| | document type = License-Dry Cask, ISFSI, (Amend) DKT 72 | | | document type = License-Dry Cask, ISFSI, (Amend) DKT 72 |
| | page count = 4 | | | page count = 4 |
| | project = EPID:L-2017-LLA-0030 | | | project = CAC:00102, EPID:L-2017-LLA-0030 |
| | stage = Other | | | stage = Other |
| }} | | }} |
Letter Sequence Other |
---|
CAC:00102, Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement (Approved, Closed) EPID:L-2017-LLA-0030, Package: Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate If Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML19011A1272019-01-29029 January 2019 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Second Request for Additional Information (W/Enclosure) Project stage: RAI ML19093A0472019-03-18018 March 2019, 4 April 2019 Package: Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate If Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 Project stage: Request ML19093A0482019-04-0404 April 2019 Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate of Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 (W/Enclosure 1) Project stage: RAI ML19193A0172019-07-11011 July 2019 Letter to R. Ngwayah Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Updated Review Schedule Project stage: Other ML19198A1402019-07-15015 July 2019 Letter to R. Ngwayah Approval of Holtec International Request for Withholding Information from Public Disclosure - Certificate of Compliance No. 1032, HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment Request No. 4 Project stage: Withholding Request Acceptance ML19158A2762019-12-20020 December 2019 Enclosure 4: Preliminary CoC 1032 Amendment No. 4 SER (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2712019-12-20020 December 2019 Package: User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4 Project stage: Request ML19158A2752019-12-20020 December 2019 Enclosure 3: Proposed CoC 1032 Amendment No. 4 Appendix B (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2742019-12-20020 December 2019 Enclosure 2: Proposed CoC 1032 Amendment No. 4 Appendix a (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2732019-12-20020 December 2019 Enclosure 1: Proposed CoC 1032 Amendment No. 4 (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2722019-12-20020 December 2019 Memorandum to J. Cai User Need for Rulemaking for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4 Project stage: Other ML20065J4272020-03-0505 March 2020 Submittal of Renewal Application for the TN-32 Dry Storage Cask - CoC 1021 Project stage: Request ML20121A2722020-04-30030 April 2020 Request to Extend the Due Date for Submitting the GEH Morris Operation License Renewal Application Project stage: Other ML20147A6062020-05-13013 May 2020 VPN-006-2020 Pge Request for Temporary Exemption Project stage: Request ML20136A0482020-05-19019 May 2020 CoC 1042 Eos A1 Issuance Package to Tn Project stage: Request ML20153A7682020-06-0101 June 2020, 11 June 2020 International, Submittal of Responses to NRC RAIs on the Renewal of the HI-STAR 100 Storage CoC Project stage: Request ML20155K7452020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Final Safety Evaluation Report Project stage: Approval ML20155K7402020-06-15015 June 2020 Issuance of Certificate of Compliance No 1032 Amendment No. 4 for HI-STORM Flood/Wind Mulitpurpose Canister Storage System Project stage: Request ML20155K7442020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix B Project stage: Other ML20155K7432020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix a Project stage: Other ML20155K7422020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Project stage: Other ML20155K7412020-06-15015 June 2020 Letter to Holtec Issuing Certificate of Compliance No. 1032 Amendment No. 4 for HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Other ML20198M6382020-07-16016 July 2020, 21 October 2020 International, Supplemental Archeological Information Project stage: Request ML20280A2892020-10-0606 October 2020 CoC 1021 (TN-32) Renewal - RAI Project stage: Request ML20283A7892020-10-0909 October 2020, 23 October 2020 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Requests for Additional Information - Part 6, Response Set 1 Project stage: Request ML20213B1882020-10-29029 October 2020 Encl: Environmental Assessment Memo to File: Environmental Assessment & Finding of No Significant Impact for Zion Solutions, LLC Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Zion Project stage: Request ML20303A2542020-10-29029 October 2020 International Submittal of RAI Responses on HI-STORM 100 License Renewal Project stage: Request ML20315A4172020-10-29029 October 2020 Application for Certificate of Compliance No. 1042, Amendment No. 2, to NUHOMS Eos System, Revision 6, Revised Responses to Request for Additional Information Project stage: Request ML20212L5892020-11-20020 November 2020 Encl: Environmental Assessment Memo to File: Environmental Assessment & Finding of No Significant Impact for Exelon Generation Co. Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Calvert Cliffs ISFSI Project stage: Request ML20326A0092020-11-20020 November 2020 Attachment 3 - Proposed HI-STORE License and Technical Specifications Project stage: Request ML20326A0052020-11-20020 November 2020, 18 December 2020 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Requests for Additional Information, Part 6, Response Set 2 Project stage: Request ML20150B6832020-11-23023 November 2020 Encl: Environmental Assessment (Memo to File: Envir. Assessment and Finding of No Significant Impact for Exelon Generation Co., LLC Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Salem ISFSI) Project stage: Request ML20344A3512020-12-10010 December 2020 CoC 1027 (TN-68) Renewal RAI Package Project stage: Request ML21004A2422021-01-0404 January 2021 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Supplemental Information Project stage: Supplement ML21004A2412021-01-0404 January 2021, 5 March 2021 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Supplemental Information Project stage: Request ML21062A0572021-04-21021 April 2021 Final Environmental Assessment and Finding of No Significant Impact of 2012 and 2015 Decommissioning Funding Plans for Turkey Point Units 3 and 4 Independent Spent Fuel Storage Installation Project stage: Request ML21062A0632021-04-21021 April 2021 Final Environmental Assessment and Finding of No Significant Impact of 2012 and 2015 Decommissioning Funding Plans for St. Lucie Units 1 and 2 Independent Spent Fuel Storage Installation Project stage: Request ML21062A1472021-04-21021 April 2021 Final Environmental Assessment and Finding of No Significant Impact of 2012 and 2015 Decommissioning Funding Plans for Seabrook Station Unit 1 Independent Spent Fuel Storage Installation Project stage: Request ML21062A0942021-04-21021 April 2021 Final Environmental Assessment and Finding of No Significant Impact of 2012 and 2015 Decommissioning Funding Plans for Duane Arnold Energy Center Independent Spent Fuel Storage Installation Project stage: Request ML21062A0712021-04-21021 April 2021 Final Environmental Assessment and Finding of No Significant Impact of 2012 and 2015 Decommissioning Funding Plans for Point Beach Units 1 and 2 Independent Spent Fuel Storage Installation Project stage: Request ML21125A1032021-06-0707 June 2021, 3 August 2021 User Need Memo Package for CoC 1042 Amendment 2 Project stage: Request ML21224A1052021-06-30030 June 2021 International, HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Requests for Addition Information - 2nd Round, Part 1 Project stage: Request ML21231A1542021-06-30030 June 2021, 10 August 2021 NAC International, Inc. - Responses to the Nuclear Regulatory Commissions (NRC) Request for Additional Information for the Request to Renew the NRC Certificate of Compliance No. 1025 for the NAC-MPC Cask System Project stage: Request ML21214A0732021-07-25025 July 2021 IEMA Second Response to GE Hitachi Morris Draft EA Fonsi on DFPs Project stage: Request ML21211A6122021-07-30030 July 2021 Attachment 3: Proposed Changed Page of HI-STORM FW FSAR Project stage: Request ML21211A6082021-07-30030 July 2021 HI-STORM FW Amendment 8 Request Project stage: Request ML21211A6092021-07-30030 July 2021 HI-STORM FW Amendment 8 Request Project stage: Request 2020-12-10
[Table View] |
|
---|
Category:License-Dry Cask
MONTHYEARML24199A2382024-08-13013 August 2024 Enclosure 1 - Certificate of Compliance No. 1032, Amendment 7 ML24199A2402024-08-13013 August 2024 Enclosure 3 - Certificate of Compliance No. 1032, Amendment 7, Appendix B ML23030B7932024-06-27027 June 2024 2. Proposed Certificate of Compliance No. 1032, Amendment 7 ML23030B7952024-06-27027 June 2024 4. Proposed Certificate of Compliance No. 1032, Amendment 7, Appendix B ML24002B1332024-01-0404 January 2024 07. FW A9 Proposed Appendix a ML24002B1342024-01-0404 January 2024 08. FW A9 Proposed Appendix B ML23041A4672023-02-15015 February 2023 Enclosure 1 - Final Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System ML22242A2152022-09-0606 September 2022 Amendment No. 8 Certificate of Compliance No. 1032 ML22242A2172022-09-0606 September 2022 Amendment No. 8 TS, Appendix B ML22019A1302022-04-25025 April 2022 HI-STORM FW Amendment 8 Proposed Certificate of Compliance ML21288A5352021-10-15015 October 2021 Attachment 12: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix a Reorganization ML21288A5342021-10-15015 October 2021 Attachment 11: HI-STORM FW Amendment 7 Certificate of Compliance Reorganization ML21237A1762021-08-25025 August 2021 Request for Supplemental Information Re Holtec Intl HI-STORM Flood/Wind Multipurpose Canister Storage System, Coc No. 1032, Amendment 7 ML21126A2692021-05-0606 May 2021 Attachment 2 - HI-STORM FW Amendment 7 Certificate of Compliance ML20225A1922020-08-12012 August 2020 Attachment 2: HI-STORM FW Amendment 7 Certificate of Compliance ML20225A1942020-08-12012 August 2020 Attachment 4: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix B ML20182A8662020-06-30030 June 2020 Attachment 4: HI-STORM FW Amendment 6 CoC, Appendix B - RSI-Related Changes ML20182A8652020-06-30030 June 2020 Attachment 3 - HI-STORM FW Amendment 6 CoC, Appendix a - RSI-Related Changes ML20182A8642020-06-30030 June 2020 Attachment 2: HI-STORM FW Amendment 6 CoC - RSI-Related Changes ML20163A7032020-06-25025 June 2020 Certificate of Compliance No. 1032 Amendment No. 5 ML20155K7422020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 ML20155K7442020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix B ML20155K7432020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix a ML20052D7912020-02-0707 February 2020 Attachment 2 - Proposed CoC Pages - (Non-Proprietary) ML19158A2732019-12-20020 December 2019 Enclosure 1: Proposed CoC 1032 Amendment No. 4 (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) ML19158A2742019-12-20020 December 2019 Enclosure 2: Proposed CoC 1032 Amendment No. 4 Appendix a (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) ML19158A2752019-12-20020 December 2019 Enclosure 3: Proposed CoC 1032 Amendment No. 4 Appendix B (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) U-604446, Registration of Use of Casks to Store Spent Fuel2018-10-15015 October 2018 Registration of Use of Casks to Store Spent Fuel ML16323A0152016-11-17017 November 2016 Registration of Spent Fuel Storage Cask Dated 11/17/2016 ML16309A1972016-11-0404 November 2016 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) 2024-08-13
[Table view] Category:ISFSI
MONTHYEARML24199A2382024-08-13013 August 2024 Enclosure 1 - Certificate of Compliance No. 1032, Amendment 7 ML24199A2402024-08-13013 August 2024 Enclosure 3 - Certificate of Compliance No. 1032, Amendment 7, Appendix B ML23030B7932024-06-27027 June 2024 2. Proposed Certificate of Compliance No. 1032, Amendment 7 ML23030B7952024-06-27027 June 2024 4. Proposed Certificate of Compliance No. 1032, Amendment 7, Appendix B ML24002B1332024-01-0404 January 2024 07. FW A9 Proposed Appendix a ML24002B1342024-01-0404 January 2024 08. FW A9 Proposed Appendix B ML23041A4672023-02-15015 February 2023 Enclosure 1 - Final Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System ML22242A2152022-09-0606 September 2022 Amendment No. 8 Certificate of Compliance No. 1032 ML22242A2172022-09-0606 September 2022 Amendment No. 8 TS, Appendix B ML22019A1302022-04-25025 April 2022 HI-STORM FW Amendment 8 Proposed Certificate of Compliance ML21288A5352021-10-15015 October 2021 Attachment 12: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix a Reorganization ML21288A5342021-10-15015 October 2021 Attachment 11: HI-STORM FW Amendment 7 Certificate of Compliance Reorganization ML21237A1762021-08-25025 August 2021 Request for Supplemental Information Re Holtec Intl HI-STORM Flood/Wind Multipurpose Canister Storage System, Coc No. 1032, Amendment 7 ML21126A2692021-05-0606 May 2021 Attachment 2 - HI-STORM FW Amendment 7 Certificate of Compliance ML20225A1922020-08-12012 August 2020 Attachment 2: HI-STORM FW Amendment 7 Certificate of Compliance ML20225A1942020-08-12012 August 2020 Attachment 4: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix B ML20182A8662020-06-30030 June 2020 Attachment 4: HI-STORM FW Amendment 6 CoC, Appendix B - RSI-Related Changes ML20182A8652020-06-30030 June 2020 Attachment 3 - HI-STORM FW Amendment 6 CoC, Appendix a - RSI-Related Changes ML20182A8642020-06-30030 June 2020 Attachment 2: HI-STORM FW Amendment 6 CoC - RSI-Related Changes ML20163A7032020-06-25025 June 2020 Certificate of Compliance No. 1032 Amendment No. 5 ML20155K7422020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 ML20155K7442020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix B ML20155K7432020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix a ML20052D7912020-02-0707 February 2020 Attachment 2 - Proposed CoC Pages - (Non-Proprietary) ML19158A2732019-12-20020 December 2019 Enclosure 1: Proposed CoC 1032 Amendment No. 4 (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) ML19158A2742019-12-20020 December 2019 Enclosure 2: Proposed CoC 1032 Amendment No. 4 Appendix a (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) ML19158A2752019-12-20020 December 2019 Enclosure 3: Proposed CoC 1032 Amendment No. 4 Appendix B (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) U-604446, Registration of Use of Casks to Store Spent Fuel2018-10-15015 October 2018 Registration of Use of Casks to Store Spent Fuel ML16323A0152016-11-17017 November 2016 Registration of Spent Fuel Storage Cask Dated 11/17/2016 ML16309A1972016-11-0404 November 2016 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) 2024-08-13
[Table view] Category:(Amend) DKT 72
MONTHYEARML24199A2382024-08-13013 August 2024 Enclosure 1 - Certificate of Compliance No. 1032, Amendment 7 ML24199A2402024-08-13013 August 2024 Enclosure 3 - Certificate of Compliance No. 1032, Amendment 7, Appendix B ML23030B7932024-06-27027 June 2024 2. Proposed Certificate of Compliance No. 1032, Amendment 7 ML23030B7952024-06-27027 June 2024 4. Proposed Certificate of Compliance No. 1032, Amendment 7, Appendix B ML24002B1332024-01-0404 January 2024 07. FW A9 Proposed Appendix a ML24002B1342024-01-0404 January 2024 08. FW A9 Proposed Appendix B ML23041A4672023-02-15015 February 2023 Enclosure 1 - Final Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System ML22145A4102022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 3: Draft Appendix B, Technical Specifications, Approved Contents and Design Features, CoC No.1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System ML22242A2152022-09-0606 September 2022 Amendment No. 8 Certificate of Compliance No. 1032 ML22242A2172022-09-0606 September 2022 Amendment No. 8 TS, Appendix B ML22019A1302022-04-25025 April 2022 HI-STORM FW Amendment 8 Proposed Certificate of Compliance ML21126A2692021-05-0606 May 2021 Attachment 2 - HI-STORM FW Amendment 7 Certificate of Compliance ML20225A1922020-08-12012 August 2020 Attachment 2: HI-STORM FW Amendment 7 Certificate of Compliance ML20225A1942020-08-12012 August 2020 Attachment 4: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix B ML20182A8662020-06-30030 June 2020 Attachment 4: HI-STORM FW Amendment 6 CoC, Appendix B - RSI-Related Changes ML20182A8642020-06-30030 June 2020 Attachment 2: HI-STORM FW Amendment 6 CoC - RSI-Related Changes ML20182A8652020-06-30030 June 2020 Attachment 3 - HI-STORM FW Amendment 6 CoC, Appendix a - RSI-Related Changes ML20163A7032020-06-25025 June 2020 Certificate of Compliance No. 1032 Amendment No. 5 ML20155K7422020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 ML20155K7432020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix a ML20155K7442020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix B ML20052D7912020-02-0707 February 2020 Attachment 2 - Proposed CoC Pages - (Non-Proprietary) ML19158A2732019-12-20020 December 2019 Enclosure 1: Proposed CoC 1032 Amendment No. 4 (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) ML19158A2742019-12-20020 December 2019 Enclosure 2: Proposed CoC 1032 Amendment No. 4 Appendix a (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) ML19158A2752019-12-20020 December 2019 Enclosure 3: Proposed CoC 1032 Amendment No. 4 Appendix B (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) U-604446, Registration of Use of Casks to Store Spent Fuel2018-10-15015 October 2018 Registration of Use of Casks to Store Spent Fuel ML16323A0152016-11-17017 November 2016 Registration of Spent Fuel Storage Cask Dated 11/17/2016 ML16309A1972016-11-0404 November 2016 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) 2024-08-13
[Table view] |
Text
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (10-2004) 10 CFR 72 CERTIFICATE OF COMPLIANCE FOR SPENT FUEL STORAGE CASKS Page 1 of 4 The U.S. Nuclear Regulatory Commission is issuing this Certificate of Compliance pursuant to Title 10 of the Code of Federal Regulations, Part 72, "Licensing Requirements for Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-related Greater than Class C Waste" (10 CFR Part 72). This certificate is issued in accordance with 10 CFR 72.238, certifying that the storage design and contents described below meet the applicable safety standards set forth in 10 CFR Part 72, Subpart L, and on the basis of the final safety analysis report (FSAR) of the cask design. This certificate is conditional upon fulfilling the requirements of 10 CFR Part 72, as applicable, and the conditions specified below.
Certificate No. Effective Expiration Date Docket No. Amendment No. Amendment Effective Date Package Identification No.
Date 1032 June 13, June 12, 72-1032 4 July 14, 2020 USA/72-1032 2011 2031 Issued To: (Name/Address)
Holtec International Krishna P. Singh Technology Campus 1 Holtec Blvd.
Camden, NJ 08104 Safety Analysis Report Title Holtec International Final Safety Analysis Report for the HI-STORM FW MPC Storage System This certificate is conditioned upon fulfilling the requirements of 10 CFR Part 72, as applicable, the attached Appendix A (Technical Specifications) and Appendix B (Approved Contents and Design Features), and the conditions specified below:
APPROVED SPENT FUEL STORAGE CASK Model No.: HI-STORM FW MPC Storage System DESCRIPTION:
The HI-STORM FW MPC Storage System consists of the following components: (1) interchangeable multipurpose canisters (MPCs), which contain the fuel; (2) a storage overpack (HI-STORM FW), which contains the MPC during storage; and (3) a transfer cask (HI-TRAC VW), which contains the MPC during loading, unloading and transfer operations. The MPC stores up to 37 pressurized water reactor fuel assemblies or up to 89 boiling water reactor fuel assemblies.
The HI-STORM FW MPC Storage System is certified as described in the Final Safety Analysis Report (FSAR) and in the U. S. Nuclear Regulatory Commissions (NRC) Safety Evaluation Report (SER) accompanying the Certificate of Compliance (CoC).
The MPC is the confinement system for the stored fuel. It is a welded, cylindrical canister with a honeycombed fuel basket, a baseplate, a lid, a closure ring, and the canister shell. All MPC components that may come into contact with spent fuel pool water or the ambient environment are made entirely of stainless steel or passivated aluminum/aluminum alloys. The canister shell, baseplate, lid, vent and drain port cover plates, and closure ring are the main confinement boundary components. All confinement boundary components are made entirely of stainless steel. The honeycombed basket provides criticality control.
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (10-2004)
CERTIFICATE OF COMPLIANCE Certificate No. 1032 10 CFR 72 FOR SPENT FUEL STORAGE CASKS Amendment No. 4 Page 2 of 4 DESCRIPTION (continued)
There are three types of MPCs: the MPC-32ML, MPC-37, and MPC-89. The number suffix indicates the maximum number of fuel assemblies permitted to be loaded in the MPC. All MPC models have the same external diameter.
The HI-TRAC VW transfer cask provides shielding and structural protection of the MPC during loading, unloading, and movement of the MPC from the cask loading area to the storage overpack. The transfer cask is a multi-walled (carbon steel/lead/carbon steel) cylindrical vessel with a neutron shield jacket attached to the exterior and a retractable bottom lid used during transfer operations.
The HI-STORM FW storage overpack provides shielding and structural protection of the MPC during storage.
The overpack is a heavy-walled steel and concrete, cylindrical vessel. Its side wall consists of plain (unreinforced) concrete that is enclosed between inner and outer carbon steel shells. The overpack has air inlets at the bottom and air outlets at the top to allow air to circulate naturally through the cavity to cool the stored MPC. The inner shell has supports attached to its interior surface to guide the MPC during insertion and removal and provide a means to protect the MPC confinement boundary against impactive or impulsive loadings. A loaded MPC is stored within the HI-STORM FW storage overpack in a vertical orientation.
CONDITIONS
- 1. OPERATING PROCEDURES Written operating procedures shall be prepared for handling, loading, movement, surveillance, and maintenance.
The users site-specific written operating procedures shall be consistent with the technical basis described in Chapter 9 of the FSAR.
- 2. ACCEPTANCE TESTS AND MAINTENANCE PROGRAM Written acceptance tests and a maintenance program shall be prepared consistent with the technical basis described in Chapter 10 of the FSAR. At completion of welding the MPC shell to baseplate, an MPC confinement weld helium leak test shall be performed using a helium mass spectrometer. The confinement boundary welds leakage rate test shall be performed in accordance with ANSI N14.5 to leaktight criterion. If a leakage rate exceeding the acceptance criteria is detected, then the area of leakage shall be determined and the area repaired per ASME Code Section III, Subsection NB, Article NB-4450 requirements. Re-testing shall be performed until the leakage rate acceptance criterion is met.
- 3. QUALITY ASSURANCE Activities in the areas of design, purchase, fabrication, assembly, inspection, testing, operation, maintenance, repair, modification of structures, systems and components, and decommissioning that are important-to-safety shall be conducted in accordance with a Commission-approved quality assurance program which satisfies the applicable requirements of 10 CFR Part 72, Subpart G, and which is established, maintained, and executed with regard to the storage system.
- 4. HEAVY LOADS REQUIREMENTS Each lift of an MPC, a HI-TRAC VW transfer cask, or any HI-STORM FW overpack must be made in accordance to the existing heavy loads requirements and procedures of the licensed facility at which the lift is made. A plant-specific review of the heavy load handling procedures (under 10 CFR 50.59 or 10 CFR 72.48, as applicable) is required to show operational compliance with existing plant specific heavy loads requirements. Lifting operations outside of structures governed by 10 CFR Part 50 must be in accordance with Section 5.2 of Appendix A.
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (10-2004)
CERTIFICATE OF COMPLIANCE Certificate No. 1032 10 CFR 72 FOR SPENT FUEL STORAGE CASKS Amendment No. 4 Page 3 of 4
- 5. APPROVED CONTENTS Contents of the HI-STORM FW MPC Storage System must meet the fuel specifications given in Appendix B to this certificate.
- 6. DESIGN FEATURES Features or characteristics for the site or system must be in accordance with Appendix B to this certificate.
- 7. CHANGES TO THE CERTIFICATE OF COMPLIANCE The holder of this certificate who desires to make changes to the certificate, which includes Appendix A (Technical Specifications) and Appendix B (Approved Contents and Design Features), shall submit an application for amendment of the certificate.
- 8. SPECIAL REQUIREMENTS FOR FIRST SYSTEMS IN PLACE For the storage configuration, each user of a HI-STORM FW MPC Storage System with a heat load equal to or greater than 30 kW shall perform a thermal validation test in which the user measures the total air mass flow rate through the cask system using direct measurements of air velocity in the inlet vents. The user shall then perform an analysis of the cask system with the taken measurements to demonstrate that the measurements validate the analytic methods described in Chapter 4 of the FSAR. The thermal validation test and analysis results shall be submitted in a letter report to the NRC pursuant to 10 CFR 72.4 within 180 days of the users loading of the first cask with a heat load equal to or greater than 30 kW. To satisfy condition 8 for casks of the same system type (i.e., HI-STORM FW casks), in lieu of additional submittals pursuant to 10 CFR 72.4, users may document in their 72.212 report a previously performed test and analysis submitted by letter report to the NRC that demonstrates validation of the analytic methods described in Chapter 4 of the FSAR.
- 9. PRE-OPERATIONAL TESTING AND TRAINING EXERCISE A dry run training exercise of the loading, closure, handling, unloading, and transfer of the HI-STORM FW MPC Storage System shall be conducted by the licensee prior to the first use of the system to load spent fuel assemblies. The training exercise shall not be conducted with spent fuel in the MPC. The dry run may be performed in an alternate step sequence from the actual procedures, but all steps must be performed. The dry run shall include, but is not limited to the following:
- a. Moving the MPC and the transfer cask into the spent fuel pool or cask loading pool.
- b. Preparation of the HI-STORM FW MPC Storage System for fuel loading.
- c. Selection and verification of specific fuel assemblies to ensure type conformance.
- d. Loading specific assemblies and placing assemblies into the MPC (using a dummy fuel assembly), including appropriate independent verification.
- e. Remote installation of the MPC lid and removal of the MPC and transfer cask from the spent fuel pool or cask loading pool.
- f. MPC welding, NDE inspections, pressure testing, draining, moisture removal (by vacuum drying or forced helium dehydration, as applicable), and helium backfilling. (A mockup may be used for this dry-run exercise.)
- g. Transfer of the MPC from the transfer cask to the overpack.
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (10-2004)
CERTIFICATE OF COMPLIANCE Certificate No. 1032 10 CFR 72 FOR SPENT FUEL STORAGE CASKS Amendment No. 4 Page 4 of 4
- h. Placement of the HI-STORM FW MPC Storage System at the ISFSI.
- i. HI-STORM FW MPC Storage System unloading, including flooding MPC cavity and removing MPC lid welds. (A mockup may be used for this dry-run exercise.)
Any of the above steps can be omitted if they have already been successfully carried out at a site to load a HISTORM 100 System (USNRC Docket 72-1014).
- 10. AUTHORIZATION The HI-STORM FW MPC Storage System, which is authorized by this certificate, is hereby approved for general use by holders of 10 CFR Part 50 licenses for nuclear reactors at reactor sites under the general license issued pursuant to 10 CFR 72.210, subject to the conditions specified by 10 CFR 72.212, this certificate, and the attached Appendices A and B. The HI-STORM FW MPC Storage System may be fabricated and used in accordance with any approved amendment to CoC No. 1032 listed in 10 CFR 72.214. Each of the licensed HI-STORM FW MPC Storage System components (i.e., the MPC, overpack, and transfer cask), if fabricated in accordance with any of the approved CoC Amendments, may be used with one another provided an assessment is performed by the CoC holder that demonstrates design compatibility. The HISTORM FW MPC Storage System may be installed on an ISFSI pad with the HI-STORM 100 Cask System (USNRC Docket 72-1014) provided an assessment is performed by the CoC holder that demonstrates design compatibility.
FOR THE NUCLEAR REGULATORY COMMISSION John B. Digitally signed by John B.
McKirgan McKirgan Date: 2020.06.15 10:12:50
-04'00' John McKirgan, Chief Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Attachments:
- 1. Appendix A
- 2. Appendix B June 15,______
Dated: _______ 2020