e NARRATIVE REPORT
  '    ' * ~                             NARRATIVE REPORT UNIT 1 June 1st           0000       Unit at full power with no major equipment problems.
' * ~
2330       Reducing load for monthly
UNIT 1 June 1st 0000 Unit at full power with no major equipment problems.
* surveillance testing.
2330 Reducing load for monthly surveillance testing.
              -June 2nd           1600       Back at rated power.
-June 2nd 1600 Back at rated power.
June 9th           0000       Reducing load for weekly turbine testing.
June 9th 0000 Reducing load for weekly turbine testing.
0248       Turbine Testing complete. Unit back at rated power.
0248 Turbine Testing complete.
June 14th           2334       Reducing load for weekly turbine testing.
Unit back at rated power.
June 15th         0253       Turbine testing complete. Unit back at rated power.
June 14th 2334 Reducing load for weekly turbine testing.
June 16th         0845       MSIV "B"' leaking.
June 15th 0253 Turbine testing complete.
1352       Decreasing power to prepare for shutdown to repair MSIV "B".
Unit back at rated power.
1717       Reactor made switch to shutdown, with Reactor power at 842 CMWT.
June 16th 0845 MSIV "B"' leaking.
June 18th         2257       Reactor mode to Startup.
1352 Decreasing power to prepare for shutdown to repair MSIV "B".
June 19th         0058       Reactor Critical.
1717 Reactor made switch to shutdown, with Reactor power at 842 CMWT.
1614       Turbine Generator on Line.
June 18th 2257 Reactor mode to Startup.
June 19th 0058 Reactor Critical.
1614 Turbine Generator on Line.
Ramping to rated.
-June 20th 0150 Reducing power for rod pattern adjustment.
0241 Resuming power increases.
0900 Steam leak in 7th Stage heater "B".
1350 7th stage heater "B"
isolate for repair to crack in dump line.
2130 7th stage heater "B"
repaired and placed back in service.
Holding power for repair of "A" TIP machine.
8507190155 850630
#$fb i
PDR ADOCK 05000321
\\h R
PDR
 
w.
NARRATIVE REPORT UNIT 1 June 21st 0121 "A" TIP machine repaired. Ramping to rated power.
1700 Back at rated power.
June 22nd 2301 Reducing load for Weekly Turbine testing.
June 27th 1217 Spurious Recirc Runback, Unit at 530 MWe.
1320 Rx. manually scrammed, personnel error actuated deluge on startup transformer IC, causing loss of A&B busses which supply recire and circ water pumps.
June 28th 1454 Startup in progress.
Beginning to pull rods.
1758 Rx. critical.
' June 29th 0222 Turbine Generator on line.
Ramping to rated.
Ramping to rated.
              -June 20th          0150      Reducing power for rod pattern adjustment.                                -
0600 Holding power to put Unit Auxillary Transformer back in service.
0241      Resuming power increases.
1600 UAT back in service.
0900      Steam leak in 7th Stage heater "B".
1350      7th stage heater "B" isolate for repair to crack in dump line.
2130      7th stage heater "B" repaired and placed back in service. Holding power for repair of "A" TIP machine.
8507190155 850630                                                    #$fb
                                                                                    \h i
PDR    ADOCK 05000321 R                PDR  ,
: w.  ...
NARRATIVE REPORT UNIT 1 June 21st  0121      "A"  TIP machine repaired. Ramping to rated power.
1700      Back at rated power.
June 22nd  2301      Reducing load for Weekly Turbine testing.
June 27th  1217      Spurious Recirc Runback, Unit at 530 MWe.
1320      Rx. manually scrammed, personnel error actuated deluge on startup transformer IC, causing loss of A&B busses which supply recire and circ water pumps.
June 28th  1454      Startup in progress. Beginning to pull rods.
1758      Rx. critical.
              ' June 29th 0222      Turbine Generator on line.
Ramping to rated.
Ramping to rated.
0600      Holding power to put Unit Auxillary Transformer back in service.
June 30th 2400 Unit at.692 MWE on preconditioning ramp.
1600      UAT back in service. Ramping to rated.
No major equipment problems.
June 30th   2400     Unit at.692 MWE on preconditioning ramp. No major equipment problems.
E
E


e-
e-
    ,g-NARRATIVE REPORT UNIT 2
,g-NARRATIVE REPORT UNIT 2
            --June 1st 0000       Unit operating at rated power.
--June 1st 0000 Unit operating at rated power.
No major equipment problems.
No major equipment problems.
June 3rd 2104       Turbine trip on high MSR level, Reactor scrammed.
June 3rd 2104 Turbine trip on high MSR level, Reactor scrammed.
              ' June'4th 0526       Reactor Critical.
' June'4th 0526 Reactor Critical.
1542       Generator tied to line. Ramping to rated power.
1542 Generator tied to line.
June 6th 0600       Achieved rated power.
Ramping to rated power.
June 9th 0100       Reducing load for Weekly Turbine Testing.
June 6th 0600 Achieved rated power.
0410       Back at rated power.
June 9th 0100 Reducing load for Weekly Turbine Testing.
June'16th 0114       Reducing load for Weekly Turbine Testing.
0410 Back at rated power.
0437       Back at rated power.
June'16th 0114 Reducing load for Weekly Turbine Testing.
June 22nd 0105       Reducing load for Weekly Turbine Testing.
0437 Back at rated power.
0445       Back at rated power.
June 22nd 0105 Reducing load for Weekly Turbine Testing.
June 30th 2400       Unit at rated power with no major equipment problems.
0445 Back at rated power.
June 30th 2400 Unit at rated power with no major equipment problems.
I e
I e
b
b


HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER           DATE COMPLETED           DESCRIPTION 84-6937             05-10-85     Repair 1831-Recirc-12AR-F-2 weld per Nutech overlay design drawing (No.
HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 84-6937 05-10-85 Repair 1831-Recirc-12AR-F-2 weld per Nutech overlay design drawing (No.
XGP-09-131)..                 -
XGP-09-131)..
Ref. HNP-1-10174, WPS-35, and DCR-84-251.
Ref. HNP-1-10174, WPS-35, and DCR-84-251.
84-6451             05-29-85       Modify Pipe Support - per WP5 S2-75-M041.
84-6451 05-29-85 Modify Pipe Support - per WP5 S2-75-M041.
Ref:   DCR 82-75, MPL E41 84-3762             01-02-85       Modify Pipe Support - per WPS 82-75-M004.
Ref:
Ref:   OCR 82-75 MPL-E41 84-5565             05-17-85       Modify Branch line hanger E51-RCIBH-1 per WPS 82-75-M028.
DCR 82-75, MPL E41 84-3762 01-02-85 Modify Pipe Support - per WPS 82-75-M004.
Ref:   DCR 82-75 84-3760             01-02-85       Install Pipe Supports E51-RCICH-702, E51-RCSEH-722; and modify pipe supports E51-RCICH-16 and E51-RCICH-17 per WPS-82-75-M006.
Ref:
Ref: DCR 82-75 85-824-             05-16-85       Install conduit and supports per WPS-81-196-E002.
OCR 82-75 MPL-E41 84-5565 05-17-85 Modify Branch line hanger E51-RCIBH-1 per WPS 82-75-M028.
Ref: DCR 81-196 MPL-R33 84-5900             05-17-85       Implementation of stiffner plates to torus nozzles (MPL-T23) per WPS-82-75-M036.
Ref:
DCR 82-75 84-3760 01-02-85 Install Pipe Supports E51-RCICH-702, E51-RCSEH-722; and modify pipe supports E51-RCICH-16 and E51-RCICH-17 per WPS-82-75-M006.
Ref:
DCR 82-75 85-824-05-16-85 Install conduit and supports per WPS-81-196-E002.
Ref: DCR 81-196 MPL-R33 84-5900 05-17-85 Implementation of stiffner plates to torus nozzles (MPL-T23) per WPS-82-75-M036.
Ref. DCR 82-75 Penetrations X-214 & X-220.
Ref. DCR 82-75 Penetrations X-214 & X-220.
84-4993             01-03-85       Modify Pipe Supports per WPS-82-75-M022 in S.W.
84-4993 01-03-85 Modify Pipe Supports per WPS-82-75-M022 in S.W.
Diagonal.
Diagonal.
Ref.: DCR 82-75 (MPL-E51) 84-4994             12031084       Modify Pipe Supports per WPS-82-75-H019 in Torus Chamber Bays 12 & 13.
Ref.: DCR 82-75 (MPL-E51) 84-4994 12031084 Modify Pipe Supports per WPS-82-75-H019 in Torus Chamber Bays 12 & 13.
Ref.: DCR 82-75 (MPL's-Ell, E21 and E41)-
Ref.: DCR 82-75 (MPL's-Ell, E21 and E41)-
c                                       -
c


          ,          HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER           DATE COMPLETED           DESCRIPTION 84-3759             01-03-85           Modify Pipe Supports per WPS 82-75-M003.
HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 84-3759 01-03-85 Modify Pipe Supports per WPS 82-75-M003.
Ref. DCR 82-75 (MPL-Ell) 84-4992             12-31-84           Modify Pipe Supports
Ref. DCR 82-75 (MPL-Ell) 84-4992 12-31-84 Modify Pipe Supports
                                                                              ~
~
per WPS-82-75-M021 in Torus Bay 16.
per WPS-82-75-M021 in Torus Bay 16.
Ref. DCR 82                                                       (MPL-Ell, E51) 84-6076             01-03-85           Modify Pipe Supports per WPS-82-75-M033 in the torus (1T48)
Ref. DCR 82 (MPL-Ell, E51) 84-6076 01-03-85 Modify Pipe Supports per WPS-82-75-M033 in the torus (1T48)
Ref.: DCR 82-75 84-4608             12-31-84           Modify Pipe Supports per WPS-82-75-M015.
Ref.: DCR 82-75 84-4608 12-31-84 Modify Pipe Supports per WPS-82-75-M015.
Ref.: DCR 82-75 (MPL-Ell, E41, E51, T48) 84-4965             05-17-85           Modify Pipe Support per-WPS-82-75-H024 in Torus Chamber Bay.7   ,
Ref.: DCR 82-75 (MPL-Ell, E41, E51, T48) 84-4965 05-17-85 Modify Pipe Support per-WPS-82-75-H024 in Torus Chamber Bay.7 Ref. DCR 82-75 (MPL-Ell) 84-5564 12-27-84 Modified Branchline hanger E11-RHRBH-8 per WPS# 82-75-M029 in Drywell Access area.
Ref. DCR 82-75 (MPL-Ell) 84-5564             12-27-84           Modified Branchline hanger E11-RHRBH-8 per WPS# 82-75-M029 in Drywell Access area.
Ref. DCR 82-75 84-3758 12-26-84 Strengthened Torus attached piping per new calculated loads by modifying, deleting and adding supports to 1G51 system per WPS 82-75-M005.
Ref. DCR 82-75 84-3758             12-26-84           Strengthened Torus attached piping per new calculated loads by modifying, deleting and adding supports to 1G51 system per WPS 82-75-M005.
Ref.: DCR 82-75.
Ref.: DCR 82-75.           _
84-5596 12-19-84 Strengthened Torus attached piping by modifying and installing pipe supports per WPS 82-75-M026 on Ell and E21 systems.
84-5596             12-19-84           Strengthened Torus attached piping by modifying and installing pipe supports per WPS 82-75-M026 on Ell and E21 systems.
Ref.: DCR 82-75
Ref.: DCR 82-75


e-e
e-e HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER.
* HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER.           DATE COMPLETED           DESCRIPTION 84-4996           .12-27-84           Strengthened Torus attached piping by modifying and installing pipe supports on Ell and T48 systems per WPS 82-75-M020.
DATE COMPLETED DESCRIPTION 84-4996
.12-27-84 Strengthened Torus attached piping by modifying and installing pipe supports on Ell and T48 systems per WPS 82-75-M020.
Ref.: DCR 82-75.
Ref.: DCR 82-75.
84-5597             12-26-84           Strengthened Torus attached piping by modifying and installing pipe supports on T48, Ell, E41, E51 and P33 systems per WPS 82-75-M031.
84-5597 12-26-84 Strengthened Torus attached piping by modifying and installing pipe supports on T48, Ell, E41, E51 and P33 systems per WPS 82-75-M031.
Ref.: DCR 82-75 84-5216             12-20-84           Strengthened Torus attached piping by modifying and installing pipe supports on.T48, Ell and E21 systems per WPS 82-75-M025.
Ref.: DCR 82-75 84-5216 12-20-84 Strengthened Torus attached piping by modifying and installing pipe supports on.T48, Ell and E21 systems per WPS 82-75-M025.
Ref.: DCR 82-75.
Ref.: DCR 82-75.
84-4585             01-16-85           Pulled cables in control room for the Analog Transmitter Trip System (A70) per WPS 81-138-E001 through E005. Ref: DCR 81-138 Rev. 1 84-4490           ~12-26-84           Strengthened Torus attached piping by modifying and           . -
84-4585 01-16-85 Pulled cables in control room for the Analog Transmitter Trip System (A70) per WPS 81-138-E001 through E005. Ref: DCR 81-138 Rev. 1 84-4490
installing pipe supports on 1821 system per WPS 82-75-M009.
~12-26-84 Strengthened Torus attached piping by modifying and installing pipe supports on 1821 system per WPS 82-75-M009.
Ref.: DCR 82-75 85-1677             04-26-85           Replaced Recirc pump Temperature recorder B31-R601 with L&N model 250 recorder per WPS 84-005-E001.
Ref.: DCR 82-75 85-1677 04-26-85 Replaced Recirc pump Temperature recorder B31-R601 with L&N model 250 recorder per WPS 84-005-E001.
Ref. DCR 84-005.
Ref.
DCR 84-005.


m
m c.
: c.
' HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 85-3072 06-13-85 Core drilled hole for 3/4 inch air line from outside through wall into TSC mechanical equipment room.
        ,            ' HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER               DATE COMPLETED           DESCRIPTION 85-3072                 06-13-85           Core drilled hole for 3/4 inch air line from outside through wall into TSC mechanical     -
Ref.: FDR 80-157 sheet 14, DCR 80-157, MPL 1X75.
equipment room.
85-72 06-20-85 Clean, prime and coat all new supports installed per DCR-84-315 in the Battery Charger Room.
Ref.: FDR 80-157                                                         sheet 14, DCR 80-157, MPL 1X75.
Ref. MWO-1-84-7976 84-7033 06-05-85 Perform Raceway Relocation to eliminate
85-72                   06-20-85           Clean, prime and coat all new supports installed per DCR-84-315 in the Battery Charger Room.
' interference with pipe support E11-RHRH-715 per WPS 82-75-M042 Ref. DCR 82-75 85-2187 05-14-85' Repair hold down bolts and base plate for 1P51-C001C Station Air Compressor Ref.
Ref. MWO-1-84-7976 84-7033                 06-05-85           Perform Raceway Relocation to eliminate
DCR 85-56 85-2500-06-03-85 Perform semi-annual P/M on 1P51-C001C and D101C and annual P/M on 1PS2-D102C per HNP-1-6360 Ref. DCR 84-32 85-2540 06-14-85 Re-route existing fire protection-water pipe per WPS-84-64-M001.
                                                      ' interference with pipe support E11-RHRH-715 per WPS 82-75-M042 Ref. DCR 82-75 85-2187                 05-14-85'         Repair hold down bolts and base plate for 1P51-C001C Station Air Compressor Ref. DCR 85-56 85-2500-               06-03-85           Perform semi-annual P/M on 1P51-C001C and D101C and annual P/M on 1PS2-D102C per HNP-1-6360 Ref. DCR 84-32 85-2540                 06-14-85           Re-route existing fire protection-water pipe per WPS-84-64-M001.     ._
Ref.: MR #1-84-6990 and DCR 85-64 84-5595 12-31-84 Install and modify Branch line hangers per WPS 82-75-M030.
Ref.: MR #1-84-6990 and DCR 85-64 84-5595                 12-31-84           Install and modify Branch line hangers per WPS 82-75-M030.
MPL-1E41.
MPL-1E41.
Ref. DCR 82-75
Ref. DCR 82-75


F 9
F 9
      .          HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER-           DATE COMPLETED           DESCRIPTION 84-4962             12-31-84             ' Install and modify pipe supports per WPS 82-75-M018 in Bay 11 of Torus Chamber. MPL -
HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER-DATE COMPLETED DESCRIPTION 84-4962 12-31-84
1E11 Ref.: DCR 82-75 84-6206             04-28-85             Set Breaker Trip element per design and perform bench test to verify proper functional operation.
' Install and modify pipe supports per WPS 82-75-M018 in Bay 11 of Torus Chamber. MPL -
Ref.: WPS 82-253-J001 and DCR 82-253 83-7734             01-07-85             ATTS modification -
1E11 Ref.:
DCR 82-75 84-6206 04-28-85 Set Breaker Trip element per design and perform bench test to verify proper functional operation.
Ref.:
WPS 82-253-J001 and DCR 82-253 83-7734 01-07-85 ATTS modification -
Delete cables and internal wires as required by design package.
Delete cables and internal wires as required by design package.
Ref.:   WPS 81-138-T013 and DCR 81-138, Rev. 1.
Ref.:
WPS 81-138-T013 and DCR 81-138, Rev. 1.
e
e
                                  -.x-m- wm.. --mm           +v- -we-,e - mw e- m   -,e -v rm
-.x-m-wm..
--mm
+v-
-we-,e
- mw e-m
-,e
-v rm


HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER         DATE COMPLETED           DESCRIPTION 85-1354.         05-03-85           Pulled cables and terminated on Standby Gas Treatment System (2T48) per WPS-83-092-E001.     '
HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 85-1354.
Also performed core drill and installed conduit and supports. Pulled cable and installed terminal boxes per WPS 83-092-E002. cut piping and installed flanges; also installed 2" diameter by-pass line and-2T46-F076 and F077 dampers.with supports per WPS 83-092-M002.
05-03-85 Pulled cables and terminated on Standby Gas Treatment System (2T48) per WPS-83-092-E001.
Ref.: DCR 83-092 85-2202         05-20-85             Removed cable and conduit and pull boxes for RCIC Steam Isolation Valve (2E51-F008).per WPS 85-65-E001 and WPS 85-65.
Also performed core drill and installed conduit and supports.
          ' 85-1017         05-01-85             Fabricated and installed cover on needle valve 2C11-F086 in Control Rod Drive System per WPS 82-206-M004.
Pulled cable and installed terminal boxes per WPS 83-092-E002.
Ref.: DCR 82-206 85-1978         05-01-85           Refurbished four 12HFA51A42F HFA relays per Special Procedure 42SP-EEL-004-2 and converted into 12HFA151A42F relays per DCR 82-171.
cut piping and installed flanges; also installed 2" diameter by-pass line and-2T46-F076 and F077 dampers.with supports per WPS 83-092-M002.
Installed into panel 2H11-P628 in previous location of relays P21C-K11L, B21C-FKKF, B21C-K11G and B21C-K11K Ref.: DCR 82-171 85-297           05-16-85           Calibrated Time Delay Relays     .
Ref.: DCR 83-092 85-2202 05-20-85 Removed cable and conduit and pull boxes for RCIC Steam Isolation Valve (2E51-F008).per WPS 85-65-E001 and WPS 85-65.
2P70-KR10, -KR12, -KR20, and
' 85-1017 05-01-85 Fabricated and installed cover on needle valve 2C11-F086 in Control Rod Drive System per WPS 82-206-M004.
                                                  -K922 per procedure HNP-2-5261.
Ref.: DCR 82-206 85-1978 05-01-85 Refurbished four 12HFA51A42F HFA relays per Special Procedure 42SP-EEL-004-2 and converted into 12HFA151A42F relays per DCR 82-171.
Installed into panel 2H11-P628 in previous location of relays P21C-K11L, B21C-FKKF, B21C-K11G and B21C-K11K Ref.:
DCR 82-171 85-297 05-16-85 Calibrated Time Delay Relays 2P70-KR10, -KR12, -KR20, and
-K922 per procedure HNP-2-5261.
These relays are found in the Dryvell Pneumatic System.
These relays are found in the Dryvell Pneumatic System.
l                                                 Ref.: DCR 81-112 u
l Ref.:
DCR 81-112 u


m HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER       DATE COMPLETED           DESCRIPTION 85-2003       05-08-85             Replaced old 1/2" finger bars with new 3/4" finger bars of stainless steel. Also rewelded cracked sparger plates on Main ~
m HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 85-2003 05-08-85 Replaced old 1/2" finger bars with new 3/4" finger bars of stainless steel.
Also rewelded cracked sparger plates on Main ~
condenser 2N61-B001A per WPS 85-76-M001.
condenser 2N61-B001A per WPS 85-76-M001.
Ref.: DCR 85-76 84-6335       05-16-85             Installed new thumbturn in pipe penetration room door at 130'-0" elevation so that it will withstand predicted differntial pressure due to a HPCI Steam Line Break.
Ref.: DCR 85-76 84-6335 05-16-85 Installed new thumbturn in pipe penetration room door at 130'-0" elevation so that it will withstand predicted differntial pressure due to a HPCI Steam Line Break.
Ref. DCR 83-209.
Ref. DCR 83-209.
85-1988       05-01-85             Refurbished three 12HFA51A42F relays per special procedure 42SP-EEL-004-2 and converted into 12HFA151A42F relays per DCR 82-171. Installed relays in panel 2Hll-OP617 in previous locations of relays EllA-KllA, E11A-K47A, and EWilA-K100A.
85-1988 05-01-85 Refurbished three 12HFA51A42F relays per special procedure 42SP-EEL-004-2 and converted into 12HFA151A42F relays per DCR 82-171.
Ref: DCR 82-171 82-2574       06-04-85             Pull cable PHA90Zll for Drywell Pneumatic System Supply line high pr' essure switch (2P70-N017)
Installed relays in panel 2Hll-OP617 in previous locations of relays EllA-KllA, E11A-K47A, and EWilA-K100A.
Ref:
DCR 82-171 82-2574 06-04-85 Pull cable PHA90Zll for Drywell Pneumatic System Supply line high pr' essure switch (2P70-N017)
Ref.: DCR 81-112 and MR#
Ref.: DCR 81-112 and MR#
2-83-2803.
2-83-2803.
85-1163                             Install oil groove on trip /trottle valve and grease fittings on RCIC Turbine system (2E51-C002)
85-1163 Install oil groove on trip /trottle valve and grease fittings on RCIC Turbine system (2E51-C002)
Ref. DCR 83-151 82-2781       06-04-85             Install new pressure switch, MPL # 2P70-N017 and field route tubing per FDR 81-112-2.
Ref. DCR 83-151 82-2781 06-04-85 Install new pressure switch, MPL # 2P70-N017 and field route tubing per FDR 81-112-2.
Ref.: DCR 81-112, and MR#
Ref.:
DCR 81-112, and MR#
2-83-2803.
2-83-2803.
85-2701       06-18-85             Repair Recirc M/G Set A Scoop
85-2701 06-18-85 Repair Recirc M/G Set A Scoop
                                          . Tube. position driver pulley (2821-S001A)
. Tube. position driver pulley (2821-S001A)
Ref. DCR 85-104
Ref.
DCR 85-104


W HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER       DATE COMPLETED           DESCRIPTION 85-945         06-18-85             Remove end caps from feedwater-heater flash chambers and install weld neck flanges in   '
W HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 85-945 06-18-85 Remove end caps from feedwater-heater flash chambers and install weld neck flanges in accordance with DCR 85-15.
accordance with DCR 85-15.
Ref.:
Ref.: SDR 85-15-2 and WPS 85-15-P001 85-1326         05-17-85             Implementation of DCR 84-142.
SDR 85-15-2 and WPS 85-15-P001 85-1326 05-17-85 Implementation of DCR 84-142.
Install hangers in cable spread room, install flex in D/G switchgear. rooms, pull cable from control room to D/G switchgear rooms and install keylock override switch for 2P64-B006 A&B & 2T47-C001 A&B 85-1536         06-05-85             Delete internal jumpers in panels 2H11-P617, P618, P620, P621, P626, P627, and P628.
Install hangers in cable spread room, install flex in D/G switchgear. rooms, pull cable from control room to D/G switchgear rooms and install keylock override switch for 2P64-B006 A&B & 2T47-C001 A&B 85-1536 06-05-85 Delete internal jumpers in panels 2H11-P617, P618, P620, P621, P626, P627, and P628.
Ref.: DCR 81-139 Rev. 1 85-2131-       06-05-85             Rework tubing and perform internal wiring in panel 2P33-P001A&B per WPS 81-165-J004 and WPS 81-165-E030 Ref.: DCR 81-165 85-2259         06-05-85             Install supports for conduit 2E21601-2A per WPS 84-310-C001 cnd C002.
Ref.: DCR 81-139 Rev. 1 85-2131-06-05-85 Rework tubing and perform internal wiring in panel 2P33-P001A&B per WPS 81-165-J004 and WPS 81-165-E030 Ref.:
Ref.: DCR 84-310 (MPL 2R25-S065) 85-1125         05-28-85             Implement DCR 84-241 per WPS 84-241-P001. Install piping supports and isolation valves for Body Feed System.
DCR 81-165 85-2259 06-05-85 Install supports for conduit 2E21601-2A per WPS 84-310-C001 cnd C002.
85-1946         06-03-85             Install modified conduit support CS-17-16 in HPCI room Ref. DCR 81-139, Rev. 1 85-2256         05-31-85             Replace Basler Electric Co.
Ref.:
DCR 84-310 (MPL 2R25-S065) 85-1125 05-28-85 Implement DCR 84-241 per WPS 84-241-P001.
Install piping supports and isolation valves for Body Feed System.
85-1946 06-03-85 Install modified conduit support CS-17-16 in HPCI room Ref. DCR 81-139, Rev. 1 85-2256 05-31-85 Replace Basler Electric Co.
Transformer Model No.
Transformer Model No.
BE10773001 with model No.
BE10773001 with model No.
Line 174: Line 212:
and 2R43-P001C Ref. DCR 85-85
and 2R43-P001C Ref. DCR 85-85


m                                               3 HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER                                               DATE COMPLETED               DESCRIPTION 84-4715                                 ' ' '
m 3
* 06-03-85             Install new overspeed trip assembly, new piston and new tappet. Also modify valve body per WPS 83-72-M001 Ref. DCR 83-72 85-1662                                                   06-17-85             Modify existing cable tray / conduit supports per WPS 84-227-E001 in Cable Spread       .
HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 84-4715 06-03-85 Install new overspeed trip assembly, new piston and new tappet.
Room Ref.:   DCR 84-227 2181                                                   06-20-85             Perform Initial Service Inspection for ATTS system per procedures 2H-1-l&2 Ref. DCR 81-139, Rev. 1 85-166                                                   06-04-85             Appendix "R" - Fabricate and install conduit, supports, pull t'                                                                        boxes, and junction boxes and pull cable in Reactor Bldg and
Also modify valve body per WPS 83-72-M001 Ref. DCR 83-72 85-1662 06-17-85 Modify existing cable tray / conduit supports per WPS 84-227-E001 in Cable Spread Room Ref.:
                                                                      ,                    Control Bldg per f                         WPS-83-144-E001 thru E007.
DCR 84-227 2181 06-20-85 Perform Initial Service Inspection for ATTS system per procedures 2H-1-l&2 Ref. DCR 81-139, Rev. 1 85-166 06-04-85 Appendix "R" - Fabricate and install conduit, supports, pull t
boxes, and junction boxes and pull cable in Reactor Bldg and Control Bldg per f
WPS-83-144-E001 thru E007.
MPL-2E41(HPCI) and 2E51 (RCIC)
MPL-2E41(HPCI) and 2E51 (RCIC)
Ref.:   DCR 83-144 85-1318                                                   05-01-85             Upgrade HFA Relays in 2C71 system in panel 2H11-P609 to Century Series per WPS 82-171-E027 Ref.: DCR 82-171 85-1542                                                   05-28-85             Install new relay in panel 2Hil-P655, remove relay 2S32-L0ER-R024 and pull new cables per WPS 81-41-E001, E002 and J001.
Ref.:
Ref.: DCR 81-41                     _
DCR 83-144 85-1318 05-01-85 Upgrade HFA Relays in 2C71 system in panel 2H11-P609 to Century Series per WPS 82-171-E027 Ref.: DCR 82-171 85-1542 05-28-85 Install new relay in panel 2Hil-P655, remove relay 2S32-L0ER-R024 and pull new cables per WPS 81-41-E001, E002 and J001.
85-6998                                                   05-14-85             Build and install support for power supply 2Cll-P59 in panel 2Hil-P616 per WPS 84-321-E001 &
Ref.:
DCR 81-41 85-6998 05-14-85 Build and install support for power supply 2Cll-P59 in panel 2Hil-P616 per WPS 84-321-E001 &
E002.
E002.
Ref.:SDR-84-321-3 and DCR 84-321 i
Ref.:SDR-84-321-3 and DCR 84-321 i
84-6141                                       _          04-24-85.._ _ -. _ Tag instrument. root _. valves for
84-6141 04-24-85.._ _ -.
                ',                                                                        Drywell Pneumatic system per WPS 81-112-M004.
_ Tag instrument. root _. valves for Drywell Pneumatic system per WPS 81-112-M004.
                                                /
/
Ref. DCR 81-112 e
Ref.
DCR 81-112 e
4 d
4 d
                  . _ __ _ _ _ _ - _ _ _ _ - _ _                                    1
1


      ,            HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER       DATE COMPLETED           DESCRIPTION 84-2850       05-01-85             Pull cable per WPS 83-173-E001 for RPT Breakers A&B on Scoop Tube actuator.
HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 84-2850 05-01-85 Pull cable per WPS 83-173-E001 for RPT Breakers A&B on Scoop Tube actuator.
Ref. DCR 83-173               -
Ref.
84-5080       05-10-85             Modify RWCU circ pump per DCR 84-74.
DCR 83-173 84-5080 05-10-85 Modify RWCU circ pump per DCR 84-74.
Ref.:   WPS-84-74-MOO 1 and FCR 84-7401 85-1323       04-26-85             Upgrade HFA relays in the 2E11 system in panel 2Hil-P617 to Century Series relays per WPS 82-171-E029.
Ref.:
Ref.:   DCR 82-171 85-1316       04-26-85             Upgrade HFA relays in 2A71 system in panel 2Hll-P622 to century series relays per WPS 82-171-E025.
WPS-84-74-MOO 1 and FCR 84-7401 85-1323 04-26-85 Upgrade HFA relays in the 2E11 system in panel 2Hil-P617 to Century Series relays per WPS 82-171-E029.
Ref.:   OCR 82-171 85-1140       05-09-85             Modify Main Turbine Stop Valves-pressure sensing lines pressure switches (2C71-N003 A,B,C&D) per WPS-83-201-E001, E002 and E003 Ref. DCR 83-201.
Ref.:
2165       05-13-85             Refurbish (5) five HFA 5149F.
DCR 82-171 85-1316 04-26-85 Upgrade HFA relays in 2A71 system in panel 2Hll-P622 to century series relays per WPS 82-171-E025.
Ref.:
OCR 82-171 85-1140 05-09-85 Modify Main Turbine Stop Valves-pressure sensing lines pressure switches (2C71-N003 A,B,C&D) per WPS-83-201-E001, E002 and E003 Ref. DCR 83-201. 2165 05-13-85 Refurbish (5) five HFA 5149F.
relays per procedure 42SP-EEL-004-2.
relays per procedure 42SP-EEL-004-2.
Ref. DCR 82-171 85-1314       05-01-85             Refurbish existing HFA relays in accordance with procedure 42SP-EEL-004-2 per WPS 82-171-E022 and adjust and test -
Ref. DCR 82-171 85-1314 05-01-85 Refurbish existing HFA relays in accordance with procedure 42SP-EEL-004-2 per WPS 82-171-E022 and adjust and test -
existing HFA relays in accordance with procedure 42SP-EEL-003-2 per WPS 82-171-E022.
existing HFA relays in accordance with procedure 42SP-EEL-003-2 per WPS 82-171-E022.
Ref.: DCR 82-171 85-1228       05-01-85             Adjust and test new HFA Century
Ref.:
                                            .__ series. relays.per__ _ ..._ _
DCR 82-171 85-1228 05-01-85 Adjust and test new HFA Century
.__ series. relays.per__ _..._
WPS-82-171-E021 and procedure 42SP-EEL-003-2.
WPS-82-171-E021 and procedure 42SP-EEL-003-2.
Ref.:   DCR 82-171
Ref.:
DCR 82-171


HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 85-1324         05-01-85           Upgrade HFA relays in 2C71 system in panel 2Hll-P611 to century series relays per WPS
HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 85-1324 05-01-85 Upgrade HFA relays in 2C71 system in panel 2Hll-P611 to century series relays per WPS 82-171-E028.
.                                            82-171-E028.
Ref.:
Ref.:   DCR 82-171             '-
DCR 82-171 4
4 84-6372       05-29-85             Correct tubing between the 3 -
84-6372 05-29-85 Correct tubing between the 3 -
valve manifold and the DP transmitter per FCR 81-139-381. Relay instrument valves and maintain " Class C" housekeeping for Rx water level for "SPDS" 85-1287       04-30-85             Motors and Actuators on valves 2E11-F016B and 2 Ell-F021B replaced. Valve on 2E11-F016B replaced. For RHR Containment Spray.
valve manifold and the DP transmitter per FCR 81-139-381.
85-1822       05-13-85             Correct wiring error per DR 2-85-212 on A71.
Relay instrument valves and maintain " Class C" housekeeping for Rx water level for "SPDS" 85-1287 04-30-85 Motors and Actuators on valves 2E11-F016B and 2 Ell-F021B replaced.
85-882         05-12-85             Install. grating in Main Condenser per DCR 85-22 and WPS 85-22-M001.
Valve on 2E11-F016B replaced.
85-1883       05-07-85             Special purpose procedure
For RHR Containment Spray.
                                            #42SP-041785-2 to remove temporary cross-tie of the DC SWGR 2R22-S016/S017. Enabling the testing of 2B(2R42-S001B) batteries.
85-1822 05-13-85 Correct wiring error per DR 2-85-212 on A71.
85-1823       05-03           Install new batteries in station battery 28 room.
85-882 05-12-85 Install. grating in Main Condenser per DCR 85-22 and WPS 85-22-M001.
85-1883 05-07-85 Special purpose procedure
#42SP-041785-2 to remove temporary cross-tie of the DC SWGR 2R22-S016/S017.
Enabling the testing of 2B(2R42-S001B) batteries.
85-1823 05-03 Install new batteries in station battery 28 room.
Reterminate cables when batteries are installed.
Reterminate cables when batteries are installed.
85-2128       05-11-85             Tube clamps and tube supports on tubing - associated with instruments 2B21-N301A, B, E, F, K, and 2821-N302 C, D, G, H, M, L removed and replaced.
85-2128 05-11-85 Tube clamps and tube supports on tubing - associated with instruments 2B21-N301A, B, E, F, K, and 2821-N302 C, D, G, H,
Instrument support modifications and fabrication
M, L removed and replaced.
                  -      _ _ _ _ .          and installation _of_ jet-.
Instrument support modifications and fabrication and installation _of_ jet-.
impingment barrier for 2P2B518-3I.
impingment barrier for 2P2B518-3I.


    ,          HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 85-1317         05-01-85           Normally energized and de-energized HFA relays upgraded on.2A71/2E51 in 2H11-P623 to Century Series
HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 85-1317 05-01-85 Normally energized and de-energized HFA relays upgraded on.2A71/2E51 in 2H11-P623 to Century Series Relays.
                                                                                            ~
~
Relays.
85-1366 05-01-85 Normally energized and selected normally de-energized HFA relays in 2A71 in 2H1-P611 to Century Series. Relays.
85-1366         05-01-85           Normally energized and selected normally de-energized HFA relays in 2A71 in 2H1-P611 to Century Series. Relays.
85-1356 05-14-85 Motors and actuators on valves 2E11-F016A and 2E11-F021A replaced.
85-1356         05-14-85           Motors and actuators on valves 2E11-F016A and 2E11-F021A replaced.           Valve 2E11-F016A replaced. For RHR containment spray.
Valve 2E11-F016A replaced.
84-6160         04-09-85           Seal on RWCU pump 2A replaced because it nad blown.
For RHR containment spray.
85-1434         05-14-85           Instrument tubing cap pressure test performed.           Cap downstream of 2831-F057A.
84-6160 04-09-85 Seal on RWCU pump 2A replaced because it nad blown.
85-883           05-17-85           Modify and repair baffles in Main Condenser (2N61) per WPS-85-22-M002 Ref. DCR-85-22.
85-1434 05-14-85 Instrument tubing cap pressure test performed.
85-1433         05-10-85           Work on ATTS instruments to be done on MWO 2-85-2181.
Cap downstream of 2831-F057A.
W
85-883 05-17-85 Modify and repair baffles in Main Condenser (2N61) per WPS-85-22-M002 Ref. DCR-85-22.
                  . . _ .            m,,m         -  w-wwm-ww-ww         mmm & , - m--. 4 h
85-1433 05-10-85 Work on ATTS instruments to be done on MWO 2-85-2181.
W m,,m w-wwm-ww-ww mmm &, -
m--.
4 h


ni'
. q W;'qrxL$.. 7,7. A.
                                                                                                                                                                .q
'h.7"' 'F 0, y.i[
: y. W;'qrxL$..
4Il ni'
4Il            .. 7,7 . A .
,y.
                                                                                                                                                                                                                                  'h.7"' 'F'a
'a
                                                                                                                                                                                                                            . < . -                          0, y.i[
[,
[,                                   UNIT SliUTDOWNS AND POWER REDUCTIONS                                                       , [h7          f' g [A, g
UNIT SliUTDOWNS AND POWER REDUCTIONS
* lia h One                             ;j , ,?
, [h f' g [A, g 7
y ,. ei M= ,q p.g,(:                                     DATE       7-5-85                               p tee Kan he                        f .:'.,
lia h One
;j,,?
y,. ei M=,q p.g,(:
DATE 7-5-85 p
June
June
* 1985 ;. . ~       ~              '! YU COMPLETED SY
* 1985 ;.. ~
                    .                                                                              REPORT MONTri                                         -
'! YU COMPLETED SY tee Kan he f.:'.,
: 7. t p       r                ELEPHONE           (912)367-7851x288g 3
REPORT MONTri
: 7. t p ELEPHONE (912)367-7851x288g
~
r 3
1.]-$
1.]-$
                                                                                                                                                                            ' .:                                                                                        M'g u       =                                                   c
M'g u
                                                        .,      ,[g         3         4 Yii         Licensee                     Et,             j'q. -                     *
=
                                                                                                                                                                                                  "Cause & Corrective           -
c ap]
ap]  .
,[g 3
No.              Date                     R. E8         s         .8 s 5           Event                     p               g "g '                   <
4 Yii Licensee Et, j'q. -
                                                                                                                                                                                      ;-                Action to                                 ,              ga mO I-35         5         j;gg           Report #                                   g                      ,, ,
"Cause & Corrective ga No.
Prevent Recurrence                              -              t ;
Date R.
6                                                                       -
E8 s
                                                                                                                                                                                                                                                                            \q
.8 s 5 Event p
                                                                                                                                                                                                                                                                'f, ~ , ;, t 85-46           06-01-85                     S       '16.5         B             5           N/A                       ZZ         ZZZZZZ .             Monthly Surveillance testing
g "g '
                                                                                                                                                                                                                                                                  ,.d.
Action to Prevent Recurrence I-35 5
85-47           06-09-85'                   S         2.8         B             5           N/A                       HA         TURBIN"               Weekly Turbine testing                                                                             *l'
j;gg Report #
                                                                                                                                                                                  '_                                                                                  .. :l 85-48           06-14-85                     S         3.3         B             5           N/A                       HA '       TURBIN               Weekly Turbine testing                                                                               >P i                                                                                                                              .  .
mO t ;
                                                                                                                                                                                                                                                                        '1 :
g 6
85-49           06-16-85                     F         3.4         A             5           N/A                       CD         VALVEX.               Reduc'ing power to repair leaking.MSIV's                                                                 }'.
\\q
                                                                                                                                                                                                                                                                              .t 85-50           06-16-85'                   F       70.9         A           2           N/A                       CD         VALVEX               Manual scram in order to repair leaking                                                                     -
'f, ~, ;, t 85-46 06-01-85 S
MSIV                                                                                                     I e t
'16.5 B
85-51.           06-16-85'                   S         9.6         B           5           .N/A-                       CD         VALVEX               Recovery"frout above scram                                                       ,
5 N/A ZZ ZZZZZZ.
i
Monthly Surveillance testing
                                                                                                                                                                                                                                                                            ' 'l 85-52           06-20-85:                   S         0.9         B           5           N/A                       RC         CONROD               Rod patEern adjustment                                                     ' . *;          ,
,.d.
85-53           06-20-85'                   S         7.3,       B           5         ~N/A'                       CD         VALVEX               Continuing' Scram Recovery                                                       }                       '
85-47 06-09-85' S
85-54           06-20-85                     F-*      12.5         A           5           N/A ,'                     Cll        IIEATER              llolding power to repair steam leak in d                                           "
2.8 B
                                              ,                                                                                                                    7th stage heater                       "B"                                                                 '
5 N/A HA TURBIN" Weekly Turbine testing
I                                 :        2                                                                         3 Method:
*l'
5 4
.. :l 85-48 06-14-85 S
Exhibit G-Instructions k
3.3 B
F: Forced                  l           Reason:                                                                                                                                                                        .
5 N/A HA '
S: Scheduled               i           A Equipment' Failure (Explain)                                       .
TURBIN Weekly Turbine testing
l-Manual                            :                            for Preparation of Dats                      @V D Maintenance of Test                                             +. 2 Manual Scram.
>P
                                                                                                                                                                                              - .-    Entry Sheets for Licensee 4           -
'1 i
I C Refuctin:;                                                 .            3 Automatic Scram.                   }                           Event Report (LER) File (NUREG .: .                                     -
85-49 06-16-85 F
D Regulatory Rest:;etion                                                 4 -Continuations                       .
3.4 A
0161)                                    ',.Q. y  ,
5 N/A CD VALVEX.
                                        .'' !            E Operator Training & License Examination                       ..?!     5-Ioad Pcduction                                                                           ;-                   Y,
Reduc'ing power to repair leaking.MSIV's
                                                                                                                                                                                                                              .~
}'.
                                                                                                                            *~-
.t 85-50 06-16-85' F
F-Adminis rs:ive 9-Other (Explain)                                     '    S Exhibit !-Same Source ..                   iy A
70.9 A
C'-Operations! Errer (Explain)               ,..g
2 N/A CD VALVEX Manual scram in order to repair leaking MSIV Ie t
        . (o/77)                                         Il-Other (Explain) ,                          i.-                                      .
85-51.
                                                                                                                                                                                        .                                            , ,' .9                              -
06-16-85' S
                                                                                                                                                                                                              -                . .;                  t y
9.6 B
      .s                               .
5
                                                                                                                                                                                                                                  ,.             :             4              ,
.N/A-CD VALVEX Recovery"frout above scram i
' 'l 85-52 06-20-85:
S 0.9 B
5 N/A RC CONROD Rod patEern adjustment 85-53 06-20-85' S
7.3, B
5
~N/A' CD VALVEX Continuing' Scram Recovery
}
85-54 06-20-85 F-12.5 A
5 N/A,'
llolding power to repair steam leak in d Cll IIEATER 7th stage heater "B" k
I 2
3 4
F: Forced l
Reason:
Method:
5 Exhibit G-Instructions
@V l-Manual for Preparation of Dats S: Scheduled i
A Equipment' Failure (Explain)
D Maintenance of Test
+.
2 Manual Scram.
Entry Sheets for Licensee 4 C Refuctin:;
3 Automatic Scram.
}
Event Report (LER) File (NUREG.:.
I 0161)
' Q. y D Regulatory Rest:;etion 4 -Continuations E Operator Training & License Examination
..?!
5-Ioad Pcduction
. ~;-
Y, S
A F-Adminis rs:ive
* ~ -
9-Other (Explain)
Exhibit !-Same Source..
iy C'-Operations! Errer (Explain)
,..g
.9 (o/77)
Il-Other (Explain) i.-
t y 4
.s
. a l.:-
: N
: N
                                                        +,+
. i...
i'..                 :.     .
i'..
                                                                                                                                                                                  . a l.:-                          .
.,, y
: j.                          w: ;                                                                                                  .g
.g
        . i. ..                            .                                                                                                                                                                                          -
.,q
a        ,
+,+
                                                                                                                                                  .,, y                                                                          .
j.
                                                                                                                                                                                                                                                      .,q
w: ;
a


1 50-351                 ,
1 50-351
DOCKETNO.
~
UNIT NAME Hatch one
UNIT SHUTDOWNS AND POWER REDUCHONS DOCKETNO. Hatch one UNIT NAME DATE 7-5-85 i
                                      ~
COMPLETED gy Lee Kanine REPORT MON 111 TELEPHONE (912) 367-7851 x 2882 I
* UNIT SHUTDOWNS AND POWER REDUCHONS                           .
June 1985 G
DATE 7-5-85                                           i COMPLETED gy Lee Kanine June 1985                                                                                                              I REPORT MON 111                                                               TELEPHONE (912) 367-7851 x 2882                       -
3 f
G w    3                                           f                                                                               '
w Licensee Eg 4
                                          -          .] g                  jYj            Licensee           Eg               4                                 Cause & Corrective u                                                         AcIlun to
Cause & Corrective
.] g jYj u
AcIlun to ekg
[}
[}
                                                          =                                Event No.           Date           6                                 Eac                           ekg                                                Provent Recurrence P-           $                    (5          Report #
No.
: i, 85-55     06-20-85'             F-         3 . 9' .       A.     5             N/A               RC'       INSTRU       Holding power to repair "A TIP machine.
Date 6
VALVEX      Scram recovery continues.                                                  '.
Eac Event
85-56     06-21-85             S       1.5 .7           B       5             N/A               CP
=
(5 Report #
Provent Recurrence P-
: i, 85-55 06-20-85' F-3. 9'.
A.
5 N/A RC' INSTRU Holding power to repair "A TIP machine.
85-56 06-21-85 S
1.5.7 B
5 N/A CP VALVEX Scram recovery continues.
[
[
85-57     06-22-85             S         4.1           B       5             N/A               HA         TURBIN       Weekly turbine test.
85-57 06-22-85 S
1-85-26              EB        TRANSF        Personnel error actuated fire sprinkler 85-58     06-27-85             F       37.0             G       2                                                                                                                                   ''
4.1 B
system spraying down startup trans-former 1C causing 1A and IB busses to                                           .
5 N/A HA TURBIN Weekly turbine test.
trip. This caused loss of power to I
85-58 06-27-85 F
37.0 G
2 1-85-26 EB TRANSF Personnel error actuated fire sprinkler system spraying down startup trans-former 1C causing 1A and IB busses to trip. This caused loss of power to I
both recire and circ water pumps.
both recire and circ water pumps.
85-59     06-29-85             S         3.6           B       5             N/A               EB         TRANSF       Scram recovery 85-60     06-29-85             F       10.0             B       5             N/A               EB         TRANSF       Holding load to put Unit Aux.
85-59 06-29-85 S
3.6 B
5 N/A EB TRANSF Scram recovery 85-60 06-29-85 F
10.0 B
5 N/A EB TRANSF Holding load to put Unit Aux.
Transformer back in service.
Transformer back in service.
85-61     06-29-85             S       41.3             B       5             N/A               EB         TRANSF       icram Recovery continues.
l 85-61 06-29-85 S
l                                                                                                                                    I'                                                                             .
41.3 B
                                                                                                          .3                                                   4
5 N/A EB TRANSF icram Recovery continues.
!            I                          2                                                                                        .
I' I
r              Exhibit G . instructions F: Forced                     Reason:                                                           Method:
2
:l              S: Scheduled                   A Eitulpment Failure (Explain)                     -
.3 4
I Manual                                i            for Preparation of Data 2 Manual Scram.                          >            Entry Sheets for Licentee                             .        ,
:l F: Forced Reason:
B-Maintenance or Test                                                                                                 ' Event Repost(LER) File (NUREG. ~
Method:
                    '"
r Exhibit G. instructions for Preparation of Data I Manual i
* C Refueling                                               ..    ,    3 Automatic Scram.          '.
S: Scheduled A Eitulpment Failure (Explain)
D Regulatory Restriction
Entry Sheets for Licentee B-Maintenance or Test 2 Manual Scram.
                                                                                                        ~
3 Automatic Scram.
4 -Continuations                                       016I) j 5-Ioad Reduction E Operator Training & Ucense Examination               :                                                      .-
' Event Repost(LER) File (NUREG. ~
5 F-Administrative r                   ' 9 m (gg)                                   -
* C Refueling
ExhibleI SanseSouw Goperational Error (Explain) noiner(E=,iaia)                     ..
~
om>
D Regulatory Restriction 4 -Continuations 016I) j 5-Ioad Reduction E Operator Training & Ucense Examination 5
                                    .                                                                                 .                         .      .          3..            .
F-Administrative r
' 9 m (gg)
ExhibleI SanseSouw Goperational Error (Explain) 3..
noiner(E=,iaia) om>
-(Ty
..=.
n-
n-
                                                  ..= .
                    -(Ty _ -                                            ;                    .'.      .


.A
. r;.y. e. ;e e..-
c.
s
s
                                                                                                                                / fv
/ fv
: f. .
: f..
                                                                                                                                                      ..c r; .y.  # e.
.c # -
                                                                                                                                                                                .A
.. m
                                                                                                                                                                        - ;e e...            .- m.
.4-4;..y:yy',j?.
c.
L. M:3 V:p DOCKETNO 50-366
                                          .',.                                                                                                                        4;..y:yy',j?.
~
                                                                                                                                            .4-      .,-                                                                    ..
UNITSHUTDOWNS AND FOWER P. EDUCTIONS '.i;'.4 l. ' -:6' UNIT NAM.J.
                                ''                      ~
Hatch Two
                                                                ,                                                                                      L. M:3                               V:p DOCKETNO                 50-366 UNITSHUTDOWNS AND FOWER P. EDUCTIONS                         '.i;'.4 l.,. ' -:6'                                                                 '*
#-5-03
UNIT NAM.J. Hatch Two
'.,, g p.-
                                                                                                                                                            ' ., , g                 p.-
DATE i@;; COMPLETED BY i
DATE #-5-03 Lee Kanipe June' 1985 i
Lee Kanipe June' 1985 REPORT MONTH TELEPHONE (912)367-7851 x2882
REPORT MONTH i@;; COMPLETED            TELEPHONE       BY(912)367-7851 x2882
*L q
                                                                                            *L                                         _
.3 g 3
                                                                                        )Y q          .3 g       3               Licensec           ,Evo                  -                                .                   ? Cause & Correct;ve
)Y Licensec
* No.       ' Date -                         g             ij   *s     Mg&         Event             p               e."o"8                                -
,Ev e."o"8 Action to
Action to                            .
? Cause & Correct;ve No.
              .                                              t-        [j E         u j gg g       Repor: #         mu             yV                                ,.
' Date -
Prevent Recurrence 5
g ij
4                                               .
*s Mg&
85-31                                                                                                                                                                    .c . .
Event p
06-03'-85                           F         18.6         A     3           N/A               HJ         TURBIN               Turbine trip on h.igh MSR level i ,-
o yV Prevent Recurrence t-
85-32     06-04N5                             S         38.3         B     5           N/A             HJ           TURBIN               Recovery?from above scram
[j E u
                                                                          '                                                            .                                      i. .               -u 85-33     06-09-85                           S           3.2         B   -5           N/A             HA           TURBIN Weeklp[turbinetesting   --j l:
j gg g Repor: #
85-34 06-1.6-85                           S           3.4         B     5'         N/A             HA           TURBIN               Weekly' turSine testing 85-35     06-22-85                           S           3.7         B     5           N/A             HA           TURBIN               Weeki).[ turbine testirig 4
mu 5
                                                                                                                                                                                    *.      .O**
4
I g                                      y                                                            3 i
.c..
                                                                                                                                                                          . ,, ~ 1 4 F: Forced                                   Reason:                                                   Picthod:
85-31 06-03'-85 F
4     ..        . Exhibit G . Instructions 5: S:heduled .,                             A 0;uip.v.:nt'Failur:(Expl:in)                             14hnu:1                                                 '
18.6 A
                                                                                                                                                                                                      'i.for Preparation of Dats B .'.!:intenan:e ciTest                                   2-Manual S:r:m.                                                                   Entry Sh:ets for Licensee             -
3 N/A HJ TURBIN Turbine trip on h.igh MSR level 85-32 06-04N5 i,-
          .                                                C. Refueling                                         .      3-Autornatic Scram.                                                               Event Report (LER) File (NUREG.
S 38.3 B
D Regulatory Restriction E-Operator Training & Ucense Examination 4 -Continuations                        . l ".hfdi..                R 0161) 5'-I.oad Pcduction                             % ,j" .                                   -
5 N/A HJ TURBIN Recovery?from above scram
F-Administrative G-Operational Error (Explain)                     -
: i..
9-Other (Explain)                                   ',: grig g5                    Exhibit 1-Same Source (9/77)                                         Il Oth:r(Exp! in)
-u 85-33 06-09-85 S
* 2(,3$[l 3 h.b..i       .n q                                                             ,
3.2 B
n                  '
-5 N/A HA TURBIN Weeklp[turbinetesting
:-      .          My.%
--j l:
m
85-34 06-1.6-85 S
3.4 B
5' N/A HA TURBIN Weekly' turSine testing 85-35 06-22-85 S
3.7 B
5 N/A HA TURBIN Weeki).[ turbine testirig 4
.O**
I
.,, ~ 1 i
g y
3 4
F: Forced Reason:
Picthod:
4
. Exhibit G. Instructions 5: S:heduled.,
A 0;uip.v.:nt'Failur:(Expl:in) 14hnu:1
'i.for Preparation of Dats B.'.!:intenan:e ciTest 2-Manual S:r:m.
Entry Sh:ets for Licensee C. Refueling 3-Autornatic Scram.
. l.h i.. 0161)
Event Report (LER) File (NUREG.
D Regulatory Restriction 4 -Continuations
" fd R E-Operator Training & Ucense Examination 5'-I.oad Pcduction
%,j".
F-Administrative
', g g 5 9-Other (Explain)
G-Operational Error (Explain) ri g Exhibit 1-Same Source (9/77)
Il Oth:r(Exp! in) 2(,3$[l 3 h.b..i
.n q
My.%
m n


                                                ~
~
                                                                                                                      ]
]
OPERATING DATA REPORT DOCKET NO. 50-321 DATE           07-10-85 COFPLETED BY: Lee M. Kanipe, Jr.
OPERATING DATA REPORT DOCKET NO.
TELEPHOPE     (912) 367-7781 x. 2882 OPERATING STATUS Notes
50-321 DATE 07-10-85 COFPLETED BY: Lee M. Kanipe, Jr.
TELEPHOPE (912) 367-7781 x. 2882 OPERATING STATUS Notes
: 1. Unit Name: E. I. Hatch Nuclear Plant Unit 1
: 1. Unit Name: E. I. Hatch Nuclear Plant Unit 1
: 2. Reporting Period: 06-85
: 2. Reporting Period: 06-85
Line 398: Line 551:
: 9. Power Level to Which Restricted, If Any (Net MWe)
: 9. Power Level to Which Restricted, If Any (Net MWe)
: 10. Reasons for Restrictions, If Any:
: 10. Reasons for Restrictions, If Any:
i i                                           This Month     Yr-to-Date       Cumulative
i i
: 11. Hours In Reporting Period                                           720         4343           83255
This Month Yr-to-Date Cumulative
: 12. Number of Hours Reactor was Critical                               635.7       3689.6           58853.6
: 11. Hours In Reporting Period 720 4343 83255
: 13. Reactor Reserve Shutdown Hours                                       0.0           0.0             0.0
: 12. Number of Hours Reactor was Critical 635.7 3689.6 58853.6
: 14. Hours Generator On-Line                                           612.0       3493.5         55361.4
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
: 15. Unit Reserve Shutdown Hours                                         0.0           0.0             0.0
: 14. Hours Generator On-Line 612.0 3493.5 55361.4
: 16. Gross Thermal Energy Generated (MWH)   .
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
1402944       7789015       117158205
: 16. Gross Thermal Energy Generated (MWH) 1402944 7789015 117158205
: 17. Gross Electrical Energy Generated (MWH)                           457440     2558340         37814060
: 17. Gross Electrical Energy Generated (MWH) 457440 2558340 37814060
: 18. Net Electrical Energy Generated (MWH)                             436540     2441260         35899106
: 18. Net Electrical Energy Generated (MWH) 436540 2441260 35899106
: 19. Unit Service Factor '                                               85.0         80.4             66.5
: 19. Unit Service Factor '
: 20. Unit Availability Factor                                           85.0         80.4             66.5
85.0 80.4 66.5
: 21. Unit Capacity Factor (Using MDC Net)                               80.6         74.7             57.3
: 20. Unit Availability Factor 85.0 80.4 66.5
: 22. Unit Capacity Factor (Using DER Net)                               78.0         72.3             55.5
: 21. Unit Capacity Factor (Using MDC Net) 80.6 74.7 57.3
: 23. Unit Forced Outage Rate                                             13.9         13.2             17.8
: 22. Unit Capacity Factor (Using DER Net) 78.0 72.3 55.5
: 23. Unit Forced Outage Rate 13.9 13.2 17.8
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage beginning December 1, 1985       10 to 13 weeks
Refueling Outage beginning December 1, 1985 10 to 13 weeks
: 25. If Shutdown at End of Report Period, Estimated Date of Startup:
: 25. If Shutdown at End of Report Period, Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):                   Forecast             Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C0t4ERCIAL OPERATION 4
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C0t4ERCIAL OPERATION 4
3
3
 
:-1 AVERAE DAILY UNIT POWER LEVEL DOCKET NO.
:-1 AVERAE DAILY UNIT POWER LEVEL DOCKET NO.     50-321 DATE:-         07-10-85 COMPLETED BY: Lee M. Kanipe'Jr.
50-321 DATE:-
TELEPHONE       (912) 367-7781 x. 2882 MONTH 06-85 DAY     AVERAGE DAILY POWER LEVEL             DAY             -AVERA E DAILY POWER LEVEL (MWe-Net)                                                 (MWe-Net)
07-10-85 COMPLETED BY: Lee M. Kanipe'Jr.
I 1           i'      751                       17                             -18 2                   719                       18                             -15 3                   755                       19                             75 4                   761                       20                           .598 5           l.     757                       21                             720 6                   761                       22                             762 7           l      760                       23                             759 8                   762                       24                             766 9                   760                       25                             762 10                 763                       26                             764 11                 764                       27                             404 12                 '766                       28                             -18 13                 773                       29                             205 14           >
TELEPHONE (912) 367-7781 x. 2882 MONTH 06-85 DAY AVERAGE DAILY POWER LEVEL DAY
772                       30                             556 15           .
-AVERA E DAILY POWER LEVEL (MWe-Net)
751                       31 16                  496 (9/77) 4
(MWe-Net)
I 1
i 751 17
-18 2
719 18
-15 3
755 19 75 4
761 20
.598 5
l.
757 21 720 6
l 761 22 762 7
760 23 759 8
762 24 766 9
760 25 762 10 763 26 764 11 764 27 404 12
'766 28
-18 13 773 29 205 14 772 30 556 15 16 751 31 496 (9/77) 4


q
q
                                            . OPERATING DATA REPORT DOCKET NO.     50-366 DATE           07-10-85' COMPLETED BY: Lee M. Kanipe Jr.
. OPERATING DATA REPORT DOCKET NO.
TELEPHOE       (912)~367-7781 x 2882 OPERATING STATUS Notes
50-366 DATE 07-10-85' COMPLETED BY: Lee M. Kanipe Jr.
: 1. Unit Name: E. I. Hatch Nuclear Plant Unit 2 2   Reporting Period: 06-85
TELEPHOE (912)~367-7781 x 2882 OPERATING STATUS Notes 1.
: 3. Licensed Thermal Power (MWt): 2436 4   Nameplate Rating (Gross MWe): 817.0
Unit Name: E. I. Hatch Nuclear Plant Unit 2 2
: 5. Design Electrical Rating (Net MWe): 784.0
Reporting Period: 06-85 3.
: 6. Maximum Dependable Capacity (Gross MWe): 803.9
Licensed Thermal Power (MWt): 2436 4
: 7. Maximum Dependable Capacity (Net MWe): 747.9
Nameplate Rating (Gross MWe): 817.0 5.
: 8. If Changes Occur in Capacity Ratings (Items N mber 3 through 7) Since Last Report, Give Reasons:
Design Electrical Rating (Net MWe): 784.0 6.
: 9. Power Level to Which Restricted, If Any (Net MWe):
Maximum Dependable Capacity (Gross MWe): 803.9 7.
Maximum Dependable Capacity (Net MWe): 747.9 8.
If Changes Occur in Capacity Ratings (Items N mber 3 through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
: 10. Reasons for Restrictions, If Any:
: 10. Reasons for Restrictions, If Any:
                      !                                          This Month     Yr-to-Date       Cumulative
This Month Yr-to-Date Cumulative
: 11. Hours In Reporting Period                                           720           4343           50880
: 11. Hours In Reporting Period 720 4343 50880
: 12. Nmber of Hours Reactor was Critical                               711.6       3132.5           33312.6
: 12. Nmber of Hours Reactor was Critical 711.6 3132.5 33312.6
: 13. Reactor Reserve Shutdown Hours                                       0.0           0.0             0.0
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
: 14. Hours Generator On-Line                                           701.4       3036.8           31660.9
: 14. Hours Generator On-Line 701.4 3036.8 31660.9
: 15. Unit Reserve Shutdown Hours                                         0.0           0.0             0.0
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 16. Gross Thermal Energy Generated (MWH)                             1681056       7080312         68281894
: 16. Gross Thermal Energy Generated (MWH) 1681056 7080312 68281894
: 17. Gross Electrical Energy Generated (MWH)                           555380       2358150         22517630
: 17. Gross Electrical Energy Generated (MWH) 555380 2358150 22517630
: 18. Net Electrical Energy Generated (MWH)                             532218       2251976         21414425
: 18. Net Electrical Energy Generated (MWH) 532218 2251976 21414425
: 19. Unit Service Factor                                                 97.4           69.9             62.2
: 19. Unit Service Factor 97.4 69.9 62.2
: 20. Unit Availability Factor                                           97.4           69.9             62.2
: 20. Unit Availability Factor 97.4 69.9 62.2
: 21. Unit Capacity Factor (Using MDC Net)                               98.8           69.3             56.3
: 21. Unit Capacity Factor (Using MDC Net) 98.8 69.3 56.3
: 22. Unit Capacity Factor (Using DER Net)                               94.3           66.1             53.7
: 22. Unit Capacity Factor (Using DER Net) 94.3 66.1 53.7
: 23. Unit Forced Outage Rate                                             2.6           3.8             12.0
: 23. Unit Forced Outage Rate 2.6 3.8 12.0
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
i
i
: 25. If Shutdown at End of Report Period, Estimated Date of Startup:
: 25. If Shutdown at End of Report Period, Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):                   Forecast             Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION l
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION l
i
i


                                                                                                        - gm AVERA E DAILY UNIT POWER LEVEL DOCKET NO.     50-366 DATE:           07-10-85
- g m
                                                              .CO WLETED BY: Lee M. Kanipe Jr.
AVERA E DAILY UNIT POWER LEVEL DOCKET NO.
TELEPHOE       (912) 367-7781 x 2882 MONTH 06-85 DAY     AVERA E DAILY POWER LEVEL             DAY             AVERA E DAILY POWER LEVEL (MWe-Net)                                                   (MWe-Net) 1           l'    762                         17                             767 2                 761                         18                             770 3                 665                         19                             .773 4                   97                         20                             777 5                 621                         21                             777 6           \
50-366 DATE:
755                         22                             761 7                 765                         23                             773 8           l 768                         24                             774 9                 765                         25'                             771 10         ,
07-10-85
772                         26                             772 11         i     769                         27                             770 12         {     770                         28                             774 13         i     779                         29                             770 14               781                         30                             773 15         i 775                         31 16               767 i
.CO WLETED BY: Lee M. Kanipe Jr.
(9/77)
TELEPHOE (912) 367-7781 x 2882 MONTH 06-85 DAY AVERA E DAILY POWER LEVEL DAY AVERA E DAILY POWER LEVEL (MWe-Net)
                          ~
(MWe-Net) 1 l
762 17 767 2
761 18 770 3
665 19
.773 4
97 20 777 5
621 21 777 6
\\
755 22 761 7
765 23 773 8
l 768 24 774 9
765 25' 771 10 772 26 772 11 i
769 27 770 12
{
770 28 774 13 i
779 29 770 14 781 30 773 15 i
775 31 16 767 (9/77) i
~
7
7


Georgia Power Company
Georgia Power Company Post Office Box 439 Baxley, Georgia 31513 Telephone 912 367-7781 912 537-9444 Edwin 1. Hatch Nuclear Plant July 8,.1985 LR-MGR-032-0785 PLANT E.
      .    ,                      Post Office Box 439 Baxley, Georgia 31513 Telephone 912 367-7781 912 537-9444 Edwin 1. Hatch Nuclear Plant July 8,.1985 LR-MGR-032-0785 PLANT E. I.' HATCH NRC Monthly Operating Report-Director
I.' HATCH NRC Monthly Operating Report-Director
          -Office of Inspection and Enforcement' United States Nuclear Regulatory Commission Region II Suite 3100
-Office of Inspection and Enforcement' United States Nuclear Regulatory Commission Region II Suite 3100 101 Marietta Street Washington, D. C.
,          101 Marietta Street Washington, D. C.                                               2G555
2G555


==Dear-Sir:==
==Dear-Sir:==
Per Tech' Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 1, Docket #50-321, and for Hatch Unit 2, Docket #50-366.
Per Tech' Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 1, Docket #50-321, and for Hatch Unit 2, Docket #50-366.
K7 x     4ct
K7 x 4ct
                                                                                    / i H. C. Nix General Manager HCN/                   $/dA$/Z/fl                               bb w
/ i H.
                                                                                                  /
C. Nix General Manager HCN/
J 59 l   I t}}
$/dA$/Z/fl bb w
/
J 9
5 l
I t}}

Latest revision as of 09:30, 12 December 2024

Monthly Operating Repts for June 1985
ML20132G095
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/30/1985
From: Kanipe L, Nix H
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
LR-MGR-032-0785, LR-MGR-32-785, NUDOCS 8507190155
Download: ML20132G095 (22)


Text

r s

e NARRATIVE REPORT

' * ~

UNIT 1 June 1st 0000 Unit at full power with no major equipment problems.

2330 Reducing load for monthly surveillance testing.

-June 2nd 1600 Back at rated power.

June 9th 0000 Reducing load for weekly turbine testing.

0248 Turbine Testing complete.

Unit back at rated power.

June 14th 2334 Reducing load for weekly turbine testing.

June 15th 0253 Turbine testing complete.

Unit back at rated power.

June 16th 0845 MSIV "B"' leaking.

1352 Decreasing power to prepare for shutdown to repair MSIV "B".

1717 Reactor made switch to shutdown, with Reactor power at 842 CMWT.

June 18th 2257 Reactor mode to Startup.

June 19th 0058 Reactor Critical.

1614 Turbine Generator on Line.

Ramping to rated.

-June 20th 0150 Reducing power for rod pattern adjustment.

0241 Resuming power increases.

0900 Steam leak in 7th Stage heater "B".

1350 7th stage heater "B"

isolate for repair to crack in dump line.

2130 7th stage heater "B"

repaired and placed back in service.

Holding power for repair of "A" TIP machine.

8507190155 850630

  1. $fb i

PDR ADOCK 05000321

\\h R

PDR

w.

NARRATIVE REPORT UNIT 1 June 21st 0121 "A" TIP machine repaired. Ramping to rated power.

1700 Back at rated power.

June 22nd 2301 Reducing load for Weekly Turbine testing.

June 27th 1217 Spurious Recirc Runback, Unit at 530 MWe.

1320 Rx. manually scrammed, personnel error actuated deluge on startup transformer IC, causing loss of A&B busses which supply recire and circ water pumps.

June 28th 1454 Startup in progress.

Beginning to pull rods.

1758 Rx. critical.

' June 29th 0222 Turbine Generator on line.

Ramping to rated.

0600 Holding power to put Unit Auxillary Transformer back in service.

1600 UAT back in service.

Ramping to rated.

June 30th 2400 Unit at.692 MWE on preconditioning ramp.

No major equipment problems.

E

e-

,g-NARRATIVE REPORT UNIT 2

--June 1st 0000 Unit operating at rated power.

No major equipment problems.

June 3rd 2104 Turbine trip on high MSR level, Reactor scrammed.

' June'4th 0526 Reactor Critical.

1542 Generator tied to line.

Ramping to rated power.

June 6th 0600 Achieved rated power.

June 9th 0100 Reducing load for Weekly Turbine Testing.

0410 Back at rated power.

June'16th 0114 Reducing load for Weekly Turbine Testing.

0437 Back at rated power.

June 22nd 0105 Reducing load for Weekly Turbine Testing.

0445 Back at rated power.

June 30th 2400 Unit at rated power with no major equipment problems.

I e

b

HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 84-6937 05-10-85 Repair 1831-Recirc-12AR-F-2 weld per Nutech overlay design drawing (No.

XGP-09-131)..

Ref. HNP-1-10174, WPS-35, and DCR-84-251.

84-6451 05-29-85 Modify Pipe Support - per WP5 S2-75-M041.

Ref:

DCR 82-75, MPL E41 84-3762 01-02-85 Modify Pipe Support - per WPS 82-75-M004.

Ref:

OCR 82-75 MPL-E41 84-5565 05-17-85 Modify Branch line hanger E51-RCIBH-1 per WPS 82-75-M028.

Ref:

DCR 82-75 84-3760 01-02-85 Install Pipe Supports E51-RCICH-702, E51-RCSEH-722; and modify pipe supports E51-RCICH-16 and E51-RCICH-17 per WPS-82-75-M006.

Ref:

DCR 82-75 85-824-05-16-85 Install conduit and supports per WPS-81-196-E002.

Ref: DCR 81-196 MPL-R33 84-5900 05-17-85 Implementation of stiffner plates to torus nozzles (MPL-T23) per WPS-82-75-M036.

Ref. DCR 82-75 Penetrations X-214 & X-220.

84-4993 01-03-85 Modify Pipe Supports per WPS-82-75-M022 in S.W.

Diagonal.

Ref.: DCR 82-75 (MPL-E51) 84-4994 12031084 Modify Pipe Supports per WPS-82-75-H019 in Torus Chamber Bays 12 & 13.

Ref.: DCR 82-75 (MPL's-Ell, E21 and E41)-

c

HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 84-3759 01-03-85 Modify Pipe Supports per WPS 82-75-M003.

Ref. DCR 82-75 (MPL-Ell) 84-4992 12-31-84 Modify Pipe Supports

~

per WPS-82-75-M021 in Torus Bay 16.

Ref. DCR 82 (MPL-Ell, E51) 84-6076 01-03-85 Modify Pipe Supports per WPS-82-75-M033 in the torus (1T48)

Ref.: DCR 82-75 84-4608 12-31-84 Modify Pipe Supports per WPS-82-75-M015.

Ref.: DCR 82-75 (MPL-Ell, E41, E51, T48) 84-4965 05-17-85 Modify Pipe Support per-WPS-82-75-H024 in Torus Chamber Bay.7 Ref. DCR 82-75 (MPL-Ell) 84-5564 12-27-84 Modified Branchline hanger E11-RHRBH-8 per WPS# 82-75-M029 in Drywell Access area.

Ref. DCR 82-75 84-3758 12-26-84 Strengthened Torus attached piping per new calculated loads by modifying, deleting and adding supports to 1G51 system per WPS 82-75-M005.

Ref.: DCR 82-75.

84-5596 12-19-84 Strengthened Torus attached piping by modifying and installing pipe supports per WPS 82-75-M026 on Ell and E21 systems.

Ref.: DCR 82-75

e-e HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER.

DATE COMPLETED DESCRIPTION 84-4996

.12-27-84 Strengthened Torus attached piping by modifying and installing pipe supports on Ell and T48 systems per WPS 82-75-M020.

Ref.: DCR 82-75.

84-5597 12-26-84 Strengthened Torus attached piping by modifying and installing pipe supports on T48, Ell, E41, E51 and P33 systems per WPS 82-75-M031.

Ref.: DCR 82-75 84-5216 12-20-84 Strengthened Torus attached piping by modifying and installing pipe supports on.T48, Ell and E21 systems per WPS 82-75-M025.

Ref.: DCR 82-75.

84-4585 01-16-85 Pulled cables in control room for the Analog Transmitter Trip System (A70) per WPS 81-138-E001 through E005. Ref: DCR 81-138 Rev. 1 84-4490

~12-26-84 Strengthened Torus attached piping by modifying and installing pipe supports on 1821 system per WPS 82-75-M009.

Ref.: DCR 82-75 85-1677 04-26-85 Replaced Recirc pump Temperature recorder B31-R601 with L&N model 250 recorder per WPS 84-005-E001.

Ref.

DCR 84-005.

m c.

' HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 85-3072 06-13-85 Core drilled hole for 3/4 inch air line from outside through wall into TSC mechanical equipment room.

Ref.: FDR 80-157 sheet 14, DCR 80-157, MPL 1X75.

85-72 06-20-85 Clean, prime and coat all new supports installed per DCR-84-315 in the Battery Charger Room.

Ref. MWO-1-84-7976 84-7033 06-05-85 Perform Raceway Relocation to eliminate

' interference with pipe support E11-RHRH-715 per WPS 82-75-M042 Ref. DCR 82-75 85-2187 05-14-85' Repair hold down bolts and base plate for 1P51-C001C Station Air Compressor Ref.

DCR 85-56 85-2500-06-03-85 Perform semi-annual P/M on 1P51-C001C and D101C and annual P/M on 1PS2-D102C per HNP-1-6360 Ref. DCR 84-32 85-2540 06-14-85 Re-route existing fire protection-water pipe per WPS-84-64-M001.

Ref.: MR #1-84-6990 and DCR 85-64 84-5595 12-31-84 Install and modify Branch line hangers per WPS 82-75-M030.

MPL-1E41.

Ref. DCR 82-75

F 9

HATCH 1 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER-DATE COMPLETED DESCRIPTION 84-4962 12-31-84

' Install and modify pipe supports per WPS 82-75-M018 in Bay 11 of Torus Chamber. MPL -

1E11 Ref.:

DCR 82-75 84-6206 04-28-85 Set Breaker Trip element per design and perform bench test to verify proper functional operation.

Ref.:

WPS 82-253-J001 and DCR 82-253 83-7734 01-07-85 ATTS modification -

Delete cables and internal wires as required by design package.

Ref.:

WPS 81-138-T013 and DCR 81-138, Rev. 1.

e

-.x-m-wm..

--mm

+v-

-we-,e

- mw e-m

-,e

-v rm

HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 85-1354.

05-03-85 Pulled cables and terminated on Standby Gas Treatment System (2T48) per WPS-83-092-E001.

Also performed core drill and installed conduit and supports.

Pulled cable and installed terminal boxes per WPS 83-092-E002.

cut piping and installed flanges; also installed 2" diameter by-pass line and-2T46-F076 and F077 dampers.with supports per WPS 83-092-M002.

Ref.: DCR 83-092 85-2202 05-20-85 Removed cable and conduit and pull boxes for RCIC Steam Isolation Valve (2E51-F008).per WPS 85-65-E001 and WPS 85-65.

' 85-1017 05-01-85 Fabricated and installed cover on needle valve 2C11-F086 in Control Rod Drive System per WPS 82-206-M004.

Ref.: DCR 82-206 85-1978 05-01-85 Refurbished four 12HFA51A42F HFA relays per Special Procedure 42SP-EEL-004-2 and converted into 12HFA151A42F relays per DCR 82-171.

Installed into panel 2H11-P628 in previous location of relays P21C-K11L, B21C-FKKF, B21C-K11G and B21C-K11K Ref.:

DCR 82-171 85-297 05-16-85 Calibrated Time Delay Relays 2P70-KR10, -KR12, -KR20, and

-K922 per procedure HNP-2-5261.

These relays are found in the Dryvell Pneumatic System.

l Ref.:

DCR 81-112 u

m HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 85-2003 05-08-85 Replaced old 1/2" finger bars with new 3/4" finger bars of stainless steel.

Also rewelded cracked sparger plates on Main ~

condenser 2N61-B001A per WPS 85-76-M001.

Ref.: DCR 85-76 84-6335 05-16-85 Installed new thumbturn in pipe penetration room door at 130'-0" elevation so that it will withstand predicted differntial pressure due to a HPCI Steam Line Break.

Ref. DCR 83-209.

85-1988 05-01-85 Refurbished three 12HFA51A42F relays per special procedure 42SP-EEL-004-2 and converted into 12HFA151A42F relays per DCR 82-171.

Installed relays in panel 2Hll-OP617 in previous locations of relays EllA-KllA, E11A-K47A, and EWilA-K100A.

Ref:

DCR 82-171 82-2574 06-04-85 Pull cable PHA90Zll for Drywell Pneumatic System Supply line high pr' essure switch (2P70-N017)

Ref.: DCR 81-112 and MR#

2-83-2803.

85-1163 Install oil groove on trip /trottle valve and grease fittings on RCIC Turbine system (2E51-C002)

Ref. DCR 83-151 82-2781 06-04-85 Install new pressure switch, MPL # 2P70-N017 and field route tubing per FDR 81-112-2.

Ref.:

DCR 81-112, and MR#

2-83-2803.

85-2701 06-18-85 Repair Recirc M/G Set A Scoop

. Tube. position driver pulley (2821-S001A)

Ref.

DCR 85-104

W HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 85-945 06-18-85 Remove end caps from feedwater-heater flash chambers and install weld neck flanges in accordance with DCR 85-15.

Ref.:

SDR 85-15-2 and WPS 85-15-P001 85-1326 05-17-85 Implementation of DCR 84-142.

Install hangers in cable spread room, install flex in D/G switchgear. rooms, pull cable from control room to D/G switchgear rooms and install keylock override switch for 2P64-B006 A&B & 2T47-C001 A&B 85-1536 06-05-85 Delete internal jumpers in panels 2H11-P617, P618, P620, P621, P626, P627, and P628.

Ref.: DCR 81-139 Rev. 1 85-2131-06-05-85 Rework tubing and perform internal wiring in panel 2P33-P001A&B per WPS 81-165-J004 and WPS 81-165-E030 Ref.:

DCR 81-165 85-2259 06-05-85 Install supports for conduit 2E21601-2A per WPS 84-310-C001 cnd C002.

Ref.:

DCR 84-310 (MPL 2R25-S065) 85-1125 05-28-85 Implement DCR 84-241 per WPS 84-241-P001.

Install piping supports and isolation valves for Body Feed System.

85-1946 06-03-85 Install modified conduit support CS-17-16 in HPCI room Ref. DCR 81-139, Rev. 1 85-2256 05-31-85 Replace Basler Electric Co.

Transformer Model No.

BE10773001 with model No.

BE36116001 in panels 2R43-P001A u __

and 2R43-P001C Ref. DCR 85-85

m 3

HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 84-4715 06-03-85 Install new overspeed trip assembly, new piston and new tappet.

Also modify valve body per WPS 83-72-M001 Ref. DCR 83-72 85-1662 06-17-85 Modify existing cable tray / conduit supports per WPS 84-227-E001 in Cable Spread Room Ref.:

DCR 84-227 2181 06-20-85 Perform Initial Service Inspection for ATTS system per procedures 2H-1-l&2 Ref. DCR 81-139, Rev. 1 85-166 06-04-85 Appendix "R" - Fabricate and install conduit, supports, pull t

boxes, and junction boxes and pull cable in Reactor Bldg and Control Bldg per f

WPS-83-144-E001 thru E007.

MPL-2E41(HPCI) and 2E51 (RCIC)

Ref.:

DCR 83-144 85-1318 05-01-85 Upgrade HFA Relays in 2C71 system in panel 2H11-P609 to Century Series per WPS 82-171-E027 Ref.: DCR 82-171 85-1542 05-28-85 Install new relay in panel 2Hil-P655, remove relay 2S32-L0ER-R024 and pull new cables per WPS 81-41-E001, E002 and J001.

Ref.:

DCR 81-41 85-6998 05-14-85 Build and install support for power supply 2Cll-P59 in panel 2Hil-P616 per WPS 84-321-E001 &

E002.

Ref.:SDR-84-321-3 and DCR 84-321 i

84-6141 04-24-85.._ _ -.

_ Tag instrument. root _. valves for Drywell Pneumatic system per WPS 81-112-M004.

/

Ref.

DCR 81-112 e

4 d

1

HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 NUMBER DATE COMPLETED DESCRIPTION 84-2850 05-01-85 Pull cable per WPS 83-173-E001 for RPT Breakers A&B on Scoop Tube actuator.

Ref.

DCR 83-173 84-5080 05-10-85 Modify RWCU circ pump per DCR 84-74.

Ref.:

WPS-84-74-MOO 1 and FCR 84-7401 85-1323 04-26-85 Upgrade HFA relays in the 2E11 system in panel 2Hil-P617 to Century Series relays per WPS 82-171-E029.

Ref.:

DCR 82-171 85-1316 04-26-85 Upgrade HFA relays in 2A71 system in panel 2Hll-P622 to century series relays per WPS 82-171-E025.

Ref.:

OCR 82-171 85-1140 05-09-85 Modify Main Turbine Stop Valves-pressure sensing lines pressure switches (2C71-N003 A,B,C&D) per WPS-83-201-E001, E002 and E003 Ref. DCR 83-201. 2165 05-13-85 Refurbish (5) five HFA 5149F.

relays per procedure 42SP-EEL-004-2.

Ref. DCR 82-171 85-1314 05-01-85 Refurbish existing HFA relays in accordance with procedure 42SP-EEL-004-2 per WPS 82-171-E022 and adjust and test -

existing HFA relays in accordance with procedure 42SP-EEL-003-2 per WPS 82-171-E022.

Ref.:

DCR 82-171 85-1228 05-01-85 Adjust and test new HFA Century

.__ series. relays.per__ _..._

WPS-82-171-E021 and procedure 42SP-EEL-003-2.

Ref.:

DCR 82-171

HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 85-1324 05-01-85 Upgrade HFA relays in 2C71 system in panel 2Hll-P611 to century series relays per WPS 82-171-E028.

Ref.:

DCR 82-171 4

84-6372 05-29-85 Correct tubing between the 3 -

valve manifold and the DP transmitter per FCR 81-139-381.

Relay instrument valves and maintain " Class C" housekeeping for Rx water level for "SPDS" 85-1287 04-30-85 Motors and Actuators on valves 2E11-F016B and 2 Ell-F021B replaced.

Valve on 2E11-F016B replaced.

For RHR Containment Spray.

85-1822 05-13-85 Correct wiring error per DR 2-85-212 on A71.85-882 05-12-85 Install. grating in Main Condenser per DCR 85-22 and WPS 85-22-M001.

85-1883 05-07-85 Special purpose procedure

  1. 42SP-041785-2 to remove temporary cross-tie of the DC SWGR 2R22-S016/S017.

Enabling the testing of 2B(2R42-S001B) batteries.

85-1823 05-03 Install new batteries in station battery 28 room.

Reterminate cables when batteries are installed.

85-2128 05-11-85 Tube clamps and tube supports on tubing - associated with instruments 2B21-N301A, B, E, F, K, and 2821-N302 C, D, G, H,

M, L removed and replaced.

Instrument support modifications and fabrication and installation _of_ jet-.

impingment barrier for 2P2B518-3I.

HATCH 2 SAFETY-RELATED MAINTENANCE WORK ORDERS TO BE REPORTED FOR JUNE 1985 85-1317 05-01-85 Normally energized and de-energized HFA relays upgraded on.2A71/2E51 in 2H11-P623 to Century Series Relays.

~

85-1366 05-01-85 Normally energized and selected normally de-energized HFA relays in 2A71 in 2H1-P611 to Century Series. Relays.

85-1356 05-14-85 Motors and actuators on valves 2E11-F016A and 2E11-F021A replaced.

Valve 2E11-F016A replaced.

For RHR containment spray.

84-6160 04-09-85 Seal on RWCU pump 2A replaced because it nad blown.

85-1434 05-14-85 Instrument tubing cap pressure test performed.

Cap downstream of 2831-F057A.85-883 05-17-85 Modify and repair baffles in Main Condenser (2N61) per WPS-85-22-M002 Ref. DCR-85-22.

85-1433 05-10-85 Work on ATTS instruments to be done on MWO 2-85-2181.

W m,,m w-wwm-ww-ww mmm &, -

m--.

4 h

. q W;'qrxL$.. 7,7. A.

'h.7"' 'F 0, y.i[

4Il ni'

,y.

'a

[,

UNIT SliUTDOWNS AND POWER REDUCTIONS

, [h f' g [A, g 7

lia h One

j,,?

y,. ei M=,q p.g,(:

DATE 7-5-85 p

June

  • 1985 ;.. ~

'! YU COMPLETED SY tee Kan he f.:'.,

REPORT MONTri

7. t p ELEPHONE (912)367-7851x288g

~

r 3

1.]-$

M'g u

=

c ap]

,[g 3

4 Yii Licensee Et, j'q. -

"Cause & Corrective ga No.

Date R.

E8 s

.8 s 5 Event p

g "g '

Action to Prevent Recurrence I-35 5

j;gg Report #

mO t ;

g 6

\\q

'f, ~, ;, t 85-46 06-01-85 S

'16.5 B

5 N/A ZZ ZZZZZZ.

Monthly Surveillance testing

,.d.

85-47 06-09-85' S

2.8 B

5 N/A HA TURBIN" Weekly Turbine testing

  • l'

.. :l 85-48 06-14-85 S

3.3 B

5 N/A HA '

TURBIN Weekly Turbine testing

>P

'1 i

85-49 06-16-85 F

3.4 A

5 N/A CD VALVEX.

Reduc'ing power to repair leaking.MSIV's

}'.

.t 85-50 06-16-85' F

70.9 A

2 N/A CD VALVEX Manual scram in order to repair leaking MSIV Ie t

85-51.

06-16-85' S

9.6 B

5

.N/A-CD VALVEX Recovery"frout above scram i

' 'l 85-52 06-20-85:

S 0.9 B

5 N/A RC CONROD Rod patEern adjustment 85-53 06-20-85' S

7.3, B

5

~N/A' CD VALVEX Continuing' Scram Recovery

}

85-54 06-20-85 F-12.5 A

5 N/A,'

llolding power to repair steam leak in d Cll IIEATER 7th stage heater "B" k

I 2

3 4

F: Forced l

Reason:

Method:

5 Exhibit G-Instructions

@V l-Manual for Preparation of Dats S: Scheduled i

A Equipment' Failure (Explain)

D Maintenance of Test

+.

2 Manual Scram.

Entry Sheets for Licensee 4 C Refuctin:;

3 Automatic Scram.

}

Event Report (LER) File (NUREG.:.

I 0161)

' Q. y D Regulatory Rest:;etion 4 -Continuations E Operator Training & License Examination

..?!

5-Ioad Pcduction

. ~;-

Y, S

A F-Adminis rs:ive

  • ~ -

9-Other (Explain)

Exhibit !-Same Source..

iy C'-Operations! Errer (Explain)

,..g

.9 (o/77)

Il-Other (Explain) i.-

t y 4

.s

. a l.:-

N

. i...

i'..

.,, y

.g

.,q

+,+

j.

w: ;

a

1 50-351

~

UNIT SHUTDOWNS AND POWER REDUCHONS DOCKETNO. Hatch one UNIT NAME DATE 7-5-85 i

COMPLETED gy Lee Kanine REPORT MON 111 TELEPHONE (912) 367-7851 x 2882 I

June 1985 G

3 f

w Licensee Eg 4

Cause & Corrective

.] g jYj u

AcIlun to ekg

[}

No.

Date 6

Eac Event

=

(5 Report #

Provent Recurrence P-

i, 85-55 06-20-85' F-3. 9'.

A.

5 N/A RC' INSTRU Holding power to repair "A TIP machine.

85-56 06-21-85 S

1.5.7 B

5 N/A CP VALVEX Scram recovery continues.

[

85-57 06-22-85 S

4.1 B

5 N/A HA TURBIN Weekly turbine test.

85-58 06-27-85 F

37.0 G

2 1-85-26 EB TRANSF Personnel error actuated fire sprinkler system spraying down startup trans-former 1C causing 1A and IB busses to trip. This caused loss of power to I

both recire and circ water pumps.

85-59 06-29-85 S

3.6 B

5 N/A EB TRANSF Scram recovery 85-60 06-29-85 F

10.0 B

5 N/A EB TRANSF Holding load to put Unit Aux.

Transformer back in service.

l 85-61 06-29-85 S

41.3 B

5 N/A EB TRANSF icram Recovery continues.

I' I

2

.3 4

l F: Forced Reason:

Method:

r Exhibit G. instructions for Preparation of Data I Manual i

S: Scheduled A Eitulpment Failure (Explain)

Entry Sheets for Licentee B-Maintenance or Test 2 Manual Scram.

3 Automatic Scram.

' Event Repost(LER) File (NUREG. ~

  • C Refueling

~

D Regulatory Restriction 4 -Continuations 016I) j 5-Ioad Reduction E Operator Training & Ucense Examination 5

F-Administrative r

' 9 m (gg)

ExhibleI SanseSouw Goperational Error (Explain) 3..

noiner(E=,iaia) om>

-(Ty

..=.

n-

.A

. r;.y. e. ;e e..-

c.

s

/ fv

f..

.c # -

.. m

.4-4;..y:yy',j?.

L. M:3 V:p DOCKETNO 50-366

~

UNITSHUTDOWNS AND FOWER P. EDUCTIONS '.i;'.4 l. ' -:6' UNIT NAM.J.

Hatch Two

  1. -5-03

'.,, g p.-

DATE i@;; COMPLETED BY i

Lee Kanipe June' 1985 REPORT MONTH TELEPHONE (912)367-7851 x2882

  • L q

.3 g 3

)Y Licensec

,Ev e."o"8 Action to

? Cause & Correct;ve No.

' Date -

g ij

  • s Mg&

Event p

o yV Prevent Recurrence t-

[j E u

j gg g Repor: #

mu 5

4

.c..

85-31 06-03'-85 F

18.6 A

3 N/A HJ TURBIN Turbine trip on h.igh MSR level 85-32 06-04N5 i,-

S 38.3 B

5 N/A HJ TURBIN Recovery?from above scram

i..

-u 85-33 06-09-85 S

3.2 B

-5 N/A HA TURBIN Weeklp[turbinetesting

--j l:

85-34 06-1.6-85 S

3.4 B

5' N/A HA TURBIN Weekly' turSine testing 85-35 06-22-85 S

3.7 B

5 N/A HA TURBIN Weeki).[ turbine testirig 4

.O**

I

.,, ~ 1 i

g y

3 4

F: Forced Reason:

Picthod:

4

. Exhibit G. Instructions 5: S:heduled.,

A 0;uip.v.:nt'Failur:(Expl:in) 14hnu:1

'i.for Preparation of Dats B.'.!:intenan:e ciTest 2-Manual S:r:m.

Entry Sh:ets for Licensee C. Refueling 3-Autornatic Scram.

. l.h i.. 0161)

Event Report (LER) File (NUREG.

D Regulatory Restriction 4 -Continuations

" fd R E-Operator Training & Ucense Examination 5'-I.oad Pcduction

%,j".

F-Administrative

', g g 5 9-Other (Explain)

G-Operational Error (Explain) ri g Exhibit 1-Same Source (9/77)

Il Oth:r(Exp! in) 2(,3$[l 3 h.b..i

.n q

My.%

m n

~

]

OPERATING DATA REPORT DOCKET NO.

50-321 DATE 07-10-85 COFPLETED BY: Lee M. Kanipe, Jr.

TELEPHOPE (912) 367-7781 x. 2882 OPERATING STATUS Notes

1. Unit Name: E. I. Hatch Nuclear Plant Unit 1
2. Reporting Period: 06-85
3. Licensed Thermal Power (MWt): 2436
4. Nameplate Rating (Gross MWe): 809.3
5. Design Electrical Rating'(Net MWe): 777.3
6. Maximum Dependable Capacity (Gross MWe): 801.2
7. Maximum Dependable Capacity (Net MWe): 752.2
8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe)
10. Reasons for Restrictions, If Any:

i i

This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720 4343 83255
12. Number of Hours Reactor was Critical 635.7 3689.6 58853.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 612.0 3493.5 55361.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1402944 7789015 117158205
17. Gross Electrical Energy Generated (MWH) 457440 2558340 37814060
18. Net Electrical Energy Generated (MWH) 436540 2441260 35899106
19. Unit Service Factor '

85.0 80.4 66.5

20. Unit Availability Factor 85.0 80.4 66.5
21. Unit Capacity Factor (Using MDC Net) 80.6 74.7 57.3
22. Unit Capacity Factor (Using DER Net) 78.0 72.3 55.5
23. Unit Forced Outage Rate 13.9 13.2 17.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage beginning December 1, 1985 10 to 13 weeks

25. If Shutdown at End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C0t4ERCIAL OPERATION 4

3

-1 AVERAE DAILY UNIT POWER LEVEL DOCKET NO.

50-321 DATE:-

07-10-85 COMPLETED BY: Lee M. Kanipe'Jr.

TELEPHONE (912) 367-7781 x. 2882 MONTH 06-85 DAY AVERAGE DAILY POWER LEVEL DAY

-AVERA E DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

I 1

i 751 17

-18 2

719 18

-15 3

755 19 75 4

761 20

.598 5

l.

757 21 720 6

l 761 22 762 7

760 23 759 8

762 24 766 9

760 25 762 10 763 26 764 11 764 27 404 12

'766 28

-18 13 773 29 205 14 772 30 556 15 16 751 31 496 (9/77) 4

q

. OPERATING DATA REPORT DOCKET NO.

50-366 DATE 07-10-85' COMPLETED BY: Lee M. Kanipe Jr.

TELEPHOE (912)~367-7781 x 2882 OPERATING STATUS Notes 1.

Unit Name: E. I. Hatch Nuclear Plant Unit 2 2

Reporting Period: 06-85 3.

Licensed Thermal Power (MWt): 2436 4

Nameplate Rating (Gross MWe): 817.0 5.

Design Electrical Rating (Net MWe): 784.0 6.

Maximum Dependable Capacity (Gross MWe): 803.9 7.

Maximum Dependable Capacity (Net MWe): 747.9 8.

If Changes Occur in Capacity Ratings (Items N mber 3 through 7) Since Last Report, Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10. Reasons for Restrictions, If Any:

This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720 4343 50880
12. Nmber of Hours Reactor was Critical 711.6 3132.5 33312.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 701.4 3036.8 31660.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1681056 7080312 68281894
17. Gross Electrical Energy Generated (MWH) 555380 2358150 22517630
18. Net Electrical Energy Generated (MWH) 532218 2251976 21414425
19. Unit Service Factor 97.4 69.9 62.2
20. Unit Availability Factor 97.4 69.9 62.2
21. Unit Capacity Factor (Using MDC Net) 98.8 69.3 56.3
22. Unit Capacity Factor (Using DER Net) 94.3 66.1 53.7
23. Unit Forced Outage Rate 2.6 3.8 12.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

i

25. If Shutdown at End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION l

i

- g m

AVERA E DAILY UNIT POWER LEVEL DOCKET NO.

50-366 DATE:

07-10-85

.CO WLETED BY: Lee M. Kanipe Jr.

TELEPHOE (912) 367-7781 x 2882 MONTH 06-85 DAY AVERA E DAILY POWER LEVEL DAY AVERA E DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 l

762 17 767 2

761 18 770 3

665 19

.773 4

97 20 777 5

621 21 777 6

\\

755 22 761 7

765 23 773 8

l 768 24 774 9

765 25' 771 10 772 26 772 11 i

769 27 770 12

{

770 28 774 13 i

779 29 770 14 781 30 773 15 i

775 31 16 767 (9/77) i

~

7

Georgia Power Company Post Office Box 439 Baxley, Georgia 31513 Telephone 912 367-7781 912 537-9444 Edwin 1. Hatch Nuclear Plant July 8,.1985 LR-MGR-032-0785 PLANT E.

I.' HATCH NRC Monthly Operating Report-Director

-Office of Inspection and Enforcement' United States Nuclear Regulatory Commission Region II Suite 3100 101 Marietta Street Washington, D. C.

2G555

Dear-Sir:

Per Tech' Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 1, Docket #50-321, and for Hatch Unit 2, Docket #50-366.

K7 x 4ct

/ i H.

C. Nix General Manager HCN/

$/dA$/Z/fl bb w

/

J 9

5 l

I t