{{#Wiki_filter:c JUL 161986 Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Electric Company ATTN: Mr. John E. Dolan Vice Chairman Engineering and Construction 1 Riverside Plaza Columbus, OH 43216 Gentlemen:
{{#Wiki_filter:c JUL 161986 Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Electric Company ATTN: Mr. John E. Dolan Vice Chairman Engineering and Construction 1 Riverside Plaza Columbus, OH 43216 Gentlemen:
By letter dated June 27, 1986, you requested a temporary waiver from the requirements of Technical Specification 3.8.1.1 concerning operability of the Emergency Diesel Generators. At that time, D. C. Cook Unit 2 was in Mode 3 (Hot Standby) and the extension was requested to evaluate and take corrective action relative to an apparent Service Water leak into the Emergency Diesel Generator lube oil system.
By {{letter dated|date=June 27, 1986|text=letter dated June 27, 1986}}, you requested a temporary waiver from the requirements of Technical Specification 3.8.1.1 concerning operability of the Emergency Diesel Generators. At that time, D. C. Cook Unit 2 was in Mode 3 (Hot Standby) and the extension was requested to evaluate and take corrective action relative to an apparent Service Water leak into the Emergency Diesel Generator lube oil system.
Following evaluation of your request, my staff indicated to you on June 27 that I would grant an extension for the period required to issue an emergency Technical Specification change. However, on June 29, 1986 you elected to place Unit 2 in cold shutdown to repair a leaking Pressurizer Spray Valve.
Following evaluation of your request, my staff indicated to you on June 27 that I would grant an extension for the period required to issue an emergency Technical Specification change. However, on June 29, 1986 you elected to place Unit 2 in cold shutdown to repair a leaking Pressurizer Spray Valve.
This action obviated the need ior the request by placing the unit in a mode not required by the Technical specifications.
This action obviated the need ior the request by placing the unit in a mode not required by the Technical specifications.

Latest revision as of 21:54, 5 December 2021

Notifies That Util 860629 Elective to Shut Down Unit 2 to Repair Leaking Pressurizer Spray Valve Obviated Need for 860627 Request for Waiver from Tech Spec 3.8.1.1 Re Operability of Emergency Diesel Generators
ML20207E831
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/16/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
References
NUDOCS 8607220434
Download: ML20207E831 (1)


Text

c JUL 161986 Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Electric Company ATTN: Mr. John E. Dolan Vice Chairman Engineering and Construction 1 Riverside Plaza Columbus, OH 43216 Gentlemen:

By letter dated June 27, 1986, you requested a temporary waiver from the requirements of Technical Specification 3.8.1.1 concerning operability of the Emergency Diesel Generators. At that time, D. C. Cook Unit 2 was in Mode 3 (Hot Standby) and the extension was requested to evaluate and take corrective action relative to an apparent Service Water leak into the Emergency Diesel Generator lube oil system.

Following evaluation of your request, my staff indicated to you on June 27 that I would grant an extension for the period required to issue an emergency Technical Specification change. However, on June 29, 1986 you elected to place Unit 2 in cold shutdown to repair a leaking Pressurizer Spray Valve.

This action obviated the need ior the request by placing the unit in a mode not required by the Technical specifications.

Should any questions remain regarding this matter, I would be glad to discuss them with you.

Sincerely, O ri gi n d c W :'I D 72 f5 5

.+. ; 0 f ; if P

James G. Keppler Regional Administrator cc: W. G. Smith, Jr. , Plant Manager -

DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII i

Ronald Callen, Michigan Puolic Service Commission EIS Coordinator, USEPA Region 5 Office i Nuclear Facilities and I Environmental Monitoring Section D. L. Wigginton, Project Manager, Office of Nuclear Reactor Regulation RIII RI RI ,

l Bur 07/ 9/86

/qg Gul' . nd [ 74%

Davi K ' pl er Nof 0 7})y fp ,16 26 i