{{#Wiki_filter:'D; Commonwealth            Edison
              ) One First N;tional Pl n, Chicigo, Illinois
('O    ~7 Addr:ss R: ply to: Post Offica 807767 (j Chicago lilinois 60690 Novembe r 12, 1982 Mr. Jame s G. Keppler, Regional Administrator Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL          60137
 
==Subject:==
LaSalle County Station, Units 1 and 2 RHR System Pressure Switches 10 CFR 50.55(e) Final Report 82-09 NRC Docket No s . 5 0-37 3 a n d 5 0-37 4
 
==Dear Mr. Keppler:==
 
Commonwealth Edison notified your of fice on October 13, 1982 of a def. :lency in accordance with 10CFR50.55(e) concerning pressure swit nes installed on the RHR system.
These components were furnished as part of the NSSS contract. General Electric Co. has reviewed the situation and has verbally indicated that the pressure rating mismatch is unique to the LaSalle site and further it appears isolated a t LaSalle. Th ese components serve a dual function.                          Their pressure rating was adequate for their primary function but during steam condensing mode of ,the RHR system, their ratings were inadequate.
The intended corrective action will be to install adequate pressure switches prior to fuel load for Unit 2.                            It is presently, anticipated that the components will be shipped to the site on or about December 10, 1982.                  It is expected that they will be installed on Unit 1 by February 1,1983. As indicated this is considered a final report for LaSalle County Station Units 1 and 2.
Please address any questions on this matter to this of fice.
Very truly yours, C
4/m/st-
[                                                          C. W. Schroeder Nuclear Licensing Administrator 1m cc:    Director o f In spection and l            En fo rcemen t , Washington, D .C.
t NRC Resident Inspector                    LSCS                                        hk}
5411N        8211190226 821112                                                        HOV i 2 996 PDR ADOCK 05000373 S                        PDR}}

Latest revision as of 11:38, 21 December 2020

Final Deficiency Rept 82-09 Re Pressure Switches Installed on RHR Sys.Ge Will Install Adequate Pressure Switches Prior to Fuel Load on Unit 2.Completion Expected by 830201
ML20066F905
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/12/1982
From: Schroeder C
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 5411N, 82-09, 82-9, NUDOCS 8211190226
Download: ML20066F905 (1)


Text

'D; Commonwealth Edison

) One First N;tional Pl n, Chicigo, Illinois

('O ~7 Addr:ss R: ply to: Post Offica 807767 (j Chicago lilinois 60690 Novembe r 12, 1982 Mr. Jame s G. Keppler, Regional Administrator Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

LaSalle County Station, Units 1 and 2 RHR System Pressure Switches 10 CFR 50.55(e) Final Report 82-09 NRC Docket No s . 5 0-37 3 a n d 5 0-37 4

Dear Mr. Keppler:

Commonwealth Edison notified your of fice on October 13, 1982 of a def. :lency in accordance with 10CFR50.55(e) concerning pressure swit nes installed on the RHR system.

These components were furnished as part of the NSSS contract. General Electric Co. has reviewed the situation and has verbally indicated that the pressure rating mismatch is unique to the LaSalle site and further it appears isolated a t LaSalle. Th ese components serve a dual function. Their pressure rating was adequate for their primary function but during steam condensing mode of ,the RHR system, their ratings were inadequate.

The intended corrective action will be to install adequate pressure switches prior to fuel load for Unit 2. It is presently, anticipated that the components will be shipped to the site on or about December 10, 1982. It is expected that they will be installed on Unit 1 by February 1,1983. As indicated this is considered a final report for LaSalle County Station Units 1 and 2.

Please address any questions on this matter to this of fice.

Very truly yours, C

4/m/st-

[ C. W. Schroeder Nuclear Licensing Administrator 1m cc: Director o f In spection and l En fo rcemen t , Washington, D .C.

t NRC Resident Inspector LSCS hk}

5411N 8211190226 821112 HOV i 2 996 PDR ADOCK 05000373 S PDR