ML23319A095: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Finding global solutions to the worlds most critical needs.
Abilene Christian University Nuclear Energy eXperimental Testing Lab ACU Box 28208, Abilene, Texas 79699-8208 acunextlab.org November 14, 2023                                                          Docket No. 50-610 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 205550001
 
==Subject:==
Abilene Christian University Construction Permit Application Preliminary Safety Analysis Report Revision 1 Abilene Christian University (ACU) submitted a construction permit application for the Molten Salt Research Reactor (MSRR) on August 12, 2022 (ML22227A201). Since acceptance of the application for review, ACU has been engaged with Nuclear Regulatory Commission (NRC) staff responding to questions posed during regulatory audits. In the audit questions and in audit meetings, NRC staff has identified information that is needed on the MSRR docket to support the staffs safety evaluation.
ACU is submitting Revision 1 of the Preliminary Safety Analysis Report to provide the needed information.
Because the regulatory audits continue, it is likely that ACU will need to provide additional information to support the NRC staff safety evaluation. ACU will identify means for submitting any additional information based on the nature and quantity of the information. If you have questions on this submittal, please contact Ben Beasley at benjamin.beasley@acu.edu or Lester Towell at lester.towell@acu.edu.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on November 14, 2023 Rusty Towell, PhD Director of NEXT Lab
 
==Enclosure:==
Abilene Christian University Molten Salt Research Reactor Preliminary Safety Analysis Report, Revision 1, November 2023 (non-proprietary)
Cc:      Michael Wentzel, Chief, NRR Advanced Reactor Licensing Branch 2 Richard Rivera, Project Manager, NRR Advanced Reactor Licensing Branch 2 Edward Helvenston, Project Manager, NRR Non-Power Production and Utilization Facility Licensing Branch Mohsin Ghazali, Project Manager, NRR Advanced Reactor Licensing Branch 2}}

Latest revision as of 00:43, 12 December 2023

Abilene Christian University Construction Permit Application Preliminary Safety Analysis Report Revision 1
ML23319A095
Person / Time
Site: Abilene Christian University
Issue date: 11/14/2023
From: Towell R
Abilene Christian University
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML23319A094 List:
References
Download: ML23319A095 (1)


Text

Finding global solutions to the worlds most critical needs.

Abilene Christian University Nuclear Energy eXperimental Testing Lab ACU Box 28208, Abilene, Texas 79699-8208 acunextlab.org November 14, 2023 Docket No. 50-610 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 205550001

Subject:

Abilene Christian University Construction Permit Application Preliminary Safety Analysis Report Revision 1 Abilene Christian University (ACU) submitted a construction permit application for the Molten Salt Research Reactor (MSRR) on August 12, 2022 (ML22227A201). Since acceptance of the application for review, ACU has been engaged with Nuclear Regulatory Commission (NRC) staff responding to questions posed during regulatory audits. In the audit questions and in audit meetings, NRC staff has identified information that is needed on the MSRR docket to support the staffs safety evaluation.

ACU is submitting Revision 1 of the Preliminary Safety Analysis Report to provide the needed information.

Because the regulatory audits continue, it is likely that ACU will need to provide additional information to support the NRC staff safety evaluation. ACU will identify means for submitting any additional information based on the nature and quantity of the information. If you have questions on this submittal, please contact Ben Beasley at benjamin.beasley@acu.edu or Lester Towell at lester.towell@acu.edu.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on November 14, 2023 Rusty Towell, PhD Director of NEXT Lab

Enclosure:

Abilene Christian University Molten Salt Research Reactor Preliminary Safety Analysis Report, Revision 1, November 2023 (non-proprietary)

Cc: Michael Wentzel, Chief, NRR Advanced Reactor Licensing Branch 2 Richard Rivera, Project Manager, NRR Advanced Reactor Licensing Branch 2 Edward Helvenston, Project Manager, NRR Non-Power Production and Utilization Facility Licensing Branch Mohsin Ghazali, Project Manager, NRR Advanced Reactor Licensing Branch 2