ML20069G515: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML20069G515
| number = ML20069G515
| issue date = 03/23/1983
| issue date = 03/23/1983
| title = Ack Receipt of 830315 Ltr Forwarding Amend 23 to License R-37.Word Sys Should Be Inserted After Ecs Spray Nozzle in Tech Spec 4.1-1
| title = Ack Receipt of Forwarding Amend 23 to License R-37.Word Sys Should Be Inserted After ECS Spray Nozzle in Tech Spec 4.1-1
| author name = Clark L
| author name = Clark L
| author affiliation = MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE,
| author affiliation = MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE,
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8303280003
| document report number = NUDOCS 8303280003
| title reference date = 03-15-1983
| document type = CORRESPONDENCE-LETTERS, EDUCATIONAL INSTITUTION TO NRC, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, EDUCATIONAL INSTITUTION TO NRC, INCOMING CORRESPONDENCE
| page count = 1
| page count = 1
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.,6HLks
                                                                                                        .x  ls "2                                NUCLEAR REACTOR LABORATORY                                  g AN INTERDL9ARTMENTAL CENTLrl OF MASSACHUSETTS INSTITUTE OF TECHNOLOGY
                                                                                                    ''i$ $ #
l O K. HARLING                          138 Albany Street Cambridge Mass. 02139      L CLARK. JR.
Dirtetor                                            (617)253- 4 20 2              Director of Reactor Operations l
l l
March 23, 1983 Mr. Cecil 0. Thomas, Chief Standardization and Special Projects Branch                                                              I Division of Licensing                                                                                      l U.S. Nuclear Regulatory Commission Washington, D.C. 20555 l
 
==Subject:==
Amendment No. 23 to Facility Operating                                                            l License No. R-37, Docket 50-20.                                                                l l
 
==Dear Mr. Thecas:==
 
This will acknowledge receipt of your let ter of March 15, 1983, forwarding                        l the above license amendment.
The word " system" was used in the original Technical Specification 4.1-1 ht was omitted when the specification was revised to change the testing frequency from semi-annually to annually. As discussed on the telephone,                                  l it is requested that reference continue to be made to the " system", which word should be inserted after "ECS spray nozzle" on the fourth line of Specification 4.1-1.
l Thank you for your attention to this matter, and please call if you should have any questions.                                                                                      ;
l Sincerely, (d              &              '
Lincoln Clark, Jr.                                  .
I LC/sbs cc: MlTRSC O
hP O      p}}

Latest revision as of 03:43, 24 October 2023

Ack Receipt of Forwarding Amend 23 to License R-37.Word Sys Should Be Inserted After ECS Spray Nozzle in Tech Spec 4.1-1
ML20069G515
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 03/23/1983
From: Lisa Clark
MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE
To: Thomas C
Office of Nuclear Reactor Regulation
References
NUDOCS 8303280003
Download: ML20069G515 (1)


Text

.,6HLks

.x ls "2 NUCLEAR REACTOR LABORATORY g AN INTERDL9ARTMENTAL CENTLrl OF MASSACHUSETTS INSTITUTE OF TECHNOLOGY

i$ $ #

l O K. HARLING 138 Albany Street Cambridge Mass. 02139 L CLARK. JR.

Dirtetor (617)253- 4 20 2 Director of Reactor Operations l

l l

March 23, 1983 Mr. Cecil 0. Thomas, Chief Standardization and Special Projects Branch I Division of Licensing l U.S. Nuclear Regulatory Commission Washington, D.C. 20555 l

Subject:

Amendment No. 23 to Facility Operating l License No. R-37, Docket 50-20. l l

Dear Mr. Thecas:

This will acknowledge receipt of your let ter of March 15, 1983, forwarding l the above license amendment.

The word " system" was used in the original Technical Specification 4.1-1 ht was omitted when the specification was revised to change the testing frequency from semi-annually to annually. As discussed on the telephone, l it is requested that reference continue to be made to the " system", which word should be inserted after "ECS spray nozzle" on the fourth line of Specification 4.1-1.

l Thank you for your attention to this matter, and please call if you should have any questions.  ;

l Sincerely, (d & '

Lincoln Clark, Jr. .

I LC/sbs cc: MlTRSC O

hP O p