. As a result, the licensee no longer scheduled main feedwater pump turbine bearing oil reservoir cleanings. During the 2015 Unit 2 refueling outage, the licensee worked on a pump submerged in this reservoir, which stirred the accumulated debris into the circulation path and may have contributed to clogging the filters.
On February 5, 2016, the Unit 2 control room received an alarm for low main feedwater pump turbine bearing oil pressure. Operators identified that the in-service lube oil filter had high differential pressure and shifted lube oil filters to place a clean one into service. When this did not restore pressure, operators attempted to adjust the turbine bearing oil pressure control valve to restore normal pressure. When this was unsuccessful, operators lowered reactor power to 70 percent and removed the main feedwater pump from service. The licensee disassembled the pressure regulating valves and discovered pieces of a failed O-ring lodged inside the pressure regulating valves, which had blocked oil flow. The licensee removed the pieces of O-ring, which corrected the low turbine bearing oil pressure. The licensee restarted the main feedwater pump, and restored the plant to full power on February 10, 2016.


The licensee also identified that operators had failed to swap filters in accordance with with Vendor Manual TDG 080 3250, "Installation, Operation and Maintenance for the General Electric Steam Turbine Feed Pump Drive," Revision 8, resulting in the failed O-ring.  
The licensee documented the low feedwater pump turbine bearing oil pressure issue in Condition Report CR-ANO-2-2016-00470 and conducted a root cause evaluation for the issue. The licensee identified that there was there was no longer a process for maintaining cleanliness of the main feedwater pump turbine lube oil reservoir. In the past, the main feedwater pump turbine bearing oil filters did not normally clog or need cleaning at power. However, Unit 2 operators needed to clean filters several times online since the last refueling outage ended in November 2015. The licensee determined that the turbine bearing oil reservoir had not been cleaned since 2006, allowing dirt, water, and debris to accumulate. Entergy Procedure EN-DC-153, Preventive Maintenance Component Classification, Revision 13, outlined the components that should have preventive maintenance scheduled. The preventive maintenance for cleaning the lube oil reservoir should have been classified as essential in accordance with Procedure EN-DC-153, but the maintenance had not been performed since 2006. Maintenance personnel changed the maintenance that included reservoir cleaning in 2007 to inactive status without documenting a technical basis, and in 2009 the licensee reclassified the maintenance as non-critical, contrary to Procedure EN-DC-153. As a result, the licensee no longer scheduled main feedwater pump turbine bearing oil reservoir cleanings. During the 2015 Unit 2 refueling outage, the licensee worked on a pump submerged in this reservoir, which stirred the accumulated debris into the circulation path and may have contributed to clogging the filters.
 
The licensee also identified that operators had failed to swap filters in accordance with with Vendor Manual TDG 080 3250, Installation, Operation and Maintenance for the General Electric Steam Turbine Feed Pump Drive, Revision 8, resulting in the failed O-ring.


=====Analysis.=====
=====Analysis.=====
The failure to perform preventive maintenance to ensure cleanliness on the main feedwater pump turbine bearing oil reservoir as required by the preventive maintenance program is a performance deficiency. The performance deficiency is more than minor because it impacted the equipment performance attribute and adversely affected the initiating events cornerstone objective to limit the likelihood of events that upset plant stability and challenged critical safety functions during shutdown as well as power operations. Specifically, the performance deficiency resulted in operators lowering reactor power and rendered a main feedwater pump unavailable. Using NRC Inspection Manual Chapter 0609 Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated June 19, 2012, the inspectors screened the finding as having very low safety significance because the finding affected a transient initiator but did not result in a reactor trip. The inspectors determined that this finding did not have a cross-cutting aspect because the most significant contributor did not reflect current licensee performance. Specifically, the maintenance strategy was changed in 2009.
The failure to perform preventive maintenance to ensure cleanliness on the main feedwater pump turbine bearing oil reservoir as required by the preventive maintenance program is a performance deficiency. The performance deficiency is more than minor because it impacted the equipment performance attribute and adversely affected the initiating events cornerstone objective to limit the likelihood of events that upset plant stability and challenged critical safety functions during shutdown as well as power operations. Specifically, the performance deficiency resulted in operators lowering reactor power and rendered a main feedwater pump unavailable. Using NRC Inspection Manual Chapter 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, the inspectors screened the finding as having very low safety significance because the finding affected a transient initiator but did not result in a reactor trip. The inspectors determined that this finding did not have a cross-cutting aspect because the most significant contributor did not reflect current licensee performance. Specifically, the maintenance strategy was changed in 2009.


=====Enforcement.=====
=====Enforcement.=====
This finding did not involve enforcement because no regulatory requirements were violated. Although the licensee failed to follow Procedure EN-DC-153, "Preventive Maintenance Component Classification," Revision 13, the inspectors determined that this was a self-imposed standard and did not constitute a regulatory requirement. The licensee entered this finding into their corrective action program as Condition Report CR-ANO-2-2016-00470. The licensee implemented the necessary preventive maintenance. FIN 05000368/2016002-02, "Failure to Clean Main Feedwater Lube Oil Reservoir Leads to Reactor Power Reduction."
This finding did not involve enforcement because no regulatory requirements were violated. Although the licensee failed to follow Procedure EN-DC-153, Preventive Maintenance Component Classification, Revision 13, the inspectors determined that this was a self-imposed standard and did not constitute a regulatory requirement. The licensee entered this finding into their corrective action program as Condition Report CR-ANO-2-2016-00470. The licensee implemented the necessary preventive maintenance. FIN 05000368/2016002-02, Failure to Clean Main Feedwater Lube Oil Reservoir Leads to Reactor Power Reduction.
{{a|4OA3}}
{{a|4OA3}}
==4OA3 Follow-up of Events and Notices of Enforcement Discretion==
==4OA3 Follow-up of Events and Notices of Enforcement Discretion==
{{IP sample|IP=IP 71153}}
{{IP sample|IP=IP 71153}}
(Closed) LER 05000368/2015-001-00, Purge Radiation Monitor Discovered Inoperable During Fuel Movement On October 26, 2015, an operator discovered the Unit 2 Containment Purge and Exhaust Isolation Process Monitor sample pump off. The sample pump had been off for approximately five hours, which made the monitor inoperable during fuel movement. The enforcement aspects of this violation are discussed in Section
(Closed) LER 05000368/2015-001-00, Purge Radiation Monitor Discovered Inoperable During Fuel Movement On October 26, 2015, an operator discovered the Unit 2 Containment Purge and Exhaust Isolation Process Monitor sample pump off. The sample pump had been off for approximately five hours, which made the monitor inoperable during fuel movement.
{{a|4OA7}}
 
==4OA7 of this report. This licensee event report is closed. These activities constitute completion of one event follow-up sample, as defined in Inspection Procedure 71153. 4OA5 Other Activities==
The enforcement aspects of this violation are discussed in Section 4OA7 of this report.
Quarterly Performance Assessment   In the NRC's 2014 annual assessment letter (ML15063A499), dated March 4, 2015, the NRC documented that the performance of Arkansas Nuclear One, Units 1 and 2, was within the Multiple/Repetitive Degraded Cornerstone Column (Column 4) of the NRC's Reactor Oversight Process Action Matrix.
 
This licensee event report is closed.
 
These activities constitute completion of one event follow-up sample, as defined in Inspection Procedure 71153.
 
{{a|4OA5}}
 
==4OA5 Other Activities==
Quarterly Performance Assessment  
 
In the NRCs 2014 annual assessment letter (ML15063A499), dated March 4, 2015, the NRC documented that the performance of Arkansas Nuclear One, Units 1 and 2, was within the Multiple/Repetitive Degraded Cornerstone Column (Column 4) of the NRCs Reactor Oversight Process Action Matrix.
 
In accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program, Issued December 23, 2015, a quarterly review of performance is required for a plant whose performance is in Column 4 of the Action Matrix.


In accordance with NRC Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," Issued December 23, 2015, a quarterly review of performance is required for a plant whose performance is in Column 4 of the Action Matrix.
On June 30, 2016, NRC management reviewed inspection and performance indicator results for Units 1 and 2. The NRC determined that continued plant operation was acceptable in the Multiple/Repetitive Degraded Cornerstone of the Reactor Oversight Process Action Matrix. In addition, no additional regulatory actions beyond those described in the annual assessment letter were identified.


On June 30, 2016, NRC management reviewed inspection and performance indicator results for Units 1 and 2. The NRC determined that continued plant operation was acceptable in the Multiple/Repetitive Degraded Cornerstone of the Reactor Oversight Process Action Matrix. In addition, no additional regulatory actions beyond those described in the annual assessment letter were identified.
{{a|4OA6}}
{{a|4OA6}}
==4OA6 Meetings, Including Exit==
==4OA6 Meetings, Including Exit==
===Exit Meeting Summary===
On July 5, 2016, the inspectors presented the inspection results to Mr. J. Browning, Site Vice President, and other members of the licensee staff. The licensee acknowledged the issues presented. The licensee confirmed that any proprietary information reviewed by the inspectors had been returned or destroyed.


=====Exit Meeting Summary=====
On July 5, 2016, the inspectors presented the inspection results to Mr. J. Browning, Site Vice President, and other members of the licensee staff. The licensee acknowledged the issues presented. The licensee confirmed that any proprietary information reviewed by the inspectors had been returned or destroyed.
{{a|4OA7}}
{{a|4OA7}}
==4OA7 Licensee-Identified Violations==
==4OA7 Licensee-Identified Violations==
The following violation of very low safety significance (Green) was identified by the licensee and is a violation of NRC requirements which meets the criteria of the NRC Enforcement Policy for being dispositioned as non-cited violation.
The following violation of very low safety significance (Green) was identified by the licensee and is a violation of NRC requirements which meets the criteria of the NRC Enforcement Policy for being dispositioned as non-cited violation.
* Unit 2 Technical Specification Limiting Condition for Operation 3.3.3.1, Radiation Monitoring Instrumentation, requires that the radiation monitoring instrumentation channels shown in Table 3.3-6, Radiation Monitoring Instrumentation, shall be operable with their alarm/trip set points within the specified limits. Table 3.3-6, Item 2.a requires that the containment purge and exhaust radiation monitoring instrumentation be capable of isolating containment when process radiation equals or exceeds two times the background radiation rate. Contrary to the above, on October 26, 2015, the licensee failed to ensure that the required containment purge and exhaust radiation monitor remained operable to isolate containment when process radiation equals or exceeds two times the background radiation rate. Specifically, the licensee failed to restart the containment purge and exhaust isolation radiation monitor sample pump, which supplies process sample flow to the radiation monitor, following an electrical bus transfer which removed power to the sample pump. As a result, the containment ventilation system would not have automatically isolated to prevent a release of radioactive material in the event of a fuel handling accident. However, operators could manually isolate the ventilation system if a fuel accident occurred. An operator restarted the process sample pump and documented the issue in Condition Report CR-ANO-2-2015-04197.


Unit 2 Technical Specification Limiting Condition for Operation 3.3.3.1, Radiation Monitoring Instrumentation, requires that the radiation monitoring instrumentation channels shown in Table 3.3-6, Radiation Monitoring Instrumentation, shall be operable with their alarm/trip set points within the specified limits. Table 3.3-6, Item 2.a requires that the containment purge and exhaust radiation monitoring instrumentation be capable of isolating containment when process radiation equals or exceeds two times the background radiation rate. Contrary to the above, on October 26, 2015, the licensee failed to ensure that the required containment purge and exhaust radiation monitor remained operable to isolate containment when process radiation equals or exceeds two times the background radiation rate. Specifically, the licensee failed to restart the containment purge and exhaust isolation radiation monitor sample pump, which supplies process sample flow to the radiation monitor, following an electrical bus transfer which removed power to the sample pump. As a result, the containment ventilation system would not have automatically isolated to prevent a release of radioactive material in the event of a fuel handling accident. However, operators could manually isolate the ventilation system if a fuel accident occurred. An operator restarted the process sample pump and documented the issue in Condition Report CR-ANO-2-2015-04197. Because the finding degraded the ability to close or isolate the containment, NRC Inspection Manual Chapter 0609 Appendix G, "Shutdown Operations Significance Determination Process Phase 1 Initial Screening and Characterization of Findings," dated May 9, 2014, directed the inspectors to use NRC Inspection Manual Chapter 0609 Appendix H, "Containment Integrity Significance Determination Process," dated May 6, 2004. The inspectors classified the finding as a degraded condition that has potentially important implications for the integrity of the containment, without affecting the likelihood of core damage (Type B). Using the Phase 1 screening for Type B findings, the inspectors determined the finding to be of very low safety significance or Green, because the deficiency did not occur within eight days of the start of the refueling outage.
Because the finding degraded the ability to close or isolate the containment, NRC Inspection Manual Chapter 0609 Appendix G, Shutdown Operations Significance Determination Process Phase 1 Initial Screening and Characterization of Findings, dated May 9, 2014, directed the inspectors to use NRC Inspection Manual Chapter 0609 Appendix H, Containment Integrity Significance Determination Process, dated May 6, 2004. The inspectors classified the finding as a degraded condition that has potentially important implications for the integrity of the containment, without affecting the likelihood of core damage (Type B). Using the Phase 1 screening for Type B findings, the inspectors determined the finding to be of very low safety significance or Green, because the deficiency did not occur within eight days of the start of the refueling outage.
 
A-1 Attachment


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


==KEY POINTS OF CONTACT==
==KEY POINTS OF CONTACT==
===Licensee Personnel===
===Licensee Personnel===
: [[contact::D. Barborek]], Engineer
: [[contact::D. Barborek]], Engineer  
: [[contact::R. Barnes]], Director, Regulatory Affair & Performance Improvement  
: [[contact::R. Barnes]], Director, Regulatory Affair & Performance Improvement  
: [[contact::L. Blocker]], Nuclear Oversight Manager  
: [[contact::L. Blocker]], Nuclear Oversight Manager  
Line 293: Line 415:
: [[contact::S. Pyle]], Regulatory Assurance Manager  
: [[contact::S. Pyle]], Regulatory Assurance Manager  
: [[contact::B. Short]], Senior Licensing Specialist  
: [[contact::B. Short]], Senior Licensing Specialist  
: [[contact::J. Toben]], Senior Manager, Project Management Regulatory and Performance Improvement
: [[contact::J. Toben]], Senior Manager, Project Management Regulatory and Performance Improvement  
 
===NRC Personnel===
===NRC Personnel===
: [[contact::R. Deese]], Senior Reactor Analyst
: [[contact::R. Deese]], Senior Reactor Analyst  


==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
===Opened and Closed===
===Opened and Closed===
: 05000368/2016002-01 FIN Failure to Incorporate Vendor Guidance in Work Order (Section 1R12)  
: 05000368/2016002-01 FIN Failure to Incorporate Vendor Guidance in Work Order (Section 1R12)  
: 05000368/2016002-02 FIN Failure to Clean Main Feedwater Lube Oil Reservoir Leads to Reactor Power Reduction (Section 4OA2.2)
: 05000368/2016002-02 FIN Failure to Clean Main Feedwater Lube Oil Reservoir Leads to Reactor Power Reduction (Section 4OA2.2)  
 
===Closed===
===Closed===
: [[Closes LER::05000368/LER-2015-001]]-00 LER Purge Radiation Monitor Discovered Inoperable During Fuel Movement (Section 4OA3)      
: 05000368/2015-001-00 LER Purge Radiation Monitor Discovered Inoperable During Fuel Movement (Section 4OA3)  


==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
==Section 1R04: Equipment Alignment==
===Procedures===
: Number Title Revision
: OP-2104.036 Emergency Diesel Generator Operation 090
: OP-2106.006 Emergency Feedwater System Operations 091
: OP-2104.037 Alternate AC Diesel Generator Operations 031
===Condition Reports===
(CRs) CR-ANO-C-2015-04883
==Section 1R05: Fire Protection==
===Procedures===
: Number Title Revision
: OP-2307.040 Unit 2 Incipient Fire Instrumentation Operability 006
: PFP-U1-R018 Unit 1 Pre-Fire Plans 018
: PFP-U2-R014 Unit 2 Pre-Fire Plans 014
: PRP-UC-R014 Common Unit Pre-Fire Plans 014
===Condition Reports===
(CRs)
: CR-ANO-2-2016-01035
: CR-ANO-2-2016-01075
: CR-ANO-2-2016-01100
: CR-ANO-1-2016-01966 CR-ANO-1-2016-01965
==Section 1R06: Flood Protection Measures==
===Drawings===
: Number Title Revision M-2217 Emergency Diesel Generator Fuel Oil System 064 M-217 Emergency Diesel Generators Fuel Oil Storage 089
===Miscellaneous===
: Number Title Revision
: EC-61840 Internal Flood Protection Design Basis 001
: CALC-ANOC-CS-15-00003 ANO Flood Protection Design Basis 001
===Condition Reports===
(CRs) CR-ANO-2-2016-01889
==Section 1R11: Licensed Operator Requalification Program and Licensed Operator Performance==
===Procedures===
: Number Title Revision
: OP-2102.004 Power Operation 061
: OP-1104.036 Emergency Diesel Generator Operation 071
===Miscellaneous===
: Number Title Revision
: SES-1-030 Unit 1 Dynamic Exam Scenario 000 A2SPGLOR160501 Loss of Turbine Load 000
==Section 1R12: Maintenance Effectiveness==
===Procedures===
: Number Title Revision
: EN-WM-105 Planning 016
===Condition Reports===
(CRs)
: CR-ANO-2-2015-04821
: CR-ANO-2-2015-04832 CR-ANO-2-2015-04859
==Section 1R13: Maintenance Risk Assessments and Emergent Work Control==
===Procedures===
: Number Title Revision
: OP-2102.004 Power Operation 061
: COPD-024 Risk Assessment Guidelines 060
===Condition Reports===
(CRs)
: CR-ANO-2-2016-01993
: CR-ANo-2-2016-02211
: CR-ANO-2-2016-02342
===Miscellaneous===
: Number Title Revision
: EC-43780 Temp Fire Water from Domestic Water 2H-7 to 2H-10 via B5B Temp Fire Pump 001
==Section 1R15: Operability Determinations and Functionality Assessments==
===Procedures===
: Number Title Revision
: OP-1203.046 Loss of Loadcenter 012
===Miscellaneous===
: Number Title Revision TD I005.0130 Installation/Maintenance Instructions for I-T-E Low Voltage Power Circuit Breakers Type K-225 thru 2000 & K600S thru 2000S 0, 1, 2, 3, 4 5010.-015-ATT-5 Qualification of Piping and Support Mods for
: PC 980066P201-01 001
===Drawings===
: Number Title Revision E-357 Schematic Diagram Aux. Bldg. Radwaste Exhaust Fan 016 6600-M2035-4(1)-9 Vertical Strainer - Model
: WN-1 009 6600-M2035-15-3 20" O.D. Basket Strainer 003
===Condition Reports===
(CRs)
: CR-ANO-C-2016-01042
: CR-ANO-1-2016-00847
: CR-ANO-1-2016-00815
: CR-ANO-1-2016-01133
: CR-ANO-2-2011-00482
: CR-ANO-2-2011-00483
: CR-ANO-2-2011-00952
: CR-ANO-2-2015-04721
: CR-ANO-2-2015-04729
: CR-ANO-1-2016-00582
: CR-ANO-2-2016-00261
: CR-ANO-2-2016-00938
: CR-ANO-2-2016-00671
===Work Orders===
: 266694
: 266985
: 390422
: 52611231 52611232
==Section 1R19: Post-Maintenance Testing==
===Procedures===
: Number Title Revision
: OP-1104.032 Fire Protection Systems 084
: OP-2104.036 Emergency Diesel Generator Operations 090
===Work Orders===
: 273894
: 277492
: 418804
: 422059 52634531
==Section 1R22: Surveillance Testing==
===Procedures===
: Number Title Revision
: OP-1000.009A Surveillance Test Program Revision Sheet 027
: OP-2104.037 Alternate AC Diesel Generator Operations 031
: OP-1103.013 RCS Leak Detection 042
: EN-CY-116 Reactor Coolant System Chemistry Control
: OP-2305.002 Reactor Coolant System Leak Detection 025
===Miscellaneous===
: Number Title Revision
: ULD-0-SYS-19
: ANO-1 Alternate AC Generator System 001 STM 2-33 ANO Unit 2 System Training Manual Alternate AC Diesel Generator 025
===Condition Reports===
(CRs)
: CR-ANO-2-2016-01634
: CR-ANO-2-2016-01643
: CR-ANO-2-2016-01644
: CR-ANO-2-2016-01646
: CR-ANO-C-2016-01852
: CR-ANO-C-2016-01865
===Work Orders===
: 52598305
: 52625903
: 52591788
: 52582007 52593621
==Section 4OA1: Performance Indicator Verification==
===Procedures===
: Number Title Revision
: EN-CY-116 Reactor Coolant System Chemistry Control 000
: EN-LI-114 Regulatory Performance Indicator Process 007
==Section 4OA2: Problem Identification and Resolution==


===Procedures===
: Number Title Revision
: OP-2203.012J Annunciator 2K10 Corrective Action 042
: OP-2203.016 Excess RCS Leakage 017
: OP-2305.002 Reactor Coolant System Leak Detection 025
: OP-2106.007 Main Feedwater Pump and FWCS Operation 055
: EN-DC-153 Preventive Maintenance Component Classification 013
: TDG 080 3250 Installation, Operation, and Maintenance for the General Electric Steam Turbine Feed Pump Drive 008
===Drawings===
: Number Title Revision Date
: 576483 Reactor Drain Tank Dimension Outline December 6, 1971
===Condition Reports===
(CRs)
: CR-ANO-2-2015-04744
: CR-ANO-2-2015-04745
: CR-ANO-2-2016-00587
: CR-ANO-2-2013-00375
: CR-ANO-2-2016-00470
: 4OA3 Follow-up of Events and Notices of Enforcement Discretion (71153) Procedures Number Title Revision
: OP-2104.033 Containment Atmosphere Control 076
: OP-2104.035 Ventilation System Operations 040
: OP-2107.007 ESF Electrical Bus Outage 018
===Drawings===
: Number Title Revision Date C2260, No. 112 Equipment Foundation for Containment Purge Exhaust Fan July 23, 1979
===Miscellaneous===
: Number Title Revision 2CAN121503 Purge Radiation Monitor Discovered Inoperable During Fuel Movement
: 2CAN080002 Proposed Technical Specification Changes - Specification 3.9.4
: STM 2-09 Containment Cooling and Purge Systems 016
===Condition Reports===
(CRs)
: CR-ANO-2-2008-00763 CR-ANO-2-2015-04197
}}
}}

Latest revision as of 21:32, 9 January 2025

NRC Inspection Report 05000313/2016002 and 05000368/2016002, April 1, 2016 Through June 30, 2016
ML16211A184
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/28/2016
From: O'Keefe N
NRC/RGN-IV/DRP/RPB-E
To: Warren C
Entergy Operations
Neil O'Keefe
References
IR 2016002
Download: ML16211A184 (27)


Text

July 28, 2016

SUBJECT:

ARKANSAS NUCLEAR ONE - NRC INSPECTION REPORT 05000313/2016002 and 05000368/2016002

Dear Mr. Warren:

On June 30, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Arkansas Nuclear One facility, Units 1 and 2. On July 5, 2016, the NRC inspectors discussed the results of this inspection with Mr. J. Browning and other members of your staff.

Inspectors documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented two findings of very low safety significance (Green) in this report.

These findings did not involve a violation of NRC requirements. Further, inspectors documented a licensee-identified violation which was determined to be of very low safety significance in this report. The NRC is treating these violations as non-cited violations (NCVs)

consistent with Section 2.3.2.a of the NRC Enforcement Policy.

If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at Arkansas Nuclear One.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at Arkansas Nuclear One.

On June 30, 2016, the NRC completed a quarterly performance review of Arkansas Nuclear One. The NRC determined that continued plant operation was acceptable and oversight in the Multiple/Repetitive Degraded Cornerstone of the Reactor Oversight Process Action Matrix remained appropriate. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Neil OKeefe, Branch Chief Project Branch E Division of Reactor Projects Docket Nos. 50-313 and 50-368 License Nos. DRP-51 and NPF-6

Enclosure:

Inspection Report 05000313/2016002 and 05000368/2016002 w/ Attachment: Supplemental Information In a

REGION IV==

Docket:

05000313; 05000368 License:

DPR-51; NPF-6 Report:

05000313/2016002; 05000368/2016002 Licensee:

Entergy Operations, Inc.

Facility:

Arkansas Nuclear One, Units 1 and 2 Location:

Junction of Highway 64 West and Highway 333 South Russellville, Arkansas Dates:

April 1 through June 30, 2016 Inspectors: B. Tindell, Senior Resident Inspector A. Barrett, Resident Inspector M. Tobin, Resident Inspector Approved By:

Neil OKeefe Chief, Project Branch E Division of Reactor Projects

- 2 -

SUMMARY

IR 05000313/2016002; 05000368/2016002; 04/01/2016 - 06/30/2016; Arkansas Nuclear One,

Units 1 and 2, Integrated Inspection Report; Maintenance Effectiveness, Problem Identification and Resolution.

The inspection activities described in this report were performed between April 1 and June 30, 2016, by the resident inspectors at Arkansas Nuclear One. Two findings of very low safety significance (Green) are documented in this report. None of these findings involved violations of NRC requirements. Additionally, NRC inspectors documented a licensee-identified violation of very low safety significance. The significance of inspection findings is indicated by their color (Green, White, Yellow, or Red), which is determined using Inspection Manual Chapter 0609, Significance Determination Process. Their cross-cutting aspects are determined using Inspection Manual Chapter 0310, Aspects within the Cross-Cutting Areas.

Violations of NRC requirements are dispositioned in accordance with the NRC Enforcement Policy. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process.

Cornerstone: Initiating Events

Green.

The inspectors identified a finding for the failure to incorporate vendor instructions in a work order. Specifically, the licensee exceeded the vendor specified torque values and performed the work with the component in service, contrary to vendor cautions, breaking the glass, wetting the auxiliary feedwater pump, and necessitating the unplanned shutdown of the main feedwater pump. The licensee replaced the ruptured sight glass and repaired and tested the wetted components. The licensee documented the issue in Condition Report CR-ANO-2-2015-04832.

The failure to incorporate vendor instructions in a work order is a performance deficiency.

The finding is more than minor because it adversely affected the procedure quality attribute of the mitigating systems cornerstone and adversely affected the cornerstone objective to ensure the reliability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, the performance deficiency resulted in the Unit 2 auxiliary feedwater pump and main feedwater pump B being rendered unavailable.

The inspectors evaluated the finding with NRC Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012,

Exhibit 2, Mitigating Systems Screening Questions. The inspectors determined that the finding required a detailed risk evaluation because the finding involved an actual loss of function of auxiliary feedwater and one train of main feedwater, designated as having high safety significance in accordance with the licensees maintenance rule program, for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. A senior reactor analyst performed a detailed risk evaluation and determined that the increase in core damage frequency was 1.3E-7/year (Green). The analyst assumed that all feedwater pumps were available until the time of the leak and that any increase in core damage frequency resulted from the unavailability of the pumps after the leak. The emergency feedwater system remained available to mitigate the increase in core damage frequency of this finding. The inspectors determined this finding has a cross-cutting aspect in the human performance area of Work Management because the primary cause of the performance deficiency involved the failure to identify and manage risk commensurate to the work and the need for coordination with different groups or job activities (Section 1R12).

[H.5]

Cornerstone: Mitigating Systems

Green.

The inspectors documented a self-revealing finding for failure to clean the main feedwater turbine lube oil reservoir. Specifically, the main feedwater turbine lube oil reservoir had not been cleaned since 2006, causing clogged filters and low main feedwater turbine bearing oil pressure on February 5, 2016. The licensee entered this finding into their corrective action program as Condition Report CR-ANO-2-2016-00470 and implemented the necessary preventive maintenance.

The failure to perform preventive maintenance to ensure cleanliness on the main feedwater pump turbine bearing oil reservoir as required by the preventive maintenance program is a performance deficiency. The performance deficiency is more than minor because it impacted the equipment performance attribute and adversely affected the initiating events cornerstone objective to limit the likelihood of events that upset plant stability and challenged critical safety functions during shutdown as well as power operations.

Specifically, the performance deficiency resulted in operators lowering reactor power and rendered a main feedwater pump unavailable. Using NRC Inspection Manual Chapter 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, the inspectors screened the finding as having very low safety significance because the finding affected a transient initiator but did not result in a reactor trip. The inspectors determined that this finding did not have a cross-cutting aspect because the most significant contributor did not reflect current licensee performance. Specifically, the maintenance strategy changed in 2009 (Section 4OA2.2).

Licensee-Identified Violations

A violation of very low safety significance that was identified by the licensee has been reviewed by the inspectors. Corrective actions taken or planned by the licensee have been entered into the licensees corrective action program. This violation and associated corrective action tracking numbers are listed in Section 4OA7 of this report.

PLANT STATUS

Unit 1 operated at 100 percent power for the entire inspection period.

Unit 2 began the period at 100 percent power. On May 26, 2016, operators reduced power to approximately 10 percent reactor power and removed the main turbine from service to repair an electrohydraulic control fluid leak associated with the turbine controls. On May 27, 2016, the plant returned to 100 percent power and remained at 100 percent power through the end of the inspection period.

REPORT DETAILS

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

1R04 Equipment Alignment

.1 Partial Walkdown

a. Inspection Scope

The inspectors performed partial system walk-downs of the following risk-significant systems:

  • June 9, 2016, Units 1 and 2, alternate ac diesel generator jacket waterJune 24, 2016, Unit 2, emergency diesel generator B electrical lineup
  • June 28, 2016, Unit 2, turbine driven emergency feedwater valve lineup

The inspectors reviewed the licensees procedures and system design information to determine the correct lineup for the systems. They visually verified that critical portions of the systems were correctly aligned for the existing plant configuration.

These activities constituted three partial system walk-down samples as defined in Inspection Procedure 71111.04.

b. Findings

No findings were identified.

1R05 Fire Protection

.1 Quarterly Inspection

a. Inspection Scope

The inspectors evaluated the licensees fire protection program for operational status and material condition. The inspectors focused their inspection on four plant areas important to safety:

  • June 9, 2016, Units 1 and 2, Fire Zone NA, alternate ac diesel generator building
  • June 23, 2016, Unit 2, Fire Zone 2154-E, control element drive mechanism room
  • June 28, 2016, Unit 1, Fire Zone 97-R, cable spreading room

For each area, the inspectors evaluated the fire plan against defined hazards and defense-in-depth features in the licensees fire protection program. The inspectors evaluated control of transient combustibles and ignition sources, fire detection and suppression systems, manual firefighting equipment and capability, passive fire protection features, and compensatory measures for degraded conditions.

These activities constituted four quarterly inspection samples, as defined in Inspection Procedure 71111.05.

b. Findings

No findings were identified.

1R06 Flood Protection Measures

a. Inspection Scope

On May 16, 2016, the inspectors completed an inspection of the stations ability to mitigate flooding due to internal causes. After reviewing the licensees flooding analysis, the inspectors chose the Units 1 and 2 diesel fuel oil storage vault, which contains risk-significant structures, systems, and components (SSCs) susceptible to flooding.

The inspectors reviewed plant design features and licensee procedures for coping with internal flooding. The inspectors walked down the selected areas to inspect the design features, including the material condition of seals, drains, and flood barriers. The inspectors evaluated whether operator actions credited for flood mitigation could be successfully accomplished.

These activities constitute completion of one flood protection measures sample, as defined in Inspection Procedure 71111.06.

b. Findings

No findings were identified.

1R11 Licensed Operator Requalification Program and Licensed Operator Performance

.1 Review of Licensed Operator Requalification

a. Inspection Scope

The inspectors observed simulator testing and training for licensed operators. The inspectors assessed the performance of the operators and the evaluators critique of their performance. The inspectors also assessed the modeling and performance of the simulator during the requalification activities.

  • May 17, 2016, Unit 1, evaluated simulator scenario performed by operating crew
  • May 18, 2016, Unit 2, simulator training for operating crew

These activities constitute completion of two quarterly licensed operator requalification program samples, as defined in Inspection Procedure 71111.11.

b. Findings

No findings were identified.

.2 Review of Licensed Operator Performance

a. Inspection Scope

The inspectors observed the performance of on-shift licensed operators in the Units 1 and 2 main control rooms. At the time of the observations, the plants were in a period of heightened activity and risk. The inspectors observed the operators performance of the following activities:

  • May 26, 2016, Unit 2, control room observation of operators connecting the main turbine to the grid
  • June 29, 2016, Unit 1, control room observation of emergency diesel generator monthly surveillance In addition, the inspectors assessed the operators adherence to plant procedures, including the conduct of operations procedure and other operations department policies.

These activities constitute completion of two quarterly licensed operator performance samples, as defined in Inspection Procedure 71111.11.

b. Findings

No findings were identified.

1R12 Maintenance Effectiveness

a. Inspection Scope

The inspectors reviewed one instance of degraded performance or condition of SSCs:

  • June 6, 2016, Unit 2, main feedwater seal cooling sight glass failure

The inspectors reviewed the extent of condition of possible common cause SSC failures and evaluated the adequacy of the licensees corrective actions. The inspectors reviewed the licensees work practices to evaluate whether these may have played a role in the degradation of the SSCs. The inspectors assessed the licensees characterization of the degradation in accordance with 10 CFR 50.65 (the maintenance rule), and verified that the licensee was appropriately tracking degraded performance and conditions in accordance with the maintenance rule.

These activities constituted completion of one maintenance effectiveness sample, as defined in Inspection Procedure 71111.12.

b. Findings

Introduction.

The inspectors identified a Green finding for the failure to incorporate vendor instructions in a work order. Specifically, the licensee exceeded the vendor specified torque values and performed the work with the component in service, contrary to vendor cautions, breaking the glass, wetting the auxiliary feedwater pump, and necessitating the unplanned shutdown of the main feedwater pump.

Description.

On November 16, 2015, during power ascension at the end of a refueling outage, Unit 2 was operating at 68 percent power with both main feedwater pumps in operation. Operations personnel documented leakage from the sight glass for Unit 2 main feedwater pump B seal cooling in Condition Report CR-ANO-2-2015-04821. On the same day, maintenance personnel attempted to tighten the sight glass fasteners to stop the leakage. While it was being tightened, the sight glass ruptured and seal cooling water began spraying out. Operators secured main feedwater pump B due to concerns about loss of seal cooling water flow and isolated the leak. Throughout the event, main feedwater pump A continued to supply feedwater and reactor power remained stable.

The licensee documented the sight glass rupture in Condition Report CR-ANO-2-2015-04832, replaced the sight glass, and restarted the main feedwater pump 43 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br /> after the event. The spray from the sight glass wetted the non-safety but risk-significant Unit 2 auxiliary feedwater pump. Operators disabled the auxiliary feedwater pump until the motor dried and maintenance personnel tested the motor insulation satisfactorily, 57 hours6.597222e-4 days <br />0.0158 hours <br />9.424603e-5 weeks <br />2.16885e-5 months <br /> after the event.

The licensee subsequently discovered that the component database listed the incorrect model for the sight glass, as documented in Condition Report CR-ANO-2-2015-04859.

The incorrect model information led planners to specify excessive torque values, which contributed to the sight glass rupture. The torque applied was 62 ft-lbs, while Vendor Drawing M-2001-1 specified 6 ft-lbs as the maximum torque for the sight glass fasteners.

Procedure EN-WM-105, Planning, Revision 16, Step 5.3[1]d(1), required planners to utilize vendor manuals to get an understanding of the equipment, its function, and operational characteristics. The inspectors reviewed Vendor Manual TD0010010, Installation, Operating, and Maintenance Instructions for Jacoby-Tarbox Full-View Sight Flow Indicators, Revision 1. The vendor manual cautioned users several times to take the sight glass out of service before tightening fasteners because glass is brittle and could fail catastrophically. The inspectors concluded that the licensee failed to consider and incorporate the vendor manuals instructions, which contributed to the sight glass failure, tripping main feedwater pump B, and wetting the auxiliary feedwater pump.

Analysis.

The failure to incorporate vendor instructions in a work order is a performance deficiency. The finding is more than minor because it adversely affected the procedure quality attribute of the mitigating systems cornerstone and adversely affected the cornerstone objective to ensure the reliability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, the performance deficiency resulted in the Unit 2 auxiliary feedwater pump and main feedwater pump B being rendered unavailable. The inspectors evaluated the finding with NRC Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions. The inspectors determined that the finding required a detailed risk evaluation because the finding represented an actual loss of function of auxiliary feedwater and one train of main feedwater, designated as having high safety significance in accordance with the licensees maintenance rule program, for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

A senior reactor analyst performed a detailed risk evaluation and determined that the increase in core damage frequency was 1.3E-7/year (Green). The analyst assumed that all feedwater pumps were available until the time of the leak and that any increase in core damage frequency resulted from the unavailability of the pumps after the leak. The auxiliary feedwater pump and a main feedwater pump were assumed to be out of service concurrently for 43 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br />. The auxiliary feedwater pump was then assumed to be out of service for an additional 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> beyond that. The analyst used Version 8.26 of the SPAR model for Arkansas Nuclear One, Unit 2, using SAPHIRE Version 8.1.4 to estimate the results. The dominant core damage sequences were losses of safety-related electrical bus 2A3 and losses of motor control centers 2B5 and 2B6. The emergency feedwater system remained available to mitigate the increase in core damage frequency of this finding.

The inspectors determined this finding has a cross-cutting aspect in the human performance area of H.5, Work Management, because the primary cause of the performance deficiency involved the failure to identify and manage risk commensurate to the work and the need for coordination with different groups or job activities.

Enforcement.

This finding did not involve enforcement action because no regulatory requirements were violated. The licensee documented the issue in Condition Report CR-ANO-2-2015-04832. The licensee replaced the ruptured sight glass and repaired and tested the wetted components. FIN 05000368/2016002-01 Failure to Incorporate Vendor Guidance in Work Order.

1R13 Maintenance Risk Assessments and Emergent Work Control

a. Inspection Scope

The inspectors reviewed two risk assessments performed by the licensee prior to changes in plant configuration and the risk management actions taken by the licensee in response to elevated risk:

  • May 2, 2016, Units 1 and 2, diesel driven fire pump out of service

The inspectors verified that these risk assessments were performed timely and in accordance with the requirements of 10 CFR 50.65 (the maintenance rule) and plant procedures. The inspectors reviewed the accuracy and completeness of the licensees risk assessments and verified that the licensee implemented appropriate risk management actions based on the result of the assessments.

Additionally, on May 26, 2016, the inspectors observed portions of one emergent work activity, a Unit 2 reactor power reduction and main turbine shutdown for repair of an electrohydraulic control fluid leak, that had the potential to cause an initiating event or to affect the functional capability of mitigating systems.

The inspectors verified that the licensee appropriately developed and followed a work plan for these activities. The inspectors verified that the licensee took precautions to minimize the impact of the work activities on unaffected SSCs.

These activities constitute completion of three maintenance risk assessments and emergent work control inspection samples, as defined in Inspection Procedure 71111.13.

b. Findings

No findings were identified.

1R15 Operability Determinations and Functionality Assessments

a. Inspection Scope

The inspectors reviewed six operability determinations that the licensee performed for degraded or nonconforming SSCs:

The inspectors reviewed the timeliness and technical adequacy of the licensees evaluations. Where the licensee determined the degraded SSC to be operable, the inspectors verified that the licensees compensatory measures were appropriate to provide reasonable assurance of operability. The inspectors verified that the licensee had considered the effect of other degraded conditions on the operability of the degraded SSC.

These activities constitute completion of six operability and functionality review samples, as defined in Inspection Procedure 71111.15.

b. Findings

No findings were identified.

1R19 Post-Maintenance Testing

a. Inspection Scope

The inspectors reviewed two post-maintenance testing activities that affected risk-significant SSCs:

  • April 15, 2016, Unit 1, electric fire pump test following rewind of motor

The inspectors reviewed licensing-and design-basis documents for the SSCs and the maintenance and post-maintenance test procedures. The inspectors observed the performance of the post-maintenance tests to verify that the licensee performed the tests in accordance with approved procedures, satisfied the established acceptance criteria, and restored the operability of the affected SSCs.

These activities constitute completion of two post-maintenance testing inspection samples, as defined in Inspection Procedure 71111.19.

b. Findings

No findings were identified.

1R22 Surveillance Testing

a. Inspection Scope

The inspectors observed five risk-significant surveillance tests and reviewed test results to verify that these tests adequately demonstrated that the SSCs were capable of performing their safety functions:

Reactor coolant system leak detection tests:

Other surveillance tests:

  • April 21, 2016, Unit 2, waste control operator daily technical specification surveillances
  • April 24, 2016, Units 1 and 2, alternate ac diesel generator
  • April 26, 2016, Units 1 and 2, emergency cooling pond volume measurement The inspectors verified that these tests met technical specification requirements, that the licensee performed the tests in accordance with their procedures, and that the results of the test satisfied appropriate acceptance criteria. The inspectors verified that the licensee restored the operability of the affected SSCs following testing.

These activities constitute completion of five surveillance testing inspection samples, as defined in Inspection Procedure 71111.22.

c. Findings

No findings were identified.

OTHER ACTIVITIES

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity, Emergency Preparedness, Public Radiation Safety, Occupational Radiation Safety, and Security

4OA1 Performance Indicator Verification

.1 Safety System Functional Failures (MS05)

a. Inspection Scope

For the period of April 1, 2015, through March 31, 2016, the inspectors reviewed licensee event reports (LERs), maintenance rule evaluations, and other records that could indicate whether safety system functional failures had occurred. The inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, and NUREG-1022, Event Reporting Guidelines: 10 CFR 50.72 and 50.73, Revision 3, to determine the accuracy of the data reported.

These activities constituted verification of the safety system functional failures performance indicator for Units 1 and 2, as defined in Inspection Procedure 71151.

b. Findings

No findings were identified.

.2 Reactor Coolant System Specific Activity (BI01)

a. Inspection Scope

The inspectors reviewed the licensees reactor coolant system chemistry sample analyses for the period of April 1, 2015, through March 31, 2016, to verify the accuracy and completeness of the reported data. The inspectors observed a chemistry technician obtain and analyze a reactor coolant system sample on April 11, 2016. The inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, to determine the accuracy of the reported data.

These activities constituted verification of the reactor coolant system specific activity performance indicator for Units 1 and 2, as defined in Inspection Procedure 71151.

b. Findings

No findings were identified.

.3 Reactor Coolant System Total Leakage (BI02)

a. Inspection Scope

The inspectors reviewed the licensees records of reactor coolant system total leakage for the period of April 1, 2015, through March 31, 2016, to verify the accuracy and completeness of the reported data. The inspectors observed the performance of the Units 1 and 2 RCS leak detection surveillance procedures on April 1, 2016. The inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, to determine the accuracy of the reported data.

These activities constituted verification of the reactor coolant system leakage performance indicator for Units 1 and 2, as defined in Inspection Procedure 71151.

b. Findings

No findings were identified.

4OA2 Problem Identification and Resolution

.1 Routine Review

a. Inspection Scope

Throughout the inspection period, the inspectors performed daily reviews of items entered into the licensees corrective action program and periodically attended the licensees condition report screening meetings. The inspectors verified that licensee personnel were identifying problems at an appropriate threshold and entering these problems into the corrective action program for resolution. The inspectors verified that the licensee developed and implemented corrective actions commensurate with the significance of the problems identified. The inspectors also reviewed the licensees problem identification and resolution activities during the performance of the other inspection activities documented in this report.

b. Findings

No findings were identified.

.2 Annual Follow-up of Selected Issues

a. Inspection Scope

The inspectors selected three issues for an in-depth follow-up:

  • On April 26, 2016, the inspectors reviewed the licensees evaluation for the November 12, 2015, Unit 2 reactor coolant system leak during post maintenance testing of the loop drain valves. The licensee isolated the leak by closing the upstream loop drain valve. (CR-ANO-2-2015-04744)
  • On June 21, 2016, the inspectors reviewed the licensees evaluation for the leakage from the Unit 2 safety injection tanks to the containment through the bonnet seal of high pressure safety injection check valve 2SI-13D. The licensee repaired the valve by cutting it out and replacing it. (CR-ANO-2-2016-00587)
  • On June 20, 2016, the inspectors reviewed the licensees evaluation for the February 5, 2016, Unit 2 power reduction and trip of a main feedwater pump due to low lube oil pressure. The licensee restored lube oil pressure by removing the failed O-ring material from the lube oil pressure control valves. (CR-ANO-2-2016-00470)

The inspectors assessed the licensees problem identification threshold, cause analyses, extent of condition reviews, and compensatory actions. The inspectors verified that the licensee appropriately prioritized the corrective actions and that these actions were adequate to correct the condition.

These activities constitute completion of three annual follow-up samples as defined in Inspection Procedure 71152.

b. Findings

Introduction.

The inspectors documented a self-revealing Green finding for the failure to periodically clean the main feedwater turbine lube oil reservoir. Specifically, the main feedwater turbine lube oil reservoir had not been cleaned since 2006, causing clogged filters and low main feedwater turbine bearing oil pressure.

Description.

On February 5, 2016, the Unit 2 control room received an alarm for low main feedwater pump turbine bearing oil pressure. Operators identified that the in-service lube oil filter had high differential pressure and shifted lube oil filters to place a clean one into service. When this did not restore pressure, operators attempted to adjust the turbine bearing oil pressure control valve to restore normal pressure. When this was unsuccessful, operators lowered reactor power to 70 percent and removed the main feedwater pump from service. The licensee disassembled the pressure regulating valves and discovered pieces of a failed O-ring lodged inside the pressure regulating valves, which had blocked oil flow. The licensee removed the pieces of O-ring, which corrected the low turbine bearing oil pressure. The licensee restarted the main feedwater pump, and restored the plant to full power on February 10, 2016.

The licensee documented the low feedwater pump turbine bearing oil pressure issue in Condition Report CR-ANO-2-2016-00470 and conducted a root cause evaluation for the issue. The licensee identified that there was there was no longer a process for maintaining cleanliness of the main feedwater pump turbine lube oil reservoir. In the past, the main feedwater pump turbine bearing oil filters did not normally clog or need cleaning at power. However, Unit 2 operators needed to clean filters several times online since the last refueling outage ended in November 2015. The licensee determined that the turbine bearing oil reservoir had not been cleaned since 2006, allowing dirt, water, and debris to accumulate. Entergy Procedure EN-DC-153, Preventive Maintenance Component Classification, Revision 13, outlined the components that should have preventive maintenance scheduled. The preventive maintenance for cleaning the lube oil reservoir should have been classified as essential in accordance with Procedure EN-DC-153, but the maintenance had not been performed since 2006. Maintenance personnel changed the maintenance that included reservoir cleaning in 2007 to inactive status without documenting a technical basis, and in 2009 the licensee reclassified the maintenance as non-critical, contrary to Procedure EN-DC-153. As a result, the licensee no longer scheduled main feedwater pump turbine bearing oil reservoir cleanings. During the 2015 Unit 2 refueling outage, the licensee worked on a pump submerged in this reservoir, which stirred the accumulated debris into the circulation path and may have contributed to clogging the filters.

The licensee also identified that operators had failed to swap filters in accordance with with Vendor Manual TDG 080 3250, Installation, Operation and Maintenance for the General Electric Steam Turbine Feed Pump Drive, Revision 8, resulting in the failed O-ring.

Analysis.

The failure to perform preventive maintenance to ensure cleanliness on the main feedwater pump turbine bearing oil reservoir as required by the preventive maintenance program is a performance deficiency. The performance deficiency is more than minor because it impacted the equipment performance attribute and adversely affected the initiating events cornerstone objective to limit the likelihood of events that upset plant stability and challenged critical safety functions during shutdown as well as power operations. Specifically, the performance deficiency resulted in operators lowering reactor power and rendered a main feedwater pump unavailable. Using NRC Inspection Manual Chapter 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, the inspectors screened the finding as having very low safety significance because the finding affected a transient initiator but did not result in a reactor trip. The inspectors determined that this finding did not have a cross-cutting aspect because the most significant contributor did not reflect current licensee performance. Specifically, the maintenance strategy was changed in 2009.

Enforcement.

This finding did not involve enforcement because no regulatory requirements were violated. Although the licensee failed to follow Procedure EN-DC-153, Preventive Maintenance Component Classification, Revision 13, the inspectors determined that this was a self-imposed standard and did not constitute a regulatory requirement. The licensee entered this finding into their corrective action program as Condition Report CR-ANO-2-2016-00470. The licensee implemented the necessary preventive maintenance. FIN 05000368/2016002-02, Failure to Clean Main Feedwater Lube Oil Reservoir Leads to Reactor Power Reduction.

4OA3 Follow-up of Events and Notices of Enforcement Discretion

(Closed) LER 05000368/2015-001-00, Purge Radiation Monitor Discovered Inoperable During Fuel Movement On October 26, 2015, an operator discovered the Unit 2 Containment Purge and Exhaust Isolation Process Monitor sample pump off. The sample pump had been off for approximately five hours, which made the monitor inoperable during fuel movement.

The enforcement aspects of this violation are discussed in Section 4OA7 of this report.

This licensee event report is closed.

These activities constitute completion of one event follow-up sample, as defined in Inspection Procedure 71153.

4OA5 Other Activities

Quarterly Performance Assessment

In the NRCs 2014 annual assessment letter (ML15063A499), dated March 4, 2015, the NRC documented that the performance of Arkansas Nuclear One, Units 1 and 2, was within the Multiple/Repetitive Degraded Cornerstone Column (Column 4) of the NRCs Reactor Oversight Process Action Matrix.

In accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program, Issued December 23, 2015, a quarterly review of performance is required for a plant whose performance is in Column 4 of the Action Matrix.

On June 30, 2016, NRC management reviewed inspection and performance indicator results for Units 1 and 2. The NRC determined that continued plant operation was acceptable in the Multiple/Repetitive Degraded Cornerstone of the Reactor Oversight Process Action Matrix. In addition, no additional regulatory actions beyond those described in the annual assessment letter were identified.

4OA6 Meetings, Including Exit

Exit Meeting Summary

On July 5, 2016, the inspectors presented the inspection results to Mr. J. Browning, Site Vice President, and other members of the licensee staff. The licensee acknowledged the issues presented. The licensee confirmed that any proprietary information reviewed by the inspectors had been returned or destroyed.

4OA7 Licensee-Identified Violations

The following violation of very low safety significance (Green) was identified by the licensee and is a violation of NRC requirements which meets the criteria of the NRC Enforcement Policy for being dispositioned as non-cited violation.

  • Unit 2 Technical Specification Limiting Condition for Operation 3.3.3.1, Radiation Monitoring Instrumentation, requires that the radiation monitoring instrumentation channels shown in Table 3.3-6, Radiation Monitoring Instrumentation, shall be operable with their alarm/trip set points within the specified limits. Table 3.3-6, Item 2.a requires that the containment purge and exhaust radiation monitoring instrumentation be capable of isolating containment when process radiation equals or exceeds two times the background radiation rate. Contrary to the above, on October 26, 2015, the licensee failed to ensure that the required containment purge and exhaust radiation monitor remained operable to isolate containment when process radiation equals or exceeds two times the background radiation rate. Specifically, the licensee failed to restart the containment purge and exhaust isolation radiation monitor sample pump, which supplies process sample flow to the radiation monitor, following an electrical bus transfer which removed power to the sample pump. As a result, the containment ventilation system would not have automatically isolated to prevent a release of radioactive material in the event of a fuel handling accident. However, operators could manually isolate the ventilation system if a fuel accident occurred. An operator restarted the process sample pump and documented the issue in Condition Report CR-ANO-2-2015-04197.

Because the finding degraded the ability to close or isolate the containment, NRC Inspection Manual Chapter 0609 Appendix G, Shutdown Operations Significance Determination Process Phase 1 Initial Screening and Characterization of Findings, dated May 9, 2014, directed the inspectors to use NRC Inspection Manual Chapter 0609 Appendix H, Containment Integrity Significance Determination Process, dated May 6, 2004. The inspectors classified the finding as a degraded condition that has potentially important implications for the integrity of the containment, without affecting the likelihood of core damage (Type B). Using the Phase 1 screening for Type B findings, the inspectors determined the finding to be of very low safety significance or Green, because the deficiency did not occur within eight days of the start of the refueling outage.

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

D. Barborek, Engineer
R. Barnes, Director, Regulatory Affair & Performance Improvement
L. Blocker, Nuclear Oversight Manager
J. Browning, Site Vice President
P. Butler, Design and Program Engineering Manager
B. Daiber, Recovery Manager
B. Davis, Engineering Director
T. Evans, General Manager of Plant Operations
D. James, Director, Regulatory Affairs & Recovery
D. Marvel, Radiation Protection Manager
N. Mosher, Licensing Specialist
D. Pehrson, Unit 1 Assistant Operations Manager
S. Pyle, Regulatory Assurance Manager
B. Short, Senior Licensing Specialist
J. Toben, Senior Manager, Project Management Regulatory and Performance Improvement

NRC Personnel

R. Deese, Senior Reactor Analyst

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened and Closed

05000368/2016002-01 FIN Failure to Incorporate Vendor Guidance in Work Order (Section 1R12)
05000368/2016002-02 FIN Failure to Clean Main Feedwater Lube Oil Reservoir Leads to Reactor Power Reduction (Section 4OA2.2)

Closed

05000368/2015-001-00 LER Purge Radiation Monitor Discovered Inoperable During Fuel Movement (Section 4OA3)

LIST OF DOCUMENTS REVIEWED