                                          DEC 051985                            /
          Docket No. 50-508
          Washington Public Power Supply System
          P. O. Box 1223
          Elma, Washington 98541
          Attention:    Mr. D. W. Mazur
                        Managing Director
  ,      Gentlemen:
          Subject: NRC Inspection - WNP-3
          This refers to the routine inspection conducted by Mr. W. P. Ang of this
          office on November 18-21, of activities authorized by NRC Construction Permit
          No. CPPR-154, and to the discussion of our findings held by Mr. Ang with
          Mr. C. E. Love and other members of your staff at the conclusion of the
          inspection.
          Areas examined during this inspection are described in the enclosed inspection
          report. Within these areas, the inspection consisted of selective
          examinations of procedures and representative records, interviews with
          personnel, and observations by the inspector.
          No violations of NRC requirements were identified within the scope of this
          inspection.
          In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
          will be placed in the NRC Public Document Room.
          Should you have any questions concerning this inspection, we will be glad to
          discuss them with you.
                                                Sincerely,
                                                              Original signed b'y
                                                                D. F. Kirsch
                                                D. F. Kirsch, Deputy Director
                                                Division of Reactor Safety and Projects
          Enclosure:
          Inspection Report No. 50-508/85-10
          cc w/ enclosure:
          A. D. Kohler, WPPSS
          R. B. Glasscock, WPPSS                  ,
          L. J. Garvin, WPPSS
          J. D. Martin, WPPSS
          State of WA
                                                            '
          bec: RSB/ Document Control Desk (RIDS)
l        Mr. J. Martin;    Mr. B. Faulkenberry;    G. Cook; Resident Inspector
                                                    *
l        RV  yp.                          g&*.-
          Wang:dh            dds        AChaffee        DKirs
          12/5/85          12/f/85        12/ y/85        12/ /85
    8512240079    851205
    PDR
    O      ADOCK 05000508
                        PDR
                                                                                    [    I I
}}
}}

Latest revision as of 07:03, 22 July 2020

Forwards Insp Rept 50-508/85-10 on 851118-21.No Violations Noted
ML20138N590
Person / Time
Site: Satsop
Issue date: 12/05/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20138N592 List:
References
NUDOCS 8512240079
Download: ML20138N590 (1)


See also: IR 05000508/1985010

Text

\

DEC 051985 /

Docket No. 50-508

Washington Public Power Supply System

P. O. Box 1223

Elma, Washington 98541

Attention: Mr. D. W. Mazur

Managing Director

, Gentlemen:

Subject: NRC Inspection - WNP-3

This refers to the routine inspection conducted by Mr. W. P. Ang of this

office on November 18-21, of activities authorized by NRC Construction Permit

No. CPPR-154, and to the discussion of our findings held by Mr. Ang with

Mr. C. E. Love and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

No violations of NRC requirements were identified within the scope of this

inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

Original signed b'y

D. F. Kirsch

D. F. Kirsch, Deputy Director

Division of Reactor Safety and Projects

Enclosure:

Inspection Report No. 50-508/85-10

cc w/ enclosure:

A. D. Kohler, WPPSS

R. B. Glasscock, WPPSS ,

L. J. Garvin, WPPSS

J. D. Martin, WPPSS

State of WA

'

bec: RSB/ Document Control Desk (RIDS)

l Mr. J. Martin; Mr. B. Faulkenberry; G. Cook; Resident Inspector

l RV yp. g&*.-

Wang:dh dds AChaffee DKirs

12/5/85 12/f/85 12/ y/85 12/ /85

8512240079 851205

PDR

O ADOCK 05000508

PDR

[ I I