ML20054F640: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
| project =  
| project = TAC:48510
| stage = Request
| stage = Request
}}
}}
Line 29: Line 29:
3/4.1.3.2 3/4.1.3.3
3/4.1.3.2 3/4.1.3.3
: 2.        Forty (40) copies of documents designated Attachments A and B which set forth the revised change in Technical Specifications and its safety evaluation, respectively.
: 2.        Forty (40) copies of documents designated Attachments A and B which set forth the revised change in Technical Specifications and its safety evaluation, respectively.
This Application for Amendment to Operating License DPR-66 is Revision 5 of Application No. lA-66 which was originally filed with the NRC by our letter dated February 23, 1982. Pursuant to 10CFR170.22 a Class II fee was submitted associated with this original application and remains applicable to this Revision.
This Application for Amendment to Operating License DPR-66 is Revision 5 of Application No. lA-66 which was originally filed with the NRC by our {{letter dated|date=February 23, 1982|text=letter dated February 23, 1982}}. Pursuant to 10CFR170.22 a Class II fee was submitted associated with this original application and remains applicable to this Revision.
We are currently in Mode 4 at 320 F Tave and plan to continue startup operations. The change to Specification 3 is required to permit continuation of the startup with shutdown banks fully withdrawn to permit the capability to be able to rapidly insert negative reactivity into the core should the need arise. Therefore, it would not be inappropriate to treat this change as an Emergency Technical Specification Change.                        Your cooperation will be appreciated.
We are currently in Mode 4 at 320 F Tave and plan to continue startup operations. The change to Specification 3 is required to permit continuation of the startup with shutdown banks fully withdrawn to permit the capability to be able to rapidly insert negative reactivity into the core should the need arise. Therefore, it would not be inappropriate to treat this change as an Emergency Technical Specification Change.                        Your cooperation will be appreciated.
go/                                                              Very truly yours, dJJ. Carey b
go/                                                              Very truly yours, dJJ. Carey b

Latest revision as of 09:27, 21 November 2023

Forwards Application for Amend to License DPR-66,consisting of Proposed Change Request 66,revising Tech Specs 3/4.1.3.2 & 3/4.1.3.3 Re Movable Control Assemblies
ML20054F640
Person / Time
Site: Beaver Valley
Issue date: 06/11/1982
From: Carey J
DUQUESNE LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20054F641 List:
References
TAC-48510, NUDOCS 8206170180
Download: ML20054F640 (2)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - _ _

~*

'Af Teiephone stzuse4ooo Nuclear Divisbon June 11, 1982 P.O. Box 4 Shippingport, PA 150774004 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Proposed Change Request No. 66, Revision 5 to Operating License Gentlemen:

Enclosed are:

1. Three original copies and thirty seven (37) copies of.a revised Application for Amendment to Operating License, DPR-66, to amend Appendix A of the Operating License to revise Technical Specifications related to Movable Control Assemblies, as follows:

3/4.1.3.2 3/4.1.3.3

2. Forty (40) copies of documents designated Attachments A and B which set forth the revised change in Technical Specifications and its safety evaluation, respectively.

This Application for Amendment to Operating License DPR-66 is Revision 5 of Application No. lA-66 which was originally filed with the NRC by our letter dated February 23, 1982. Pursuant to 10CFR170.22 a Class II fee was submitted associated with this original application and remains applicable to this Revision.

We are currently in Mode 4 at 320 F Tave and plan to continue startup operations. The change to Specification 3 is required to permit continuation of the startup with shutdown banks fully withdrawn to permit the capability to be able to rapidly insert negative reactivity into the core should the need arise. Therefore, it would not be inappropriate to treat this change as an Emergency Technical Specification Change. Your cooperation will be appreciated.

go/ Very truly yours, dJJ. Carey b

8206170100 820611 Vice President, Nuclear PDR ADOCK 05000334 P PDR

. s-

, B:avar Valley Pow:r Station, Unit No. 1 Docket No. 50-334, Licanas No. DPR-66 Proposed Change Raquest No. 66, Revision 5 to Operating License Page 2 cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power S tation Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 I