ENS 40570: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 03/06/2004 00:50 EST
| event date = 03/06/2004 00:50 EST
| last update date = 03/06/2004
| last update date = 03/06/2004
| title = Manual Reactor Trip At Millstone 2 Due To Spurious Trip Of The "B"  Feed Pump
| title = Manual Reactor Trip at Millstone 2 Due to Spurious Trip of the "B"  Feed Pump
| event text = The licensee reported that the "B" Steam Generator Feed Pump tripped unexpectedly and would not reset causing lowering steam generator water levels. Operators manually tripped the reactor and all control rods properly inserted. The auxiliary feed water (AFW) system automatically initiated to restore steam generator water levels. The lowest steam generator water level observed during the event was 55% level as opposed to the normal level of 70%. No primary relief valves lifted. Operators established decay heat removal capability using AFW system and the atmospheric steam dump valves. The licensee initiated a post trip review to determine the cause of the feed pump trip.
| event text = The licensee reported that the "B" Steam Generator Feed Pump tripped unexpectedly and would not reset causing lowering steam generator water levels. Operators manually tripped the reactor and all control rods properly inserted. The auxiliary feed water (AFW) system automatically initiated to restore steam generator water levels. The lowest steam generator water level observed during the event was 55% level as opposed to the normal level of 70%. No primary relief valves lifted. Operators established decay heat removal capability using AFW system and the atmospheric steam dump valves. The licensee initiated a post trip review to determine the cause of the feed pump trip.
The NRC Resident inspector has been notified by the licensee.
The NRC Resident inspector has been notified by the licensee.

Latest revision as of 21:24, 1 March 2018

ENS 40570 +/-
Where
Millstone Dominion icon.png
Connecticut (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
LER: 05000336/LER-2004-001
Time - Person (Reporting Time:+-3.8 h-0.158 days <br />-0.0226 weeks <br />-0.00521 months <br />)
Opened: Janet Novak
02:02 Mar 6, 2004
NRC Officer: Rich Laura
Last Updated: Mar 6, 2004
40570 - NRC Website
Loading map...