ML24155A163: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:No: III-24-010                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 May 22, 2024
{{#Wiki_filter:No: III-24-010 May 22, 2024


==Contact:==
==Contact:==
Viktoria Mitlyng                                       , 630-829-9662 Prema Chandrathil, 630-829-9663 NRC Schedules Open House to Discuss Braidwood Nuclear Power Plant Performance
Viktoria Mitlyng, 630-829-9662 Prema Chandrathil, 630-829-9663 NRC Schedules Open House to Discuss Braidwood Nuclear Power Plant Performance


Nuclear Regulatory Commission staff will discuss the 2023 safety performance of the Braidwood nuclear power plant during an open house                                   May 29. The two-unit plant, operated by Constellation Energy Generation, is located in Braceville, Illinois, approximately 20 miles south                                                                         -
Nuclear Regulatory Commission staff will discuss the 2023 safety performance of the Braidwood nuclear power plant during an open house May 29. The two-unit plant, operated by Constellation Energy Generation, is located in Braceville, Illinois, approximately 20 miles south -
southwest of Joliet.
southwest of Joliet.


The meeting will be held from 5 -6 p.m. Central time at the Braidwood City Hall, 141 W.                                                                                     Main St           . in Braidwood. The NRC staff responsible for plant inspection and oversight, including the resident inspectors based at the site, will be available to answer questions and provide information of interest to the community.
The meeting will be held from 5 -6 p.m. Central time at the Braidwood City Hall, 141 W. Main St. in Braidwood. The NRC staff responsible for plant inspection and oversight, including the resident inspectors based at the site, will be available to answer questions and provide information of interest to the community.


The open house format allows more interaction with the NRC staff and facilitates one-on-one and small-group discussions. It also gives flexibility to nearby residents and others who want to attend.
The open house format allows more interaction with the NRC staff and facilitates one-on-one and small-group discussions. It also gives flexibility to nearby residents and others who want to attend.
Line 34: Line 34:
Plant inspections are performed by two NRC resident inspectors and inspection specialists from the agencys Region III office in Lisle, Illinois.
Plant inspections are performed by two NRC resident inspectors and inspection specialists from the agencys Region III office in Lisle, Illinois.


The annual assessment letter                               for Braidwood is on the NRC website. Current performance information is also available and updated on a quarterly basis.}}
The annual assessment letter for Braidwood is on the NRC website. Current performance information is also available and updated on a quarterly basis.}}

Latest revision as of 13:35, 4 October 2024

News Release-III-24-010: NRC Schedules Open House to Discuss Braidwood Nuclear Power Plant Performance
ML24155A163
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/22/2024
From:
Office of Public Affairs Region II
To:
References
News Release-III-24-010
Download: ML24155A163 (1)


Text

No: III-24-010 May 22, 2024

Contact:

Viktoria Mitlyng, 630-829-9662 Prema Chandrathil, 630-829-9663 NRC Schedules Open House to Discuss Braidwood Nuclear Power Plant Performance

Nuclear Regulatory Commission staff will discuss the 2023 safety performance of the Braidwood nuclear power plant during an open house May 29. The two-unit plant, operated by Constellation Energy Generation, is located in Braceville, Illinois, approximately 20 miles south -

southwest of Joliet.

The meeting will be held from 5 -6 p.m. Central time at the Braidwood City Hall, 141 W. Main St. in Braidwood. The NRC staff responsible for plant inspection and oversight, including the resident inspectors based at the site, will be available to answer questions and provide information of interest to the community.

The open house format allows more interaction with the NRC staff and facilitates one-on-one and small-group discussions. It also gives flexibility to nearby residents and others who want to attend.

The NRC determined that Braidwood operated safely during 2023. All inspection findings and performance indicators were green or very low safety significance. As a result, Braidwood remains under the NRCs normal level of oversight, which entails thousands of hours of inspection each year.

The NRC Reactor Oversight Process uses color-coded inspection findings and indicators to measure plant performance. The colors start at green and increase to white, yellow or red, commensurate with the safety significance of the issues involved. Inspection findings or performance indicators with more than very low safety significance trigger increased NRC oversight.

Plant inspections are performed by two NRC resident inspectors and inspection specialists from the agencys Region III office in Lisle, Illinois.

The annual assessment letter for Braidwood is on the NRC website. Current performance information is also available and updated on a quarterly basis.