ML20199E293: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20199E293 | | number = ML20199E293 | ||
| issue date = 12/31/1998 | | issue date = 12/31/1998 | ||
| title = Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with | | title = Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with | ||
| author name = Katz P, Olsen H | | author name = Katz P, Olsen H | ||
| author affiliation = BALTIMORE GAS & ELECTRIC CO. | | author affiliation = BALTIMORE GAS & ELECTRIC CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 9901200371 | | document report number = NUDOCS 9901200371 | ||
| title reference date = 01-15-1999 | |||
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | | document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | ||
| page count = 7 | | page count = 7 | ||
| Line 16: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:O e | {{#Wiki_filter:O e | ||
.g | o | ||
.g PETER E. KATZ Baltimore Gas and Electric Company Plant General Manager Calvert Cliffs Nuclear Power Plant Calvest Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 1 | |||
January 15,1999 1 | January 15,1999 1 | ||
U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: | U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: | ||
Document Control Desk | |||
==SUBJECT:== | ==SUBJECT:== | ||
Calvert Clifts Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Desember 1998 Ooerating Data Reports | Calvert Clifts Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Desember 1998 Ooerating Data Reports The subject reports are being sent to you as required by Technical Specification 5.6.4. | ||
The subject reports are being sent to you as required by Technical Specification 5.6.4. | i Should you have any questions, please contact Mr. Bruce B. Mrowca at (410) 495-3989. | ||
Should you have any questions, please contact Mr. Bruce B. Mrowca at (410) 495-3989. | Very truly yours, PEK/HOO/bjd Attachments | ||
Very truly yours, PEK/HOO/bjd Attachments | -9 cc: | ||
S. Fleishman, Esquire Resident Inspector, NRC | |||
' E. Silberg, Esquire R. I. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC S. S. Bajwa, NRC P. Lewis, INPO I | |||
II. J. Miller, NRC | II. J. Miller, NRC K. N. l2rson, ANI | ||
/ft I | |||
/ | |||
9901200371 981231 PDR ADOCK 05000317 R | |||
9901200371 981231 PDR | PDR l | ||
OPERATING DisTA stEPORT Docket No. 50-317 Calvert Cliffs Unit 1 January 15, 1999 Prepared by Herman O. Olsen Telephone : (410) 4 95- 6734 REPORTING PERIOD | OPERATING DisTA stEPORT Docket No. 50-317 Calvert Cliffs Unit 1 January 15, 1999 Prepared by Herman O. Olsen Telephone : (410) 4 95-6734 REPORTING PERIOD DECEMBER 1998 DESIGN ELECTRICAL RATING (NET MWe) 845 MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 Year-Cumulative This month to-Date to Date | ||
: 1. NUMBER OF HOURS REACTOR WAS CRITICAL | : 1. NUMBER OF HOURS REACTOR WAS CRITICAL 744,0 7,235.5 152,991.6 | ||
: 2. HOURS GENERATOR ON LINE | : 2. HOURS GENERATOR ON LINE 744.0 7,184.1 150,074.0 | ||
: 3. UNIT RESERVE SHUTDOWN HOURS | : 3. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 | ||
: 4. NET ELECTRICAL ENERGY GENERATED (MWH) | : 4. NET ELECTRICAL ENERGY GENERATED (MWH) 637,527 6,116,771 121,623,360 1 | ||
i l | i l | ||
i 5 | i 5 | ||
| Line 45: | Line 47: | ||
b -- | b -- | ||
l | l OPERATING. DATA REPORT l | ||
Docket No. 50-318 Calvert Cliffs Unit 2 | |||
~ January 15, 1999 Prepared by Herman O. Olsen l. | |||
Telephone : (410) 4 95-6734 j | |||
: 2. HOURS GENERATOR ON LINE | REPORTING PERIOD DECEMBER 1998 DESIGN ELECTRICAL RATING (NET MWe) 845 MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 Year-Cumulative j | ||
: 3. UNIT RESERVE SHUTDOWN HOURS | This month to-Date to Date | ||
: 4. NET ELECTRICAL ' ENERGY GENERATED (MWH) | : 1. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8,402.6 145,393.1- | ||
i l | : 2. HOURS GENERATOR ON LINE 744.0. | ||
8,394.2. | |||
143,630.3 | |||
: 3. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 | |||
: 4. NET ELECTRICAL ' ENERGY GENERATED (MWH) 649,451 7,225,493 117,180,603 1 | |||
i l | |||
l l.. | |||
l' i: | l' i: | ||
b | b | ||
g | g e | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | |||
50-317 UNITNAME Calven Cliffs - Ul | |||
'DATE January 15.1999 COMPLETED BY 11erman O. Olsen TELEPilONE (4101495-6734 REPORTING MONTH Deceseber 1998 NO. | |||
DATE | DATE TYPE DURATION REASON' METIIOD OF CAUSE/ CORRECTIVE ACTIONS F: FORCED (ilOURS) | ||
- SilUTTING S: SCllEDULED DOWN* | |||
COMMENTS There were no shutdowns this month. | |||
2 Reason: | |||
Method: | |||
A - Equipment Failure 1 - Manual - | |||
B - Maintenance or Test 2 - Manual Scram. | |||
C - Refueling 3 - Automatic Scram. | |||
D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Other F-Administrative G - Operational Error 11 - Other | |||
. UNIT SHUTDOWNS AND POWER REDUCTIONS | |||
. DOCKET NO. | |||
50-318 UNIT NAME Calvert Cliffs-U2 DATE-January 15.-1909 COMPLETED BY lierman O. Olsen. | |||
. TELEPHONE (4101495-6734 REPORT MONTH Deceamber 1998 NOi DATE TYPE | |||
' DURATION REASON'' | |||
MET 110D OF CAUSE/ CORRECTIVE ACTIONS F: FORCED (IIOURS) | |||
SilUTTING S: SCilEDULED DOWN* | |||
COMMENTS There were no shutdowns this month. | |||
Reason: | Reason: | ||
A - Equipment Failure | Method: | ||
B - Maintenance or Test | A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram. | ||
C - Refueling | C - Refueling 3 - Automatic Scram. | ||
D - Regulatory Restriction | D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Other F-Administrative G - Operational Error iI - Other | ||
i: | |||
DOCKET NO. 50 J D CALVERT CLIFFS - UNIT I January 15,1999 | |||
January 15,1999 | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE e | OF OPERATING EXPERIENCE e | ||
f | f December 1998 The unit began the month at 100% power. | ||
On 12/02/98 at 0205 power was reduced to 30% to repair an intercept valve that was oscillating due to | On 12/02/98 at 0205 power was reduced to 30% to repair an intercept valve that was oscillating due to contr91 system problems. Power was returned to 100% at 1500. | ||
contr91 system problems. Power was returned to 100% at 1500. | |||
The unit operated at 100% power for the remainder of the month. | The unit operated at 100% power for the remainder of the month. | ||
l I | l I | ||
| Line 94: | Line 108: | ||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE | OF OPERATING EXPERIENCE December 1998 I | ||
December 1998 | ) | ||
The unit operated at 100% power for the entire month. | |||
i l | |||
l | |||
i i | i i | ||
l | i l | ||
!}} | !}} | ||
Latest revision as of 08:00, 10 December 2024
| ML20199E293 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 12/31/1998 |
| From: | Katz P, Olsen H BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9901200371 | |
| Download: ML20199E293 (7) | |
Text
O e
o
.g PETER E. KATZ Baltimore Gas and Electric Company Plant General Manager Calvert Cliffs Nuclear Power Plant Calvest Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 1
January 15,1999 1
U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Clifts Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Desember 1998 Ooerating Data Reports The subject reports are being sent to you as required by Technical Specification 5.6.4.
i Should you have any questions, please contact Mr. Bruce B. Mrowca at (410) 495-3989.
Very truly yours, PEK/HOO/bjd Attachments
-9 cc:
S. Fleishman, Esquire Resident Inspector, NRC
' E. Silberg, Esquire R. I. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC S. S. Bajwa, NRC P. Lewis, INPO I
II. J. Miller, NRC K. N. l2rson, ANI
/ft I
/
9901200371 981231 PDR ADOCK 05000317 R
PDR l
OPERATING DisTA stEPORT Docket No. 50-317 Calvert Cliffs Unit 1 January 15, 1999 Prepared by Herman O. Olsen Telephone : (410) 4 95-6734 REPORTING PERIOD DECEMBER 1998 DESIGN ELECTRICAL RATING (NET MWe) 845 MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 Year-Cumulative This month to-Date to Date
- 1. NUMBER OF HOURS REACTOR WAS CRITICAL 744,0 7,235.5 152,991.6
- 2. HOURS GENERATOR ON LINE 744.0 7,184.1 150,074.0
- 3. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 4. NET ELECTRICAL ENERGY GENERATED (MWH) 637,527 6,116,771 121,623,360 1
i l
i 5
I
b --
l OPERATING. DATA REPORT l
Docket No. 50-318 Calvert Cliffs Unit 2
~ January 15, 1999 Prepared by Herman O. Olsen l.
Telephone : (410) 4 95-6734 j
REPORTING PERIOD DECEMBER 1998 DESIGN ELECTRICAL RATING (NET MWe) 845 MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 Year-Cumulative j
This month to-Date to Date
- 1. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8,402.6 145,393.1-
- 2. HOURS GENERATOR ON LINE 744.0.
8,394.2.
143,630.3
- 3. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 4. NET ELECTRICAL ' ENERGY GENERATED (MWH) 649,451 7,225,493 117,180,603 1
i l
l l..
l' i:
b
g e
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-317 UNITNAME Calven Cliffs - Ul
'DATE January 15.1999 COMPLETED BY 11erman O. Olsen TELEPilONE (4101495-6734 REPORTING MONTH Deceseber 1998 NO.
DATE TYPE DURATION REASON' METIIOD OF CAUSE/ CORRECTIVE ACTIONS F: FORCED (ilOURS)
- SilUTTING S: SCllEDULED DOWN*
COMMENTS There were no shutdowns this month.
2 Reason:
Method:
A - Equipment Failure 1 - Manual -
B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram.
D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Other F-Administrative G - Operational Error 11 - Other
. UNIT SHUTDOWNS AND POWER REDUCTIONS
. DOCKET NO.
50-318 UNIT NAME Calvert Cliffs-U2 DATE-January 15.-1909 COMPLETED BY lierman O. Olsen.
. TELEPHONE (4101495-6734 REPORT MONTH Deceamber 1998 NOi DATE TYPE
' DURATION REASON
MET 110D OF CAUSE/ CORRECTIVE ACTIONS F: FORCED (IIOURS)
SilUTTING S: SCilEDULED DOWN*
COMMENTS There were no shutdowns this month.
Reason:
Method:
A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram.
D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Other F-Administrative G - Operational Error iI - Other
i:
DOCKET NO. 50 J D CALVERT CLIFFS - UNIT I January 15,1999
SUMMARY
OF OPERATING EXPERIENCE e
f December 1998 The unit began the month at 100% power.
On 12/02/98 at 0205 power was reduced to 30% to repair an intercept valve that was oscillating due to contr91 system problems. Power was returned to 100% at 1500.
The unit operated at 100% power for the remainder of the month.
l I
i-4 l
l.
Is
1 DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 January 15,1999 l
SUMMARY
OF OPERATING EXPERIENCE December 1998 I
)
The unit operated at 100% power for the entire month.
i l
i i
i l
!