ENS 50172: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 06/04/2014 PDT
| event date = 06/04/2014 PDT
| last update date = 06/04/2014
| last update date = 06/04/2014
| title = Part 21 - Defect Identified In Single Loop Operation Minimum Critical Power Ratio
| title = Part 21 - Defect Identified in Single Loop Operation Minimum Critical Power Ratio
| event text = The following is a synopsis of information received via facsimile from AREVA:
| event text = The following is a synopsis of information received via facsimile from AREVA:
AREVA identified a defect is in the calculation of the single loop operation (SLO) minimum critical power ratio (MCPR) operating limits for Browns Ferry Units 1, 2, and 3. Specifically, the defect is associated with the usage of non-conservative inputs in the SLO pump seizure analyses for the three plants, which results in non-conservative limits for SLO.
AREVA identified a defect is in the calculation of the single loop operation (SLO) minimum critical power ratio (MCPR) operating limits for Browns Ferry Units 1, 2, and 3. Specifically, the defect is associated with the usage of non-conservative inputs in the SLO pump seizure analyses for the three plants, which results in non-conservative limits for SLO.

Latest revision as of 20:50, 1 March 2018

ENS 50172 +/-
Where
Areva Inc
Richland, Washington (NRC Region 4)
Organization: Areva Inc
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+8.37 h0.349 days <br />0.0498 weeks <br />0.0115 months <br />)
Opened: Alan B Meginnis
15:22 Jun 4, 2014
NRC Officer: Charles Teal
Last Updated: Jun 4, 2014
50172 - NRC Website