ENS 40146: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
| event date = 09/10/2003 17:46 CDT | | event date = 09/10/2003 17:46 CDT | ||
| last update date = 11/07/2003 | | last update date = 11/07/2003 | ||
| title = Unanalyzed Condition Due | | title = Unanalyzed Condition Due to a Potential Break in Fire Protection Water System | ||
| event text = Potential break of Fire Water Main in Admin Bldg could cause both divisions of Safe Shutdown equipment to be inoperable by flooding the battery rooms for #11 & 12 125VDC Batteries. Vulnerable section of piping has been isolated to eliminate the flooding concern. Fire Protection compensatory actions have been established in accordance with the site Fire Protection Program. | | event text = Potential break of Fire Water Main in Admin Bldg could cause both divisions of Safe Shutdown equipment to be inoperable by flooding the battery rooms for #11 & 12 125VDC Batteries. Vulnerable section of piping has been isolated to eliminate the flooding concern. Fire Protection compensatory actions have been established in accordance with the site Fire Protection Program. | ||
The licensee informed the NRC resident inspector. | The licensee informed the NRC resident inspector. | ||
Latest revision as of 21:24, 1 March 2018
| Where | |
|---|---|
| Monticello Minnesota (NRC Region 3) | |
| Reporting | |
| 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
| Time - Person (Reporting Time:+-1.73 h-0.0721 days <br />-0.0103 weeks <br />-0.00237 months <br />) | |
| Opened: | Chet Desmarais 21:02 Sep 10, 2003 |
| NRC Officer: | Howie Crouch |
| Last Updated: | Nov 7, 2003 |
| 40146 - NRC Website
| |