IR 07200202/2000001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20259A154
| number = ML20346A100
| issue date = 08/13/2020
| issue date = 11/06/2020
| title = Electric Boat Corporation, NRC Form 591M Part 1, Inspection Report No. 03003772/2020001
| title = C&C Irradiator Service, LLC, NRC Form 591M Part 1, Inspection Report No. 03039072/2020001
| author name = Reichard M
| author name = Ragland R
| author affiliation = NRC/RGN-I/DNMS
| author affiliation = NRC/RGN-I/DNMS
| addressee name = Plante J
| addressee name =  
| addressee affiliation = Electric Boat Corp
| addressee affiliation = C&C Irradiator Service, LLC
| docket = 03003772
| docket = 03039072
| license number = 06-01781-08
| license number = 08-35447-01
| contact person =  
| contact person =  
| document report number = IR 2020001
| document report number = IR 2020001
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:NRC FORM 591M PART 1       U.S. NUCLEAR REGULATORY COMMISSION (07-2012)
{{#Wiki_filter:NRC FORM 591M PART 1     U.S. NUCLEAR REGULATORY COMMISSION (07-2012)*
10 CFR 2.201 SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION 1. LICENSEE/LOCATION INSPECTED    2. NRC/REGIONAL OFFICE Electric Boat Corporation    Region 1 75 Eastern Point Road    2100 Renaissance Blvd Groton, CT 06340-4989    Suite 100 King of Prussia, PA 19406-2713 REPORT NUMBER(s) 2020001 3. DOCKET NUMBER(S)  4. LICENSE NUMBER(S)  5. DATE(S) OF INSPECTION 030-03772   06-01781-08    08/11/2020 - 08/13/2020 LICENSEE:
10 CFR 2.201 SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION 1. LICENSEE/LOCATION INSPECTED:   2. NRC/REGIONAL OFFICE C&C Irradiator Service, LLC 1030 Evarts Street, NE    U.S. Nuclear Regulatory Commission Washington, DC 20018 & Indianapolis, IN jobsite  Region I, 2100 Renaissance Blvd, Suite 100 King of Prussia, Pennsylvania 19406-2713 REPORT NUMBER(S) 2020-001 3. DOCKET NUMBER(S)  4. LICENSE NUMBER(S)  5. DATE(S) OF INSPECTION 030-39072   08-35447-01  October 10 - 17, and 11/06/2020 LICENSEE:
The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear Regulatory Commission (NRC ) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. The inspection findings are as follows:
The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. The inspection findings are as follows:
1. Based on the inspection findings, no violations were identifie o 2. Previous violation(s) close o 3.The violations(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to exercise discretion, were satisfie Non-cited violation(s) were discussed involving the following requirement(s):
x 1. Based on the inspection findings, no violations were identifie . Previous violation(s) close . The violation(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to exercise discretion, were satisfie Non-cited violation(s) were discussed involving the following requirement(s) and corrective action(s):
o 4. During this inspection, certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being cited in accordance with the NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance with 10 CFR 19.11. (Violations and Corrective Actions)
4. During this inspection, certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being cited in accordance with the NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance with 10 CFR 19.11. (Violations and Corrective Actions)
Statement of Corrective Actions I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified. This statement of corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken, date when full compliance will be achieved). I understand that no further written response to NRC will be required, unless specifically requeste TITLE   PRINTED NAME   SIGNATURE   DATE LICENSEE'S REPRESENTATIVE Michael Reichard NRC INSPECTOR     Michael C. Reichard Digitally signed by Michael C. Reichard Date: 2020.09.12 12:38:54 -04'00'
Statement of Corrective Actions I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified. This statement of corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken, date when full compliance will be achieved). I understand that no further written response to NRC will be required, unless specifically requeste Title   Printed Name   Signature   Date LICENSEES REPRESENTATIVE NRC INSPECTOR Deborah A. Piskura, Sr. Health Physicist Randolph C. Ragland Digitally signed by Randolph C. Ragland Date: 2020.11.09 14:22:13 -05'00'
Christopher Cahill BRANCH CHIEF Christopher G. Cahill Digitally signed by Christopher G. Cahill Date: 2020.09.14 10:29:23 -04'00'
Randolph Ragland, Sr. Health Physicist RCR for DAP BRANCH CHIEF     Christopher G. Cahill Digitally signed by Christopher G. Cahill Date: 2020.11.09 15:19:30 -05'00'
NRC FORM 591M PART 1 (07/2012)         Page 1 of 1
*NRC FORM 591M PART 1 (07-2012) (RI Rev. 09/12/2013) G:\WBL Documents\WBL Inspection Records\R08-35447-01.2020001.591M-Part1.doc SUNSI Review Completed By:  / RA / R. C. Ragland  x Public x Non-Sensitive This document becomes an NRC Official Agency Record once it is signed by the Branch Chief
}}
}}

Latest revision as of 01:15, 7 February 2021

C&C Irradiator Service, LLC, NRC Form 591M Part 1, Inspection Report No. 03039072/2020001
ML20346A100
Person / Time
Site: 03039072, 07200202
Issue date: 11/06/2020
From: Randolph Ragland
Division of Nuclear Materials Safety I
To:
C&C Irradiator Service
References
IR 2020001
Download: ML20346A100 (1)


Text

NRC FORM 591M PART 1 U.S. NUCLEAR REGULATORY COMMISSION (07-2012)*

10 CFR 2.201 SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION 1. LICENSEE/LOCATION INSPECTED: 2. NRC/REGIONAL OFFICE C&C Irradiator Service, LLC 1030 Evarts Street, NE U.S. Nuclear Regulatory Commission Washington, DC 20018 & Indianapolis, IN jobsite Region I, 2100 Renaissance Blvd, Suite 100 King of Prussia, Pennsylvania 19406-2713 REPORT NUMBER(S) 2020-001 3. DOCKET NUMBER(S) 4. LICENSE NUMBER(S) 5. DATE(S) OF INSPECTION 030-39072 08-35447-01 October 10 - 17, and 11/06/2020 LICENSEE:

The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. The inspection findings are as follows:

x 1. Based on the inspection findings, no violations were identifie . Previous violation(s) close . The violation(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to exercise discretion, were satisfie Non-cited violation(s) were discussed involving the following requirement(s) and corrective action(s):

4. During this inspection, certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being cited in accordance with the NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance with 10 CFR 19.11. (Violations and Corrective Actions)

Statement of Corrective Actions I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified. This statement of corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken, date when full compliance will be achieved). I understand that no further written response to NRC will be required, unless specifically requeste Title Printed Name Signature Date LICENSEES REPRESENTATIVE NRC INSPECTOR Deborah A. Piskura, Sr. Health Physicist Randolph C. Ragland Digitally signed by Randolph C. Ragland Date: 2020.11.09 14:22:13 -05'00'

Randolph Ragland, Sr. Health Physicist RCR for DAP BRANCH CHIEF Christopher G. Cahill Digitally signed by Christopher G. Cahill Date: 2020.11.09 15:19:30 -05'00'

  • NRC FORM 591M PART 1 (07-2012) (RI Rev. 09/12/2013) G:\WBL Documents\WBL Inspection Records\R08-35447-01.2020001.591M-Part1.doc SUNSI Review Completed By: / RA / R. C. Ragland x Public x Non-Sensitive This document becomes an NRC Official Agency Record once it is signed by the Branch Chief