MONTHYEARML20212H5071999-09-27027 September 1999 Application for Amends to Licenses DPR-44 & DPR-56,change Application ECR 96-01511,to Revise TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20211M7081999-09-0101 September 1999 Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2 ML20210P8811999-08-11011 August 1999 Application for Amends to Licenses DPR-44 & DPR-56 in Order to Clarify PBAPS Licensing Basis to Include Specific Info Re Allowed Containment Overpressure Credit Needed to Ensure Adequate NPSH Available for ECCS Pumps.Ufsar Changes,Encl ML20210N0711999-08-0606 August 1999 Exigent License Change Application ECR 99-01727 for Licenses DPR-44 & DPR-56,incorporating Note Into TS Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20209F7641999-07-12012 July 1999 License Change Application ECR 99-01255,revising TS Sections 2.1.1.2 & 5.6.5 by Incorporating Revised SLMCPR & Deleting Previously Added footnotes.Non-proprietary & Proprietary Info Re Slmcpr,Encl.Proprietary Info Withheld ML20209B9141999-07-0101 July 1999 Application ECR 99-01497 for Amend to Licenses DPR-44 & DPR-56,reflecting Change in Corporate Structure ML20205F6221999-03-29029 March 1999 Application for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2421999-03-0101 March 1999 License Amend Request ECR 98-01802 for Licenses DPR-44 & DPR-56,proposing Changes to Support PBAPS Mod P00507 Which Will Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term T/H Stability Solution Hardware ML20198N2471998-12-24024 December 1998 License Change Application ECR 96-01511,revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20236R3011998-07-10010 July 1998 Application for License Change ECR 98-01403,requesting Change to License DPR-44 Revising TS Section 2.0 & non-proprietary & Proprietary Versions of 980609 Addl Info Re 1.10 Cycle Specific Slmcpr.Proprietary Version Withheld ML20247C2481998-05-0101 May 1998 License Change Application ECR 98-00499 for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20217G7481998-03-20020 March 1998 License Change Application ECR 97-02809,revising Tech Specs to Incorporate end-of-cycle Recirculation Pump Trip Sys at Units 1 & 2 ML20217Q4631998-03-0202 March 1998 Application for Amend to License DPR-12,adding Requirements to TS to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4151998-02-0404 February 1998 Application for Amends to Licenses DPR-44 & DPR-56,revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20211H9171997-09-26026 September 1997 Application for Amend to License DPR-56,deleting Submitted Page 2.0-1 to Be Replaced W/Encl Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20141G4821997-06-30030 June 1997 License Change Request ECR 96-03620,revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8501997-06-0404 June 1997 License Change Application ECR 97-00086,revising TS Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of EDGs on ECCS Initiation During Listed Events ML20141L0081997-05-23023 May 1997 License Change Application ECR 96-02324,revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0721997-05-0909 May 1997 License Change Application ECR 96-00982,revising TS SR 3.6.1.3.16 Re Replacement Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141A7861997-05-0505 May 1997 Application for Amend to Licenses DPR-44 & DPR-56,requesting Approval for Implementation of Plant Mod to ECCS Pumps in Order to Satisfy Recommendations Stipulated in NRC Bulletin 96-003 ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML20137P7511997-03-31031 March 1997 License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20134F6091996-10-30030 October 1996 Application for Amend to License DPR-56,revising Slmcprs,Ts Section 2.0,by Incorporating Rev Due to GE Determination That Previous Calculation Is non-conservative ML20117L2821996-09-0606 September 1996 Application for Amends to Licenses DPR-44 & DPR-56 Adding Notes to Allow Core Spray & LPCI Pumps to Start out-of- Sequence Under Certain Conditions & Adding Notes to Selected Surveillance Requirements ML20117F9321996-08-27027 August 1996 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Error in TS Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6711996-08-23023 August 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits to Incorporate New Safety Limit Min Critical Power Ratios,Due to Use of GE13 Fuel Product Line ML20117M6981996-06-13013 June 1996 License Change Request ECR 96-02011 to License DPR-44, Permitting One Time Performance of SR 3.3.1.1.12 for APRM Flow Biased High Scram Function,W/Delayed Entry Into Associated TS Conditions & Required Actions for Up to Six H ML20101K7961996-03-25025 March 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits ML20100J7361996-02-15015 February 1996 License Change Request 95-11 to Licenses DPR-44 & DPR-56, Reflecting Implementation of 10CFR50,App J,Option B ML20095J1251995-12-21021 December 1995 TS Change Request 95-08,eliminating Outdated Matl from FOLs & Making FOL for Unit 2 Consistent W/Fol for Unit 3 ML20095J6971995-12-19019 December 1995 TS Change Request 95-13 to Licenses DPR-44 & DPR-56, Correcting Administrative Error in Improved Tech Specs Re Ventilation Filter Testing Program ML20095A1621995-11-30030 November 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Request 95-12,changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to 940 Psig ML20094Q6541995-11-21021 November 1995 Application for Amends to Licenses DPR-44 & DPR-56,changing SR for High Pressure Test of the HPCI & RCIC Sys. Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated ML20092L6251995-09-22022 September 1995 Informs of Change to Pbaps,Units 2 & 3 TS Bases,Figure 1.1-1.Change Allows PBAPS Units 2 & 3 to Maximize Generation Throughout Entire Fuel Cycle ML20092A2071995-09-0101 September 1995 Application for Amend to License DPR-56,consisting of Change Request 95-07,deleting License Condition 2.C ML20092B9361995-08-28028 August 1995 Rev E to TS Change Request (Tscr) 93-16 to Licenses DPR-44 & DPR-56 Re Implementation of Improved Ts.Rev E to Tscr 93-16 Redesignates Change Control Mechanism from 10CFR50.59,as Indicated Previously,To 10CFR50.54(a) for Six Listed Items ML20086Q4271995-07-21021 July 1995 Application for Amends to Licenses DPR-44 & DPR-56,proposing Overall Conversion of Current PBAPS TS to Improved TS as Contained in NUREG-1433, Std Ts,Ge Plants,BWR/4 ML20083Q7341995-05-16016 May 1995 Rev a to Tscr 93-16 Re Conversion to Improved TSs as Contained in NUREG-1433 ML20083K8581995-05-0909 May 1995 Application for Amend to Licenses DPR-44 & DPR-56,consisting of Change Request 93-16 Re Conversion of Current PBAPS TS to Improved TS ML20082M3191995-04-12012 April 1995 Suppl 2 to License Change Request 94-08,supporting Mod P00068-3,which Upgrades Major Components of TIP Sys to Correct Typo.Revised TS Page 186 Encl ML20087H0411995-04-10010 April 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Requests 94-11,94-12 & 94-13,relocating Certain Review & Audit Requirements to Plant UFSAR ML20082B2121995-03-23023 March 1995 Revised Page 4 to TS Change Request 90-03 ML20082B0491995-03-22022 March 1995 License Change Request 95-04 to Licenses DPR-44 & DPR-56, Reducing Local Leak Rate Test Hold Time Duration from One H to 20 Minutes ML20081H1261995-03-16016 March 1995 Application for Amends to Licenses DPR-44 & DPR-56 Re Requirements for SRMs While in Refueling Condition ML20080H0401995-02-10010 February 1995 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Errors Made During Past TS Changes ML20078A0531995-01-17017 January 1995 Application for Amends to Licenses DPR-44 & DPR-56,proposing to Change Source Range Monitor to Range Neutron Monotors & Delete Intermediate Range Monitors ML20077S6191995-01-13013 January 1995 License Change Request 94-07 to Licenses DPR-44 & DPR-56, Revising Allowed Time Between Signal Calibrs of LPRM from Every 6 Wks (Approx 1,000 EFPH) to Every 2,000 Megawatt Days Per Std Ton ML20077S4691995-01-13013 January 1995 License Change Request 94-08 to Licenses DPR-44 & DPR-56, Revising TS Tables 3.7.1 & 3.7.4 to Reflect Reduction in Number of Primary Containment Power Operated Outboard Valves for TIP Probes,Per PBAPS Mod P00068 ML20078L7541994-11-21021 November 1994 TS Change Request 94-14 to License DPR-56,re One Time Schedular Exemption from 10CFR50,App J,Section III.D.1(a) Concerning 10CFR50,App J Type a Test Intervals ML20078K7601994-11-17017 November 1994 License Change Request 93-13 to Licenses DPR-44 & DPR-56, Revising TS to Support Mods 5384 & 5386,upgrading Main Stack & Vent Stack Radiation Monitoring Sys 1999-09-27
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217K9761999-10-14014 October 1999 Amend 234 to License DPR-56,changing TS in Response to 990301 Application & Suppls ,1001 & 06,to Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Monitoring Sys ML20217B4261999-10-0505 October 1999 Amend 233 to License DPR-56,changing Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Repts ML20212H5071999-09-27027 September 1999 Application for Amends to Licenses DPR-44 & DPR-56,change Application ECR 96-01511,to Revise TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20216H6891999-09-24024 September 1999 Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively, Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by TSs SR 3.9.1.1 ML20211M7081999-09-0101 September 1999 Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2 ML20211D5471999-08-23023 August 1999 Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Correct Typo & Editorial Errors Introduced in TSs by Previous Amends ML20210P8811999-08-11011 August 1999 Application for Amends to Licenses DPR-44 & DPR-56 in Order to Clarify PBAPS Licensing Basis to Include Specific Info Re Allowed Containment Overpressure Credit Needed to Ensure Adequate NPSH Available for ECCS Pumps.Ufsar Changes,Encl ML20210N0711999-08-0606 August 1999 Exigent License Change Application ECR 99-01727 for Licenses DPR-44 & DPR-56,incorporating Note Into TS Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20209F7641999-07-12012 July 1999 License Change Application ECR 99-01255,revising TS Sections 2.1.1.2 & 5.6.5 by Incorporating Revised SLMCPR & Deleting Previously Added footnotes.Non-proprietary & Proprietary Info Re Slmcpr,Encl.Proprietary Info Withheld ML20209B9141999-07-0101 July 1999 Application ECR 99-01497 for Amend to Licenses DPR-44 & DPR-56,reflecting Change in Corporate Structure ML20205K7371999-04-0707 April 1999 Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively, Consisting of Changes to TS SRs Re Secondary Containment Doors in Response to 980204 Application,As Revised by ML20205F6221999-03-29029 March 1999 Application for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2421999-03-0101 March 1999 License Amend Request ECR 98-01802 for Licenses DPR-44 & DPR-56,proposing Changes to Support PBAPS Mod P00507 Which Will Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term T/H Stability Solution Hardware ML20198N2471998-12-24024 December 1998 License Change Application ECR 96-01511,revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20155C6011998-10-26026 October 1998 Amend 226 to License DPR-44,revising TSs for Safety Limit MCPR from Current Value of 1.11 to 1.10 for Two Recirculation Loop Operation & from 1.13 to 1.12 for Single Recirculation Loop Operation ML20154H4691998-10-0505 October 1998 Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Permit Incorporation of EOC-RPT Sys at Plant,Units 2 & 3 ML20154J2261998-10-0505 October 1998 Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20154G6551998-10-0101 October 1998 Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively, Revising Plant,Units 2 & 3 TSs to Exclude MSIV Leakage from Total Type B & Type C Local Leak Rate Test Results ML20153B9581998-09-14014 September 1998 Amend 9 to License DPR-12,adding Requirements for Control of Effluents & Annual Reporting Per 10CFR50.36a ML20238F2611998-08-24024 August 1998 Amend 222 to License DPR-44,revising Pbaps,Unit 2 TSs to Support Mod P00271,which Would Replace SRMs & IRMs W/Wrnms, During Forthcoming Outage 2R12,scheduled for Early Oct 1998 ML20236R3011998-07-10010 July 1998 Application for License Change ECR 98-01403,requesting Change to License DPR-44 Revising TS Section 2.0 & non-proprietary & Proprietary Versions of 980609 Addl Info Re 1.10 Cycle Specific Slmcpr.Proprietary Version Withheld ML20247C2481998-05-0101 May 1998 License Change Application ECR 98-00499 for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20217G7481998-03-20020 March 1998 License Change Application ECR 97-02809,revising Tech Specs to Incorporate end-of-cycle Recirculation Pump Trip Sys at Units 1 & 2 ML20217Q4631998-03-0202 March 1998 Application for Amend to License DPR-12,adding Requirements to TS to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4151998-02-0404 February 1998 Application for Amends to Licenses DPR-44 & DPR-56,revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20212G8261997-10-24024 October 1997 Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively, Changing TSs to Eliminate Inconsistency Between ECCS Operability Requirements & Autostart & Protective Trip Bypass of EDGs on ECCS Initiation Signal ML20217J5571997-10-0909 October 1997 Amend 225 to License DPR-56,revising MCPR Safety Limit in Section 2.1 of TSs from 1.07 to 1.11 for Two Recirculation Loops in Operation ML20217D8101997-09-30030 September 1997 Amend 224 to License DPR-56,revises TS to Support PBAPS Mod P00271,which Would Replace Source Range & Intermediate Range Monitors W/Wide Range Neutron Monitoring System ML20211H9171997-09-26026 September 1997 Application for Amend to License DPR-56,deleting Submitted Page 2.0-1 to Be Replaced W/Encl Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20216G5321997-09-0404 September 1997 Amends 220 & 223 to Licenses DPR-44 & DPR-56,respectively, Revising TS to Extend Replacement Frequency for Inflatable Seat Seals for Primary Containment Purge & Vent Valves to 96 Months ML20217M7961997-08-19019 August 1997 Amends 219 & 222 to Licenses DPR-44 & DPR-56,respectively, Extending APRM Flow Bias Instrumentation Surveillance Interval from 18 Months to 24 Months ML20141G4821997-06-30030 June 1997 License Change Request ECR 96-03620,revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8501997-06-0404 June 1997 License Change Application ECR 97-00086,revising TS Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of EDGs on ECCS Initiation During Listed Events ML20141L0081997-05-23023 May 1997 License Change Application ECR 96-02324,revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0721997-05-0909 May 1997 License Change Application ECR 96-00982,revising TS SR 3.6.1.3.16 Re Replacement Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141A7861997-05-0505 May 1997 Application for Amend to Licenses DPR-44 & DPR-56,requesting Approval for Implementation of Plant Mod to ECCS Pumps in Order to Satisfy Recommendations Stipulated in NRC Bulletin 96-003 ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML20137P7511997-03-31031 March 1997 License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20135B3851997-02-19019 February 1997 Amends 218 & 221 to Licenses DPR-44 & DPR-56,respectively, Changing Min Allowable Charging Water Header Pressure from Value 955 Psig to Value of 940 Psig in TS 3.10.8 ML20134F6091996-10-30030 October 1996 Application for Amend to License DPR-56,revising Slmcprs,Ts Section 2.0,by Incorporating Rev Due to GE Determination That Previous Calculation Is non-conservative ML20117L2821996-09-0606 September 1996 Application for Amends to Licenses DPR-44 & DPR-56 Adding Notes to Allow Core Spray & LPCI Pumps to Start out-of- Sequence Under Certain Conditions & Adding Notes to Selected Surveillance Requirements ML20117F9321996-08-27027 August 1996 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Error in TS Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6711996-08-23023 August 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits to Incorporate New Safety Limit Min Critical Power Ratios,Due to Use of GE13 Fuel Product Line ML20117M6981996-06-13013 June 1996 License Change Request ECR 96-02011 to License DPR-44, Permitting One Time Performance of SR 3.3.1.1.12 for APRM Flow Biased High Scram Function,W/Delayed Entry Into Associated TS Conditions & Required Actions for Up to Six H ML20101K7961996-03-25025 March 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits ML20100J7361996-02-15015 February 1996 License Change Request 95-11 to Licenses DPR-44 & DPR-56, Reflecting Implementation of 10CFR50,App J,Option B ML20095J1251995-12-21021 December 1995 TS Change Request 95-08,eliminating Outdated Matl from FOLs & Making FOL for Unit 2 Consistent W/Fol for Unit 3 ML20095J6971995-12-19019 December 1995 TS Change Request 95-13 to Licenses DPR-44 & DPR-56, Correcting Administrative Error in Improved Tech Specs Re Ventilation Filter Testing Program ML20095A1621995-11-30030 November 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Request 95-12,changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to 940 Psig ML20094Q6541995-11-21021 November 1995 Application for Amends to Licenses DPR-44 & DPR-56,changing SR for High Pressure Test of the HPCI & RCIC Sys. Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated 1999-09-27
[Table view] |
Text
_
Station Support Depar* ment
~
. 10CFR50.90
.=k_ } } ; '
, =y PECO ENERGY r!! 3?; ="a dG5 Chesterorook Boulevard Wayne. PA 190W 5691 June 9,1994 Docket Nos. 50-277 50-278 '
Ucense Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specifications Change Request 94-06 ,
Dear Sir:
PECO Energy Company hereby submits Technical Specifications (TS) Change l
~
Request No. 94-06, in accordance with 10CFR50.90 requesting changes to Appendix A of the Peach Bottom Facility Operating Licenses. Attachment 1 to this letter describes the proposed changes and provides justification for the <
change. Attachment 2 provides the revised TS pages. ;
This submittal requests changes to the Unit 2 and Unit 3 TS governing Surveillance Requirements for scram insertion times. The proposed changes <
would make these Surveillance Requirements similar to the Surveillance Requirements in NUREG-1433, " Standard Technical Specifications General Electric Plants, BWR/4."
PECO Energy requests that these proposed changes be effective prior to the '
start of refueling outage 2R10, scheduled for September 16,1994. Approval of these changes will result in increased flexibility in scheduling activities to satisfy ,
the Surveillance Requirements governing scram insertion times. If you have any ,
questions regarding this matter, please contact us. ;
Very truly yours, ,
L/1. d. U [
G. A. Hunger, Jr., Director Ucensing ,
JLP/eas !
Enclosures:
Affidavit, Attachment 1, Attachment 2 1[.00Ul C/ 9406150279 940609 PDR ADOCK 0500o277 P PDR
Jun3 9,,1994 .
Page 2 cc: T. T. Martin, Administrator, Region I, USNRC W. L Schmidt, USNRC Senior Resident inspector, PBAPS R. R. Jarati, Cornmonwee".h of Pennsylvania
/
t i
1 I
l
' COMMONWEALTH OF PENNSYLVANIA :
- ss.
COUNTY OF CHESTER :
W. H. Smith, Ill, being first duly sworn, deposes and says:
That he is Vice President of PECO Energy Company; the Applicant herein; that he has read the attached Attachment 1 and Attachment 2 of the Technical Specifications Change Request (Number 94-06) for Peach Bottom Facility Operating Licenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
~
v Vice President Subscribed and sworn to before me this 7 day of 1994.
,h \
^' :
Notary Public Eta A Sanon $yuse p
d?L%%2t%
i ATTACHMENT 1 PEACH BOTTOM ATOMIC POWER STATION :
UNITS 2 AND 3 l Docket Nos. 50-277 f 50-278 ,
Ucense Nos. DPR-44 DPR-56 TECHNICAL SPECIFICATIONS CHANGE REQUEST 94-06
" Surveillance Requirements for Scram insertion Times" l
l 1
Supporting information for Changes - 4 Pages l- .
I i
l l
Docket Nos. 50-277 50-278 !
Ucense Nos. DPR-44 DPR-56 PECO Energy Company, Licensee under Facility Operating Licenses DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS), Unit No. 2 and Unit No.
3, respectively, requests that the Technical Specifications (TS) be amended as proposed below to make Surveillance Requirements (SR) governing scram insertion times to be similar to the corresponding SR in NUREG-1433, ' Standard Technical Specifications General Electric Plants, BWR/4."
This TS Change Request for PBAPS, Units 2 and 3, provides a discussion and description of the proposed changes, a safety assessment, information supporting a finding of No Significant Hazards Consideration, and information supporting an Environmental Assessment.
The proposed revised TS pages for Units 2 and 3 are provided in Attachment 2.
Proposed changes are indicated by vertical bars in the margin of the pages.
We request that, if approved, the changes be effective upon issuance.
Discussion and Descriotion of the Prooosed Changes
- 1. Revise SR 4.3.C.1 (page 103) to require that each control rod be scram time tested after each refueling outage or after a reactor shutdown that is greater than 120 days with reactor steam dome pressure greater than or equal to 800 psig prior to exceeding 40% of Rated Power. Scram time testing is not required for control rods inserted per Specification 3.3.B.1.
- 2. Replace SR 4.3.C.2 (page 104) with the requirement to perform scram time testing with the reactor steam dome pressure greater than or equal to 800 psig prior to exceeding 40% of Rated Power for only those control rods associated with the core cells affected by any fuel movement within the reactor pressure vessel.
- 3. Add SR 4.3.C.3 (page 104) to perform scram time testing for a representative sample of control rods at least once per 120 days of power operation with the reactor steam dome pressure greater than or equal to 800 psig.
- 4. Add SR 4.3.C.4 (page 104) to perform scram time testing at any reactor steam dome pressure for individual control rods prior to declaring them operable after work on the control rod or control rod drive system is performed that could affect scram insertion time. Scram times as a function of reactor steam dome pressures less than 800 psig are provided in the Core Operating Limits Report.
r 1
. Docktt Nos. 50-277 50-278 License Nos. DPR-44 DPR-56
- 5. Revise TS BASES 3.3.C and 4.3.C (pages 111 through 113) to describe: the :
rationale for performing scram time testing with reactor pressure greater than or !
equal to 800 psig; the rationale for requiring control rods to be scram time !
tested once per 120 days; what constitutes a representative sample of control rods; examples of work that could affect scram times; and the rationale and methods for performing scram time testing following work that could affect the scram insertion times. All discussion of scram performance of Dresden 2 and 3 during pre-operational and startup testing has been deleted.
- 6. Add SR 4.3.C.5 (page 104) to perform scram time testing with the reactor steam dome pressure greater than or equal to 800 psig prior to exceeding 40%
of Rated Power after work on the control rod or control rod drive system that could affect scram insertion time.
- 7. Revise SR 4.5.K.2 (page 133b) from performing scram time testing of 19 or more control rods on a rotation basis to performing scram time testing of a representative sample of control rods. This provides consistency with SR 4.3.C.3 and TS BASES 3.3.C and 4.3.C.
Safety Assessment Currently, following a refueling outage, control rod scram time testing for any control rod fully withdrawn during startup, must be performed during operational hydrostatic testing or during startup prior to synchronizing the main turbine generator. Any control rods not tested during the startup must be tested at greater than 30% power but less than 40% power.
Proposed change 1 will require that scram time testing for all control rods be completed prior to exceeding 40% Reactor Power. This change is acceptable based on industry experience with control rod scram time testing coupled with the additional requirement in proposed change 4 that scram time testing of any control rod on which work was performed must be satisfactorily completed before that control rod can be declared operable. Proposed changes 2,3,4 and 6 add some new requirements and make some existing requirements more restrictive. These changes do not impact any safety analysis assumptions and are consistent with NUREG-1433.
Proposed change 5 revises the BASES to accurately reflect the previously discussed j SR changes. Consistency between the BASES and their corresponding specifications is necessary to avoid misinterpretations and to enhance the understanding of the intent of the requirements. These proposed changes have no impact on any safety analysis assumptions.
Docket Nos. 50-277 50-278 Ucense Nos. DPR-44 DPR-56 Proposed change 7 is administrative in nature and does not involve any technical changes. This proposed change has no impact on any safety analysis assumptions.
The requirement of performing scram time testing of a representative sample of the 185 control rods is equivalent to scram time testing of 19 or more control rods on a rotation basis. Because these changes are administrative in nature, no question of safety is involved.
No Sianificant Hazards Considerations The changes proposed in this Application do not constitute a significant hazards consideration in that:
i) The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed changes will not involve any physical changes to plant systems, structures, or components (SSC). These proposed changes will not alter operation of process variables or SSC as described in the safety analysis. The proposed changes establish or maintain adequate acsurance that components are operable when necessary for the prevention or mitigation of accidents or ;
transients and that plant variables are maintained within limits necessary to satisfy the assumptions for initial conditions in the safety analysis. In particular, proposed change 1 is acceptable based on industry experience with control rod scram time testing coupled with the additional requirement in proposed change 4 that scram time testing of any control rod on which work was performed must ,
be satisfactorily completed before that control rod can be declared operable.
The proposed changes will not allow continuous plant operation with plant conditions such that a single failure will result in a loss of any safety function.
Therefore, the changes will not involve a significant increase in the probability or consequences of an accident previously evaluated.
ii) The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed changes do not alter the plant configuration (no new or different type of equipment will be installed or removed) and will not alter the method used by any system to perform its design function. The proposed changes do not allow plant operation in any mode that is not already evaluated. Therefore, ;
these changes will not create the possibility of a new or different kind of accident from any accident previously evaluated.
Docket Nos. 50-277 50-278 l License Nos. DPR-44 !
DPR-56 iii) The proposed changes do not involve a significant reduction in a margin of safety. l l
Following a refueling outage, control rod scram time testing for all control rods is currently required to be performed during operational hydrostatic testing or j during startup prior to synchronizing the main turbine generator. Any control ;
rods not tested during operational hydrostatic testing must be tested at greater l than 30% power but less than 40% power. Proposed change 1 will require that 1
scram time testing for all control rods be completed prior to exceeding 40%
Reactor Power. This change is acceptable based on industry experience with control rod scram time testing coupled with the additional requirement in proposed change 4 that scram time testing of any control rod on which work was performed must be satisfactorily completed before that control rod can be declared operable. Proposed changes 2,3,4 and 6 add some new requirements and make some existing requirements more restrictive. The margin of safety is not reduced by more restrictive changes. If anything, the margin of safety may increase. Proposed change 5 revises the BASES to provide consistency with the previously discussed SR changes. Proposed change 7 is administrative in nature and does not involve any technical changes. Proposed changes 5 and 7 will not reduce a rrargin of safety because they have no impact on any safety analysis assumptions. Therefore, these changes will not involve a significant reduction in a margin of safety.
Information Succortino an Environmental Assessment An environmental impact assessment is not required for the changes proposed by this Application because the changes conform to the criteria for " actions eligible for categorical exclusion," as provided for under 10CFR51.22(c)(9). The requested changes will have no impact on the environment. The proposed changes do not involve a Significant Hazards Consideration as discussed in the preceding section.
The proposed changes do not involve a significant change in the types or significant increase in the amounts of any effluents that may be released offsite. The proposed changes would not authorize any change in the authorized power level of the facility.
In addition, the proposed changes do not involve a significant increase in individual or cumulative occupation radiation exposure.
Conclusion The Plant Operations Review Committee and the Nuclear Review Board have reviewed the proposed changes to the TS and have concluded that the changes do not involve an unreviewed safety question and will not endanger the public health and safety. l l