ML17252B413: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/15/1976
| issue date = 12/15/1976
| title = Letter Regarding Dresden Station Units 2 and 3 Torus-To-Drywell Vacuum Breaker Bushings
| title = Letter Regarding Dresden Station Units 2 and 3 Torus-To-Drywell Vacuum Breaker Bushings
| author name = Stephenson B B
| author name = Stephenson B
| author affiliation = Commonwealth Edison Co
| author affiliation = Commonwealth Edison Co
| addressee name = Keppler J G
| addressee name = Keppler J
| addressee affiliation = NRC/RGN-III
| addressee affiliation = NRC/RGN-III
| docket = 05000237, 05000249
| docket = 05000237, 05000249
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:,,.. ***.*.* ** . -'* CommonweM'I Edison Dresden Nucle-wer Station R.R. #1 Morris, Illinois *so450 Telephone 815/942-2920  
{{#Wiki_filter:,,.. ***.*.* **
** .. -l:--,., . . *"' ___________
CommonweM'I Edison Dresden Nucle-wer Station R.R. #1 Morris, Illinois *so450 Telephone 815/942-2920  
LTR._/l-7_6-883 De_cembei;-.
.. -l:--,.,
19.79 Mr. James G. Keppler, Regional Director Directorate of Regulatory Operations  
___________ B~~? LTR._/l-7_6-883 De_cembei;-. l~_, 19.79 Mr. James G. Keppler, Regional Director Directorate of Regulatory Operations,£?'Region TII U. S. Nuclear Regulatory Commission 799 Roo~eyelt Road Gien Ellyn, Illinois 60137  
,£?'Region TII U. S. Nuclear Regulatory Commission 799 Road Gien Ellyn, Illinois 60137 .SUBJECT.:
.SUBJECT.:
Dresden Station Torus-to-Drywell Vacuum Breaker  
Dresden Station Torus-to-Drywell Vacuum Breaker  


==REFERENCES:==
==REFERENCES:==
: 1) Letter from B. B. Stephenson to J. F. O'Leary dated July 29, 1974 (Abnormal Occurrence report no. 50-237 /1974-27)
: 1)
: 2) Drawing number:* M-25. REPORT NUMBER: 50-237/1974-27A REPORT DATE: December 15, 1976 OCCURRENCE DATE: July 20, 1974 FACILITY:* .Dresden Nuclear Power Station,.
Letter from B. B. Stephenson to J. F. O'Leary dated July 29, 1974 (Abnormal Occurrence report no.
Morris, Illinois . . / . The referenced Abnormal Occurrence report s:tat;ed that a study was in . progress to evaluate the possible(::iuse of phosphorus-bronze in place of teflon as a bushing material in the breakers on Units 2 and 3. .-* The vacuum breaker performance has been monitored for approximately three years. During this period three binding pi;-oblems h.;ive been experienced; two
50-237 /1974-27)
: 2)
Drawing number:* M-25.
REPORT NUMBER:
50-237/1974-27A REPORT DATE:
December 15, 1976 OCCURRENCE DATE:
July 20, 1974 FACILITY:*.Dresden Nuclear Power Station,. Morris, Illinois  
/
The referenced Abnormal Occurrence report s:tat;ed that a study was in  
. progress to evaluate the possible(::iuse of phosphorus-bronze in place of teflon as a bushing material in the toru~~to-drywell vac~um breakers on Units 2 and 3.
The vacuum breaker performance has been monitored for approximately three years.
During this period three binding pi;-oblems h.;ive been experienced; two
* with teflon bushings and one with phosphorus-bronze bushings.
* with teflon bushings and one with phosphorus-bronze bushings.
Based on the results far there is no justification for of the teflon with bushings.
Based on the results th~s far there is no justification for replace~ent of the teflon bu~hings with phosphorus-bron~e bushings.
Additionally, based on the reduced frequency of failures, no other action is planned at this time. Power St?tion BBS: CES :jo cc: Director of Inspection  
Additionally, based on the reduced frequency of failures, no other action is planned at this time.
& Enforcement Director*
Power St?tion BBS: CES :jo cc:
of Management Information  
Director of Inspection & Enforcement Director* of Management Information & Program Control File/NRC DEC 2 3 1976 13044  
& Program Control File/NRC DEC 2 3 1976 13044 ....}}
....}}

Latest revision as of 11:21, 8 January 2025

Letter Regarding Dresden Station Units 2 and 3 Torus-To-Drywell Vacuum Breaker Bushings
ML17252B413
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/15/1976
From: Stephenson B
Commonwealth Edison Co
To: James Keppler
NRC/RGN-III
References
50-237/1974-27A, BBS Ltr. #76-883, LER 74-027-00, LER 74-027A-00
Download: ML17252B413 (1)


Text

,,.. ***.*.* **

CommonweM'I Edison Dresden Nucle-wer Station R.R. #1 Morris, Illinois *so450 Telephone 815/942-2920

.. -l:--,.,

___________ B~~? LTR._/l-7_6-883 De_cembei;-. l~_, 19.79 Mr. James G. Keppler, Regional Director Directorate of Regulatory Operations,£?'Region TII U. S. Nuclear Regulatory Commission 799 Roo~eyelt Road Gien Ellyn, Illinois 60137

.SUBJECT.:

Dresden Station Torus-to-Drywell Vacuum Breaker

REFERENCES:

1)

Letter from B. B. Stephenson to J. F. O'Leary dated July 29, 1974 (Abnormal Occurrence report no.

50-237 /1974-27)

2)

Drawing number:* M-25.

REPORT NUMBER:

50-237/1974-27A REPORT DATE:

December 15, 1976 OCCURRENCE DATE:

July 20, 1974 FACILITY:*.Dresden Nuclear Power Station,. Morris, Illinois

/

The referenced Abnormal Occurrence report s:tat;ed that a study was in

. progress to evaluate the possible(::iuse of phosphorus-bronze in place of teflon as a bushing material in the toru~~to-drywell vac~um breakers on Units 2 and 3.

The vacuum breaker performance has been monitored for approximately three years.

During this period three binding pi;-oblems h.;ive been experienced; two

Based on the results th~s far there is no justification for replace~ent of the teflon bu~hings with phosphorus-bron~e bushings.

Additionally, based on the reduced frequency of failures, no other action is planned at this time.

Power St?tion BBS: CES :jo cc:

Director of Inspection & Enforcement Director* of Management Information & Program Control File/NRC DEC 2 3 1976 13044

....