| {{#Wiki_filter:}} | | {{#Wiki_filter:200 Energy Way Kennett Square, PA 19348 www.constellation.com |
| | |
| | 10 CFR 50.90 |
| | |
| | October 4, 2024 |
| | |
| | U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN: Document Control Desk |
| | |
| | Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 USNRC Docket Nos. 50-352 and 50-353 |
| | |
| | ==Subject:== |
| | Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise Unit 2 Technical Specification Page |
| | |
| | ==References:== |
| | : 1. Constellation Energy Generation, LLC (CEG) letter to the U.S. Nuclear Regulatory Commission (USNRC), License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS), dated September 26, 2022 (USNRC Agencywide Documents Access and Management System (ADAMS) Accession No. ML22269A569). |
| | : 2. CEG letter to the US NRC, License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation, dated February 17, 2023 (ADAMS Accession No. ML23052A023 ). |
| | : 3. CEG letter to the US NRC, Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit 1 PPS First Installation in 2026, dated April 23, 2024 (ADAMS Accession No. ML24114A322). |
| | : 4. CEG letter to the US NRC, Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise Unit 2 Technical Specifications, dated May 28, 2024 (ADAMS Accession No. ML24149A211). |
| | |
| | In accordance with 10 CFR 50.90, Constellation Energy Generation, LLC (CEG) requested amendments to Renewed Facility Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (LGS), Units 1 and 2, respectively (Reference 1). The proposed changes would revise the LGS licensing and design basis to incorporate a planned digital modification at LGS (i.e., |
| | the LGS Digital Modernization Project). |
| | |
| | Supplement to License Amendment Request Docket Nos. 50-352 and 50- 353 October 4, 2024 Page 2 |
| | |
| | CEG subsequently requested an amendment to Appendix A, Technical Specifications (TS) for LGS, Units 1 and 2, respectively (Reference 2). The proposed changes would revise the LGS TS to adopt features from NUREG-1433, Revision 5, Standard Technical Specifications for General Electric BWR/4 Plants. The proposed changes would support the installation of the new Plant Protection System (PPS) described in Reference 1. Reference 2 also contained an Exemption Request from requirements of 10 CFR 50.62, the Anticipated Transient Without Scram (ATWS) Rule, to support pre-outage installation support activities. |
| | |
| | In Reference 3, CEG provided the USNRC an updated PPS installation schedule reflecting LGS, Unit 1 PPS installation in the planned April 2026 refueling outage (Li1R21), and LGS, U nit 2 installation in the planned April 202 7 refueling outage (Li2R19). |
| | |
| | In Reference 4, CEG submitted updated proposed TS changes to reflect the LGS, Unit 2 PPS installation in 2027 as communicated in Reference 3. Reference 4, Attachment 1 contained the revised markups of the affected LGS, Unit 2 TS pages. Reference 4, Attachment 2 contained the corresponding LGS, Unit 2 clean TS pages. |
| | |
| | The markup and clean TS pages provided in Reference 4 reflected a proposed Insert 2 on TS Page 3/4 3-42. Insert 2 was originally introduced in Reference 2. The change to Insert 2 between the Reference 2 submittal and the Reference 4 submittal was intended to only reflect the change in the implementation schedule as communicated in Reference 3. |
| | |
| | Per telephone communications, the USNRC identified and communicated a discrepancy between Insert 2 as provided in R eference 2 and as provided in Reference 4. The discrepancy was also reflected in the provided clean TS page 3/4 3-42 in Reference 4. |
| | of this supplement provides the corrected Insert 2 for TS page 3/4 3-42. Attachment 2 of this supplement provides t he corrected clean TS page 3/4 3-42 which incorporates the corrected Insert 2. The corrections resolve the Insert 2 discrepancy between Reference s 2 and 4. |
| | |
| | CEG has reviewed the information supporting a finding of no significant hazards consideration, and the environmental consideration, which was previously provided to the USNRC in the Reference 2 letter. CEG has concluded that the information provided in this supplemental letter does not affect the bases for concluding that the proposed license amendments do not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92. In addition, CEG has concluded that the information in this supplemental letter does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendments. |
| | |
| | There are no regulatory commitments contained within this letter. |
| | |
| | In accordance with 10 CFR 50.91, Notice for public comment; State consultation, paragraph (b), |
| | CEG is notifying the Commonwealth of Pennsylvania of this license amendment request supplement by transmitting a copy of this letter to the designated State Official. |
| | |
| | Supplement to License Amendment Request Docket Nos. 50-352 and 50- 353 October 4, 2024 Page 3 |
| | |
| | If you have any questions concerning this submittal, please contact Ashley Rickey at 267-533-1427. |
| | |
| | I declare under penalty of perjury that the foregoing is true and correct. Executed on this 4 th day of October 2024. |
| | |
| | Respectfully, |
| | |
| | Wendi Para Sr. Manager - Licensing Constellation Energy Generation, LLC |
| | |
| | Attachments: |
| | : 1. Corrected Insert 2 for Technical Specification P age 3/4 3-42 |
| | : 2. Clean T echnical Specification P age 3/4 3-42 |
| | |
| | cc: USNRC Region I, Regional Administrator USNRC Project Manager, LGS USNRC Senior Resident Inspector, LGS Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Protection ATTACHMENT 1 |
| | |
| | Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise Unit 2 Technical Specification Page |
| | |
| | Limerick Generating Station, Unit 2 Renewed Facility Operating License No. NPF-85 |
| | |
| | Corrected Insert 2 for Technical Specification Page 3/4 3-42 Insert 2 |
| | |
| | Note: For a period of 30 days preceding exit of OPERATIONAL CONDITION 1 at the start of the 2027 refueling outage, the LCO is not applicable when the following conditions are met: |
| | |
| | Maximum Maximum Inoperable Minimum Suppression THERMAL POWER Safety/Relief Valves Pool Water Level |
| | |
| | 90% RTP 0 of 14 23 feet |
| | |
| | 87% RTP 0 of 14 22 feet |
| | |
| | 84% RTP 1 of 14 22 feet |
| | |
| | Recirc Runback on Level 3 Function is Available and not in Bypass. |
| | ATTACHMENT 2 |
| | |
| | Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise Unit 2 Technical Specification Page |
| | |
| | Limerick Generating Station, Unit 2 Renewed Facility Operating License No. NPF-85 |
| | |
| | Clean Technical Specification Page |
| | |
| | 3/4 3-42 INSTRUMENTATION 3/4.3.4 RECIRCULATION PUMP TRIP ACTUATION INSTRUMENTATION ATWS RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.4.1 The anticipated transient without scram recirculation pump trip (ATWS-RPT) system instrumentation channels shown in Table 3.3.4.1-1 shall be OPERABLE with their trip setpoints set consistent with values shown in the Trip Setpoint column of Table 3.3.4.1-2. |
| | APPLICABILITY: OPERATIONAL CONDITION 1. |
| | Note: For a period of 30 days preceding exit of OPERATIONAL CONDITION 1 atthe start of the 2027 refueling outage, the LCO is not applicable when the following conditions are met: |
| | THERMAL POWERMaximum Safety/Relief Valves Maximum Inoperable Minimum SuppressionPool Water Level 90% RTP 0 of 14 23 feet 87% RTP 0 of 14 22 feet 84% RTP 1 of 14 22 feet Recirc Runback on Level 3 Function is Available and not in Bypass. |
| | ACTION: |
| | : a. With an ATWS recirculation pump trip system instrumentation channeltrip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3.4.1-2, declare the channel inoperable until the channel is restored to OPERABLE status with the channel trip setpoint adjusted consistent with the Trip Setpoint value. |
| | : b. With the number of OPERABLE channels one less than required by theMinimum OPERABLE Channels per Trip System requirement for one or both trip systems, place the inoperable channel(s) in the tripped condition within 24 hours or in accordance with the Risk Informed Completion Time Program*. |
| | : c. With the number of OPERABLE channels two or more less than requiredby the Minimum OPERABLE Channels per Trip System requirement for one trip system and: |
| | : 1. If the inoperable channels consist of one reactor vessel waterlevel channel and one reactor vessel pressure channel, place both inoperable channels in the tripped condition within 24 hours or in accordance with the Risk Informed Completion Time Program, or if this action will initiate a pump trip, declare the trip system inoperable. |
| | : 2. If the inoperable channels or two reactor vessel pressure channels, declare thechannels include two reactor vessel water level trip system inoperable. |
| | : d. With one trip system inoperable, restore the inoperable trip systemto OPERABLE status within 72 hours or in accordance with the Risk Informed Completion Time Program, or be in at least STARTUP within the next 6 hours. |
| | : e. With both trip systems inoperable, restore at least one trip systemto OPERABLE status within 1 hour or be in at least STARTUP within the next 6 hours. |
| | SURVEILLANCE REQUIREMENTS 4.3.4.1.1 Each of the required ATWS recirculation pump trip system instrumentation channels shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION operations at the frequencies specified in the Surveillance Frequency Control Program. |
| | 4.3.4.1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed in accordance with the Surveillance Frequency Control Program. |
| | *Not applicable when trip capability is not maintained. |
| | LIMERICK - UNIT 2 3/4 3-42 Amendment No. 33, 34, 147, 203}} |
Letter Sequence Supplement |
---|
EPID:L-2023-LLA-0005, Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality (Approved, Closed) EPID:L-2023-LLA-0025, (Open) |
|
MONTHYEARNL-23-0020, Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality2023-01-12012 January 2023 Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality Project stage: Request ML23013A2202023-01-13013 January 2023 Safety Evaluation for License Amendment No. 189 Tech Spec Limiting Conditions for Operability Reqs for Auto Depressurization System Stage 4 Flow Paths Prior to Initial Criticality Project stage: Approval ML23013A2182023-01-13013 January 2023 Amendment No. 189 to License NPF-91 - Tech Spec Limiting Conditions for Operability Req for Auto Depressurization System Stage 4 Flow Paths Prior to Initial Criticality Project stage: Other ML23013A2172023-01-13013 January 2023 Letter for License Amend No. 189 Tech Spec Limiting Conditions for Operability Req for Auto Depressurization System Stage 4 Flow Paths Prior to Initial Criticality Project stage: Other ML23013A2192023-01-13013 January 2023 Amendment No. 189 - Amendment Attachment Project stage: Other ML23052A0232023-02-17017 February 2023 License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation Project stage: Request ML23086B9282023-03-27027 March 2023 Acceptance of Requested Licensing Action for License Amendment Request to Support Digital Modernization Project Installation Project stage: Acceptance Review ML23114A3472023-05-0202 May 2023 Request for Withholding Information from Public Disclosure for Limerick Generating Station, Units 1 and 2 (EPIDs L-2023-LLA-0025 and L-2023-LLE-0005) Project stage: Withholding Request Acceptance ML23173A0632023-06-20020 June 2023 RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support Project stage: RAI ML23201A1262023-07-18018 July 2023 Additional RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support Project stage: RAI ML23193B0122023-07-20020 July 2023 Audit Plan in Support of Review of License Amendment Request and Exemption Request for Digital Instrumentation and Controls Installation Support (Epids L-2023-LLA-0025 and L-2023-LLE-0005) Project stage: Other ML23202A2192023-07-21021 July 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . Project stage: Supplement ML23228A0942023-08-16016 August 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . Project stage: Supplement ML23271A0042023-10-24024 October 2023 Installation Support License Amendment Request Public Notice and Hearing Request Notice Project stage: Other ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . Project stage: Supplement LG-24-063, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-28028 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation Project stage: Other ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation Project stage: Supplement ML24176A1292024-06-20020 June 2024 Estimated Completion Schedule Change Email Project stage: Other ML24151A3842024-10-31031 October 2024 – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 Project stage: Approval 2023-07-18
[Table View] |
|
---|
Category:Letter
MONTHYEARML24151A3842024-10-31031 October 2024 – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 ML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval ML24303A2782024-10-29029 October 2024 10 CFR 50.46 Annual Report ML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . 2024-09-06
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24180A1592024-06-18018 June 2024 EQ-EV-386-GLIM-NP, Revision 2, Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24026A2962024-01-26026 January 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, . ML23255A0952023-09-12012 September 2023 Resubmittal of License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) – to Address ML23212B2362023-07-31031 July 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC Documents ML23212B1052023-07-31031 July 2023 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . ML23143A3422023-05-23023 May 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23103A3342023-04-13013 April 2023 Submittal of Changes to Technical Specifications Bases ML23095A2232023-04-0505 April 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Human Factors ML23005A0082023-02-23023 February 2023 Technical Specifications to Correct Non-conservative Technical Specification Table 3.3.2-1 for Main Steam Line Isolation Trip Function 1.G (EPID L 2020 Lla 0034) Amds. 259 and 221 ML22321A1052022-11-17017 November 2022 License Amendment Request for Application to Adopt TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems and Associated Technical Specification Changes ML22055A6012022-02-24024 February 2022 License Amendment Request - Proposed Changes to Technical Specification 3.3.7.4, Remote Shutdown System Instrumentation and Controls ML22055A6002022-02-24024 February 2022 License Amendment Request - Proposed Change to Correct Nonconservative Technical Specification Table 3.3.2-1 for Main Steam Line Isolation Trip Function 1.g ML22045A4802022-02-14014 February 2022 Supplement - Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Categorization Process in Accordance with RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21349B3642021-12-15015 December 2021 Supplement - Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Categorization Process in Accordance ML21349B3782021-12-15015 December 2021 License Amendment Request Proposed Changes to Technical Specification Surveillance Requirements for Emergency Diesel Generator Frequency and Voltage Tolerances and for Emergency Core Cooling System Pump Flow ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21125A2152021-05-0505 May 2021 Supplement Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categorization Process in Accordance RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21070A4122021-03-11011 March 2021 Requesting Revision to License Condition in Appendix C in Renewed Facility Operating License ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments ML21048A3242021-02-17017 February 2021 License Amendment Request for Application to Revise Technical Specifications to Adopt TSTF-205 -A Revision of Calibration, Channel Functional Test, and Related Definitions ML20273A2152020-09-29029 September 2020 License Amendment Request: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML20247J3722020-09-0303 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process2020-04-30030 April 2020 License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process ML20092P4782020-04-0101 April 2020 Emergency License Amendment Request Proposed One-Time Change to Revise Main Steam Isolation Valve Allowable Leakage Rate Limit ML20078G3072020-03-18018 March 2020 License Amendment Request for Proposed Changes to Technical Specifications 3.10.8 Inservice Leak and Hydrostatic Testing ML20036E4882020-02-0505 February 2020 TS Change and Relief Requests Related to Safety Relief Valve Testing ML19329A2122019-11-25025 November 2019 License Amendment Request: Proposed Clarification Changes to Technical Specifications to Support Implementation of 10 CFR 50.69 RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions ML19213A2462019-08-0101 August 2019 License Amendment Request - Proposed Relocation of Chlorine and Toxic Gas Detection System Technical Specifications JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19099A3672019-04-0909 April 2019 Revise the Technical Specifications for Permanent Extension of Types a and C Leak Rate Test Frequencies and Permanently Extend the Drywell Bypass Leakage Test Frequency RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. ML18347B3662018-12-13013 December 2018 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b ML18305B2702018-11-0101 November 2018 Response to Request for Additional Information - License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements ML18292A4512018-10-19019 October 2018 License Amendment Request - Revise Technical Specifications to Allow Penetration Flow Path Isolation for Inoperable Isolation Actuation Instrumentation RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement ML18149A2962018-05-10010 May 2018 Enclosure 1 - Limerick Staffing LAR - Evaluation of Proposed Changes and Attachments 1A and 1B, Emergency Plan Marked-Up Pages and Emergency Plan Clean Copy Pages ML18149A3022018-05-10010 May 2018 Enclosure 4 - Summary of Regulatory Commitments RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) 2024-08-28
[Table view] Category:Technical Specification
MONTHYEARML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 ML24106A1832024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML23212B1052023-07-31031 July 2023 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise ML23103A3342023-04-13013 April 2023 Submittal of Changes to Technical Specifications Bases ML22105A0422022-04-13013 April 2022 Submittal of Changes to Technical Specifications Bases ML22055A6012022-02-24024 February 2022 License Amendment Request - Proposed Changes to Technical Specification 3.3.7.4, Remote Shutdown System Instrumentation and Controls ML21048A3242021-02-17017 February 2021 License Amendment Request for Application to Revise Technical Specifications to Adopt TSTF-205 -A Revision of Calibration, Channel Functional Test, and Related Definitions ML20273A2152020-09-29029 September 2020 License Amendment Request: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML20111A1772020-04-13013 April 2020 Submittal of Changes to Technical Specifications Bases ML20078G3072020-03-18018 March 2020 License Amendment Request for Proposed Changes to Technical Specifications 3.10.8 Inservice Leak and Hydrostatic Testing JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls ML19106A1602019-04-12012 April 2019 Submittal of Changes to Technical Specifications Bases ML19036A9132019-02-28028 February 2019 Issuance of Amendment Nos. 234 and 197 Adopt TSTF-372, Revision 4, Addition of LCO 3.0.8, Inoperability of Snubbers ML18347B3662018-12-13013 December 2018 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b ML18235A1092018-08-23023 August 2018 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers ML18108A1772018-04-13013 April 2018 Submittal of Changes to Technical Specifications Bases ML17109A0702017-04-13013 April 2017 Submittal of Changes to Technical Specifications Bases ML15323A2572015-11-19019 November 2015 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change ML15223B3232015-08-11011 August 2015 Submit License Amendment Request - Supplement Proposed Changes to the Technical Specifications to Address Secondary Containment Personnel Access Door Openings ML15119A5172015-04-14014 April 2015 Submittal of Changes to Technical Specifications Bases ML15043A6492015-02-12012 February 2015 Exigent License Amendment Request - Extension of Implementation Period for License Amendment No. 174, Leak Detection System Technical Specification Setpoint, Allowable Value and Design Basis Changes ML14112A4742014-04-10010 April 2014 Enclosure 2: Bases ML14112A4722014-04-10010 April 2014 Enclosure 1: Bases ML13119A5772013-04-10010 April 2013 Limerick Generating Station, Units 1 & 2, Submittal of Changes to Technical Specifications Bases ML12117A2242012-04-12012 April 2012 Limerick, Units 1 and 2, Submittal of Changes to Technical Specifications Bases ML1128700802011-10-12012 October 2011 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change ML1117100072011-06-14014 June 2011 License Amendment Request to Include an Alternate Method of Verifying Drywell Unidentified Leakage ML1116505632011-06-14014 June 2011 License Amendment Request to Include Alternate Method of Verifying Drywell Unidentified Leakage ML11126A2892011-04-15015 April 2011 Limerick Generating Station, Units 1 and 2, Regarding Submittal of Changes to Technical Specifications Bases ML1109700662011-04-0606 April 2011 License Amendment Request to Revise Operability Requirements and Actions for RCS Leakage Instrumentation ML1011706972010-04-22022 April 2010 Submittal of Changes to Technical Specifications Bases ML1011706982010-04-22022 April 2010 Submittal of Changes to Technical Specifications Bases ML1008503982010-03-25025 March 2010 Markup of Proposed Technical Requirements Manual & Technical Specifications Bases Pages ML0912800592009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/09/2009 ML0912800572009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/09/2009 ML0905703782009-02-25025 February 2009 License Amendment Request - Removal of Technical Specification 3/4.4.8 Concerning Structural Integrity Requirements ML0821207262008-08-27027 August 2008 Tech Spec Pages for Amendment 193 Increase in Emergency Diesel Generator Day Tank Minimum Fuel Volume RS-07-044, Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program2007-08-0808 August 2007 Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program ML0717802932007-06-27027 June 2007 License Amendment Request, Proposed Changes to Accident Monitoring Instrumentation Technical Specifications ML0713604212007-04-27027 April 2007 Changes to Technical Specifications Bases RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0606703282006-03-0606 March 2006 Tech Specification Pages for License Amendment 184 Removal of License Conditions Concerning Emergency Core Cooling System Pump Suction Strainers ML0605302142006-02-17017 February 2006 Technical Specification Pages Pressure Isolation Valve Table ML0532703942005-11-22022 November 2005 Technical Specification Pages Re Accident Monitoring Instrumentation Surveillance Requirements ML0533303552005-10-10010 October 2005 Supplement to the Request for License Amendment Related to Application of Alternative Source Term, Dated February 27, 2004 ML0527200192005-09-27027 September 2005 Issuance of Amendments Re Relocation of Operability and Surveillance Instrumentation, Technical Specifications 2024-06-13
[Table view] Category:Amendment
MONTHYEARML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML23212B1052023-07-31031 July 2023 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise ML22055A6012022-02-24024 February 2022 License Amendment Request - Proposed Changes to Technical Specification 3.3.7.4, Remote Shutdown System Instrumentation and Controls ML21048A3242021-02-17017 February 2021 License Amendment Request for Application to Revise Technical Specifications to Adopt TSTF-205 -A Revision of Calibration, Channel Functional Test, and Related Definitions JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML20078G3072020-03-18018 March 2020 License Amendment Request for Proposed Changes to Technical Specifications 3.10.8 Inservice Leak and Hydrostatic Testing RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls ML19036A9132019-02-28028 February 2019 Issuance of Amendment Nos. 234 and 197 Adopt TSTF-372, Revision 4, Addition of LCO 3.0.8, Inoperability of Snubbers ML18235A1092018-08-23023 August 2018 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers ML15223B3232015-08-11011 August 2015 Submit License Amendment Request - Supplement Proposed Changes to the Technical Specifications to Address Secondary Containment Personnel Access Door Openings ML0905703782009-02-25025 February 2009 License Amendment Request - Removal of Technical Specification 3/4.4.8 Concerning Structural Integrity Requirements ML0821207262008-08-27027 August 2008 Tech Spec Pages for Amendment 193 Increase in Emergency Diesel Generator Day Tank Minimum Fuel Volume ML0717802932007-06-27027 June 2007 License Amendment Request, Proposed Changes to Accident Monitoring Instrumentation Technical Specifications ML0606703282006-03-0606 March 2006 Tech Specification Pages for License Amendment 184 Removal of License Conditions Concerning Emergency Core Cooling System Pump Suction Strainers ML0605302142006-02-17017 February 2006 Technical Specification Pages Pressure Isolation Valve Table ML0532703942005-11-22022 November 2005 Technical Specification Pages Re Accident Monitoring Instrumentation Surveillance Requirements ML0533303552005-10-10010 October 2005 Supplement to the Request for License Amendment Related to Application of Alternative Source Term, Dated February 27, 2004 ML0527200192005-09-27027 September 2005 Issuance of Amendments Re Relocation of Operability and Surveillance Instrumentation, Technical Specifications ML0510902392005-04-13013 April 2005 Tech Spec Pages for Amendment 173 and 135 Limiting Conditions for Operation and Surveillance Requirements ML0501805042005-01-18018 January 2005 Technical Specification Pages ML0434901662004-12-0303 December 2004 Supplement to the Request for License Amendment Related to Proposed Changes to Control Rod Requirements, Dated July 22, 2004 RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program2004-11-29029 November 2004 Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program ML0415404572004-05-20020 May 2004 License Amendment Request, Activation of the Trip Outputs of the Oscillation Power Range Monitor Portion of the Power Range Neutron Monitoring System ML0411202312004-04-20020 April 2004 Technical Specification Pages for Limerick Generating Station, Units 1 and 2, License Amendment, Issuance of Amendment Generic Letter 88-01 Requirements ML0405603662004-02-13013 February 2004 Response to RAI Concerning Safety Limit Minimum Critical Power Ratio (SLMCPR) Change, License Amendment Request: AR A1443067 ML0326708342003-09-0808 September 2003 Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process ML0234505702002-11-27027 November 2002 Request for Technical Specifications Change to Eliminate Requirements for Post Accident Sampling System Using the Consolidated Line Item Improvement Process ML0208101822002-03-20020 March 2002 Technical Specification Pages, Limerick. Unit 1 & 2, Amendment Nos 158 & 120 (TAC Nos MB2271 & MB2272) ML0207204342002-03-12012 March 2002 Technical Specification Pages for Amendment 156, Limerick, Unit 1 2024-04-12
[Table view] |
Text
200 Energy Way Kennett Square, PA 19348 www.constellation.com
10 CFR 50.90
October 4, 2024
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN: Document Control Desk
Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 USNRC Docket Nos. 50-352 and 50-353
Subject:
Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise Unit 2 Technical Specification Page
References:
- 1. Constellation Energy Generation, LLC (CEG) letter to the U.S. Nuclear Regulatory Commission (USNRC), License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS), dated September 26, 2022 (USNRC Agencywide Documents Access and Management System (ADAMS) Accession No. ML22269A569).
- 2. CEG letter to the US NRC, License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation, dated February 17, 2023 (ADAMS Accession No. ML23052A023 ).
- 3. CEG letter to the US NRC, Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit 1 PPS First Installation in 2026, dated April 23, 2024 (ADAMS Accession No. ML24114A322).
- 4. CEG letter to the US NRC, Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise Unit 2 Technical Specifications, dated May 28, 2024 (ADAMS Accession No. ML24149A211).
In accordance with 10 CFR 50.90, Constellation Energy Generation, LLC (CEG) requested amendments to Renewed Facility Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (LGS), Units 1 and 2, respectively (Reference 1). The proposed changes would revise the LGS licensing and design basis to incorporate a planned digital modification at LGS (i.e.,
the LGS Digital Modernization Project).
Supplement to License Amendment Request Docket Nos. 50-352 and 50- 353 October 4, 2024 Page 2
CEG subsequently requested an amendment to Appendix A, Technical Specifications (TS) for LGS, Units 1 and 2, respectively (Reference 2). The proposed changes would revise the LGS TS to adopt features from NUREG-1433, Revision 5, Standard Technical Specifications for General Electric BWR/4 Plants. The proposed changes would support the installation of the new Plant Protection System (PPS) described in Reference 1. Reference 2 also contained an Exemption Request from requirements of 10 CFR 50.62, the Anticipated Transient Without Scram (ATWS) Rule, to support pre-outage installation support activities.
In Reference 3, CEG provided the USNRC an updated PPS installation schedule reflecting LGS, Unit 1 PPS installation in the planned April 2026 refueling outage (Li1R21), and LGS, U nit 2 installation in the planned April 202 7 refueling outage (Li2R19).
In Reference 4, CEG submitted updated proposed TS changes to reflect the LGS, Unit 2 PPS installation in 2027 as communicated in Reference 3. Reference 4, Attachment 1 contained the revised markups of the affected LGS, Unit 2 TS pages. Reference 4, Attachment 2 contained the corresponding LGS, Unit 2 clean TS pages.
The markup and clean TS pages provided in Reference 4 reflected a proposed Insert 2 on TS Page 3/4 3-42. Insert 2 was originally introduced in Reference 2. The change to Insert 2 between the Reference 2 submittal and the Reference 4 submittal was intended to only reflect the change in the implementation schedule as communicated in Reference 3.
Per telephone communications, the USNRC identified and communicated a discrepancy between Insert 2 as provided in R eference 2 and as provided in Reference 4. The discrepancy was also reflected in the provided clean TS page 3/4 3-42 in Reference 4.
of this supplement provides the corrected Insert 2 for TS page 3/4 3-42. Attachment 2 of this supplement provides t he corrected clean TS page 3/4 3-42 which incorporates the corrected Insert 2. The corrections resolve the Insert 2 discrepancy between Reference s 2 and 4.
CEG has reviewed the information supporting a finding of no significant hazards consideration, and the environmental consideration, which was previously provided to the USNRC in the Reference 2 letter. CEG has concluded that the information provided in this supplemental letter does not affect the bases for concluding that the proposed license amendments do not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92. In addition, CEG has concluded that the information in this supplemental letter does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendments.
There are no regulatory commitments contained within this letter.
In accordance with 10 CFR 50.91, Notice for public comment; State consultation, paragraph (b),
CEG is notifying the Commonwealth of Pennsylvania of this license amendment request supplement by transmitting a copy of this letter to the designated State Official.
Supplement to License Amendment Request Docket Nos. 50-352 and 50- 353 October 4, 2024 Page 3
If you have any questions concerning this submittal, please contact Ashley Rickey at 267-533-1427.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 4 th day of October 2024.
Respectfully,
Wendi Para Sr. Manager - Licensing Constellation Energy Generation, LLC
Attachments:
- 1. Corrected Insert 2 for Technical Specification P age 3/4 3-42
- 2. Clean T echnical Specification P age 3/4 3-42
cc: USNRC Region I, Regional Administrator USNRC Project Manager, LGS USNRC Senior Resident Inspector, LGS Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Protection ATTACHMENT 1
Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise Unit 2 Technical Specification Page
Limerick Generating Station, Unit 2 Renewed Facility Operating License No. NPF-85
Corrected Insert 2 for Technical Specification Page 3/4 3-42 Insert 2
Note: For a period of 30 days preceding exit of OPERATIONAL CONDITION 1 at the start of the 2027 refueling outage, the LCO is not applicable when the following conditions are met:
Maximum Maximum Inoperable Minimum Suppression THERMAL POWER Safety/Relief Valves Pool Water Level
90% RTP 0 of 14 23 feet
87% RTP 0 of 14 22 feet
84% RTP 1 of 14 22 feet
Recirc Runback on Level 3 Function is Available and not in Bypass.
ATTACHMENT 2
Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise Unit 2 Technical Specification Page
Limerick Generating Station, Unit 2 Renewed Facility Operating License No. NPF-85
Clean Technical Specification Page
3/4 3-42 INSTRUMENTATION 3/4.3.4 RECIRCULATION PUMP TRIP ACTUATION INSTRUMENTATION ATWS RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.4.1 The anticipated transient without scram recirculation pump trip (ATWS-RPT) system instrumentation channels shown in Table 3.3.4.1-1 shall be OPERABLE with their trip setpoints set consistent with values shown in the Trip Setpoint column of Table 3.3.4.1-2.
APPLICABILITY: OPERATIONAL CONDITION 1.
Note: For a period of 30 days preceding exit of OPERATIONAL CONDITION 1 atthe start of the 2027 refueling outage, the LCO is not applicable when the following conditions are met:
THERMAL POWERMaximum Safety/Relief Valves Maximum Inoperable Minimum SuppressionPool Water Level 90% RTP 0 of 14 23 feet 87% RTP 0 of 14 22 feet 84% RTP 1 of 14 22 feet Recirc Runback on Level 3 Function is Available and not in Bypass.
ACTION:
- a. With an ATWS recirculation pump trip system instrumentation channeltrip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3.4.1-2, declare the channel inoperable until the channel is restored to OPERABLE status with the channel trip setpoint adjusted consistent with the Trip Setpoint value.
- b. With the number of OPERABLE channels one less than required by theMinimum OPERABLE Channels per Trip System requirement for one or both trip systems, place the inoperable channel(s) in the tripped condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or in accordance with the Risk Informed Completion Time Program*.
- c. With the number of OPERABLE channels two or more less than requiredby the Minimum OPERABLE Channels per Trip System requirement for one trip system and:
- 1. If the inoperable channels consist of one reactor vessel waterlevel channel and one reactor vessel pressure channel, place both inoperable channels in the tripped condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or in accordance with the Risk Informed Completion Time Program, or if this action will initiate a pump trip, declare the trip system inoperable.
- 2. If the inoperable channels or two reactor vessel pressure channels, declare thechannels include two reactor vessel water level trip system inoperable.
- d. With one trip system inoperable, restore the inoperable trip systemto OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or in accordance with the Risk Informed Completion Time Program, or be in at least STARTUP within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- e. With both trip systems inoperable, restore at least one trip systemto OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least STARTUP within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.3.4.1.1 Each of the required ATWS recirculation pump trip system instrumentation channels shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION operations at the frequencies specified in the Surveillance Frequency Control Program.
4.3.4.1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed in accordance with the Surveillance Frequency Control Program.
- Not applicable when trip capability is not maintained.
LIMERICK - UNIT 2 3/4 3-42 Amendment No. 33, 34, 147, 203