IR 05000454/2021401: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:March 24, 2021 | ||
==SUBJECT:== | |||
BYRON STATION - SECURITY BASELINE INSPECTION REPORT 05000454/2021401 AND 05000455/2021401 | |||
==Dear Mr. Rhoades:== | |||
On March 1, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station and discussed the results of this inspection with Mr. Curtis Catencamp and other members of your staff. The results of this inspection are documented in the enclosed report. | |||
No findings or violations of more than minor significance were identified during this inspection. | |||
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, | |||
/RA/ | |||
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66 | |||
===Enclosure:=== | |||
As stated | |||
==Inspection Report== | |||
Docket Numbers: 05000454 and 05000455 License Numbers: NPF-37 and NPF-66 Report Numbers: 05000454/2021401 and 05000455/2021401 Enterprise Identifier: I-2021-401-0112 Licensee: Exelon Generation Company, LLC Facility: Byron Station Location: Byron, IL Inspection Dates: January 12, 2021 to March 01, 2021 Inspectors: A. Anderson, Physical Security Inspector G. Bonano, Physical Security Inspector J. Gilliam, Physical Security Inspector J. Kutlesa, Physical Security Inspector Approved By: Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Enclosure | |||
=SUMMARY= | |||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | |||
===List of Findings and Violations=== | |||
No findings or violations of more than minor significance were identified. | |||
===Additional Tracking Items=== | |||
None. | |||
=INSPECTION SCOPES= | |||
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at: | |||
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. | |||
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could be performed, in part, remotely. | |||
==SAFEGUARDS== | |||
==71130.01 - Access Authorization== | |||
The inspectors evaluated the access authorization program through completion of the following | |||
===inspection elements: Access Authorization=== | |||
{{IP sample|IP=IP 71130.01|count=1}} | |||
(1) | |||
* Tier I: All | |||
* Tier II: 02.05 a; 02.06 a, c; 02.07 a, b; 02.08 a, c | |||
* Tier III: 02.09; 02.10 a, b; 02.11 a | |||
==71130.02 - Access Control== | |||
The inspectors evaluated the access control program through completion of the following | |||
===inspection elements: Access Control=== | |||
{{IP sample|IP=IP 71130.02|count=1}} | |||
(1) | |||
* Tier I: All | |||
* Tier II: 02.06 a - c; 02.07 a; 02.08 a, c, f, i | |||
* Tier III: 02.09; 02.10 a | |||
==OTHER ACTIVITIES - BASELINE== | |||
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below: | |||
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17) | |||
=== | |||
{{IP sample|IP=IP 71151|count=1}} | |||
The inspectors verified licensee performance indicators submittals listed below | |||
: (1) August 2020 - January | |||
==INSPECTION RESULTS== | |||
No findings were identified. | |||
==EXIT MEETINGS AND DEBRIEFS== | |||
The inspectors verified no proprietary information was retained or documented in this report. | |||
* On March 1, 2021, the inspectors presented the security baseline inspection results to Mr. Curtis Catencamp and other members of the licensee staff. | |||
=DOCUMENTS REVIEWED= | |||
Inspection Type Designation Description or Title Revision or | |||
Procedure Date | |||
71130.01 Corrective Action AR 4308339 Security Programs Audit Report; NOSA-BYR-20-02 01/21/2020 | |||
Documents through | |||
2/14/2020 | |||
AR 4394288 Security Programs Audit Exit Meeting Handout; Audit NOSA- 01/19/2021 | |||
BYR-21-01 through | |||
2/05/2021 | |||
Procedures SY-AA-103-500- Critical Group Inclusion Removal Form 002 | |||
F-04 | |||
SY-AA-103-500- Exelon Legal Action Self-Reporting Form 002 | |||
F-05 | |||
SY-AA-103-500- Maintaining Unescorted Access Authorization 000 | |||
F-07 | |||
SY-AA-103-500- Behavior Observation Program (BOP) - Annual Supervisor 000 | |||
F-09 Review | |||
SY-AA-103-506 Utilizing The Personnel Access Data System (PADS) 016 | |||
SY-AA-103-506- Request For Information 000 | |||
F-01 | |||
SY-AA-103-506- PADS Monthly Review Form 000 | |||
F-02 | |||
SY-AA-103-507 Review Criteria For Determining Trustworthiness and 007 | |||
Reliability | |||
SY-AA-103-507- Access Authorization Fitness For Duty Determination-of- 000 | |||
F-02 Fitness Review | |||
SY-AA-103-507- Adjudication of Potentially Disqualifying Information (PDI) 000 | |||
F-03 | |||
SY-AA-103-507- Exelon Access Authorization (Licensee Employee) Reported 000 | |||
F-06 Legal Action | |||
SY-AA-103-507- Exelon Access Authorization (Contractor Employee) 000 | |||
F-07 Reported Legal Action | |||
SY-AA-103-511 Access Authorization In-processing, Out-processing of 026 | |||
Personnel | |||
SY-AA-103-511- Access Request Form 002 | |||
Inspection Type Designation Description or Title Revision or | |||
Procedure Date | |||
F-01 | |||
SY-AA-103-511- Request for Permanent Security Access Status Level 000 | |||
F-02 | |||
SY-AA-103-511- Out-processing Checklist, Non-outage Contractor Personnel 001 | |||
F-04 | |||
SY-AA-103-511- Out-processing Checklist, Outage Contractor Personnel 001 | |||
F-05 | |||
71130.02 Corrective Action AR 04400320 NOS ID- Annual Malware Scans Were Not Completed 02/04/2021 | |||
Documents | |||
Procedures SY-AA-101-106 Control and Classification of Safeguards Information (SGI) 021 | |||
and Sensitive Unclassified Non-Safeguards Information | |||
(SUNSI) | |||
SY-AA-101-112- Protected Area Search Processes 4 | |||
1004 | |||
SY-AA-101-112- Owner Controlled Area Inspection Processes 2 | |||
1005 | |||
SY-AA-101-112- Protected Area Entry - Vehicle Search 9 | |||
F-06 | |||
SY-AA-101-115 Controlling Gates and Power Operated Active Vehicle 15 | |||
Barriers | |||
SY-AA-101-117- Visitor/Vehicle Registration Log; multiple date entries 003; 10/2020 | |||
F-03 - 01/2021 | |||
SY-BY-101-112- Owner Controlled Area (OCA) Receiving Building Search 3 | |||
1001 Activities | |||
71151 Miscellaneous LS-AA-2160 Rev Security Performance Indicator Reports, IDS Compensatory Rev 005 for | |||
5-2020-08, 09, Measures Sheet and Supporting SERs and ARs 08/01/2020 - | |||
10, 11, 12 and 01/31/2021 | |||
2160-2021-01; | |||
SY-AA-101-155- | |||
F-01, Rev 3 | |||
6 | |||
}} | }} |
Revision as of 13:35, 9 September 2021
ML21083A104 | |
Person / Time | |
---|---|
Site: | Byron |
Issue date: | 03/24/2021 |
From: | Steven Orth Plant Support Branch II |
To: | Rhodes D Exelon Generation Co, Exelon Nuclear |
References | |
IR 2021401 | |
Download: ML21083A104 (8) | |
Text
March 24, 2021
SUBJECT:
BYRON STATION - SECURITY BASELINE INSPECTION REPORT 05000454/2021401 AND 05000455/2021401
Dear Mr. Rhoades:
On March 1, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station and discussed the results of this inspection with Mr. Curtis Catencamp and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000454 and 05000455 License Numbers: NPF-37 and NPF-66 Report Numbers: 05000454/2021401 and 05000455/2021401 Enterprise Identifier: I-2021-401-0112 Licensee: Exelon Generation Company, LLC Facility: Byron Station Location: Byron, IL Inspection Dates: January 12, 2021 to March 01, 2021 Inspectors: A. Anderson, Physical Security Inspector G. Bonano, Physical Security Inspector J. Gilliam, Physical Security Inspector J. Kutlesa, Physical Security Inspector Approved By: Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could be performed, in part, remotely.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program through completion of the following
inspection elements: Access Authorization
(1)
- Tier I: All
- Tier II: 02.05 a; 02.06 a, c; 02.07 a, b; 02.08 a, c
- Tier III: 02.09; 02.10 a, b; 02.11 a
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
(1)
- Tier I: All
- Tier II: 02.06 a - c; 02.07 a; 02.08 a, c, f, i
- Tier III: 02.09; 02.10 a
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17)
=
The inspectors verified licensee performance indicators submittals listed below
- (1) August 2020 - January
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On March 1, 2021, the inspectors presented the security baseline inspection results to Mr. Curtis Catencamp and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.01 Corrective Action AR 4308339 Security Programs Audit Report; NOSA-BYR-20-02 01/21/2020
Documents through
2/14/2020
AR 4394288 Security Programs Audit Exit Meeting Handout; Audit NOSA- 01/19/2021
BYR-21-01 through
2/05/2021
Procedures SY-AA-103-500- Critical Group Inclusion Removal Form 002
F-04
SY-AA-103-500- Exelon Legal Action Self-Reporting Form 002
F-05
SY-AA-103-500- Maintaining Unescorted Access Authorization 000
F-07
SY-AA-103-500- Behavior Observation Program (BOP) - Annual Supervisor 000
F-09 Review
SY-AA-103-506 Utilizing The Personnel Access Data System (PADS) 016
SY-AA-103-506- Request For Information 000
F-01
SY-AA-103-506- PADS Monthly Review Form 000
F-02
SY-AA-103-507 Review Criteria For Determining Trustworthiness and 007
Reliability
SY-AA-103-507- Access Authorization Fitness For Duty Determination-of- 000
F-02 Fitness Review
SY-AA-103-507- Adjudication of Potentially Disqualifying Information (PDI) 000
F-03
SY-AA-103-507- Exelon Access Authorization (Licensee Employee) Reported 000
F-06 Legal Action
SY-AA-103-507- Exelon Access Authorization (Contractor Employee) 000
F-07 Reported Legal Action
SY-AA-103-511 Access Authorization In-processing, Out-processing of 026
Personnel
SY-AA-103-511- Access Request Form 002
Inspection Type Designation Description or Title Revision or
Procedure Date
F-01
SY-AA-103-511- Request for Permanent Security Access Status Level 000
F-02
SY-AA-103-511- Out-processing Checklist, Non-outage Contractor Personnel 001
F-04
SY-AA-103-511- Out-processing Checklist, Outage Contractor Personnel 001
F-05
71130.02 Corrective Action AR 04400320 NOS ID- Annual Malware Scans Were Not Completed 02/04/2021
Documents
Procedures SY-AA-101-106 Control and Classification of Safeguards Information (SGI) 021
and Sensitive Unclassified Non-Safeguards Information
(SUNSI)
SY-AA-101-112- Protected Area Search Processes 4
1004
SY-AA-101-112- Owner Controlled Area Inspection Processes 2
1005
SY-AA-101-112- Protected Area Entry - Vehicle Search 9
F-06
SY-AA-101-115 Controlling Gates and Power Operated Active Vehicle 15
Barriers
SY-AA-101-117- Visitor/Vehicle Registration Log; multiple date entries 003; 10/2020
F-03 - 01/2021
SY-BY-101-112- Owner Controlled Area (OCA) Receiving Building Search 3
1001 Activities
71151 Miscellaneous LS-AA-2160 Rev Security Performance Indicator Reports, IDS Compensatory Rev 005 for
5-2020-08, 09, Measures Sheet and Supporting SERs and ARs 08/01/2020 -
10, 11, 12 and 01/31/2021
2160-2021-01;
SY-AA-101-155-
F-01, Rev 3
6