ML20069G417: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20069G417
| number = ML20069G417
| issue date = 09/20/1982
| issue date = 09/20/1982
| title = Forwards Revision 2 to Fire Protection Evaluation Rept, Perry Nuclear Power Plant Units 1 & 2, Per FSAR Section 9.5.1.Draft Rept Provided in 820831 Ltr to Close SER Confirmatory Items 36-40
| title = Forwards Revision 2 to Fire Protection Evaluation Rept, Perry Nuclear Power Plant Units 1 & 2, Per FSAR Section 9.5.1.Draft Rept Provided in to Close SER Confirmatory Items 36-40
| author name = Davidson D
| author name = Davidson D
| author affiliation = CLEVELAND ELECTRIC ILLUMINATING CO.
| author affiliation = CLEVELAND ELECTRIC ILLUMINATING CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8209290074
| document report number = NUDOCS 8209290074
| title reference date = 08-31-1982
| package number = ML20069G422
| package number = ML20069G422
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 29: Line 30:
==Dear Mr. Denton:==
==Dear Mr. Denton:==


Enclosed are forty (40) copies of Revision 2 to the Perry Nuclear Power Plant Fire Protection Evaluation Report (gal Report No.1958, Rev. 2). This revision is in a format designed to keep current the Perry Fire Protection Evaluation Report. A draf t copy of these Fire Protection Evaluation Report change pages was provided in our letter dated August 31,1982 to close our SER confirmatory items numbered 36, 37, 38, 39, ar.d 40. This report is referenced in Section 9.5.1 of the Perry Final Safety Analysis Report.
Enclosed are forty (40) copies of Revision 2 to the Perry Nuclear Power Plant Fire Protection Evaluation Report (gal Report No.1958, Rev. 2). This revision is in a format designed to keep current the Perry Fire Protection Evaluation Report. A draf t copy of these Fire Protection Evaluation Report change pages was provided in our {{letter dated|date=August 31, 1982|text=letter dated August 31,1982}} to close our SER confirmatory items numbered 36, 37, 38, 39, ar.d 40. This report is referenced in Section 9.5.1 of the Perry Final Safety Analysis Report.
Very truly yours, Dalwy R. Davidson Vice President System Engineering and Construction DRD:mb Enclosure hD yO{
Very truly yours, Dalwy R. Davidson Vice President System Engineering and Construction DRD:mb Enclosure hD yO{
cc: Jay Silberg, Esq.                                                                                                              7 YO John Stefano Max Gildner N. Fioravante J.Stang 9209290074 820920 PDR ADOCK 05000440 F                            PDR
cc: Jay Silberg, Esq.                                                                                                              7 YO John Stefano Max Gildner N. Fioravante J.Stang 9209290074 820920 PDR ADOCK 05000440 F                            PDR
                                                 - - - - - - - - -}}
                                                 - - - - - - - - -}}

Latest revision as of 11:26, 31 May 2023

Forwards Revision 2 to Fire Protection Evaluation Rept, Perry Nuclear Power Plant Units 1 & 2, Per FSAR Section 9.5.1.Draft Rept Provided in to Close SER Confirmatory Items 36-40
ML20069G417
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/20/1982
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20069G422 List:
References
NUDOCS 8209290074
Download: ML20069G417 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _

Y ttt[ II ". pl C$[

ut t. w af{,/ M ,is Q 1,

a I

s. {[ (u' I~?

it, o( f f is l l la lJ i .1 ) n t i iI * ? ?< Tl 15

' ? j '4 f) {s fj$

o h], [J/.!; i;j,1U 2

P o. box 5000 - CLEVELAND. oHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation Datwyn R. Davidson ecE PnESioeNT September 20,1982 SYSTEM ENGINEERING AND CONSTAUCTION Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Fire Protection Evaluation Report

Dear Mr. Denton:

Enclosed are forty (40) copies of Revision 2 to the Perry Nuclear Power Plant Fire Protection Evaluation Report (gal Report No.1958, Rev. 2). This revision is in a format designed to keep current the Perry Fire Protection Evaluation Report. A draf t copy of these Fire Protection Evaluation Report change pages was provided in our letter dated August 31,1982 to close our SER confirmatory items numbered 36, 37, 38, 39, ar.d 40. This report is referenced in Section 9.5.1 of the Perry Final Safety Analysis Report.

Very truly yours, Dalwy R. Davidson Vice President System Engineering and Construction DRD:mb Enclosure hD yO{

cc: Jay Silberg, Esq. 7 YO John Stefano Max Gildner N. Fioravante J.Stang 9209290074 820920 PDR ADOCK 05000440 F PDR

- - - - - - - - -