IR 05000254/1987007: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20206R029
| number = ML20206R110
| issue date = 04/15/1987
| issue date = 04/14/1987
| title = Forwards Safeguards Insp Repts 50-254/87-07 & 50-265/87-07 on 870330-0403.No Violations Noted.Confirmation of Commitments to Address Two Insp Concerns Requested within 30 Days
| title = Partially Withheld Insp Repts 50-254/87-07 & 50-265/87-07 on 870330-0403 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Plan & Procedures,Mgt effectiveness- Security Organization & Security Program Audit
| author name = Axelson W
| author name = Creed J, Pirtle G
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name = Reed C
| addressee name =  
| addressee affiliation = COMMONWEALTH EDISON CO.
| addressee affiliation =  
| docket = 05000254, 05000265
| docket = 05000254, 05000265
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = NUDOCS 8704220086
| document report number = 50-254-87-07, 50-254-87-7, 50-265-87-07, 50-265-87-7, NUDOCS 8704220103
| package number = ML20206R031
| package number = ML20206R031
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 2
| page count = 2
}}
}}
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:- ___ _
v      1
o U.S. NUCLEAR REGULATORY COMMISSION
,
  *
b, B m,m~ .. -- ,. m ._,  ,
        '
OA J JMT JO I UUaiv n, ; 0N l
APR 151987 Docket No. 50-254 Docket No. 50-265 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
This refers to the routine safeguards inspection conducted by Mr. G. L. Pirtle of this office on March 30 through April 3, 1987, of activities at the Quad Cities Nuclear Generating Station, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-29 and No. DPR-30 and to the discussion of our findings with Mr. R. Bax and other members of your staff at the conclusion of the inspectio The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personne No violations of NRC requirements were identified during the course of this inspectio Sections 4.c and 5.a of the Report Details identify commitments to address two inspection concerns. Please advise us in writing, within 30 days, if our understanding of your commitments is incorrec Areas examined during this inspection concern a subject matter which is exempt from disclosure according to Part 73, Title 10, Code of Federal Regulations, Section 73.21(c)(2). This information must be handled and protected in accordance with the provisions of 10 CFR 73.21. Consequently, our report of this inspection will not be placed in the NRC Public Document Roo We will gladly discuss any questions you have concerning this inspectio


Sincerely, 8704220086 870415 W. L. Axelson, Chief PDR ADOCK 05000254 G  PDR  Nuclear Materials Safety and Safeguards Branch Enclosure: Inspection Reports No. 50-254/87007(DRSS); and No. 50-265/87007(DRSS)
==REGION III==
  (UNCLASSIFIED )
Reports No. 50-254/87007(DRSS); 50-265/87007(DRSS)
p/g6$
Docket Nos. 50-254; 50-265  Licenses No. DPR-29; DPR-30 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: Quad Cities Nuclear Power Station, Units 1 and 2 Inspection At: Quad Cities Site, Cordova, Illinois Inspection Conducted: March 30 through April 3, 1987 Date of Previous Physical Security Inspection: September 16-19, 1985 Type of Inspection: Unannounced Physical Security Inspector: S$MM o    4 Is l 9Il G. L. Pirtle    Date Physical Security Inspector Approved By:    Y!87
See Attached Distribution RIII M RIII Pir11e/mnj / -G s son Enclosure contains
  [y.R. Creed, Chief   Date L5afeguards Section Inspection Summary Inspection on March 30 through April 3,1987 (Reports No. 50-254/87007(DRSS);
  ,@9 I
No. 50-265/87007(DRSS)
    - r Upon separation this 4/mlB7  ?^^^ l ' "- m
Areas Inspected: Included a review of Security Plan and Procedures, Management Effectiveness-Security Program; Security Organization; Security Program Audit, Records and Reports; Testing and Maintenance; Physical Barriers-Vital and Protected Areas; Compensatory Measures; Security System Power Supply; Lighting; Assessment Aids; Access Control-Personnel and Packages; Detection Aids-Vital Areas; Alarm Stations; Security Force Training and Qualification Plan; Security Force Contingency Plan; and Licensee's Actions on IE Information Notice No. 86-91
    -- ly page is Decontrolled
  " Limiting Access." The inspection was conducted by one NRC inspector and was initiated during the dayshif Results: The licensee was found to be in compliance with NRC requirements in the areas examined during the inspectio PDR ADOCK 05000254    Enclosure contains O PDR Upon separation this
  . - ._ _ _ - . _ _ dbr i+u ul u uA>th W __
. .
  ..
  -_ _ _ _ _ _ _ _ _ _ _ _
page is Decontrolled


'o        " -~
tr
    .
  .'
  . 0 O A :~ ~ A
      '
A"'^ ' ' '-^ % ll A TIQ M
-
va  _u w hi\ 30 MU T y ni tuli


Commonwealth Edison Company    2  APR 151987 Distribution cc w/ enclosure:
Two concerns were noted during the inspection. One concern pertained to assigning a person to the position of Assistant Site Security Administrato The other concern pertained to more timely removal of security badges from the security computer system when need for unescorted access had terminate The licensee's immediate actions resolved the initial concerns. Significant improvements and upgrading of several major components of the security system were note (Details - UNCLASSIFIED )
D. L. Farrar, Director of Nuclear Licensing R. L. Bax, Plant Manager IE File IE/DI/0RPB IE/ES NMSS/SGPL NRR/PWR-B/SSPB cc w/ enclosures, w/o UNCLASSIFIED SAFEGUARDS INFORMATION:
i
DCS/RSB (RIDS)
 
Licensing Fee Management Branch Resident Inspector, RIII Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division
I (
>
Enclosure contatns 2 Upon separation this page is Decontrolled
:
___
i wQf
    !"f Iw g t    Enclosure contains
      .
t).[O 9E4 A T'^ * '
        ,, Upon separation this j        page is Decontrolled
- - . . - - . - _ _ _ . _ _ . _ _ _ _ . _ . - - - . _ - _ _ . _ _ _ . -  --
        . - - . _- _ _- _ . - . _ . -
}}
}}

Latest revision as of 03:57, 6 December 2021

Partially Withheld Insp Repts 50-254/87-07 & 50-265/87-07 on 870330-0403 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Plan & Procedures,Mgt effectiveness- Security Organization & Security Program Audit
ML20206R110
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/14/1987
From: Creed J, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20206R031 List:
References
50-254-87-07, 50-254-87-7, 50-265-87-07, 50-265-87-7, NUDOCS 8704220103
Download: ML20206R110 (2)


Text

- ___ _

o U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Reports No. 50-254/87007(DRSS); 50-265/87007(DRSS)

Docket Nos. 50-254; 50-265 Licenses No. DPR-29; DPR-30 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: Quad Cities Nuclear Power Station, Units 1 and 2 Inspection At: Quad Cities Site, Cordova, Illinois Inspection Conducted: March 30 through April 3, 1987 Date of Previous Physical Security Inspection: September 16-19, 1985 Type of Inspection: Unannounced Physical Security Inspector: S$MM o 4 Is l 9Il G. L. Pirtle Date Physical Security Inspector Approved By: Y!87

[y.R. Creed, Chief Date L5afeguards Section Inspection Summary Inspection on March 30 through April 3,1987 (Reports No. 50-254/87007(DRSS);

No. 50-265/87007(DRSS)

Areas Inspected: Included a review of Security Plan and Procedures, Management Effectiveness-Security Program; Security Organization; Security Program Audit, Records and Reports; Testing and Maintenance; Physical Barriers-Vital and Protected Areas; Compensatory Measures; Security System Power Supply; Lighting; Assessment Aids; Access Control-Personnel and Packages; Detection Aids-Vital Areas; Alarm Stations; Security Force Training and Qualification Plan; Security Force Contingency Plan; and Licensee's Actions on IE Information Notice No. 86-91

" Limiting Access." The inspection was conducted by one NRC inspector and was initiated during the dayshif Results: The licensee was found to be in compliance with NRC requirements in the areas examined during the inspectio PDR ADOCK 05000254 Enclosure contains O PDR Upon separation this

. .

..

-_ _ _ _ _ _ _ _ _ _ _ _

page is Decontrolled

tr

.'

Two concerns were noted during the inspection. One concern pertained to assigning a person to the position of Assistant Site Security Administrato The other concern pertained to more timely removal of security badges from the security computer system when need for unescorted access had terminate The licensee's immediate actions resolved the initial concerns. Significant improvements and upgrading of several major components of the security system were note (Details - UNCLASSIFIED )

i

I (

Enclosure contatns 2 Upon separation this page is Decontrolled

___