IR 05000456/1978006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20150D187
| number = ML20150D187
| issue date = 11/27/1978
| issue date = 11/27/1978
| title = Ack Receipt of 781114 Ltr Informing NRC of Steps Taken to Correct Violations Noted During inspec#50-456/78-06 & #50-457/78-06
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted During Inspec 50-456/78-06 & 50-457/78-06
| author name = Keppler J
| author name = Keppler J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 7812050062
| document report number = NUDOCS 7812050062
| title reference date = 11-14-1978
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1

Latest revision as of 00:12, 15 June 2022

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted During Inspec 50-456/78-06 & 50-457/78-06
ML20150D187
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/27/1978
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
References
NUDOCS 7812050062
Download: ML20150D187 (1)


Text

.

- -

.

.

c/ % UNITED STATES

., o 4 NUCLEAR REGULATORY COMMISSION 4 , REGION ill

  • g 799 ROOSEVELT ROAD GLEN ELLYN,ILLINofS 60137 November 27, 1978

.

Docket No. 50-456 Docket No. 50-457 i

Commonwealth Edison Company ATTN: Byron Lee, J p .

Vice President

, P.O. Box 767

! Chicago, IL 60690 Gentlemen:

This will acknowledge receipt of your letter dated November 14, 1978,

, supplementing your letter of September 7, 1978, which was submitted in response to the items of noncompliance identified in our letter dated August 7, 1978, and IE Inspection Report Nos. 50-456/78-06 and 50-457/78-06 and further discussed in our letter of September 25,

,

197 i Our position regarding item A.1, which conccrns control and calibra-tion of testing devices used for activities affecting the quality of l Category I concrete, remains unchanged; however, in accordance with your request, we have referred this matter to our Headquarters, and you will be informed of the results of their revie ,

Your cooperation with us is appreciate ,

Sincerely,

.

A t

'

ames G. Kepp er Director cc: R. Cosaro, Site Project Superintendent

'

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC-

'

TTSh 78120500 cot bl 1

- -

.

l