{{#Wiki_filter:January 19, 2022
{{#Wiki_filter:January 19, 2022
Mr. Cleve Reasoner, Chief Executive Officer
Mr. Cleve Reasoner, Chief Executive Officer
   and Chief Nuclear Officer
   and Chief Nuclear Officer
Wolf Creek Nuclear Operating Corp.
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
P.O. Box 411
Burlington, KS 66839
Burlington, KS 66839
SUBJECT:       WOLF CREEK GENERATING STATION - NOTIFICATION OF NRC
 
                EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS INSPECTION
SUBJECT:                                                                   WOLF CREEK GENERATING STATION -         NOTIFICATION OF NRC
                (05000482/2022002) AND REQUEST FOR INFORMATION
              EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS INSPECTION
              (05000482/2022002) AND REQUEST FOR INFORMATION
 
Dear Mr. Reasoner:
Dear Mr. Reasoner:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct the baseline inspection of changes, tests and experiments at your Wolf Creek
will conduct the baseline inspection of changes, tests and experiments at your Wolf Creek
Generating Station from April 11 - 15, 2022. The inspection will consist of three reactor
Generating Station           from         April 11 -           15, 2022. The inspection will consist of three reactor
inspectors from the NRCs Region IV office for one week. The inspection will be conducted in
inspectors from the NRCs Region IV office for one week. The inspection will be conducted in
accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes, Tests and
accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes, Tests and
Experiments, dated December 8, 2016.
Experiments, dated December 8, 2016.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
 
and your staff. To minimize the impact to your onsite resources and to ensure a productive
Experience has shown that this inspection is resource intensive for both the NRC inspectors
inspection, we have enclosed a request for information needed for this inspection. Please note
and your staff. To minimize the impact to your onsite resources and to ensure a productive
that the documents are requested to be provided by March 28, 2022. Upon review of these
inspection, we have enclosed a request for information needed for this inspection. Please note
documents, the inspectors will select additional documentation for review upon arrival. It is
that the documents are requested to be provided by March 28, 2022. Upon review of these
documents, the inspectors will select additional documentation for review upon arrival. It is
important that all documents are up-to-date and complete in order to minimize the number of
important that all documents are up-to-date and complete in order to minimize the number of
additional documents requested during the preparation and/or the onsite portions of the
additional documents requested during the preparation and/or the onsite portions of the
inspection.
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Jason Knust of your Licensing organization.
that our regulatory contact for this inspection will be Jason Knust of your Licensing organization.
Line 46: Line 52:
lead inspector, Fabian Thomas, by telephone at 817-200-1126 or by e-mail at
lead inspector, Fabian Thomas, by telephone at 817-200-1126 or by e-mail at
Fabian.Thomas@nrc.gov.
Fabian.Thomas@nrc.gov.
PAPERWORK REDUCTION ACT STATEMENT
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150-0011). Send comments
approved these information collections (approval number 3150-0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
regarding this information collection to the Information Services Branch, Office of the Chief
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office
DC 20555-0001, or by           e-mail to Infocollects.Resource@nrc.gov , and to the Desk Officer, Office
of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Budget, Washington, DC 20503.
Budget, Washington, DC 20503.
C. Reasoner                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    2


C. Reasoner                                      2
PUBLIC PROTECTION NOTIFICATION
PUBLIC PROTECTION NOTIFICATION
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
displays a currently valid OMB control number.
This letter, its enclosure, and your response (if any) will be made available for public inspection
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public
Inspections, Exemptions, Requests for Withholding.
Inspections, Exemptions, Requests for Withholding.  
                                              Sincerely,
 
                                                                    Digitally signed by Vincent G.
                                                                        Sincerely,
                                              Vincent G. Gaddy GaddyDate: 2022.01.19 15:15:07 -06'00'
 
                                              Vincent Gaddy, Chief
 
                                              Engineering Branch 1
 
                                              Division of Reactor Safety
 
                                                                        Vincent Gaddy, Chief
                                                                        Engineering Branch 1
                                                                        Division of Reactor Safety
 
 
 
Docket No. 05000482
Docket No. 05000482
License No. NPF-42
License No. NPF-42
Enclosure:
Enclosure:
Request for Information
Request for Information
Cc w/ encl: Distribution via LISTSERV


Cc w/ encl:  Distribution via LISTSERV


  ML22019A093
  ML22019A093
SUNSI Review         ADAMS:       Non-Publicly Available Non-Sensitive Keyword:
                    SUNSI Review                                                             ADAMS:                                                                             Non-Publicly Available                     Non-Sensitive Keyword:
  By: FDT               Yes No Publicly Available       Sensitive
    By: FDT                                                                                                             Yes                   No                               Publicly Available                                                               Sensitive
  OFFICE         RI:DRS/EB1 C:DRS/EB1
    OFFICE RI:DRS/EB1 C:DRS/EB1
  NAME           FThomas     VGaddy
    NAME FThomas VGaddy
  SIGNATURE /RA/             /RA/
    SIGNATURE /RA/                                   /RA/
  DATE           1/19/2022   1/19/2022
    DATE 1/19/2022 1/19/2022
                             
                                                                 
                                      Request for Information
                                      Request for Information
                  Evaluations of Changes, Tests and Experiments Inspection
                Evaluations of Changes, Tests and Experiments Inspection
                                    Wolf Creek Generating Station
                                  Wolf Creek Generating Station
Inspection Report:             05000482/2022002
 
Inspection Dates:               April 11 - 15, 2022
 
Inspection Procedure:           IP 71111.17T, Evaluations of Changes, Tests and Experiments
Inspection Report:                                                                                                                                                                     05000482/2022002
Lead Inspector:                 Fabian Thomas, Reactor Inspector
 
Inspection Dates:                   April 11 - 15, 2022
 
Inspection Procedure:                                                                                                                         IP 71111.17T, Evaluations of Changes, Tests and Experiments
 
Lead Inspector:                     Fabian Thomas, Reactor Inspector
 
 
Information Requested for the In-Office Preparation Week
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by March 28, 2022, to the attention of Fabian Thomas. We request that you
format (preferred) by March 28, 2022, to the attention of Fabian Thomas. We request that you
categorize the documents in your response with the numbered list below. If only hard copies of
categorize the documents in your response with the numbered list below. If only hard copies of
the requested documents are available or if the electronic format is too large, please inform the
the requested documents are available or if the electronic format is too large, please inform the
lead inspector and provide the documents on the first day of the onsite inspection. Also, the
lead inspector and provide the documents on the first day of the onsite inspection. Also, the
inspectors will select specific items from the information requested below and request from your
inspectors will select specific items from the information requested below and request from your
staff additional documents needed during the onsite inspection weeks. We ask that the specific
staff additional documents needed during the onsite inspection weeks. We ask that the specific
items requested be available and ready for review on the first day of inspection. If you have any
items requested be available and ready for review on the first day of inspection. If you have any
questions regarding this information request, please contact the lead inspector as soon as
questions regarding this information request, please contact the lead inspector as soon as
possible.
possible.
     1. A copy of any procedures for conducting 10 CFR 50.59 applicability determinations,
 
     1.                     A copy of any procedures for conducting 10 CFR 50.59 applicability determinations,
         screenings, and evaluations and any other 10 CFR 50.59 program-related documents.
         screenings, and evaluations and any other 10 CFR 50.59 program-related documents.
         These documents, for example, may include procedures for implementation of alternate
         These documents, for example, may include procedures for implementation of alternate
         processes or screening criteria such as for replacement part evaluations, design
         processes or screening criteria such as for replacement part evaluations, design
         equivalent changes, long-term configuration control, etc.
         equivalent changes, long-term configuration control, etc.
     2. A list with descriptions of all 10 CFR 50.59 applicability determinations of fully
 
     2.                     A list with descriptions of all 10 CFR 50.59 applicability determinations of fully
         implemented changes, tests and experiments performed since the last triennial 10 CFR
         implemented changes, tests and experiments performed since the last triennial 10 CFR
         50.59 inspection that did not result in a screening.
         50.59 inspection that did not result in a screening.
     3. A list with descriptions of all 10 CFR 50.59 screenings of fully implemented changes,
 
         tests and experiments performed since the last triennial 10 CFR 50.59 inspection that
     3.                     A list with descriptions of all 10 CFR 50.59 screenings of fully implemented changes,
         tests and experiments performed since the last triennial 10 CFR 50.59 inspection that
         did not result in an evaluation.
         did not result in an evaluation.
     4. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,
 
         tests and experiments performed since the last triennial 10 CFR 50.59 inspection that
     4.                     A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,
         tests and experiments performed since the last triennial 10 CFR 50.59 inspection that
         did not result in an application for a license amendment.
         did not result in an application for a license amendment.
     5. A list with descriptions of all fully implemented changes, tests and experiments where an
 
     5.                     A list with descriptions of all fully im plemented changes, tests and experiments where an
         alternate process or screening criteria was applied since the last triennial 10 CFR 50.59
         alternate process or screening criteria was applied since the last triennial 10 CFR 50.59
         inspection.
         inspection.
                                                                                          Enclosure


     6. A list with descriptions of all temporary plant modifications implemented since the last
 
         triennial 10 CFR 50.59 inspection. Please note whether these temporary modifications
 
 
 
  Enclosure
     6.                     A list with descriptions of all temporary plant modifications implemented since the last
         triennial 10 CFR 50.59 inspection. Please note whether these temporary modifications
         remain in effect.
         remain in effect.
     7. A list with descriptions of all compensatory actions for degraded or non-conforming
 
         conditions implemented since the last triennial 10 CFR 50.59 inspection.
     7.                     A list with descriptions of all compensatory actions for degraded or non-conforming
     8. A list with descriptions of all normal, abnormal, and emergency operating procedure
         conditions implemented since the last triennial 10 CFR 50.59 inspection.
 
     8.                     A list with descriptions of all normal, abnormal, and emergency operating procedure
         changes implemented since the last triennial 10 CFR 50.59 inspection.
         changes implemented since the last triennial 10 CFR 50.59 inspection.
     9. A list with descriptions of all corrective action documents related to 10 CFR 50.59
 
         applicability determinations, screenings, and evaluations since the last triennial 10 CFR
     9.                     A list with descriptions of all corrective action documents related to 10 CFR 50.59
         applicability determinations, screenings, and eval  uations since the last triennial 10 CFR
         50.59 inspection.
         50.59 inspection.
     10. A list including qualification dates of personnel qualified to prepare, review, or approve
     10. A list including qualification dates of personnel qualified to prepare, review, or approve
         10 CFR 50.59 applicability determinations, screenings, and evaluations.
         10 CFR 50.59 applicability determinations, screenings, and evaluations.
     11. A copy of the current updated final safety analysis report, technical specifications, and
     11. A copy of the current updated final safety analysis report, technical specifications, and
         technical specification bases.
         technical specification bases.
     12. A copy of any self-assessments or audits performed of 10 CFR 50.59 programs since
     12. A copy of any self-assessments or audits performed of 10 CFR 50.59 programs since
         the last triennial 10 CFR 50.59 inspection.
         the last triennial 10 CFR 50.59 inspection.
     13. A copy of the most recent submittal of the report containing a brief description of any
     13. A copy of the most recent submittal of the report containing a brief description of any
         changes, tests and experiments, including a summary of the evaluation of each, required
         changes, tests and experiments, including a summary of the evaluation of each, required
         by 10 CFR 50.59(d)(2).
         by 10 CFR 50.59(d)(2).
     14. A list of systems and system designators and a set of one-line (i.e., simplified) system
     14. A list of systems and system designators and a set of one-line (i.e., simplified) system
         diagrams.
         diagrams.
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
 
Note: Descriptions should be brief but of suffici ent detail to ensure that inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Inspector Contact Information:
Inspector Contact Information:
  Fabian Thomas                    Jonathan Braisted             Gerond George
 
  Reactor Inspector                Reactor Inspector             Senior Reactor Inspector
  Fabian Thomas                    Jonathan Braisted                 Gerond George
  817-200-1126                      817-200-1469                   817-200-1562
  Reactor Inspector                Reactor Inspector                 Senior Reactor Inspector
  Fabian.Thomas@nrc.gov            Jonathan.Braisted@nrc.gov     Gerond.George@nrc.gov
  817-200-1126                      817-200-1469                     817-200-1562
  Fabian.Thomas@nrc.gov            Jonathan.Braisted@nrc.gov         Gerond.George@nrc.gov
 
 
Mailing Address:
Mailing Address:
U.S. NRC, Region IV
U.S. NRC, Region IV
Attn: Fabian Thomas
Attn: Fabian Thomas

Latest revision as of 23:48, 18 November 2024

Notification of NRC Evaluations of Changes, Tests and Experiments Inspection (05000482/2022002) and Request for Information
ML22019A093
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/19/2022
From: Vincent Gaddy
Region 4 Engineering Branch 1
To: Reasoner C
Wolf Creek
References
IR 2022002
Download: ML22019A093 (5)


See also: IR 05000482/2022002

Text

January 19, 2022

Mr. Cleve Reasoner, Chief Executive Officer

and Chief Nuclear Officer

Wolf Creek Nuclear Operating Corp.

P.O. Box 411

Burlington, KS 66839

SUBJECT: WOLF CREEK GENERATING STATION - NOTIFICATION OF NRC

EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS INSPECTION

(05000482/2022002) AND REQUEST FOR INFORMATION

Dear Mr. Reasoner:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff

will conduct the baseline inspection of changes, tests and experiments at your Wolf Creek

Generating Station from April 11 - 15, 2022. The inspection will consist of three reactor

inspectors from the NRCs Region IV office for one week. The inspection will be conducted in

accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes, Tests and

Experiments, dated December 8, 2016.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. To minimize the impact to your onsite resources and to ensure a productive

inspection, we have enclosed a request for information needed for this inspection. Please note

that the documents are requested to be provided by March 28, 2022. Upon review of these

documents, the inspectors will select additional documentation for review upon arrival. It is

important that all documents are up-to-date and complete in order to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Jason Knust of your Licensing organization.

If there are any questions about this inspection or the material requested, please contact the

lead inspector, Fabian Thomas, by telephone at 817-200-1126 or by e-mail at

Fabian.Thomas@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of the Chief

Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov , and to the Desk Officer, Office

of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and

Budget, Washington, DC 20503.

C. Reasoner 2

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

Vincent Gaddy, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No. 05000482

License No. NPF-42

Enclosure:

Request for Information

Cc w/ encl: Distribution via LISTSERV

ML22019A093

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: FDT Yes No Publicly Available Sensitive

OFFICE RI:DRS/EB1 C:DRS/EB1

NAME FThomas VGaddy

SIGNATURE /RA/ /RA/

DATE 1/19/2022 1/19/2022

Request for Information

Evaluations of Changes, Tests and Experiments Inspection

Wolf Creek Generating Station

Inspection Report: 05000482/2022002

Inspection Dates: April 11 - 15, 2022

Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests and Experiments

Lead Inspector: Fabian Thomas, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (preferred) by March 28, 2022, to the attention of Fabian Thomas. We request that you

categorize the documents in your response with the numbered list below. If only hard copies of

the requested documents are available or if the electronic format is too large, please inform the

lead inspector and provide the documents on the first day of the onsite inspection. Also, the

inspectors will select specific items from the information requested below and request from your

staff additional documents needed during the onsite inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any

questions regarding this information request, please contact the lead inspector as soon as

possible.

1. A copy of any procedures for conducting 10 CFR 50.59 applicability determinations,

screenings, and evaluations and any other 10 CFR 50.59 program-related documents.

These documents, for example, may include procedures for implementation of alternate

processes or screening criteria such as for replacement part evaluations, design

equivalent changes, long-term configuration control, etc.

2. A list with descriptions of all 10 CFR 50.59 applicability determinations of fully

implemented changes, tests and experiments performed since the last triennial 10 CFR

50.59 inspection that did not result in a screening.

3. A list with descriptions of all 10 CFR 50.59 screenings of fully implemented changes,

tests and experiments performed since the last triennial 10 CFR 50.59 inspection that

did not result in an evaluation.

4. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,

tests and experiments performed since the last triennial 10 CFR 50.59 inspection that

did not result in an application for a license amendment.

5. A list with descriptions of all fully im plemented changes, tests and experiments where an

alternate process or screening criteria was applied since the last triennial 10 CFR 50.59

inspection.

Enclosure

6. A list with descriptions of all temporary plant modifications implemented since the last

triennial 10 CFR 50.59 inspection. Please note whether these temporary modifications

remain in effect.

7. A list with descriptions of all compensatory actions for degraded or non-conforming

conditions implemented since the last triennial 10 CFR 50.59 inspection.

8. A list with descriptions of all normal, abnormal, and emergency operating procedure

changes implemented since the last triennial 10 CFR 50.59 inspection.

9. A list with descriptions of all corrective action documents related to 10 CFR 50.59

applicability determinations, screenings, and eval uations since the last triennial 10 CFR

50.59 inspection.

10. A list including qualification dates of personnel qualified to prepare, review, or approve

10 CFR 50.59 applicability determinations, screenings, and evaluations.

11. A copy of the current updated final safety analysis report, technical specifications, and

technical specification bases.

12. A copy of any self-assessments or audits performed of 10 CFR 50.59 programs since

the last triennial 10 CFR 50.59 inspection.

13. A copy of the most recent submittal of the report containing a brief description of any

changes, tests and experiments, including a summary of the evaluation of each, required

by 10 CFR 50.59(d)(2).

14. A list of systems and system designators and a set of one-line (i.e., simplified) system

diagrams.

Note: Descriptions should be brief but of suffici ent detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Inspector Contact Information:

Fabian Thomas Jonathan Braisted Gerond George

Reactor Inspector Reactor Inspector Senior Reactor Inspector

817-200-1126 817-200-1469 817-200-1562

Fabian.Thomas@nrc.gov Jonathan.Braisted@nrc.gov Gerond.George@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Fabian Thomas

1600 East Lamar Blvd.

Arlington, TX 76011-4125