NO TOLEDO Docket No. 50-346                                               EDISON License No. htF-3                                               $5$oTo@ AVENUE i-                                                                           TOLEDO. OHIO 436520001 August 31, 1988                                         Log No. KA88-0286 NP-29-88-01
NO TOLEDO Docket No. 50-346 EDISON License No. htF-3
                                                                                  ?RIC311Y Roungg Mr. A. Bert Davis, Regional Administrator                           v      MF-- !jumL U. S. Nuclear Regulatory Commission Region III                                                 ph                  Q  c   _,
$5$oTo@ AVENUE i-TOLEDO. OHIO 436520001 August 31, 1988 Log No. KA88-0286 NP-29-88-01
799 Roosevelt Road                                                 g           M- ^
?RIC311Y Roungg Mr. A. Bert Davis, Regional Administrator MF-- !jumL v
Glen Ellyn, Illinois 60317                                           g         %    -
Q U. S. Nuclear Regulatory Commission ph Region III c
a
799 Roosevelt Road g
                                                                                                ''C FIL[   v.
M- ^
Glen Ellyn, Illinois 60317 g
''C a
FIL[
v.


==Subject:==
==Subject:==
Special Report of Inoperable Seismic Honitor System Due to Maintenance Gentlemen:
Special Report of Inoperable Seismic Honitor System Due to Maintenance Gentlemen:
On July 22, 1988 with the reactor defueled the Seismic Monitoring System accelerometers vere removed for calibration. However, the accelerometers could not be calibrated to acceptable standards. Since these accelerometers are obsolete, spare parts and direct rcplacements are not available. Subsequently, it was decided to replace the accelerometers with a new type under plant modification number 88-0060. Due to priority conflicts in the outage schedule, the modification was not implemented prior to August 21, 1988. This report is being submitted in accordance with Technical Specification 3.3.3.3 because the seismic monitoring system has been inoperable for more than 30 days.
On July 22, 1988 with the reactor defueled the Seismic Monitoring System accelerometers vere removed for calibration.
However, the accelerometers could not be calibrated to acceptable standards.
Since these accelerometers are obsolete, spare parts and direct rcplacements are not available.
Subsequently, it was decided to replace the accelerometers with a new type under plant modification number 88-0060. Due to priority conflicts in the outage schedule, the modification was not implemented prior to August 21, 1988.
This report is being submitted in accordance with Technical Specification 3.3.3.3 because the seismic monitoring system has been inoperable for more than 30 days.
This modification is scheduled for completion by September 15, 1988. This vill return the seismic monitor system to an operable status.
This modification is scheduled for completion by September 15, 1988. This vill return the seismic monitor system to an operable status.
YoursA ul ,
YoursA ul,
                ,/ /*g             }-   ,
,/ /*g
C f   /
}-
gfLouis"F. ' Storz
AQ C
                          ,  syf      -
f
AQ Plant Manager Davis-Besse Nuclear Power Station LFS/ed cc Mr. Paul Byron DB-1 NRC Resident Inspector USNRC Document Control Desk Vashington, D. C. 20555 9
/
00?? $$0$ gs                             }gyff.,o1%
syf gfLouis"F. ' Storz Plant Manager Davis-Besse Nuclear Power Station LFS/ed cc Mr. Paul Byron DB-1 NRC Resident Inspector USNRC Document Control Desk Vashington, D. C.
                                                                                                      .)}}
20555 9
00?? $$0$ gs
}gyff.,o1%
.)}}

Latest revision as of 01:25, 11 December 2024

Special Rept:On 880722,Tech Spec 3.3.3.3 Violated.Caused by Accelerometers Being Inoperable for More than 30 Days.Mod 88-0060 to Replace Accelerometers Scheduled for Completion by 880915
ML20154C527
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/31/1988
From: Storz L
TOLEDO EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
KA88-0286, KA88-286, NP-29-88-01, NP-29-88-1, NUDOCS 8809140397
Download: ML20154C527 (1)


Text

--

NO TOLEDO Docket No. 50-346 EDISON License No. htF-3

$5$oTo@ AVENUE i-TOLEDO. OHIO 436520001 August 31, 1988 Log No. KA88-0286 NP-29-88-01

?RIC311Y Roungg Mr. A. Bert Davis, Regional Administrator MF-- !jumL v

Q U. S. Nuclear Regulatory Commission ph Region III c

799 Roosevelt Road g

M- ^

Glen Ellyn, Illinois 60317 g

C a

FIL[

v.

Subject:

Special Report of Inoperable Seismic Honitor System Due to Maintenance Gentlemen:

On July 22, 1988 with the reactor defueled the Seismic Monitoring System accelerometers vere removed for calibration.

However, the accelerometers could not be calibrated to acceptable standards.

Since these accelerometers are obsolete, spare parts and direct rcplacements are not available.

Subsequently, it was decided to replace the accelerometers with a new type under plant modification number 88-0060. Due to priority conflicts in the outage schedule, the modification was not implemented prior to August 21, 1988.

This report is being submitted in accordance with Technical Specification 3.3.3.3 because the seismic monitoring system has been inoperable for more than 30 days.

This modification is scheduled for completion by September 15, 1988. This vill return the seismic monitor system to an operable status.