|
|
Line 27: |
Line 27: |
| Administrative Judge Bodega Marine Laboratory University of California West Side Road Bodega Bay, California 94923 Mr. Gustave A. Linenberger Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission 4350 East-West Highway Bethesda, Maryland 20014 Re: Clinch River Breeder Reactor Plant (Docket No. 50-537) | | Administrative Judge Bodega Marine Laboratory University of California West Side Road Bodega Bay, California 94923 Mr. Gustave A. Linenberger Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission 4350 East-West Highway Bethesda, Maryland 20014 Re: Clinch River Breeder Reactor Plant (Docket No. 50-537) |
| Gentlemen: | | Gentlemen: |
| I have been advised that the February 27, 1984 letter from Francis'X Gavigan, DOE, to Mr. Thomas King, NRC, which transmit-ted the CRBRP redress plan to the NRC Staff for review and which was served upon the Board and all present and former parties, omitted page 15 of the redress plan. Enclosed herewith is a copy of the missing page 15. | | I have been advised that the {{letter dated|date=February 27, 1984|text=February 27, 1984 letter}} from Francis'X Gavigan, DOE, to Mr. Thomas King, NRC, which transmit-ted the CRBRP redress plan to the NRC Staff for review and which was served upon the Board and all present and former parties, omitted page 15 of the redress plan. Enclosed herewith is a copy of the missing page 15. |
| Sincerely, Geo L. Edgar Attorney for Project Management Corporation cc: All On Attached Service List g403020100 840301 gDR ADOCK O M fD 03 | | Sincerely, Geo L. Edgar Attorney for Project Management Corporation cc: All On Attached Service List g403020100 840301 gDR ADOCK O M fD 03 |
|
| |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20151R5611986-01-30030 January 1986 Summarizes 851216 Mgt Meeting at Oak Ridge Operations Ofc to Review & Inspect Redress & Reclamation of Crbr Site.Drawings Reviewed,Discussions Held & Tour of Site Performed.Site Restoration Concluded to Be as Described in Plans & Specs ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20128R0001985-06-0606 June 1985 Partial Response to FOIA Request for Records Re Desirability of Voluntary or Required Redress of Nuclear Plant Sites Where Work Undertaken But Const No Longer Contemplated. Forwards Documents Listed in App a ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20140C6121984-06-18018 June 1984 Advises That Time for Commission to Review ALAB-761 Expired. Commission Declined Review.Decision Became Final Agency Action on 840611.Served on 840618 ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20128R0161984-02-29029 February 1984 Expresses Thanks for 840222 Review of Site Redress Planning. Concurs W/Conceptual Approach & 1-yr Period for Development of Final Site Redress Plan & Investigation of Potential Use of Site.Ml Lacy Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 1986-03-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 ML20073S2761983-05-0505 May 1983 Forwards Revised Responses to SER Item 6 Re Qa,Including Info to Complete Identification of safety-related Structures,Sys & Components Controlled by Crbr QA Program for PSAR.Marked-up Tech Specs Encl ML20073Q3491983-04-28028 April 1983 Forwards Revised Response to SER Item 6, Qa. Response Provides Addl Info Re Identification of safety-related Structures,Sys & Components Controlled by QA Program ML20073R2221983-04-27027 April 1983 Requests to Make Limited Appearance Statement at 830718 CP Hearings Re Regional Socioeconomic Impacts ML20069L1801983-04-27027 April 1983 Informs That Evaluation of Seismic Adequacy of Primary Heat Transport Sys Branch Line & Consequences of Line Failure Being Conducted,In Response to ACRS 830419 Request.Results Will Be Forwarded by 830517 ML20073K3441983-04-18018 April 1983 Forwards Static Tests of 1/20-Scale Models of Crbr Head in Support on LMFBR Safety Program ML20071G2761983-04-18018 April 1983 Recommends That Commission Retain Technical Cadre of Experts to Review Crbr & Overall DOE Breeder Program 1986-03-13
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20073B8031983-04-11011 April 1983 Forwards Applicant Ninth Set of Interrogatories Inadvertently Omitted from Matls Filed on 830408 ML20077A0561983-03-21021 March 1983 Appeals Denial of FOIA Request for Transcript of Commission 830105 Meeting Re Exemption Request for Crbr Transcript ML20072F6971983-03-0202 March 1983 Forwards Draft Statement of Scope & Schedule for Forthcoming CP Hearings & Requests Telcon to Discuss Schedule. Certificate of Svc Encl ML20072F0501983-01-25025 January 1983 FOIA Request for Transcript of Commission 830105 Meeting to Consider Exemption Request Per 10CFR50.12 for Crbr ML20070L4761982-12-30030 December 1982 Challenges Statement in Applicant 821228 Reply,That Congress,In Enacting Continuing Resolution for FY83,intended Site Preparation Activities to Continue.Svc List Encl ML20023B3241982-12-23023 December 1982 Advises That Conference Rept on Continuing Resolution for FY83, Published in 821220 Congressional Record.Language Cited in NRDC & Sierra Club 821221 Brief Appears on Page H10636 ML20064K7021982-11-0505 November 1982 Appeals Denial of FOIA Request for Repts,Memoranda or Other Work Performed by Science Applications,Inc for Crbr Project ML20028F7451982-10-29029 October 1982 FOIA Request for Documents Sent W/Wood Blocks from Site ML20070R4341982-10-27027 October 1982 FOIA Request for NRC Correspondence W/White House & Congress Re Crbr Since Jan 1981 ML20065D3491982-09-15015 September 1982 Requests Addl Time to Comment on Draft Suppl to 1977 Fes ML20064M4051982-09-10010 September 1982 FOIA Request for Crac & Crac 2 Analyses for Facilities ML20065B2001982-09-0909 September 1982 Requests Addl Time to Comment on Draft Suppl to Fes (NUREG- 0139,Suppl 1).Total Cost of Emergency Preparedness Not Factored in Results.No Discussion Disclosed Consequences of Potential Radiological Exposure to Biota Due to Accident ML20058G5661982-08-0202 August 1982 Informs That Davis-Besse Case Provides No Authority for Proceeding Today W/Project in Preconst Stage ML20063D6261982-07-26026 July 1982 FOIA Request for Input to Chapter 7 & App J of Fes & Suppl to Crbr ML20063D6241982-07-26026 July 1982 FOIA Request for Documents by Science Applications,Inc for Crbr Project Including Fes,Site Suitability Rept & SER ML20063D6081982-07-22022 July 1982 FOIA Requet for Comments/Documents by NRC Staff or Contractors on Fes & Recently Issued Suppl for Crbr ML20054L9271982-07-0808 July 1982 Requests than No Procedural Decisions Be Made at 820708 Affirmation Session Pending Response from Intervenors Re Relevant Threshold Issues.Filing Will Be Submitted by 820709 ML20064L4691982-06-28028 June 1982 FOIA Request for NMSS Comments Re EIS for Facility ML20055A9011982-06-10010 June 1982 Informs of Changes That Have Occurred Since Initial Issuance of Fes for Crbr.New Updated Environ Statement Requested ML20055A8661982-06-0808 June 1982 Urges Creation of Suppl to Fes for Crbr Due to Design & Regulatory Changes Since 1977 Fes Issued ML20055A8951982-06-0808 June 1982 Urges Issuance of Suppl to Crbr Fes.Fes Requires Updating Due to Recent Changes in Design & Regulations ML20040F0161982-02-0101 February 1982 Forwards C Komanoff 820128 Signed Original Supplemental Statement ML20040D5791982-01-28028 January 1982 Forwards NRDC & Sierra Club Supplemental Comments Opposing Applicants' Exemption & C Komanoff Statement.Original Statement to Be Filed Later ML20040C7281982-01-22022 January 1982 Forwards C Komanoff & Ee Clebsch Signed Statements as Stated in 820118 Ltr.W/O Encl ML20039F7391982-01-11011 January 1982 Forwards Relevant Pages of Ref 2-4 of Applicant Site Preparation Activities Rept,In Response to Commission 811224 Order.Certificate of Svc Encl ML20039A7471981-12-17017 December 1981 Clarifies Issue Raised at Commission 811216 Meeting. Intervenors Do Not Object to Applicant'S Proposed Timetable But Also Would Not Object to Compression of Timetable by Number of Wks ML20062M5631981-12-15015 December 1981 Forwards Applicants' Proposed Schedule for Review of Section 50.12 Request.Certificate of Svc Encl ML20010G1111981-09-0404 September 1981 Requests That ASLB Direct DOE to Inform Parties of DOE View of Current Status of Proceeding & Steps DOE Will Take to Reopen Licensing Hearings,To Serve All Communications W/ NRC on All Parties & to Provide Advance Notice of Meetings 1984-03-08
[Table view] |
Text
. _.
" NEWMAN 8e HOLTZINGER, P. C.
1025 CONNECTICUT AVENUE,N.V.
00LKETE0 WAS HIN GTON, D. C. 2O O36 U$NK wituAM E.s AEn,Ja.+
-( JAca a.NEwMAN JOMN E.MOLTEINGE A,JR. - E.OREGOmf sARNES MApoLo r.mCis couGLAS L.eEnESFOnD tu.unicr AmELeao 202-862-8400 j,,,,g,,,,c,g ,
J A eCunNIGHT,JR. STEVEN P.FRANTE A L .Ec- e84 WR -1 P3 :44 ...AN G. SM STEvCN C.GOLDOERG C EOnGE L.EDGan EATHLEEN M.SMEA JfLL E. GRANT DAvs0 G.POwELL FREDERIC S.GmAT DOUGLAS G,GAEEN
- MOLLT N.LINDEMAN u.0LLTNNEwMAu March 1,198h,I'Q{6]h}.yh]If cc.g m c, g .g . .Ev,N J. u ,30,.
JOHN T. STOUGM,J A. qg y' CAVIC 3. RASKIN JAMES S.wASeLE JANEI.RYAN Mt1MAEL A.SAUSER DON ALD J.SILVERM AN ALVIW M.GUTTERMAN JACOLYN A.SIMMONS THOMAS A.SCMMUTE JOSEPH E.3TUBBS NOBERT l.wMITE CD &a.
Chairman Marshall E. Miller Administrative Judge Nuclear Regulatory Commission 4350 East-West Highway Bethesda, Maryland 20014 Dr. Cadet; Hand, Jr.
Administrative Judge Bodega Marine Laboratory University of California West Side Road Bodega Bay, California 94923 Mr. Gustave A. Linenberger Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission 4350 East-West Highway Bethesda, Maryland 20014 Re: Clinch River Breeder Reactor Plant (Docket No. 50-537)
Gentlemen:
I have been advised that the February 27, 1984 letter from Francis'X Gavigan, DOE, to Mr. Thomas King, NRC, which transmit-ted the CRBRP redress plan to the NRC Staff for review and which was served upon the Board and all present and former parties, omitted page 15 of the redress plan. Enclosed herewith is a copy of the missing page 15.
Sincerely, Geo L. Edgar Attorney for Project Management Corporation cc: All On Attached Service List g403020100 840301 gDR ADOCK O M fD 03
O l
s 15 t
land will be included as an integral part of th'e forestry management program conducted by the DOE in this area. Seedlings will be planted as a part of that forestry management program.
Redress activities would be scheduled to commence af ter the spring of 1985. Before commencement and during redress, all cpplicable env.ironmental contrc]s will be maintained (see sections 2.2 and 3.3) . If prior to commencement industrial uses for the site are identified and committed which are consistent with the longstanding development plan for the site, then redress would be af fected in accordance with this plan on those areas of the site not ccmmitted to industrial use. This plan will assure that the environment of the site is protected, consistent with preserving its previously dedicated potential for industrial use.
l
-p.,
i
\
.I
+
)
l d
l
}
f T??*:.: -
$?
}.
ts !lN{
$ 4 L 4i % .9 t
1
1 l
UNITED STATES OF AMERICA 9,"%{'JD
% NUCLEAR REGULATORY COMMISSION BEFORE THE i
ATOMIC SAFETY AND LICENSING APPEAL BOAR @4 g 1 P3
. 00ChEhh3 & SEgy;ri BRANCH
)
In the< Matter Of )
)
UNITED STATES DEPARTMENT OF ENERGY )
)
PROJECT MANAGEMENT CORPORATION ) Docket No. 50-537CP
)
TENNESSEE VALLEY AUTHORITY )
)
(Clinch River . Breeder Reactor Plant) )
}
s CERTIFICATE OF SERVICE Service has been effected on this date by hand or first class mail as follows:
Marshall E. Miller, Esquire Chairman Atomic Safety and Licensing Board Nuclear Regulatory Commission 4350 East-West Highway Bethesda,. Maryland 20814 (2 copies by hand)
Dr. Cadet H. Hand, Jr.
Director Bodega Marine Laboratory University of California West Side Road Bodega Bay, California 94923 Mr. Gustave A. Linenberger Atomic Safety and Licensing Board Nuclear Regulatory Commission 4350 East-West Highway Bethesda, Maryland 20814 (by hand)
Mr. Gary J. Edles Chairman Atomic Safety and Licensing Appeal Board Nuclear Regulatory Commission 4350 Eas.t-West Highway Bethesda, Maryland 20814
. , ,- .- . . . _ - ., . . - - . . - . . - . , - _ . . - - - - = _ . - _ . - - - - .
.- -. - - _ - = .
M -
2-
?
Dr. W. Reed Johnson Atomic Safety and Licensing Appeal Board U.S. Nuclear Regulatory Commission 4350 East-West Highway Bethesda, Maryland 20814 a
Mr. Howard A. Wilber Atomic Safety and Licensing Appeal Board U.S. Nuclear Regulatory Commission 4350 East-West Highway Bethesda, Maryland 20814 Atomic Safety and Licensing Board Panel !
U.S. Nuclear Regulatory Commission Washington, D.C. 20555
- Docket & Service Section Office of the Secretary U.S. Nuclear Regulatory Commission r L Washington, D.C. 20555 (original, 3 copies and date/ time copy delivered by hand)
Stuart Treby, Esquire Sherwin E. Turk, Esquire Elaine I. Chan, Esquire Geary S. Mizuno, Esquire Office of Executive Legal Director
-U.S. Nuclear Regulatory Commission 7735 Old Georgetwon Road Bethesda, Maryland 20814 (2 copies by hand)
William M. Leech, Jr., Esquire William B. Hubbard, Esquire Michael D. Pearigen, Esquire State of Tennessee Office of the Attorney General 450 James Robertson Parkway Nashville, Tennessee 37219 Oak Ridge Public Library Civic Center Oak P.idge, Tennessee 37830 ,
Herbert S. Sanger, Jr., Esquire
. Lewis ~E. Wallace, Esquire W. Walter LaRoche, Esquire '
James F. Burger, Esquire Edward J. Vigluicci, Esquire Tennessee Valley Authority Office of the General Counsel l 400 West Summit Hill Drive l Knoxville, Tennessee 37902 (2 copies) l l
. s Lawson McGhee Public Library 500 West Church Street Knoxville, Tennessee 37502 William R. Lantrip, Esquire Attorney for the City of Oak Ridge Post Office Box 1 Oak Ridge, Tennessee 37830 Leon Silverstron, Esquire William D. Luck, Esquire U.S. Department of Energy 1000 Independence Avenue, S.W.
Room 6B-256 Washington, D.C. 20585 (2 copies by hand)
Commissioner John L. Parish Tennessee Department of Economic and Community Development Andrew Jackson Building Suite 1007 Nashville, Tennessee 37219 Barbara A. Finamore, Esquire S. Jacob Scherr, Esquire Natural Resources Defense Council, Inc.
1725 Eye Street, N.W., Suite 600 '
Washington, D.C. 20006 (by hand)
George jg> Edgar ff Attorney for ProjecWanagement Corp.
Newman & Holtzinger, P.C.
1025 Connecticut Avenue, N.W.
Suite 1200 Washington, D.C. 20036
-Telephone: (202) 862-8459 Dated: March 1, 1984
- / Denotes service by hand at 1717 "H" Street, N.W., Washington, D.C.
- , - . - - --. .