| {{#Wiki_filter: | | {{#Wiki_filter:March 24, 2021 |
| | |
| | ==SUBJECT:== |
| | BYRON STATION - SECURITY BASELINE INSPECTION REPORT 05000454/2021401 AND 05000455/2021401 |
| | |
| | ==Dear Mr. Rhoades:== |
| | On March 1, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station and discussed the results of this inspection with Mr. Curtis Catencamp and other members of your staff. The results of this inspection are documented in the enclosed report. |
| | |
| | No findings or violations of more than minor significance were identified during this inspection. |
| | |
| | This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. |
| | |
| | Sincerely, |
| | /RA/ |
| | |
| | Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety |
| | |
| | Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66 |
| | |
| | ===Enclosure:=== |
| | As stated |
| | |
| | ==Inspection Report== |
| | Docket Numbers: |
| | 05000454 and 05000455 |
| | |
| | License Numbers: |
| | NPF-37 and NPF-66 |
| | |
| | Report Numbers: |
| | 05000454/2021401 and 05000455/2021401 |
| | |
| | Enterprise Identifier: I-2021-401-0112 |
| | |
| | Licensee: |
| | Exelon Generation Company, LLC |
| | |
| | Facility: |
| | Byron Station |
| | |
| | Location: |
| | Byron, IL |
| | |
| | Inspection Dates: |
| | January 12, 2021 to March 01, 2021 |
| | |
| | Inspectors: |
| | A. Anderson, Physical Security Inspector |
| | |
| | G. Bonano, Physical Security Inspector |
| | |
| | J. Gilliam, Physical Security Inspector |
| | |
| | J. Kutlesa, Physical Security Inspector |
| | |
| | Approved By: |
| | Steven K. Orth, Chief |
| | Plant Support Branch |
| | Division of Reactor Safety |
| | |
| | =SUMMARY= |
| | The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. |
| | |
| | ===List of Findings and Violations=== |
| | No findings or violations of more than minor significance were identified. |
| | |
| | ===Additional Tracking Items=== |
| | None. |
| | |
| | =INSPECTION SCOPES= |
| | |
| | Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at: |
| | http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. |
| | |
| | Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could be performed, in part, remotely. |
| | |
| | ==SAFEGUARDS== |
| | ==71130.01 - Access Authorization== |
| | The inspectors evaluated the access authorization program through completion of the following |
| | |
| | ===inspection elements: |
| | Access Authorization=== |
| | {{IP sample|IP=IP 71130.01|count=1}} |
| | |
| | (1) |
| | * Tier I: All |
| | * Tier II: 02.05 a; 02.06 a, c; 02.07 a, b; 02.08 a, c |
| | * Tier III: 02.09; 02.10 a, b; 02.11 a |
| | |
| | ==71130.02 - Access Control== |
| | The inspectors evaluated the access control program through completion of the following |
| | |
| | ===inspection elements: |
| | Access Control=== |
| | {{IP sample|IP=IP 71130.02|count=1}} |
| | |
| | (1) |
| | * Tier I: All |
| | * Tier II: 02.06 a - c; 02.07 a; 02.08 a, c, f, i |
| | * Tier III: 02.09; 02.10 a |
| | |
| | ==OTHER ACTIVITIES - BASELINE== |
| | ===71151 - Performance Indicator Verification |
| | |
| | The inspectors verified licensee performance indicators submittals listed below: |
| | PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17) |
| | |
| | === |
| | {{IP sample|IP=IP 71151|count=1}} |
| | |
| | The inspectors verified licensee performance indicators submittals listed below |
| | : (1) August 2020 - January |
| | |
| | ==INSPECTION RESULTS== |
| | No findings were identified. |
| | |
| | ==EXIT MEETINGS AND DEBRIEFS== |
| | The inspectors verified no proprietary information was retained or documented in this report. |
| | * On March 1, 2021, the inspectors presented the security baseline inspection results to Mr. Curtis Catencamp and other members of the licensee staff. |
| | |
| | =DOCUMENTS REVIEWED= |
| | |
| | Inspection |
| | Procedure |
| | Type |
| | Designation |
| | Description or Title |
| | Revision or |
| | Date |
| | 71130.01 |
| | Corrective Action |
| | Documents |
| | AR 4308339 |
| | Security Programs Audit Report; NOSA-BYR-20-02 |
| | 01/21/2020 |
| | through |
| | 2/14/2020 |
| | AR 4394288 |
| | Security Programs Audit Exit Meeting Handout; Audit NOSA- |
| | BYR-21-01 |
| | 01/19/2021 |
| | through |
| | 2/05/2021 |
| | Procedures |
| | SY-AA-103-500- |
| | F-04 |
| | Critical Group Inclusion Removal Form |
| | 2 |
| | SY-AA-103-500- |
| | F-05 |
| | Exelon Legal Action Self-Reporting Form |
| | 2 |
| | SY-AA-103-500- |
| | F-07 |
| | Maintaining Unescorted Access Authorization |
| | 000 |
| | SY-AA-103-500- |
| | F-09 |
| | Behavior Observation Program (BOP) - Annual Supervisor |
| | Review |
| | 000 |
| | SY-AA-103-506 |
| | Utilizing The Personnel Access Data System (PADS) |
| | 016 |
| | SY-AA-103-506- |
| | F-01 |
| | Request For Information |
| | 000 |
| | SY-AA-103-506- |
| | F-02 |
| | PADS Monthly Review Form |
| | 000 |
| | SY-AA-103-507 |
| | Review Criteria For Determining Trustworthiness and |
| | Reliability |
| | 007 |
| | SY-AA-103-507- |
| | F-02 |
| | Access Authorization Fitness For Duty Determination-of- |
| | Fitness Review |
| | 000 |
| | SY-AA-103-507- |
| | F-03 |
| | Adjudication of Potentially Disqualifying Information (PDI) |
| | 000 |
| | SY-AA-103-507- |
| | F-06 |
| | Exelon Access Authorization (Licensee Employee) Reported |
| | Legal Action |
| | 000 |
| | SY-AA-103-507- |
| | F-07 |
| | Exelon Access Authorization (Contractor Employee) |
| | Reported Legal Action |
| | 000 |
| | SY-AA-103-511 |
| | Access Authorization In-processing, Out-processing of |
| | Personnel |
| | 26 |
| | SY-AA-103-511- |
| | Access Request Form |
| | 2 |
| | |
| | Inspection |
| | Procedure |
| | Type |
| | Designation |
| | Description or Title |
| | Revision or |
| | Date |
| | F-01 |
| | SY-AA-103-511- |
| | F-02 |
| | Request for Permanent Security Access Status Level |
| | 000 |
| | SY-AA-103-511- |
| | F-04 |
| | Out-processing Checklist, Non-outage Contractor Personnel |
| | 001 |
| | SY-AA-103-511- |
| | F-05 |
| | Out-processing Checklist, Outage Contractor Personnel |
| | 001 |
| | 71130.02 |
| | Corrective Action |
| | Documents |
| | AR 04400320 |
| | NOS ID-Annual Malware Scans Were Not Completed |
| | 2/04/2021 |
| | Procedures |
| | SY-AA-101-106 |
| | Control and Classification of Safeguards Information (SGI) |
| | and Sensitive Unclassified Non-Safeguards Information |
| | (SUNSI) |
| | 21 |
| | SY-AA-101-112- |
| | 1004 |
| | Protected Area Search Processes |
| | SY-AA-101-112- |
| | 1005 |
| | Owner Controlled Area Inspection Processes |
| | SY-AA-101-112- |
| | F-06 |
| | Protected Area Entry - Vehicle Search |
| | SY-AA-101-115 |
| | Controlling Gates and Power Operated Active Vehicle |
| | Barriers |
| | SY-AA-101-117- |
| | F-03 |
| | Visitor/Vehicle Registration Log; multiple date entries |
| | 003; 10/2020 |
| | - 01/2021 |
| | SY-BY-101-112- |
| | 1001 |
| | Owner Controlled Area (OCA) Receiving Building Search |
| | Activities |
| | 71151 |
| | Miscellaneous |
| | LS-AA-2160 Rev |
| | 5-2020-08, 09, |
| | 10, 11, 12 and |
| | 2160-2021-01; |
| | SY-AA-101-155- |
| | F-01, Rev 3 |
| | Security Performance Indicator Reports, IDS Compensatory |
| | Measures Sheet and Supporting SERs and ARs |
| | Rev 005 for |
| | 08/01/2020 - |
| | 01/31/2021 |
| }} | | }} |
Similar Documents at Byron |
---|
Category:Inspection Report
MONTHYEARIR 05000454/20240032024-11-12012 November 2024 Integrated Inspection Report 05000454/2024003 and 05000455/2024003 IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 IR 05000454/20244012024-04-0303 April 2024 Cyber Security Inspection Report 05000454/2024401 and 05000455/2024401 (Public) IR 05000454/20230112024-03-20020 March 2024 Fire Protection Team Inspection Report 05000454/2023011 and 05000455/2023011 IR 05000454/20240102024-03-15015 March 2024 Comprehensive Engineering Team Inspection Report 05000454/2024010 and 05000455/2024010 IR 05000454/20230062024-02-28028 February 2024 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2023006 and 05000454/2023006) IR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements IR 05000454/20235012023-08-31031 August 2023 – Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) IR 05000454/20230022023-08-0303 August 2023 Integrated Inspection Report 05000454/2023002 and 05000455/2023002 IR 05000454/20234022023-07-18018 July 2023 Baseline Security Inspection Document; 05000454/2023402; 05000455/2023402 IR 05000454/20230012023-05-0505 May 2023 Integrated Inspection Report 05000454/2023001 and 05000455/2023001 IR 05000454/20230102023-04-19019 April 2023 License Phase 1 Report 05000454/2023010 IR 05000454/20234012023-03-30030 March 2023 Baseline Security Inspection 05000454/2023401; and 05000455/2023401 IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 IR 05000454/20220062023-03-0101 March 2023 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2022006 and 05000454/2022006) IR 05000454/20220042023-02-0101 February 2023 Integrated Inspection Report 05000454/2022004 and 05000455/2022004 IR 05000454/20220102023-01-17017 January 2023 Design Basis Assurance Inspection (Programs) Inspection Report Report 05000454/2022010 and 05000455/2022010 IR 05000454/20224052022-12-0909 December 2022 Material Control and Accounting Program Inspection Report 05000454/2022405 and 05000455/2022405 IR 05000454/20220032022-11-0707 November 2022 Integrated Inspection Report 05000454/2022003 and 05000455/2022003 BYRON 2022-0072, Steam Generator Tube Inspection Report for Refueling Outage 232022-10-27027 October 2022 Steam Generator Tube Inspection Report for Refueling Outage 23 IR 05000454/20220052022-08-24024 August 2022 Updated Inspection Plan for Byron Station Units 1 and 2 (Report 05000454/2022005; 05000455/2022005) IR 05000454/20224022022-08-0909 August 2022 Security Baseline Inspection Report 05000454/2022402 and 05000455/2022402 IR 05000454/20220022022-08-0808 August 2022 Integrated Inspection Report 05000454/2022002 and 05000455/2022002 IR 05000454/20224032022-07-28028 July 2022 Unit 2 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000454/2022403 05000455/2022403 IR 05000454/20220012022-05-0303 May 2022 Integrated Inspection Report 05000454/2022001 and 05000455/2022001 IR 05000454/20224012022-04-0404 April 2022 Security Baseline Inspection Report 05000454/2022401 and 05000455/2022401 IR 05000454/20210062022-03-0202 March 2022 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2021006 and 05000455/2021006) IR 05000454/20210042022-02-11011 February 2022 Integrated Inspection Report 05000454/2021004 and 05000455/2021004 IR 05000454/20210122022-01-0606 January 2022 Biennial Problem Identification and Resolution Inpsection Report 05000454/2021012 and 05000455/2021012 IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 IR 05000454/20214032021-11-22022 November 2021 Security Baseline Inspection Report 05000454/2021403 and 05000455/2021403 IR 05000454/20210032021-10-29029 October 2021 Integrated Inspection Report 05000454/2021003 and 05000455/2021003 and Exercise of Enforcement Discretion IR 05000454/20214022021-09-28028 September 2021 Security Baseline Inspection Report 05000454/2021402 and 05000455/2021402 IR 05000454/20210052021-09-0101 September 2021 Updated Inspection Plan for Byron Station Units 1 and 2 (05000454/2021005 and 05000455/2021005) IR 05000454/20210022021-08-0404 August 2021 Integrated Inspection Report 05000454/2021002; 05000455/2021002; and 07200068/2021001 IR 05000454/20210112021-05-14014 May 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000454/2021011 and 05000455/2021011 IR 05000454/20215012021-04-21021 April 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2021501 and 05000455/2021501 IR 05000454/20210012021-04-20020 April 2021 Integrated Inspection Report 05000454/2021001 and 05000455/2021001 IR 05000454/20214012021-03-24024 March 2021 Security Baseline Inspection Report 05000454/2021401 and 05000455/2021401 IR 05000454/20180102021-03-19019 March 2021 Closure of Auxiliary Feedwater System Unresolved Item 05000454/2018010-04 and 05000455/2018010-04 IR 05000454/20200062021-03-0404 March 2021 Annual Assessment Letter for Byron Station (Report 05000454/2020006 and 05000455/2020006) IR 05000454/20210102021-02-0909 February 2021 Triennial Fire Protection Inspection Report 05000454/2021010 and 05000455/2021010 IR 05000454/20200042021-01-27027 January 2021 Integrated Inspection Report 05000454/2020004 and 05000455/2020004 2024-08-08
[Table view] Category:Letter
MONTHYEARIR 05000454/20240032024-11-12012 November 2024 Integrated Inspection Report 05000454/2024003 and 05000455/2024003 05000454/LER-2024-002, Reactor Vessel Closure Head Penetration 31 Degraded2024-11-0707 November 2024 Reactor Vessel Closure Head Penetration 31 Degraded RS-24-122, Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2024-11-0707 November 2024 Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24297A2702024-10-23023 October 2024 Notification of NRC Baseline Inspection and Request for Information: Inspection Report 05000455/2025002 RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24281A1502024-10-0707 October 2024 Request for Information for NRC Commercial Grade Dedication Inspection Report 05000454/2025010 and 05000455/2025010 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24116A1192024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24113A2892024-04-22022 April 2024 Notification of NRC Baseline Inspection and Request for Information ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) BYRON 2024-0020, Annual Dose Report for 20232024-04-18018 April 2024 Annual Dose Report for 2023 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition BYRON 2024-0021, Registration of Use of Cask to Store Spent Fuel2024-04-11011 April 2024 Registration of Use of Cask to Store Spent Fuel RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors IR 05000454/20244012024-04-0303 April 2024 Cyber Security Inspection Report 05000454/2024401 and 05000455/2024401 (Public) RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report BYRON 2024-0019, Registration of Use of Cask to Store Spent Fuel2024-03-28028 March 2024 Registration of Use of Cask to Store Spent Fuel RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000454/20230112024-03-20020 March 2024 Fire Protection Team Inspection Report 05000454/2023011 and 05000455/2023011 IR 05000454/20240102024-03-15015 March 2024 Comprehensive Engineering Team Inspection Report 05000454/2024010 and 05000455/2024010 2024-09-06
[Table view] |
Text
March 24, 2021
SUBJECT:
BYRON STATION - SECURITY BASELINE INSPECTION REPORT 05000454/2021401 AND 05000455/2021401
Dear Mr. Rhoades:
On March 1, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station and discussed the results of this inspection with Mr. Curtis Catencamp and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000454 and 05000455
License Numbers:
NPF-37 and NPF-66
Report Numbers:
05000454/2021401 and 05000455/2021401
Enterprise Identifier: I-2021-401-0112
Licensee:
Exelon Generation Company, LLC
Facility:
Byron Station
Location:
Byron, IL
Inspection Dates:
January 12, 2021 to March 01, 2021
Inspectors:
A. Anderson, Physical Security Inspector
G. Bonano, Physical Security Inspector
J. Gilliam, Physical Security Inspector
J. Kutlesa, Physical Security Inspector
Approved By:
Steven K. Orth, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could be performed, in part, remotely.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program through completion of the following
===inspection elements:
Access Authorization===
Main article: IP 71130.01
(1)
- Tier II: 02.05 a; 02.06 a, c; 02.07 a, b; 02.08 a, c
- Tier III: 02.09; 02.10 a, b; 02.11 a
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
Main article: IP 71130.02
(1)
- Tier II: 02.06 a - c; 02.07 a; 02.08 a, c, f, i
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17)
=
The inspectors verified licensee performance indicators submittals listed below
- (1) August 2020 - January
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On March 1, 2021, the inspectors presented the security baseline inspection results to Mr. Curtis Catencamp and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71130.01
Corrective Action
Documents
AR 4308339
Security Programs Audit Report; NOSA-BYR-20-02
01/21/2020
through
2/14/2020
AR 4394288
Security Programs Audit Exit Meeting Handout; Audit NOSA-
BYR-21-01
01/19/2021
through
2/05/2021
Procedures
SY-AA-103-500-
F-04
Critical Group Inclusion Removal Form
2
SY-AA-103-500-
F-05
Exelon Legal Action Self-Reporting Form
2
SY-AA-103-500-
F-07
Maintaining Unescorted Access Authorization
000
SY-AA-103-500-
F-09
Behavior Observation Program (BOP) - Annual Supervisor
Review
000
SY-AA-103-506
Utilizing The Personnel Access Data System (PADS)
016
SY-AA-103-506-
F-01
Request For Information
000
SY-AA-103-506-
F-02
PADS Monthly Review Form
000
SY-AA-103-507
Review Criteria For Determining Trustworthiness and
Reliability
007
SY-AA-103-507-
F-02
Access Authorization Fitness For Duty Determination-of-
Fitness Review
000
SY-AA-103-507-
F-03
Adjudication of Potentially Disqualifying Information (PDI)
000
SY-AA-103-507-
F-06
Exelon Access Authorization (Licensee Employee) Reported
Legal Action
000
SY-AA-103-507-
F-07
Exelon Access Authorization (Contractor Employee)
Reported Legal Action
000
SY-AA-103-511
Access Authorization In-processing, Out-processing of
Personnel
26
SY-AA-103-511-
Access Request Form
2
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
F-01
SY-AA-103-511-
F-02
Request for Permanent Security Access Status Level
000
SY-AA-103-511-
F-04
Out-processing Checklist, Non-outage Contractor Personnel
001
SY-AA-103-511-
F-05
Out-processing Checklist, Outage Contractor Personnel
001
71130.02
Corrective Action
Documents
AR 04400320
NOS ID-Annual Malware Scans Were Not Completed
2/04/2021
Procedures
SY-AA-101-106
Control and Classification of Safeguards Information (SGI)
and Sensitive Unclassified Non-Safeguards Information
(SUNSI)
21
SY-AA-101-112-
1004
Protected Area Search Processes
SY-AA-101-112-
1005
Owner Controlled Area Inspection Processes
SY-AA-101-112-
F-06
Protected Area Entry - Vehicle Search
SY-AA-101-115
Controlling Gates and Power Operated Active Vehicle
Barriers
SY-AA-101-117-
F-03
Visitor/Vehicle Registration Log; multiple date entries
003; 10/2020
- 01/2021
SY-BY-101-112-
1001
Owner Controlled Area (OCA) Receiving Building Search
Activities
71151
Miscellaneous
LS-AA-2160 Rev
5-2020-08, 09,
10, 11, 12 and
2160-2021-01;
SY-AA-101-155-
F-01, Rev 3
Security Performance Indicator Reports, IDS Compensatory
Measures Sheet and Supporting SERs and ARs
Rev 005 for
08/01/2020 -