ML20134E813: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20134E813
| number = ML20134E813
| issue date = 07/30/1985
| issue date = 07/30/1985
| title = Ack Receipt of 850528 Clarification of Response to NRC 841213 Order Per 850423 Ltr Re Design Mods & Design Change Process
| title = Ack Receipt of 850528 Clarification of Response to NRC 841213 Order Per Re Design Mods & Design Change Process
| author name = Murley T
| author name = Murley T
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Line 20: Line 20:


==Subject:==
==Subject:==
Letter Clarifying Response to NRC Order dated December 13, 1984 This letter acknowledges your May 28, 1985 clarification of our April 23, 1985 letter concerning the evaluation of previous design modifications and of the design modification process. We accept this clarification with the ur.derstand-ing that your review will include the following elements:
Letter Clarifying Response to NRC Order dated December 13, 1984 This letter acknowledges your May 28, 1985 clarification of our {{letter dated|date=April 23, 1985|text=April 23, 1985 letter}} concerning the evaluation of previous design modifications and of the design modification process. We accept this clarification with the ur.derstand-ing that your review will include the following elements:
The detailed review of specified design changes will provide a representative review of all aspects of the design change process.
The detailed review of specified design changes will provide a representative review of all aspects of the design change process.
For any design change selected for detailed review, reviewers shall not have previously been personally and substantially involved in the engineering, design or evaluation of that design change.
For any design change selected for detailed review, reviewers shall not have previously been personally and substantially involved in the engineering, design or evaluation of that design change.

Latest revision as of 17:09, 14 December 2021

Ack Receipt of 850528 Clarification of Response to NRC 841213 Order Per Re Design Mods & Design Change Process
ML20134E813
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/30/1985
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 8508200466
Download: ML20134E813 (2)


Text

,

3 JUL 3 01985 Docket No. 50-213 Connecticut Yankee Atomic Power Company ATTN: Mr. J. F. Opeka Senior Vice President - Nuclear Engineering and Operations Group P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:

Subject:

Letter Clarifying Response to NRC Order dated December 13, 1984 This letter acknowledges your May 28, 1985 clarification of our April 23, 1985 letter concerning the evaluation of previous design modifications and of the design modification process. We accept this clarification with the ur.derstand-ing that your review will include the following elements:

The detailed review of specified design changes will provide a representative review of all aspects of the design change process.

For any design change selected for detailed review, reviewers shall not have previously been personally and substantially involved in the engineering, design or evaluation of that design change.

All Task Group Members screen design changes to determine whether a detailed review is required and any member can designate a change for such review.

Review of the interfaces between the internal organizations involved in the design change process will be included in both design process and design change reviews.

These elements are based on your submittals, Task Group procedures, and July 16, 1985 discussions between Messrs. R. Kacich and R. Schmidt of your staff and Mr. P. Swetland of my staff.

Sincerely, Orf ernal Wigned by The::as E. Murley Thomas E. Murley Regional Administrator 8508200466 850730 PDR ADOCK 05000213 P PDR OFFICIAL RECORD COPY 114/MCCA8E/7/12/85 - 0001.0.0 07/12/85 g) ,

\

O h

r o

i JUL 3 01985 2

cc:

R. Graves, Plant Superintendent 9- D. O. Nordquist, Manager of Quality Assurance R. T. Laudenat, Manager, Generation Facilities Licensing E. J. Mroczka, Vice President, Nuclear Operations Gerald Garfield, Esquire Public Document Room (PDR)

Local Public Docu.nent Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Connecticut bec:

Region I Docket Room (with concurrences)

Sen Mr 0;: = thn; Office (.;/: :::1)

Section Chief, DRP

%Ekk b'

RI.eR .

Swetland/ca a, h, McCabe Holody R g proz Gut z ngpr A y' f*

S pospecki N 7/M/85 7(25 (t5 1 g(gg y 6g .

OFFICIAL RECORD COPY 114/MCCABE/7/12/85 - 0002.0.0 07/12/85