ML24143A063: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:May 22, 2024
{{#Wiki_filter:May 22, 2024
 
Doug Pehrson, Site Vice President  
 
Arkansas Nuclear One  
 
Entergy Operations, Inc.  
Doug Pehrson, Site Vice President
N-TSB-58  
Arkansas Nuclear One
1448 S.R. 333  
Entergy Operations, Inc.
Russellville, AR 72802-0967  
N-TSB-58
SUBJECT:
1448 S.R. 333
ARKANSAS NUCLEAR ONE - NOTIFICATION OF INSPECTION (NRC  
Russellville, AR 72802-0967
INSPECTION REPORT 05000368/2024003) AND REQUEST FOR  
 
INFORMATION
SUBJECT:     ARKANSAS NUCLEAR ONE - NOTIFICATION OF INSPECTION (NRC
              INSPECTION REPORT 05000368/2024003) AND REQUEST FOR
              INFORMATION
 
Dear Doug Pehrson,
Dear Doug Pehrson,
 
During the week of July 15, 2024, two inspectors from the Nuclear Regulatory  
During the week of July 15, 2024, two inspectors from the Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline biennial requalification  
Commissions (NRC) Region IV office will perform the baseline biennial requalification
inspection at ANO2, using NRC Inspection Procedure 71111.11B, Licensed Operator  
inspection at ANO2, using NRC Inspection Procedure 71111.11B, Licensed Operator
Requalification Program.
Requalification Program.
Experience has shown that this inspection is a resource intensive inspection both for the NRC  
 
inspectors and your staff. To minimize the impact to your onsite resources and to ensure a  
Experience has shown that this inspection is a resource intensive inspection both for the NRC
productive inspection, we have enclosed a request for documents needed for this inspection.  
inspectors and your staff. To minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
These documents have been divided into three groups:
These documents have been divided into three groups:
 
*
  *  The first group (Section A of the enclosure) identifies information to be provided prior to
The first group (Section A of the enclosure) identifies information to be provided prior to  
      the inspection to ensure that the inspectors are adequately prepared.
the inspection to ensure that the inspectors are adequately prepared.  
 
*
  *  The second group (Section B of the enclosure) identifies the information the inspectors
The second group (Section B of the enclosure) identifies the information the inspectors  
      will need upon arrival at the site.
will need upon arrival at the site.  
 
*
  *  The third group (Section C of this enclosure) identifies the items which are necessary to
The third group (Section C of this enclosure) identifies the items which are necessary to  
      close out the inspection and are usually sent a few weeks after the inspectors have left
close out the inspection and are usually sent a few weeks after the inspectors have left  
      the site.
the site.  
 
It is important that all these documents are up to date and complete to minimize the number of  
It is important that all these documents are up to date and complete to minimize the number of
additional documents requested during the preparation and/or the onsite portions of the  
additional documents requested during the preparation and/or the onsite portions of the
inspection.
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Michael Hall of your training organization.


We have discussed the schedule for these inspection activities with your staff and understand
D. Pehrson
that our regulatory contact for this inspection will be Michael Hall of your training organization.
2
D. Pehrson 2
Our inspection dates are subject to change based on your updated schedule of examination  
Our inspection dates are subject to change based on your updated schedule of examination  
activities. If there are any questions about this inspection or the material requested, please  
activities. If there are any questions about this inspection or the material requested, please  
Line 87: Line 81:


  ML24143A063
  ML24143A063
  SUNSI Review               ADAMS:   Non-Publicly Available  Non-Sensitive       Keyword:
  SUNSI Review
  By: CMH13 Yes    No  Publicly Available       Sensitive                 NRC-002
ADAMS:
OFFICE       OE:DORS/OB
Non-Publicly Available
NAME         CHarrignton
  Non-Sensitive
SIGNATURE   /RA/
Keyword:  
DATE         05/22/24
By: CMH13
                                 
Yes    No
                                Initial Request for Information
  Publicly Available
                            Biennial Requalification Inspection
Sensitive  
                                            ANO2
  NRC-002
OFFICE
OE:DORS/OB
NAME
CHarrignton
SIGNATURE
/RA/
DATE
05/22/24


Inspection Report:                             05000368/2024003
Enclosure
 
Initial Request for Information
Inspection Dates:                               July 15, 2024 - July 19, 2024
Biennial Requalification Inspection
 
ANO2
Inspection Procedure:                       IP 71111.11B, Licensed Operator Requalification
                                    Program
Inspection Report:  
 
05000368/2024003
Lead Inspector:                                 Chris Harington, Operations Engineer
 
Inspection Dates:
 
July 15, 2024 - July 19, 2024
A. The following information is requested to support inspection preparation activities.
Inspection Procedure:
  These items are listed by section as they appear in the inspection module (i.e. 03.04a,
IP 71111.11B, Licensed Operator Requalification  
  03.04b, etc.). Requested materials can be sent via a file hosting service (preferably
Program
  Box) or in an electronic format on CD/DVD to arrive at the Region IV office no later
Lead Inspector:
  than June 28, 2024.
Chris Harington, Operations Engineer
 
A. The following information is requested to support inspection preparation activities.  
      *  CD/DVD to:  US Nuclear Regulatory Commission, Region IV
These items are listed by section as they appear in the inspection module (i.e. 03.04a,  
                        ATTN:  Chris Harrington
03.04b, etc.). Requested materials can be sent via a file hosting service (preferably  
                        1600 E. Lamar Blvd
Box) or in an electronic format on CD/DVD to arrive at the Region IV office no later  
                        Arlington, TX 76011
than June 28, 2024.
 
*
  General Requests:
CD/DVD to:  US Nuclear Regulatory Commission, Region IV
 
ATTN:  Chris Harrington
      *  List of licensed operators (SRO & RO) by crew (operating & staff)
1600 E. Lamar Blvd
 
Arlington, TX 76011
      *  Training and Operations Department organization charts (with qualified LOR
General Requests:
          evaluators identified)
*
 
List of licensed operators (SRO & RO) by crew (operating & staff)
      *  Procedures that identify process for revising and maintaining LO continuing training
*
          program up to date
Training and Operations Department organization charts (with qualified LOR  
 
evaluators identified)
      *  List of outstanding LOR program changes
*
 
Procedures that identify process for revising and maintaining LO continuing training  
      *  List of plant events and industry operating experience incorporated into LOR
program up to date
          program since last BRQ
*
 
List of outstanding LOR program changes
      *  Audits and/or self-assessment reports addressing the licensed operator
*
          requalification training program
List of plant events and industry operating experience incorporated into LOR  
 
program since last BRQ
      *  Last 2 years of Simulator Review Committee (or equivalent) meeting minutes
*
 
Audits and/or self-assessment reports addressing the licensed operator  
      *  Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes
requalification training program
 
*
      *  A summary report of all condition reports related to operator actions/errors in the
Last 2 years of Simulator Review Committee (or equivalent) meeting minutes
          control room
*
 
Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes
 
*
 
A summary report of all condition reports related to operator actions/errors in the  
 
control room
                                                                                      Enclosure
  *  Any revised requalification training that was based on licensed operator performance
      issues


2
*
Any revised requalification training that was based on licensed operator performance
issues
03.04a:  Biennial Requalification Written Examinations
03.04a:  Biennial Requalification Written Examinations
 
*
  *  The current and approved biennial written examination schedule
The current and approved biennial written examination schedule  
 
*
  *  The current requalification cycle written examination results for both SRO & RO that
The current requalification cycle written examination results for both SRO & RO that  
      have already been administered up to the week prior to the inspectors arrival onsite.
have already been administered up to the week prior to the inspectors arrival onsite.
 
*
  *  All written examinations that have been approved for administration up to and
All written examinations that have been approved for administration up to and  
      including the week before the inspectors are onsite. This will need to have adequate
including the week before the inspectors are onsite. This will need to have adequate  
      password protection or double envelope protection if mailed via regular mail per
password protection or double envelope protection if mailed via regular mail per  
      NUREG-1021.
NUREG-1021.  
 
*
  *  The current requalification cycle examination methodology (sample plan)
The current requalification cycle examination methodology (sample plan)
 
03.04b:  Annual Requalification Operating Tests
03.04b:  Annual Requalification Operating Tests
 
*
  *  The schedule for the operating tests (JPMs & scenarios) to be given the week of
The schedule for the operating tests (JPMs & scenarios) to be given the week of  
      July 15, 2024 (week inspectors are onsite)
July 15, 2024 (week inspectors are onsite)
 
*
  *  The operating tests (JPMs & scenarios) (password protected and provide separately
The operating tests (JPMs & scenarios) (password protected and provide separately  
      via telephone at later date) to be given the week of July 15, 2024
via telephone at later date) to be given the week of July 15, 2024
 
*
  *  Current requalification cycle operating tests (SRO & RO) and results up to the week
Current requalification cycle operating tests (SRO & RO) and results up to the week  
      prior to the inspection inspectors arrival onsite
prior to the inspection inspectors arrival onsite
 
*
  *  All 2023 NRC required annual operating tests
All 2023 NRC required annual operating tests
 
*
  *  Current requalification cycle operating test methodology (sample plan)
Current requalification cycle operating test methodology (sample plan)
 
03.04c:  Administration of an Annual Requalification Operating Test
03.04c:  Administration of an Annual Requalification Operating Test
 
*
  *  All procedures used to administer the annual operating test
All procedures used to administer the annual operating test
  * All procedures used to assess operator performance
*
  * All procedures that describe conduct of simulator training
All procedures used to assess operator performance
  * All procedures used to test, operate, and maintain the simulator
*
 
All procedures that describe conduct of simulator training
*
All procedures used to test, operate, and maintain the simulator
03.04d:  Requalification Examination Security
03.04d:  Requalification Examination Security
*
Submit any tracking tools that you use to prevent excessive overlap on the written
examinations and meet the intent of sampling all required topics on a periodic basis.
*
Submit any tracking tools that you use to prevent excessive overlap on the operating
tests and meet the intent of sampling all required malfunctions (including major
events, instrument/component malfunctions, TS calls, etc.) on a periodic basis.


  *  Submit any tracking tools that you use to prevent excessive overlap on the written
3
      examinations and meet the intent of sampling all required topics on a periodic basis.
*
 
All procedures that describe examination security, including procedures used to  
  * Submit any tracking tools that you use to prevent excessive overlap on the operating
develop the examinations that include guidelines on overlap between examinations  
      tests and meet the intent of sampling all required malfunctions (including major
in current exam cycle tests and prior year examinations
      events, instrument/component malfunctions, TS calls, etc.) on a periodic basis.
*
 
List of all condition reports since the last biennial requalification inspection related to  
 
examination security and overlap
 
 
 
 
                                          2
  *  All procedures that describe examination security, including procedures used to
      develop the examinations that include guidelines on overlap between examinations
      in current exam cycle tests and prior year examinations
 
  *  List of all condition reports since the last biennial requalification inspection related to
      examination security and overlap
 
03.04e:  Remedial Training and Re-Examinations
03.04e:  Remedial Training and Re-Examinations
 
*
  *  List of remedial training conducted or planned since last requalification exam
List of remedial training conducted or planned since last requalification exam  
      (includes training provided to operators to enable passing requalification exam and
(includes training provided to operators to enable passing requalification exam and  
      training provided to correct generic or individual weaknesses observed during
training provided to correct generic or individual weaknesses observed during  
      previous requalification exam cycle)
previous requalification exam cycle)
 
*
  *  Remediation plans (lesson plans, reference materials, and attendance
Remediation plans (lesson plans, reference materials, and attendance  
      documentation)
documentation)
 
03.04f:  Operator License Conditions
03.04f:  Operator License Conditions
 
*
  *  All procedures and program documentation for maintaining active operator licenses,
All procedures and program documentation for maintaining active operator licenses,  
      tracking training attendance, and ensuring medical fitness of licensed operators
tracking training attendance, and ensuring medical fitness of licensed operators
 
*
  *  All procedures and associated documentation that supports reactivation of any
All procedures and associated documentation that supports reactivation of any  
      SRO/RO license (operating or staff crew) since the last biennial inspection
SRO/RO license (operating or staff crew) since the last biennial inspection
 
03.04g:  Control Room Simulator
03.04g:  Control Room Simulator
*
All simulator management and configuration procedures if not already provided
*
Simulator discrepancy report summary list for all open discrepancy reports and
summary list for those items closed since July 16, 2022.
*
Primary parameters tested to verify core physics parameters (such as moderator
temperature coefficient, integral rod worth)). The applicable reference graphs from
the plant physics data book (electronic or other means as available) should also be
included as well as the test procedures used and the acceptance criteria with results.
*
All simulator modification packages that are on hold, delayed, or not completed in the
last 2 years
*
A list of simulator modification packages completed in the last two-year window


  *  All simulator management and configuration procedures if not already provided
4
 
B. The following information is requested to support the onsite inspection activities.  
  *  Simulator discrepancy report summary list for all open discrepancy reports and
Requested materials should be available to the inspectors, either electronically or  
      summary list for those items closed since July 16, 2022.
hardcopy, upon site arrival on July 15, 2024.
 
03.03:  Requalification Exam Results / 03.04a and 03.04b:  Biennial Requalification Written  
  *  Primary parameters tested to verify core physics parameters (such as moderator
Exam and Annual Requalification Operating Tests Quality
      temperature coefficient, integral rod worth)). The applicable reference graphs from
*
      the plant physics data book (electronic or other means as available) should also be
All operating tests (JPMs & scenarios) to be given in all subsequent weeks after  
      included as well as the test procedures used and the acceptance criteria with results.
onsite week, if available
 
*
  *  All simulator modification packages that are on hold, delayed, or not completed in the
All results up to the day the inspectors leave the site
      last 2 years
03.04f:  Conformance with Operator License Conditions
 
*
  *  A list of simulator modification packages completed in the last two-year window
Access to licensed operators records (operating and staff crews)
 
*
 
Access to licensed operators training attendance records
 
*
 
Access to licensed operators medical records
 
03.04g:  Control Room Simulator Performance
 
*
 
Simulator discrepancies from July 16, 2022 - July 15, 2024. This should include all  
 
open and closed simulator discrepancy reports, including the  
 
documentation/justification for closure.  
 
*
 
Acceptance test documentation, including hardware and software model revisions at  
 
the time of acceptance (as available)
 
*
                                          3
Documentation that validates current models, including the thermal-hydraulics and  
B. The following information is requested to support the onsite inspection activities.
neutronics models, to the actual plant  
  Requested materials should be available to the inspectors, either electronically or
*
  hardcopy, upon site arrival on July 15, 2024.
All current model deficiencies, including FSAR vs design differences in the simulator  
 
(any documentation on this)
  03.03:  Requalification Exam Results / 03.04a and 03.04b:  Biennial Requalification Written
*
          Exam and Annual Requalification Operating Tests Quality
Summary list of modifications from July 16, 2022 - July 15, 2024.
 
*
      *  All operating tests (JPMs & scenarios) to be given in all subsequent weeks after
Plant modifications (both hardware and software) completed on the simulator by due  
          onsite week, if available
date from July 16, 2022 - July 15, 2024.
 
*
      *  All results up to the day the inspectors leave the site
Simulator differences lesson plan used in training (current to July 15, 2024)
 
*
  03.04f:  Conformance with Operator License Conditions
The complete book of all simulator annual performance test packages (usually in a  
 
single book but may be electronic or in single test packages), complete with all  
      *  Access to licensed operators records (operating and staff crews)
transient tests, steady state tests, and malfunction tests.  This should also include  
      * Access to licensed operators training attendance records
the test procedures for each test, the acceptance criteria, and results. For each  
      * Access to licensed operators medical records
transient test, the reference chart should be included or an equivalent subject matter  
 
expert review versus the simulator results with a write-up for any differences beyond  
  03.04g:  Control Room Simulator Performance
the ANSI standard requirements.
 
      *  Simulator discrepancies from July 16, 2022 - July 15, 2024. This should include all
          open and closed simulator discrepancy reports, including the
          documentation/justification for closure.
 
      *  Acceptance test documentation, including hardware and software model revisions at
          the time of acceptance (as available)
 
      *  Documentation that validates current models, including the thermal-hydraulics and
          neutronics models, to the actual plant
 
      *  All current model deficiencies, including FSAR vs design differences in the simulator
          (any documentation on this)
 
      *  Summary list of modifications from July 16, 2022 - July 15, 2024.
 
      *  Plant modifications (both hardware and software) completed on the simulator by due
          date from July 16, 2022 - July 15, 2024.
 
      *  Simulator differences lesson plan used in training (current to July 15, 2024)
 
      *  The complete book of all simulator annual performance test packages (usually in a
          single book but may be electronic or in single test packages), complete with all
          transient tests, steady state tests, and malfunction tests.  This should also include
          the test procedures for each test, the acceptance criteria, and results. For each
          transient test, the reference chart should be included or an equivalent subject matter
          expert review versus the simulator results with a write-up for any differences beyond
          the ANSI standard requirements.
 
 
 
 
 
 
                                              4
      *  All test packages used to verify core physics parameters (such as moderator
          temperature coefficient and integral rod worth). The applicable reference graphs from
          the plant physics data book (electronic or other means as available) should also be
          included as well as the test procedures used and the acceptance criteria with results.
 
      *  All simulator tests, configuration management, and related documents available in
          the room for inspectors to review. This includes training needs analysis packages,
          Simulator Review Committee meeting minutes, etc.
 
      *  Current copy of ANSI 3.5 standard you are committed to for simulator testing
 
C.  ANO2 is required to send the final results summary (see Table 1 below) and any
  remaining exams and operating tests that have not been reviewed to the regional
  office lead inspector for this inspection for final review and comparison against the
  Significance Determination Tools to communicate the exit results for the inspection.
 
      TABLE 1:  EXAMINATION RESULTS
 
        1. Total number of licensed operators.
        2. Number of licensed operators administered a requalification
            examination required by 10 CFR 55.59(a).
        3. Number of individual licensed operators who failed any portion of a
            requalification examination (written, JPM, or individual simulator
            scenario failures).
        4. Divide line 3 by line 2 to obtain the individual requalification
            examination failure rate. Line 3/Line 2.                                      %
        5. Number of crews administered simulator scenarios as part of a
            requalification examination required by 10 CFR 55.59(a).
        6. Number of crews who performed unsatisfactorily on the
            simulator scenarios.
        7. Divide line 6 by line 5 to obtain the crew simulator scenario
            failure rate. Line 6/Line 5.                                                  %
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


                                              5
5
*
All test packages used to verify core physics parameters (such as moderator
temperature coefficient and integral rod worth). The applicable reference graphs from
the plant physics data book (electronic or other means as available) should also be
included as well as the test procedures used and the acceptance criteria with results.
*
All simulator tests, configuration management, and related documents available in
the room for inspectors to review. This includes training needs analysis packages,
Simulator Review Committee meeting minutes, etc.
*
Current copy of ANSI 3.5 standard you are committed to for simulator testing
C. ANO2 is required to send the final results summary (see Table 1 below) and any
remaining exams and operating tests that have not been reviewed to the regional
office lead inspector for this inspection for final review and comparison against the
Significance Determination Tools to communicate the exit results for the inspection.
TABLE 1:  EXAMINATION RESULTS
1. Total number of licensed operators.
2. Number of licensed operators administered a requalification
examination required by 10 CFR 55.59(a).
3. Number of individual licensed operators who failed any portion of a
requalification examination (written, JPM, or individual simulator
scenario failures).
4. Divide line 3 by line 2 to obtain the individual requalification
examination failure rate. Line 3/Line 2.
%
5. Number of crews administered simulator scenarios as part of a
requalification examination required by 10 CFR 55.59(a).
6. Number of crews who performed unsatisfactorily on the
simulator scenarios.
7. Divide line 6 by line 5 to obtain the crew simulator scenario
failure rate. Line 6/Line 5.
%
}}
}}

Latest revision as of 18:13, 24 November 2024

Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information
ML24143A063
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/22/2024
From: Harrington C
NRC/RGN-IV/DORS/OB
To: Pehrson D
Entergy Operations
References
IR 2024003
Download: ML24143A063 (1)


See also: IR 05000368/2024003

Text

May 22, 2024

Doug Pehrson, Site Vice President

Arkansas Nuclear One

Entergy Operations, Inc.

N-TSB-58

1448 S.R. 333

Russellville, AR 72802-0967

SUBJECT:

ARKANSAS NUCLEAR ONE - NOTIFICATION OF INSPECTION (NRC

INSPECTION REPORT 05000368/2024003) AND REQUEST FOR

INFORMATION

Dear Doug Pehrson,

During the week of July 15, 2024, two inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline biennial requalification

inspection at ANO2, using NRC Inspection Procedure 71111.11B, Licensed Operator

Requalification Program.

Experience has shown that this inspection is a resource intensive inspection both for the NRC

inspectors and your staff. To minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

These documents have been divided into three groups:

The first group (Section A of the enclosure) identifies information to be provided prior to

the inspection to ensure that the inspectors are adequately prepared.

The second group (Section B of the enclosure) identifies the information the inspectors

will need upon arrival at the site.

The third group (Section C of this enclosure) identifies the items which are necessary to

close out the inspection and are usually sent a few weeks after the inspectors have left

the site.

It is important that all these documents are up to date and complete to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Michael Hall of your training organization.

D. Pehrson

2

Our inspection dates are subject to change based on your updated schedule of examination

activities. If there are any questions about this inspection or the material requested, please

contact me, Chris Harrington, at (817) 200-1254 (christopher.harrington@nrc.gov).

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Chris Harrington, Operations Engineer

Operations Branch

Division of Reactor Safety

Docket No. 05000368

License No. NPF-6

Enclosure:

Initial Request for Information

Biennial Requalification Inspection

Signed by Harrington, Chris

on 05/22/24

ML24143A063

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: CMH13

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

OE:DORS/OB

NAME

CHarrignton

SIGNATURE

/RA/

DATE

05/22/24

Enclosure

Initial Request for Information

Biennial Requalification Inspection

ANO2

Inspection Report: 05000368/2024003

Inspection Dates:

July 15, 2024 - July 19, 2024

Inspection Procedure:

IP 71111.11B, Licensed Operator Requalification

Program

Lead Inspector:

Chris Harington, Operations Engineer

A. The following information is requested to support inspection preparation activities.

These items are listed by section as they appear in the inspection module (i.e. 03.04a,

03.04b, etc.). Requested materials can be sent via a file hosting service (preferably

Box) or in an electronic format on CD/DVD to arrive at the Region IV office no later

than June 28, 2024.

CD/DVD to: US Nuclear Regulatory Commission, Region IV

ATTN: Chris Harrington

1600 E. Lamar Blvd

Arlington, TX 76011

General Requests:

List of licensed operators (SRO & RO) by crew (operating & staff)

Training and Operations Department organization charts (with qualified LOR

evaluators identified)

Procedures that identify process for revising and maintaining LO continuing training

program up to date

List of outstanding LOR program changes

List of plant events and industry operating experience incorporated into LOR

program since last BRQ

Audits and/or self-assessment reports addressing the licensed operator

requalification training program

Last 2 years of Simulator Review Committee (or equivalent) meeting minutes

Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes

A summary report of all condition reports related to operator actions/errors in the

control room

2

Any revised requalification training that was based on licensed operator performance

issues

03.04a: Biennial Requalification Written Examinations

The current and approved biennial written examination schedule

The current requalification cycle written examination results for both SRO & RO that

have already been administered up to the week prior to the inspectors arrival onsite.

All written examinations that have been approved for administration up to and

including the week before the inspectors are onsite. This will need to have adequate

password protection or double envelope protection if mailed via regular mail per

NUREG-1021.

The current requalification cycle examination methodology (sample plan)

03.04b: Annual Requalification Operating Tests

The schedule for the operating tests (JPMs & scenarios) to be given the week of

July 15, 2024 (week inspectors are onsite)

The operating tests (JPMs & scenarios) (password protected and provide separately

via telephone at later date) to be given the week of July 15, 2024

Current requalification cycle operating tests (SRO & RO) and results up to the week

prior to the inspection inspectors arrival onsite

All 2023 NRC required annual operating tests

Current requalification cycle operating test methodology (sample plan)

03.04c: Administration of an Annual Requalification Operating Test

All procedures used to administer the annual operating test

All procedures used to assess operator performance

All procedures that describe conduct of simulator training

All procedures used to test, operate, and maintain the simulator

03.04d: Requalification Examination Security

Submit any tracking tools that you use to prevent excessive overlap on the written

examinations and meet the intent of sampling all required topics on a periodic basis.

Submit any tracking tools that you use to prevent excessive overlap on the operating

tests and meet the intent of sampling all required malfunctions (including major

events, instrument/component malfunctions, TS calls, etc.) on a periodic basis.

3

All procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current exam cycle tests and prior year examinations

List of all condition reports since the last biennial requalification inspection related to

examination security and overlap

03.04e: Remedial Training and Re-Examinations

List of remedial training conducted or planned since last requalification exam

(includes training provided to operators to enable passing requalification exam and

training provided to correct generic or individual weaknesses observed during

previous requalification exam cycle)

Remediation plans (lesson plans, reference materials, and attendance

documentation)

03.04f: Operator License Conditions

All procedures and program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators

All procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection

03.04g: Control Room Simulator

All simulator management and configuration procedures if not already provided

Simulator discrepancy report summary list for all open discrepancy reports and

summary list for those items closed since July 16, 2022.

Primary parameters tested to verify core physics parameters (such as moderator

temperature coefficient, integral rod worth)). The applicable reference graphs from

the plant physics data book (electronic or other means as available) should also be

included as well as the test procedures used and the acceptance criteria with results.

All simulator modification packages that are on hold, delayed, or not completed in the

last 2 years

A list of simulator modification packages completed in the last two-year window

4

B. The following information is requested to support the onsite inspection activities.

Requested materials should be available to the inspectors, either electronically or

hardcopy, upon site arrival on July 15, 2024.

03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written

Exam and Annual Requalification Operating Tests Quality

All operating tests (JPMs & scenarios) to be given in all subsequent weeks after

onsite week, if available

All results up to the day the inspectors leave the site

03.04f: Conformance with Operator License Conditions

Access to licensed operators records (operating and staff crews)

Access to licensed operators training attendance records

Access to licensed operators medical records

03.04g: Control Room Simulator Performance

Simulator discrepancies from July 16, 2022 - July 15, 2024. This should include all

open and closed simulator discrepancy reports, including the

documentation/justification for closure.

Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available)

Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant

All current model deficiencies, including FSAR vs design differences in the simulator

(any documentation on this)

Summary list of modifications from July 16, 2022 - July 15, 2024.

Plant modifications (both hardware and software) completed on the simulator by due

date from July 16, 2022 - July 15, 2024.

Simulator differences lesson plan used in training (current to July 15, 2024)

The complete book of all simulator annual performance test packages (usually in a

single book but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include

the test procedures for each test, the acceptance criteria, and results. For each

transient test, the reference chart should be included or an equivalent subject matter

expert review versus the simulator results with a write-up for any differences beyond

the ANSI standard requirements.

5

All test packages used to verify core physics parameters (such as moderator

temperature coefficient and integral rod worth). The applicable reference graphs from

the plant physics data book (electronic or other means as available) should also be

included as well as the test procedures used and the acceptance criteria with results.

All simulator tests, configuration management, and related documents available in

the room for inspectors to review. This includes training needs analysis packages,

Simulator Review Committee meeting minutes, etc.

Current copy of ANSI 3.5 standard you are committed to for simulator testing

C. ANO2 is required to send the final results summary (see Table 1 below) and any

remaining exams and operating tests that have not been reviewed to the regional

office lead inspector for this inspection for final review and comparison against the

Significance Determination Tools to communicate the exit results for the inspection.

TABLE 1: EXAMINATION RESULTS

1. Total number of licensed operators.

2. Number of licensed operators administered a requalification

examination required by 10 CFR 55.59(a).

3. Number of individual licensed operators who failed any portion of a

requalification examination (written, JPM, or individual simulator

scenario failures).

4. Divide line 3 by line 2 to obtain the individual requalification

examination failure rate. Line 3/Line 2.

%

5. Number of crews administered simulator scenarios as part of a

requalification examination required by 10 CFR 55.59(a).

6. Number of crews who performed unsatisfactorily on the

simulator scenarios.

7. Divide line 6 by line 5 to obtain the crew simulator scenario

failure rate. Line 6/Line 5.

%