StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 03/11/2004 14:30 CST | | event date = 03/11/2004 14:30 CST | ||
| last update date = 03/11/2004 | | last update date = 03/11/2004 | ||
| title = Voluntary Report Involving Potential Tsc Unavailability During | | title = Voluntary Report Involving Potential Tsc Unavailability During a Dba Loca | ||
| event text = Monticello Nuclear Generating plant is making a voluntary report with regard to the Technical Support Center (TSC) not meeting design criteria Subsection 8.2-1.f of Supplement 1 to NUREG-0737. This specifies that the TSC will be provided with radiological protection necessary to assure that the radiation exposure to any person working in the TSC would not exceed 5 REM whole body (or its equivalent part of the body) for the duration of the accident. | | event text = Monticello Nuclear Generating plant is making a voluntary report with regard to the Technical Support Center (TSC) not meeting design criteria Subsection 8.2-1.f of Supplement 1 to NUREG-0737. This specifies that the TSC will be provided with radiological protection necessary to assure that the radiation exposure to any person working in the TSC would not exceed 5 REM whole body (or its equivalent part of the body) for the duration of the accident. | ||
During review of the calculations associated with an on-going Alternative Source Term project, plant staff identified the potential for a radiation shine path to exist from the reactor building to the TSC during a DBA [Design Basis Accident] - Loss of Coolant Accident [LOCA], that could result in radiation levels reaching a point dictating evacuation of the TSC under existing emergency plan procedures. | During review of the calculations associated with an on-going Alternative Source Term project, plant staff identified the potential for a radiation shine path to exist from the reactor building to the TSC during a DBA [Design Basis Accident] - Loss of Coolant Accident [LOCA], that could result in radiation levels reaching a point dictating evacuation of the TSC under existing emergency plan procedures. |
Latest revision as of 21:24, 1 March 2018
Where | |
---|---|
Monticello Minnesota (NRC Region 3) | |
Reporting | |
Other Unspec Reqmnt | |
Time - Person (Reporting Time:+0.87 h0.0363 days <br />0.00518 weeks <br />0.00119 months <br />) | |
Opened: | Dale Johnson 21:22 Mar 11, 2004 |
NRC Officer: | Steve Sandin |
Last Updated: | Mar 11, 2004 |
40585 - NRC Website
| |