November 10, 1997
November 10, 1997
    -Duke Energy Corporation ATIN: Mr. H. B. Barron Vicc President McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville NC 28078-8985 F'%)ECT:       PLANT PERFORMANCE REVIEW (PPR) - MCGUIRE NUCLEAR STATION
-Duke Energy Corporation ATIN: Mr. H. B. Barron Vicc President McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville NC 28078-8985 F'%)ECT:
PLANT PERFORMANCE REVIEW (PPR) - MCGUIRE NUCLEAR STATION


==Dear Mr. Barron:==
==Dear Mr. Barron:==
On October 15. 1997, the regional staff completed the semiannual Plant Performance Review (PPR) of McGuire Nuclear Station.
The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for McGuire Nuclear Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March - September 1997.
PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the McGuire Nuclear Station PPR review and the general time frame of planned inspections-plus the exact dates of team inspections.
It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next six months.
Individual' inspections are identified by the month (s) in which we intend to conduct the inspection.
Exact dates are not provided for non-team inspections because experience has proven that we must often ch q e dates as the result of higher priority requirements and conflicts at your site or other sites. You will be contacted three-six weeks prior to individual inspections to confirm dates.
Tne rationale or basis for each inspection outside the core ins)ection program is provided so that you are aware of the reasons for emplasis in these program areas.
Resident inspections are not listes due to their ongoing and continuous nature.
The NRC's general policy for reactor inspections is that each ins)ection shall be announced, except when announcing the inspection could reasona)ly i
compromise the. objectives of the inspectors. Therefore, some specific
\\
inspections. such as in the security and radiological protection areas, may i
not be announced.
I As part of the regional initiative inspection program, we plan to conduct followup ins six months. pections of fire barrier penetration seal issues during the next The issues are discussed in Information Notice (IN) 88-04.
97112 I
"50052 971110"$$'
lil@!BlE{ ele,EkIl a


On October 15. 1997, the regional staff completed the semiannual Plant Performance Review (PPR) of McGuire Nuclear Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for McGuire Nuclear Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March - September 1997. PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
=
This letter advises you of our planned inspection effort resulting from the McGuire Nuclear Station PPR review and the general time frame of planned inspections-plus the exact dates of team inspections. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next six months. Individual' inspections are identified by the month (s) in which we intend to conduct the inspection. Exact dates are not provided for non-team inspections because experience has proven that we must often ch q e dates as the result of higher priority requirements and conflicts at your site or other sites. You will be contacted three-six weeks prior to individual inspections to confirm dates. Tne rationale or basis for each inspection outside the core ins)ection program is provided so that you are aware of the reasons for emplasis in these program areas. Resident inspections are not listes due to their ongoing and continuous nature.
DEC 2
The NRC's general policy for reactor inspections is that each ins)ection shall be announced, except when announcing the inspection could reasona)ly                        i compromise the. objectives of the inspectors. Therefore, some specific                    \
Seals,guate Qualification and.00cumentation of Fire Barrier Penetration "Inade and IN 88-56. " Potential Problems with Silicone foam Fire Barrier.
inspections. such as in the security and radiological protection areas, may                  i not be announced.                                                                            I As part of the regional initiative inspection program, we plan to conduct followup ins six months. pections    of fire The issues      barrier penetration are discussed                    seal issues in Information        during Notice (IN)    the next 88-04.
Penetration Seals."
97112                          '
Inspection of the McGuire Nuclear Station has been planned for March 1998.
I "50052 971110"$$'                                                      lil@!BlE{ ele,EkIl
We will inform you of any changes to the inspection plan.
__                                                                a
If you have-any questions, please contact me ?t 404-562-4510 Sincerely.
 
                                      .-      =                       _    -    _.    ..
DEC                                       2 "Inade Seals,guate and INQualification and.00cumentation 88-56. " Potential               of Fire Barrier Problems with Silicone foam Fire Penetration Barrier.
Penetration Seals." Inspection of the McGuire Nuclear Station has been planned for March 1998.
We will inform you of any changes to the inspection plan.       If you have-any questions, please contact me ?t 404-562-4510 Sincerely.
Original signed by:
Original signed by:
Charles R. Ogle. Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos, 50-369, 50-370 License Nos. NPF-9.-NPF-17
Charles R. Ogle. Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos, 50-369, 50-370 License Nos. NPF-9.-NPF-17
Line 40: Line 54:
Inspection Plan cc w/ encl:
Inspection Plan cc w/ encl:
Michael T. Cash Regulatory Compliance Duke Energy Corporation 12700 Hagers Ferry Road Huntersville, NC 28078-8985 G. A. Copp Licensing - EC050 Duke Energy Corporation P, O. Box 1006 Charlotte, NC 28201-1006 Paul R. Newton Legcl Department (PB05E)
Michael T. Cash Regulatory Compliance Duke Energy Corporation 12700 Hagers Ferry Road Huntersville, NC 28078-8985 G. A. Copp Licensing - EC050 Duke Energy Corporation P, O. Box 1006 Charlotte, NC 28201-1006 Paul R. Newton Legcl Department (PB05E)
Duke Energy Cor) oration 422 South Churc1 Street Charlotte.-NC 28242-0001 Mr. Robert P. Gruber Executive Director Public Staff - NCUC P. O. Box 29520 Raleigh, NC .27626-0520 cc w/ encl' cont'd: (See page 3)
Duke Energy Cor) oration 422 South Churc1 Street Charlotte.-NC 28242-0001 Mr. Robert P. Gruber Executive Director Public Staff - NCUC P. O. Box 29520 Raleigh, NC.27626-0520 cc w/ encl' cont'd:
(See page 3)


3     x 4 ,
3 x
DEC4                                               3L                                                       .
4,
ccEw/ encl: cont'*01             .                                Distribution w/enclb                       t J._ Michael;McGarry III Esq.                                     V.-Nerses.-NRR-Winston and Strawn                                               R. Carroll. RII 1400 L Street. NW                                                 C. Ogle.- RII Washington..D. C. 20005-                                         .K. Barr, RII-                             {
DEC4 3L ccEw/ encl: cont'*01 Distribution w/enclb t
H. Christenten. RII-Mel Fry. AcCing Director .             ..                        A. Belisle. RII Division:of Radiation Protection :                               P.' Fredrickson, RII N.-C.-Department of Environmental.                               C. Payne, RII Health:& Natural Resources                                   PUBLIC L3825 Barrett Drive Raleigh.iNC 27609-7721                                         -NRC Resident-Inspector:
J._ Michael;McGarry III Esq.
                                                                                      .U.S. Nuclear Regulatory Comm.
V.-Nerses.-NRR-Winston and Strawn R. Carroll. RII 1400 L Street. NW C. Ogle.- RII Washington..D. C.
County-ManagerLef Mecklenburg County                             12700 Hagers Ferry Road -                    -
20005-
720 East Fourth "treet-                                           Huntersville. NC 28078-8985.              .
.K. Barr, RII-
{
H. Christenten. RII-Mel Fry. AcCing Director.
A. Belisle. RII Division:of Radiation Protection :
P.' Fredrickson, RII N.-C.-Department of Environmental.
C. Payne, RII Health:& Natural Resources PUBLIC L3825 Barrett Drive Raleigh.iNC 27609-7721
-NRC Resident-Inspector:
.U.S. Nuclear Regulatory Comm.
County-ManagerLef Mecklenburg County 12700 Hagers Ferry Road -
720 East Fourth "treet-Huntersville. NC 28078-8985.
Charlotte. NC 2882
Charlotte. NC 2882
                    ' Peter R. Haruen IV
' Peter R. Haruen IV
                  -Account Sales Manager
-Account Sales Manager
                  = Power Systems Field Sales-Westinghouse Electric Corpcration
= Power Systems Field Sales-Westinghouse Electric Corpcration
                  'P. O. Box 7288
'P. O. Box 7288
                  - Charlotte; NC -28241:
- Charlotte; NC -28241:
                  .Dr;: John M. Barry. < Directcr Mecklenburg County Department of Environmental Prot;-ction
.Dr;: John M. Barry. < Directcr Mecklenburg County Department of Environmental Prot;-ction
:700 North Tryon Street Charlotte.-NC 23203 Karen E.-l:>ng-
:700 North Tryon Street Charlotte.-NC 23203 Karen E.-l:>ng-
                    . Assistant Attorney General-LN. C. Department of Justice
. Assistant Attorney General-LN. C. Department of Justice
                  . P. O. Bo'< 629
. P. O. Bo'< 629
.                  'Raleigh NC 27602 OFFICE'       RII:DRS'     RII:DRS       RIL:DRS       RII:DRS _
'Raleigh NC 27602 OFFICE' RII:DRS' RII:DRS RIL:DRS RII:DRS _
N             $   h         HC         S               PFR         KS DATE:         If/(,/97 10/l'/97           4/if/97-     10/9/97             n/747 mos -    @ -e Y vre - e            4 Ee) - e       vre     e       Ee ' e vre m 0FFICIAL RECORD COPY- -DOCUMENTNAME:'4:\MCGLET,997
N
(-g                         e.-                   --            #                                  -...u
$ h HC S
PFR KS DATE:
If/(,/97 10/l'/97 4/if/97-10/9/97 n/747 Ee '
Y 4 Ee) - e vre e
-e vre -
e e
vre m
mos -
0FFICIAL RECORD COPY-
-DOCUMENTNAME:'4:\\MCGLET,997 1
(-g 4
r+-
e.-
9
-...u


MCGUIRE NUCLEAR STATION                                                   .
MCGUIRE NUCLEAR STATION INSPECTION PLAN INSPECTION PLANNED-PROCEDURE /
INSPECTION PLAN INSPECTION                                                           PLANNED-PROCEDURE /                                     ' NUMBER OF       INSPECTION   TYPE OF INSPECTION - COMENTS TITLE TEMPORARY                                       INSPECTORS         DATES INSTRUCTION IP 40500 EFFECTIVENESS OF LICENSEE                 4           2/23-27/98 Core - a multi-disciplined team CONTROLS IN IDENTIFYING.                               3/2-6/98 to assess licensee corrective RESOLVING. AND PREVENTING                                         action /self assessment.
' NUMBER OF INSPECTION TYPE OF INSPECTION - COMENTS TITLE TEMPORARY INSPECTORS DATES INSTRUCTION IP 40500 EFFECTIVENESS OF LICENSEE 4
PROBLEMS IP 71714 COLD WEATHER PREPARATIONS               1 (RI)           12/97   Regional Initiative - seasonal region-wide initiative IP 62700 MAINTENANCE IMPLEMENTATION                 1               1/98   Regional Initiative - determine if equipment material condition is being maintained.
2/23-27/98 Core - a multi-disciplined team CONTROLS IN IDENTIFYING.
3/2-6/98 to assess licensee corrective RESOLVING. AND PREVENTING action /self assessment.
PROBLEMS IP 71714 COLD WEATHER PREPARATIONS 1 (RI) 12/97 Regional Initiative - seasonal region-wide initiative IP 62700 MAINTENANCE IMPLEMENTATION 1
1/98 Regional Initiative - determine if equipment material condition is being maintained.
specifically that equipment used for reactor operations.
specifically that equipment used for reactor operations.
IP 50001 STEAM GENERATOR REPLACEMENT               1             11/97   Regional Initiative - continued-INSPECTION                                               12/97   inspection of Unit 2 SGRP activities.
IP 50001 STEAM GENERATOR REPLACEMENT 1
IP 50001 STEAM GENERATOR REPLACEMENT               1             12/97   Regional Initiative - continued         '
11/97 Regional Initiative - continued-INSPECTION 12/97 inspection of Unit 2 SGRP activities.
INSPECTION                                                       inspection of Unit 2 SGRP activities.   (As-Built Mod Review)
IP 50001 STEAM GENERATOR REPLACEMENT 1
IP 37550 ENGINEERING                               1             12/97   Core - focus on the resolution of FWST design issues (including wide range level indication) and open items.
12/97 Regional Initiative - continued INSPECTION inspection of Unit 2 SGRP activities.
IP 84750 RADI0 ACTIVE WASTE SYSTEMS. WATER         1               4/98   Core CHEMISTRY. CONFIRMATORY MEASUREMENTS AND RADIOLOGICAL ENVIRONMENTAL MONITORING ENCLOSURE                                           Page 1 of 2
(As-Built Mod Review)
IP 37550 ENGINEERING 1
12/97 Core - focus on the resolution of FWST design issues (including wide range level indication) and open items.
IP 84750 RADI0 ACTIVE WASTE SYSTEMS. WATER 1
4/98 Core CHEMISTRY. CONFIRMATORY MEASUREMENTS AND RADIOLOGICAL ENVIRONMENTAL MONITORING ENCLOSURE Page 1 of 2


(MCGINSP.997. cont'd)
(MCGINSP.997. cont'd)
INSPECTION                                                 PLANNED PROCEDURE /
INSPECTION PLANNED PROCEDURE /
TITLE              NUMBER OF INSPECTION   TiPE OF INSPECTION - C0 K NTS TEMPORARY                                     INSPECTORS   DATES INSTRUCTION IP 86750   SOLID RADI0 ACTIVE WASTE             1         4/98   Core MANAGEMENT AND TRANSPORTATION OF RADI0 ACTIVE MATERIALS IP 83750   OCCUPATIONAL EXPOSURE                 1         1/98   Core
NUMBER OF INSPECTION TiPE OF INSPECTION - C0 K NTS TITLE TEMPORARY INSPECTORS DATES INSTRUCTION IP 86750 SOLID RADI0 ACTIVE WASTE 1
      'IP 81700   PHYSICAL SECURITY PROGRAM FOR         1     (1) 12/97 Core - (1) vehicle barriers (TI POWER REACTORS                               (2) 1/98 2515-132) and (2) safeguards ing: .:.Mn IP 64704   FIRE PROTECTION PROGRAM               1         3/98   Regional Initiative - generic fire barrier penetration seal issues IP 64704   FIRE PROTECTION PROGRAM               1         12/97 Regional Initiative - review auxiliary building fire protection system flow test.
4/98 Core MANAGEMENT AND TRANSPORTATION OF RADI0 ACTIVE MATERIALS IP 83750 OCCUPATIONAL EXPOSURE 1
t ENCLOSURE                                   Page 2 of 2}}
1/98 Core
'IP 81700 PHYSICAL SECURITY PROGRAM FOR 1
(1) 12/97 Core - (1) vehicle barriers (TI POWER REACTORS (2) 1/98 2515-132) and (2) safeguards ing:.:.Mn IP 64704 FIRE PROTECTION PROGRAM 1
3/98 Regional Initiative - generic fire barrier penetration seal issues IP 64704 FIRE PROTECTION PROGRAM 1
12/97 Regional Initiative - review auxiliary building fire protection system flow test.
t ENCLOSURE Page 2 of 2}}

Latest revision as of 07:39, 10 December 2024

Advises of Planned Insp Effort Resulting from McGuire Nuclear Station PPR Review & General Time Frame of Planned Insps Plus Exact Dates of Team Insps.Followup Insps of Fire Barrier Penetration Seal to Be Conducted in Six Months
ML20199F959
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/10/1997
From: Ogle C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Barron H
DUKE POWER CO.
References
NUDOCS 9711250052
Download: ML20199F959 (5)


Text

_ _ _ - -.

November 10, 1997

-Duke Energy Corporation ATIN: Mr. H. B. Barron Vicc President McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville NC 28078-8985 F'%)ECT:

PLANT PERFORMANCE REVIEW (PPR) - MCGUIRE NUCLEAR STATION

Dear Mr. Barron:

On October 15. 1997, the regional staff completed the semiannual Plant Performance Review (PPR) of McGuire Nuclear Station.

The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for McGuire Nuclear Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March - September 1997.

PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the McGuire Nuclear Station PPR review and the general time frame of planned inspections-plus the exact dates of team inspections.

It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next six months.

Individual' inspections are identified by the month (s) in which we intend to conduct the inspection.

Exact dates are not provided for non-team inspections because experience has proven that we must often ch q e dates as the result of higher priority requirements and conflicts at your site or other sites. You will be contacted three-six weeks prior to individual inspections to confirm dates.

Tne rationale or basis for each inspection outside the core ins)ection program is provided so that you are aware of the reasons for emplasis in these program areas.

Resident inspections are not listes due to their ongoing and continuous nature.

The NRC's general policy for reactor inspections is that each ins)ection shall be announced, except when announcing the inspection could reasona)ly i

compromise the. objectives of the inspectors. Therefore, some specific

\\

inspections. such as in the security and radiological protection areas, may i

not be announced.

I As part of the regional initiative inspection program, we plan to conduct followup ins six months. pections of fire barrier penetration seal issues during the next The issues are discussed in Information Notice (IN) 88-04.

97112 I

"50052 971110"$$'

lil@!BlE{ ele,EkIl a

=

DEC 2

Seals,guate Qualification and.00cumentation of Fire Barrier Penetration "Inade and IN 88-56. " Potential Problems with Silicone foam Fire Barrier.

Penetration Seals."

Inspection of the McGuire Nuclear Station has been planned for March 1998.

We will inform you of any changes to the inspection plan.

If you have-any questions, please contact me ?t 404-562-4510 Sincerely.

Original signed by:

Charles R. Ogle. Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos, 50-369, 50-370 License Nos. NPF-9.-NPF-17

Enclosure:

Inspection Plan cc w/ encl:

Michael T. Cash Regulatory Compliance Duke Energy Corporation 12700 Hagers Ferry Road Huntersville, NC 28078-8985 G. A. Copp Licensing - EC050 Duke Energy Corporation P, O. Box 1006 Charlotte, NC 28201-1006 Paul R. Newton Legcl Department (PB05E)

Duke Energy Cor) oration 422 South Churc1 Street Charlotte.-NC 28242-0001 Mr. Robert P. Gruber Executive Director Public Staff - NCUC P. O. Box 29520 Raleigh, NC.27626-0520 cc w/ encl' cont'd:

(See page 3)

3 x

4,

DEC4 3L ccEw/ encl: cont'*01 Distribution w/enclb t

J._ Michael;McGarry III Esq.

V.-Nerses.-NRR-Winston and Strawn R. Carroll. RII 1400 L Street. NW C. Ogle.- RII Washington..D. C.

20005-

.K. Barr, RII-

{

H. Christenten. RII-Mel Fry. AcCing Director.

A. Belisle. RII Division:of Radiation Protection :

P.' Fredrickson, RII N.-C.-Department of Environmental.

C. Payne, RII Health:& Natural Resources PUBLIC L3825 Barrett Drive Raleigh.iNC 27609-7721

-NRC Resident-Inspector:

.U.S. Nuclear Regulatory Comm.

County-ManagerLef Mecklenburg County 12700 Hagers Ferry Road -

720 East Fourth "treet-Huntersville. NC 28078-8985.

Charlotte. NC 2882

' Peter R. Haruen IV

-Account Sales Manager

= Power Systems Field Sales-Westinghouse Electric Corpcration

'P. O. Box 7288

- Charlotte; NC -28241:

.Dr;: John M. Barry. < Directcr Mecklenburg County Department of Environmental Prot;-ction

700 North Tryon Street Charlotte.-NC 23203 Karen E.-l:>ng-

. Assistant Attorney General-LN. C. Department of Justice

. P. O. Bo'< 629

'Raleigh NC 27602 OFFICE' RII:DRS' RII:DRS RIL:DRS RII:DRS _

N

$ h HC S

PFR KS DATE:

If/(,/97 10/l'/97 4/if/97-10/9/97 n/747 Ee '

Y 4 Ee) - e vre e

-e vre -

e e

vre m

mos -

0FFICIAL RECORD COPY-

-DOCUMENTNAME:'4:\\MCGLET,997 1

(-g 4

r+-

e.-

9

-...u

MCGUIRE NUCLEAR STATION INSPECTION PLAN INSPECTION PLANNED-PROCEDURE /

' NUMBER OF INSPECTION TYPE OF INSPECTION - COMENTS TITLE TEMPORARY INSPECTORS DATES INSTRUCTION IP 40500 EFFECTIVENESS OF LICENSEE 4

2/23-27/98 Core - a multi-disciplined team CONTROLS IN IDENTIFYING.

3/2-6/98 to assess licensee corrective RESOLVING. AND PREVENTING action /self assessment.

PROBLEMS IP 71714 COLD WEATHER PREPARATIONS 1 (RI) 12/97 Regional Initiative - seasonal region-wide initiative IP 62700 MAINTENANCE IMPLEMENTATION 1

1/98 Regional Initiative - determine if equipment material condition is being maintained.

specifically that equipment used for reactor operations.

IP 50001 STEAM GENERATOR REPLACEMENT 1

11/97 Regional Initiative - continued-INSPECTION 12/97 inspection of Unit 2 SGRP activities.

IP 50001 STEAM GENERATOR REPLACEMENT 1

12/97 Regional Initiative - continued INSPECTION inspection of Unit 2 SGRP activities.

(As-Built Mod Review)

IP 37550 ENGINEERING 1

12/97 Core - focus on the resolution of FWST design issues (including wide range level indication) and open items.

IP 84750 RADI0 ACTIVE WASTE SYSTEMS. WATER 1

4/98 Core CHEMISTRY. CONFIRMATORY MEASUREMENTS AND RADIOLOGICAL ENVIRONMENTAL MONITORING ENCLOSURE Page 1 of 2

(MCGINSP.997. cont'd)

INSPECTION PLANNED PROCEDURE /

NUMBER OF INSPECTION TiPE OF INSPECTION - C0 K NTS TITLE TEMPORARY INSPECTORS DATES INSTRUCTION IP 86750 SOLID RADI0 ACTIVE WASTE 1

4/98 Core MANAGEMENT AND TRANSPORTATION OF RADI0 ACTIVE MATERIALS IP 83750 OCCUPATIONAL EXPOSURE 1

1/98 Core

'IP 81700 PHYSICAL SECURITY PROGRAM FOR 1

(1) 12/97 Core - (1) vehicle barriers (TI POWER REACTORS (2) 1/98 2515-132) and (2) safeguards ing:.:.Mn IP 64704 FIRE PROTECTION PROGRAM 1

3/98 Regional Initiative - generic fire barrier penetration seal issues IP 64704 FIRE PROTECTION PROGRAM 1

12/97 Regional Initiative - review auxiliary building fire protection system flow test.

t ENCLOSURE Page 2 of 2