ML20065C240: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:..      -
{{#Wiki_filter:}}
! . l-    ,
l C  ). Camm:nw=lth Byron Nuctrar StationEdison C>~      4450 North Gstman Church Road '                                                  i y                            Byron, Illinois 61010                                                            j l
i i
4 I
March 25, 1994 4
;              LTR:            BYRON 94-0120 FILE:          2.7.300                                                                            1 1
!                                                                                                                  {
!              Mr. J. B.-Martin                                                                                  l l              Regional Administrator
!              Regirm. III i              U. S. Nuclear Regulatory Ccennission                                                            .)
:              801 Warrenville Road i
Lisle, IL 60532-4351
 
==SUBJECT:==
Annual Environmental Operating Report for Facility Licenses NPF-37 and 66
 
==Dear Mr. Martin:==
 
e
!                      Byron is submitting the Annual Environmental Operating Report as                          .i j              required by the Operating License, Appendix B, Section 5.4 for Facility
.              Licenses NPF-37 and 66.            The period of the report is from January 1, 1993 to.          {
;              December 31, 1993.
1 The report was reviewed against the objectives-of the Environmental Protection Plan as stated in Section 1.0 Appendix B to the Operating License, and it has been determined that these objectives are being met.
)                      A summary and analysis of the results of environmental protection activities required by Appendix B, Section 4.2 are provided in Attachment A.
i There were no non-compliances to the Environmental Prot ection Plan; j              therefore, no corrective actions were required by Appendix B, Section 3              5 . 4 .1 (1) '. A change in station design which involved a potentially.significant j              unreviewed environmental question as defined in Section 3.1 is described in
~
Attachment B. There were no non-routine reports submitted per Section 5.4.2.
n  ;g b
4 i
      -'                                                                                                    I (3696ZZ/032594/1) y
          ;;a4588n:488;jg4 R
ywas /nau A 6*'5#
                  .          .                              .                                                - )
 
4 BYRON 94-0120 Page 2 March 25, 1994 In accordance with Regulatory Guide 10.1, one copy of this report is provided for your use and 18 copies are being submitted directly to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington, D.C.
20555.
Sincerely, N
G. K. Schwartz Station Manager Byron Nuclear Power Station GKS/LAL/rp Attachment cc: NRC Resident Inspector Document Control Desk (18 copies) /
Site Nuclear Licensing Administrator Environmental Services (3696ZZ/032594/2)
_ - _ __ _ ___________ ___ .}}

Revision as of 04:25, 31 March 2020

Forwards Byron Station Environ Protection Plan 1993 Annual Environ Operating Rept. No Noncompliances to Environ Protection Plan Noted,Therefore No Corrective Actions Necessary
ML20065C240
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/25/1994
From: Schwartz G
COMMONWEALTH EDISON CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20065C243 List:
References
BYRON-94-0120, BYRON-94-120, NUDOCS 9404050091
Download: ML20065C240 (2)


Text