{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Complete a CPS 3006.01C007, Control Rod Withdrawal Checklist - Mode 3 JPM Number: 30060117LAF01 Revision Number: 00 Date:
Developed By:
Instructor                        Date Validated By:
SME or Instructor                  Date Reviewed By:
Operations Representative          Date Approved By:
Training Department                Date
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:    All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
_________  1. Task description and number, JPM description and number are identified.
_________  2. Knowledge and Abilities (K/A) references are included.
_________  3. Performance location specified. (in-plant, control room, or simulator)
_________  4. Initial setup conditions are identified.
_________  5. Initiating and terminating cues are properly identified.
_________  6. Task standards identified and verified by SME review.
_________  7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
_________  8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Current Procedure Rev.                            Date:
Procedure Rev. Referenced                        Date:
* If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.
_________  9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
_________  10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
_________  11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                            Date SME/Instructor                                            Date SME/Instructor                                            Date Page 2 of 15
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision    Date                            Description 00                New JPM Page 3 of 15
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
NLO            RO            SRO              STA            SRO Cert JPM
 
==Title:==
Complete a CPS No. 3006.01C007, Control Rod Withdrawal Checklist - Mode 3 JPM Number:      30060117LAN01                                    Revision Number:00 Task Number and
 
==Title:==
300601.17, Perform Control Rod Withdrawal Checklist - Mode 3.
K/A System          K/A Number            Importance (RO/SRO)
Generic            2.1.23              3.9                  4.0 Suggested Testing Environment:Simulator Actual Testing Environment:                  Simulator            Plant          Control Room Testing Method:            Simulate    Faulted/Alternate Path:          Yes        No Perform                  SRO Only:          Yes        No Time Critical:        Yes          No Estimated Time to Complete: 20 minutes                  Actual Time Used:              minutes
 
==References:==
CPS No. 3006.01C007, Control Rod Withdrawal Checklist - Mode 3, Rev. 4c EVALUATION
 
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory            Unsatisfactory Comments:
Evaluators Name:                                        (Print)
Evaluators Signature:                                  Date:
Page 4 of 15
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
SIMULATOR SETUP CONDITIONS
* IC-83 on the ILT_EXAM_JPM_LOAD, or any IC setup with the plant in Mode 3 and the Mode Switch in the Refuel position. Do not remove the key from the Mode Switch.
TASK STANDARDS:
* CPS No. 3006.01C007 is completed correctly.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* Copy of CPS No. 3006.01C007, Control Rod Withdrawal Checklist - Mode 3 with Sections A
          & B complete.
* CPS No. 9000.01, CONTROL ROOM SURVEILLANCE LOG , Rev 034 A
* CPS No. 9000.01D001, CONTROL ROOM SURVEILLANCE LOG - MODE 1, 2, 3 DATA SHEET Rev 049 D PROCEDURAL/
 
==REFERENCES:==
* CPS No. 3006.01C007, Control Rod Withdrawal Checklist - Mode 3, Rev. 4c
* CPS No. 9000.01, CONTROL ROOM SURVEILLANCE LOG , Rev 034 A
* CPS No. 9000.01D001, CONTROL ROOM SURVEILLANCE LOG - MODE 1, 2, 3 DATA SHEET Rev 049 D EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
Page 5 of 15
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS AND INITIATING CUE:
The plant is in Mode 3 and it is desired to perform control rod withdrawals. CPS No.
3006.01C007, Control Rod Withdrawal Checklist - Mode 3, has been started in preparation for withdrawing the first rod (24-29).
The CRS directs you to initiate Table 1 of CPS No. 3006.01C007 by performing Section C steps 1 through 4.
Day 1 is todays date, and the time is 0110.
NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide a MARKED UP copy of the following procedure to the student.
* CPS No. 3006.01C007, Control Rod Withdrawal Checklist - Mode 3 with Sections A & B complete.
START TIME:
Page 6 of 15
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS No. 3006.01C007 Control Rod Withdrawal Checklist - Mode 3
: 1. Enters todays date under Day 1 of Table 1 Standard:          Todays date is entered under Day 1 of Table 1.
Cue:                None, self revealing Comments SAT                UNSAT                  Comment Number
: 2. 2.a)1)
Operator conducts an IRM channel check.
Standard:          IRM channel check is completed satisfactorily using DCS indications and/or P678 charts, and the operator initials the appropriate block.
Cue:                If operator asks, provide IRM Backpanel Readings Cue Sheet. Provide CPS 9000.01D001. Provide CPS 9000.01 if asked for.
Comments SAT                UNSAT                  Comment Number Page 7 of 15
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
: 3. 2.a)2)
Operator conducts a SDV level ATM channel check.
Standard:        SDV level ATM channel check is completed satisfactorily, and the operator initials the appropriate block.
Cue:              Provide the SDV level RPS ATM Cue Sheet. Provide CPS 9000.01D001.
Provide CPS 9000.01 if asked for.
Comments SAT                  UNSAT                    Comment Number
: 4. 2.a)3)
Verify that all surveillances in Section B are current.
Standard:    Operator verifies that all surveillances are current, and initials the appropriate block.
Cue:          Dates indicate that all surveillances are current.
Comments SAT                  UNSAT                    Comment Number Page 8 of 15
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
: 5. 2.a)4)
If the control rod has been withdrawn for 7 days, then insert it at least one notch, and verify accumulator pressure is  1550 psig.
Standard:    No action required.
Cue:        None, self revealing Comments SAT                  UNSAT                  Comment Number Page 9 of 15
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
: 6. 2.b)
Verify all other control rods in a 5 by 5 array centered on the control rod being withdrawn are disarmed.
Standard:    Block should be marked NA, because Steps 2.a)1 thru 4) are being met.
Cue:
Comments    If the operator checks this, no other rods are disarmed.
SAT                  UNSAT                    Comment Number Page 10 of 15
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
Faulted Step
        *7. 3.
Verify the Reactor Mode Switch is locked in the REFUEL position.
Standard:    Operator identifies that the key is still in the Mode Switch, and notifies the CRS.
The operator does not initial the appropriate block until the key has been removed.
Key may be placed in the Key Locker.
Cue:        Acknowledge the report and tell the operator to remove the key and continue with the task.
Take the key from the operator, and notify the operator that the key will be placed in the Key Locker.
Comments    To be Locked in the REFUEL position the reactor mode switch key must be removed from the console per ITS B 3.9.2, SR 3.9.2.1.
SAT                  UNSAT                    Comment Number
: 8. 4.
Verify all control rods , other than the control rod being withdrawn, are fully inserted.
Standard:    Operator verifies that all the control rods are inserted, and initials the appropriate block.
Cue:
Comments SAT                  UNSAT                    Comment Number Page 11 of 15
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
TERMINATING CUES:
The key has been removed from the Mode Switch and Section C, Steps 1 through 4 of CPS No.
3006.01C007 have been completed.
STOP TIME:
Page 12 of 15
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS AND INITIATING CUE:
The plant is in Mode 3 and it is desired to perform control rod withdrawals. CPS No.
3006.01C007, Control Rod Withdrawal Checklist - Mode 3, has been started in preparation for withdrawing the first rod (24-29).
The CRS directs you to initiate Table 1 of CPS No. 3006.01C007 by performing Section C steps 1 through 4.
Day 1 is todays date, and the time is 0110.
Page 13 of 15
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
IRM Backpanel Readings (Cue Sheet for JPM Step 2 if needed)
A        6 E        5 C        6 G        5 B        6 F        6 D        5 H        5 Page 14 of 15
 
JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)
SDV Level RPS ATM Readings (Cue Sheet for JPM Step 3 if needed) 1C11-N601A          0 1C11-N601B        -1 1C11-N601C        -0.5 1C11-N601D      -0.25 Page 15 of 15
 
CLINTON POWER STATION Job Performance Measure Verify Conditions Are Met to Enter Mode 2 From Mode 1 JPM Number: 30060106LAF01 Revision Number: 00 Date:
Developed By:
Instructor                          Date Validated By:
SME or Instructor                  Date Reviewed By:
Operations Representative          Date Approved By:
Training Department                Date
 
JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:    All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
_________  1. Task description and number, JPM description and number are identified.
_________  2. Knowledge and Abilities (K/A) references are included.
_________  3. Performance location specified. (in-plant, control room, or simulator)
_________  4. Initial setup conditions are identified.
_________  5. Initiating and terminating cues are properly identified.
_________  6. Task standards identified and verified by SME review.
_________  7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
_________  8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Current Procedure Rev.                            Date:
Procedure Rev. Referenced                        Date:
* If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.
_________  9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
_________  10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
_________  11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                            Date SME/Instructor                                            Date SME/Instructor                                            Date Page 2 of 13
 
JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision    Date                              Description 00                New format and numbering convention, revalidated. This replaces JPM 300601.06. Revision number reset to 0.
Page 3 of 13
 
JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
NLO            RO            SRO              STA            SRO Cert JPM
 
==Title:==
Verify Conditions Are Met to Enter Mode 2 From Mode 1 JPM Number:      30060106LAF01                                    Revision Number:00 Task Number and
 
==Title:==
300601.06, Complete Control Room actions to perform Shifting Reactor Mode Switch to START & HOT STBY.
K/A System          K/A Number            Importance (RO/SRO)
Generic            2.1.31              4.2                  3.9 Suggested Testing Environment:Simulator Actual Testing Environment:                  Simulator            Plant          Control Room Testing Method:            Simulate    Faulted/Alternate Path:          Yes        No Perform                  SRO Only:          Yes        No Time Critical:        Yes          No Estimated Time to Complete: 20 minutes                  Actual Time Used:              minutes
 
==References:==
CPS No. 3006.01 Unit Shutdown Rev 33a CPS No. 9000.06D001, HEATUP/COOLDOWN, INSERVICE LEAK &
HYDROSTATIC TESTING 30 MINUTE TEMPERATURE LOG Rev 30a EVALUATION
 
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory            Unsatisfactory Comments:
Evaluators Name:                                        (Print)
Evaluators Signature:                                  Date:
Page 4 of 13
 
JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 13
 
JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
SIMULATOR SETUP CONDITIONS IC-86 on the ILT_EXAM_JPM_LOAD or any other IC with the following conditions:
* Power level at 8%.
* APRM C failed to 4% power.
* MOV Test Prep Switches for DW Clg and Chill Wtr (5050) and SSW System Div 3 (5064) in TEST.
* Keys in 4 other MOV Test Prep Switches with switches in NORM TASK STANDARDS:
* Completes applicable steps of CPS 3006.01 Unit Shutdown, Section 8.6 & 8.4.7.5.
* Determines that the mode change should not be performed.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* Marked up copy of CPS 3006.01, completed to step 8.6 with the exception of step 8.4.7.5.
* Copy of CPS 3006.01, Appendix C.
* Copy of CPS 9000.06D001 PROCEDURAL/
 
==REFERENCES:==
* CPS 3006.01, Unit Shutdown, Rev. 33a EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
Page 6 of 13
 
JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS AND INITIATING CUE:
A plant shutdown is in progress. You are directed to verify conditions are met to enter Mode 2 IAW CPS 3006.01, Unit Shutdown.
NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide a MARKED UP copy of the following procedure to the student.
* CPS 3006.01, completed to step 8.6 with the exception of step 8.4.7.5.
* CPS 3006.01, Appendix C.
* CPS 90005.01D001.
START TIME:
Page 7 of 13
 
JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS 8.6  Shifting Reactor Mode Switch To Start & Hot Stby
: 1. 8.6.1.1 Section 8.4 completed as appropriate.
Standard:          Operator checks CPS 3006.01 Section 8.4 and determines that 8.4.7.5. has not been initialed. Reports to the CRS.
Cue:                Acknowledge the report as CRS and, if necessary, direct the operator to perform 8.4.7.5.
Comments SAT                UNSAT                    Comment Number Page 8 of 13
 
JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)
Faulted Step
        *2. 8.4.7.5 Verify IRM/APRM overlap is achieved.
            ) Overlap between IRMs and APRMs exist when sufficient (4 channels per ITS LCO 3.3.1.1 Table functions) IRMs and APRMs concurrently have on-scale readings such that the transition between MODE 1 and MODE 2 can be made without either APRM downscale rod block (5% RTP), or IRM upscale rod block (108/125 full scale).
Standard:
* Operator determines that APRM C is giving a downscale rod block and step 8.4.7.5. is not satisfied.
* Operator reports to the CRS that APRM C is reading 4% and has a Downscale Rod Block.
Cue:        As the CRS, acknowledge report. If necesssary, direct operator to complete Section 8.6 to determine if there are any other problems.
Comments SAT                  UNSAT                Comment Number Page 9 of 13
 
JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)
Faulted Step
          *3. 8.6.1.2 Verify/place MOV TEST PREP switches in NORMAL.
[Listed on Appendix C]
Standard:
* Operator checks Appendix C and verifies completed entries and identifies switches on section 5050 & 5064 have not been checked.
* Operator determines that switches for DW Clg & Chill Wtr and SSW System Div 3 are in TEST, and places switches in NORMAL.
Cue:          If report is made about switches being in TEST, acknowledge report as CRS. If necessary direct the operator to place the switches in Normal.
If asked, the MSIV Leakage Control MOV TPS are in NORMAL (Backpanel)
Comments SAT                UNSAT                  Comment Number
: 4. 8.6.1.3.
Prepare for use during cooldown CPS 9000.06D001, Heatup/Cooldown, Inservice Leak and Hydrostatic Testing 30 Minute Temperature Log.
Standard:    Operator reviews CPS 9000.06D001 and fills in appropriate blocks.
Cue:          Provide a copy of CPS 9000.06D001.
Comments SAT                UNSAT                  Comment Number Page 10 of 13
 
JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)
NOTE APRM rod blocks will occur at 5% with mode switch in RUN.
: 5. 8.6.2 Insert control rods per the specified sequence to decrease reactor power to 6 - 8%.
Standard:    Operator verifies that power is 6 - 8%.
Cue:        None Comments SAT                  UNSAT                    Comment Number
: 6. 8.6.3.1 Verify IRM/APRM Overlap completed per 8.4.7.
Standard:    Actions per this step should have been identified in step 1, and completed in step 2 of this JPM. If the actions were not completed earlier then they should be completed now. Refer to Step 2 for standard Cue:        None Comments SAT                  UNSAT                    Comment Number Page 11 of 13
 
JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)
: 7. 8.6.3.2 Adjust IRM Range Switches so all operable IRMs read on scale (preferred 15 -
75)
Standard:    Operator verifies that all operable IRMs are reading on scale and are in the range of 15 - 75.
Cue:          None Comments SAT                UNSAT                  Comment Number TERMINATING CUES:
The operator determines the Mode change should not be made.
STOP TIME:
Page 12 of 13
 
JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS AND INITIATING CUE:
A plant shutdown is in progress. You are directed to verify conditions are met to enter Mode 2 IAW CPS 3006.01, Unit Shutdown.
Page 13 of 13
 
CLINTON POWER STATION Job Performance Measure Perform a Jet Pump Operability Test per CPS No. 9041.01 JPM Number: 90410101LAN01 Revision Number: 00 Date:
Developed By:
Instructor                        Date Validated By:
SME or Instructor                  Date Reviewed By:
Operations Representative          Date Approved By:
Training Department                Date
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:    All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
_________  1. Task description and number, JPM description and number are identified.
_________  2. Knowledge and Abilities (K/A) references are included.
_________  3. Performance location specified. (in-plant, control room, or simulator)
_________  4. Initial setup conditions are identified.
_________  5. Initiating and terminating cues are properly identified.
_________  6. Task standards identified and verified by SME review.
_________  7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
_________  8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Current Procedure Rev.                            Date:
Procedure Rev. Referenced                        Date:
* If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.
_________  9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
_________  10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
_________  11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                            Date SME/Instructor                                            Date SME/Instructor                                            Date Page 2 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision    Date                              Description 00                New format and numbering convention, revalidated. This replaces JPM 012202J005. Revision number reset to 0.
Page 3 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
NLO            RO            SRO              STA            SRO Cert JPM
 
==Title:==
Perform a Jet Pump Operability Test per CPS No. 9041.01 JPM Number:      90410101LAN01                                    Revision Number:03 Task Number and
 
==Title:==
904101.01, Perform the Jet Pump Operability Test K/A System          K/A Number            Importance (RO/SRO)
Generic            2.2.12              3.0                  3.4 Suggested Testing Environment: Any Actual Testing Environment:        Simulator                      Plant          Control Room Testing Method:            Simulate            Alternate Path:          Yes        No Perform                  SRO Only:          Yes        No Time Critical:        Yes        No Estimated Time to Complete: 40 minutes                  Actual Time Used:              minutes
 
==References:==
CPS No. 9041.01, Jet Pump Operability Test, Rev. 36 CPS No. 9041.01D001, Jet Pump Operability Test Data Sheet, Rev. 34 EVALUATION
 
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory            Unsatisfactory Comments:
Evaluators Name:                                        (Print)
Evaluators Signature:                                  Date:
Page 4 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to perform, simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
SIMULATOR SET-UP CONDITIONS
* None TASK STANDARDS:
* CPS No. 9041.01, Jet Pump Operability Test, has been completed satisfactorily.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* Calculator PROCEDURAL/
 
==REFERENCES:==
* CPS No. 9041.01, Jet Pump Operability Test, Rev 36
* CPS No. 9041.01D001, Jet Pump Operability Test Data Sheet, Rev. 34 EVALUATOR INSTRUCTIONS:
* Preference is to perform JPM on the simulator, but may also be performed in the Main Control Room with the plant at or near 90% power (ie>70%), and Reactor Recirc in 2 loop operation.
Page 5 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS AND INITIATING CUE:
You are the extra RO and the CRS has directed you to perform CPS No. 9041.01, Jet Pump Operability Test, using the supplied CPS No. 9041.01, Jet Pump Operability Test and CPS 9041.01D001, Jet Pump Operability Test Data Sheet.
The computerized method of performing CPS No. 9041.01 is not available at this time.
APRM calibrations are NOT in progress.
NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide the following to the student.
* CPS No. 9041.01, Jet Pump Operability Test, Rev 36
* CPS No. 9041.01D001, Jet Pump Operability Test Data Sheet, Rev. 34
* Calculator START TIME:
Page 6 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS 5.0    Prerequisites
: 1. 5.1, Recirculation System Status 5.1.1 Initial 5.1.1.1.1) Loop flow mismatch maintained within 5% of rated core flow (4.225 mlbm/hr) when effective core flow is  70% of rated core flow (59.15 mlbm/hr),
5.2 (Record) Record Rx power using OD-3, 3D Monicore, or APRM indication 5.3 (Initial) Notify SMngt of test start, and log Time and Date.
Standard:
* Checks the following squares for:
5.1.1.1.1), 5.2, & 5.3
* 5.1.1 Initials the 9041.01D001
* 5.2 Documents power on the 9041.01D001 Cue:                Report that authorization has been granted Report that logging information will be done by the B operator.
Comments            This is a passive surveillance but if performed in the MCR obtain permission to access the information from the various locations.
SAT                UNSAT                  Comment Number Page 7 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
NOTE During two-loop (single-loop) operation, steps pertaining to single-loop (two-loop) operation should have N/A in initial or data blanks.
If APRM calibrations are in progress, DCS computer points for RR Flow may be invalid. Check alternate data sources to verify values.
          *2  8.1.1 (Record) Use computer points B33DA013 (Loop A) and B33DA014 (Loop B) to determine operating Recirculation Loop A and/or B Flow in GPM.
Standard:    Record Recirc Loop A and/or B flows on CPS No. 9041.01D001 Cue:          Provide Data Sheet for Section 8.1 and 8.2 Comments      Recirc Loop Drive Flows on DCS display 4A use computer points B33-DA013 and B33-DA014.
SAT                UNSAT                Comment Number
          *3. 8.1.2 (Record) Use computer points B33-DA009 (FCV 1B33-F060A) and B33-DA010 (FCV 1B33-F060B) to determine operating Recirculation FCV position.
Standard:    Record positions of FCVs B33-F060A and B33-F060B on CPS N0.
9041.01D001.
Cue:          If performed in the Simulator, RVDT is selected for both FCVs.
Comments      F060A and F060B valve positions on DCS display 4A use computer points B33-DA009 and B33-DA010.
If performed in the MCR ensure permission is granted to open 1H13-P634.
SAT                UNSAT                Comment Number Page 8 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
          *4. 8.1.3 Determine the Established Recirculation Loop and/or B flow using step 8.1.3.2 as follows:
IF      RR Pumps for TWO LOOP operation are in fast speed, THEN    Use Figure 1a (1b) and Recirc FCV A (B) position from step 8.1.2 (x-axis value) to determine Established Recirc Loop A (B) Flow (y-axis value).
Standard:    Determine Established Recirc Loop A and B Flows and record on CPS No.
9041.01D001.
Cue:
Comments      The valves should be between:
A    29100 - 29200 B    29100 - 29200 SAT                UNSAT                Comment Number
          *5. 8.1.4 (Record) For each operating Recirc Loop A and/or B, calculate the %
deviation of the indicated loop flow from the established loop flow using the data sheet formula.
Standard:    Calculate percent deviation for both loops and record on CPS No. 9041.01D001.
Cue:
Comments SAT                UNSAT                Comment Number Page 9 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM) 8.2 Indicated Total Core Flow versus Established Total Core Flow
          *6. 8.2.1 (Record) Use computer point B33NA001 to determine Indicated Total Core Flow.
Standard:    Record total Jet Pump Flow on CPS No. 9041.01D001.
Cue:
Comments      Total Core Flow on DCS display 4A uses computer point B33-NA001.
SAT                UNSAT                Comment Number
: 7. 8.2.2 (Record) Calculate the Total Recirc Flow, sum of Loop A and B Flow from step 8.1.1 using the data sheet formula.
Standard:    Calculate and record Total Recirc Flow on CPS No. 9041.01D001 Cue:
Comments SAT                UNSAT                Comment Number Page 10 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
          *8. 8.2.3 (Record) Determine and record the Established Total Core Flow value per 8.2.3.1 or 8.2.3.2 below.
: 1. For TWO LOOP operation, using Figure 2a and the Total Recirc Flow from step 8.2.2 as the x-axis value, determine the Established Total Core Flow.
Standard:    Determine and record the Established Total Core Flow on CPS No. 9041.01D001.
Cue:
Comments SAT                UNSAT                  Comment Number
          *9. 8.2.4 (Record) Calculate the percent deviation in Total Core Flow from Established Core Flow using the data sheet formula.
Standard:    Calculate and record percent deviation on CPS No. 9041.01D001.
Cue:          If asked, engineering judgement is not being used.
Comments SAT                UNSAT                  Comment Number Page 11 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM) 8.3 Indicated Jet Pump Flow/dP Versus Established Jet Pump Flow/dP
          *10. 8.3.1 (Record) Using computer points B33NA009 - 028, or P619 indications, record for each jet pump for the operating loops, the indicated diffuser-to-lower plenum Jet Pump flow or Jet Pump dP.
Standard:      Record Jet Pump Flows using computer points on CPS No. 9041.01D001 Cue:          Provide Data Sheet for Section 8.3 Comments SAT                UNSAT              Comment Number Page 12 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
NOTE For TWO LOOP operation, if the results of steps 8.1.4 and 8.2.4 are acceptable, the surveillance results are acceptable, and steps 8.3.2, 8.3.3, 8.3.4 may be omitted (N/Ad).
For SINGLE LOOP operation, these steps should be performed for the operating jet pumps, but acceptance criteria has not been established.
: 11. 8.3.2 (Record)  Calculate the Average Jet Pump Flow for each recirc loop using Formula #1 or Average Jet Pump dP (P619 dP meter scales are in %)
for each recirc loop using Formula #2.
Standard:    Not required due to steps 8.1.4 and 8.2.4 are acceptable Steps 8.3.2, 8.3.3, 8.3.4 may be omitted Cue:
Comments SAT              UNSAT                  Comment Number Page 13 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
: 12. 8.4 (Initial)  If an Engineering evaluation was performed, are jet pumps OPERABLE.
Standard:      Engineering evaluation is not performed Cue:
Comments        Step can be NAd SAT                UNSAT                Comment Number
: 13. 8.5 (Initial)  Notify SMngt at test completion.
Standard:      Notify SMngt at test completion.
Cue:            Acknowledge completion.
Comments        The student will need to provide procedure and D001.
SAT                UNSAT                Comment Number TERMINATING CUES:
CPS No. 9041.01, Jet Pump Operability Test, completed satisfactorily.
STOP TIME:
Page 14 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
Data for Section 8.1 and 8.2 Reactor Power                        96%
INDICATED Loop A Flow                31429 INDICATED Loop B Flow                32006 B33-DA009      B33-F060A Recirc FCV Position        RVDT 58%
B33-DA010      B33-F060B Recirc FCV Position        RVDT 59%
B33NA001        Indicated Total Core Flow            75.6 Page 15 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
Jet Pump Flow for Section 8.3 Jet Pump Number JP 1          3.96 JP 2          3.96 JP 3          3.70 JP 4          3.74 JP 5          3.77 JP 6          3.78 JP 7          3.70 JP 8          3.73 JP 9          3.70 JP 10          3.63 JP 11          4.10 JP 12          4.10 JP 13          3.86 JP 14          3.85 JP 15          3.99 JP 16          3.91 JP 17          3.86 JP 18          3.81 JP 19          3.80 JP 20          3.80 Page 16 of 17
 
JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)
Initiating Cue You are the extra RO and the CRS has directed you to perform CPS No. 9041.01, Jet Pump Operability Test, using the supplied CPS No. 9041.01, Jet Pump Operability Test and CPS 9041.01D001, Jet Pump Operability Test Data Sheet.
The computerized method of performing CPS No. 9041.01 is not available at this time.
APRM calibrations are NOT in progress.
Page 17 of 17
 
CLINTON POWER STATION Job Performance Measure Determine Expected Dose Operator Would Receive While Performing an LLRT JPM Number: 99555501NAN01 Revision Number: 00 Date:
Developed By:
Instructor                        Date Validated By:
SME or Instructor                  Date Reviewed By:
Operations Representative          Date Approved By:
Training Department                Date
 
JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:    All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
_________  1. Task description and number, JPM description and number are identified.
_________  2. Knowledge and Abilities (K/A) references are included.
_________  3. Performance location specified. (in-plant, control room, or simulator)
_________  4. Initial setup conditions are identified.
_________  5. Initiating and terminating cues are properly identified.
_________  6. Task standards identified and verified by SME review.
_________  7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
_________  8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Current Procedure Rev.                            Date:
Procedure Rev. Referenced                        Date:
* If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.
_________  9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
_________  10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
_________  11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                            Date SME/Instructor                                            Date SME/Instructor                                            Date Page 2 of 10
 
JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision    Date                              Description 00                New format and numbering convention, revalidated. This replaces JPM 033299J006. Revision number reset to 0.
Page 3 of 10
 
JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
NLO            RO            SRO              STA            SRO Cert JPM
 
==Title:==
Determine Expected Dose Operator Would Receive While Performing LLRT JPM Number:      99555501NAN01                                    Revision Number:00 Task Number and
 
==Title:==
995555.01, Complete in-plant radiological practices for High Radiation Zone K/A System          K/A Number            Importance (RO/SRO)
Generic            2.3.10              2.9                  3.3 Suggested Testing Environment:Any Actual Testing Environment:                Simulator              Plant          Control Room Testing Method:            Simulate            Alternate Path:          Yes        No Perform                  SRO Only:          Yes        No Time Critical:        Yes        No Estimated Time to Complete: 10 minutes                  Actual Time Used:              minutes
 
==References:==
CPS No. RP-AA-203, Exposure Control and Authorization, Rev. 2 EVALUATION
 
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory            Unsatisfactory Comments:
Evaluators Name:                                        (Print)
Evaluators Signature:                                  Date:
Page 4 of 10
 
JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
* Expected dose is determined and operators, who would not exceed their dose limit, are selected.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* Radiation survey map of the Containment Steam Tunnel
* Simplified drawing of penetration 1MC-061
* RP-AA-203, Exposure Control and Authorization
* Calculator PROCEDURAL/
 
==REFERENCES:==
* CPS No. RP-AA-203, Exposure Control and Authorization, Rev. 2 EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
Page 5 of 10
 
JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS AND INITIATING CUE:
You are part of a team that is responsible for performing LLRTs during a refueling outage. You have been given the responsibility to set up for a test on RWCU LLRT 1MC-061. This will require you and one other member of your team to perform tasks in the Containment Steam Tunnel approximately 30cm from 1G33-F053. The tasks are estimated to take 90 minutes to complete.
The SRO in charge of the LLRTs has asked you to determine the following:
* Expected dose that you would receive.
* Which members of the team could assist you without requiring a Dose Level Extension Form.
The following is a list of LLRT Team Members and their exposure history.
Name      Annual TEDE Dose:          Annual TEDE Dose:      Annual TEDE Dose:
Non ROG                    Mid West ROG            Clinton Station John      0 mrem                      245 mrem                1547 mrem Tim      261 mrem                    89 mrem                1319 mrem Paul      154 mrem                    0 mrem                  1625 mrem NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide the following to the student.
* Radiation survey map of the Containment Steam Tunnel
* Simplified drawing of penetration 1MC-061
* RP-AA-203
* Calculator START TIME:
Page 6 of 10
 
JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS
: 1. Locates survey map of the Containment Steam Tunnel Standard:          Describes the locations where survey maps can be found.
Cue:                When operator describes where survey maps are located, provide him with a copy of the Containment Steam Tunnel map.
Comments            Survey maps may be found in the following locations:
* Service Building entrance to the RCA
* R & S line near the Maintenance Area
* Radiation Protection Desk
* Access Control Point SAT                UNSAT                    Comment Number Page 7 of 10
 
JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)
: 2. Determines the Dose Rate near 1G33-F053 Standard:    Dose Rate determined to be 200 mr/hr @ 30 cm from valve 1G33-F053, and/or 150 mr/hr in the area around 1G33-F053.
Cue:          None Comments SAT                UNSAT                Comment Number
          *3. Calculates expected dose.
Standard:    Expected dose calculated to be:
* 300 mrem if the 200 mr/hr rate is used.
* 225 mrem if the 150 mr/hr rate is used.
Cue:          None Comments SAT                UNSAT                Comment Number Page 8 of 10
 
JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)
          *4  Determines which operators could assist without requiring a Dose Level Extension Form.
Standard:    Operator determines that Tim could assist.
Cue:          None Comments:    The Admin Limit that would require a Dose Level Extension Form is 2000 mr/yr.
Name        Annual TEDE        Annual TEDE    Annual TEDE  Total Received Dose: Non ROG      Dose: MWROG        Dose:CPS    @ 225 mrem John            0 mrem            245 mrem        1547 mrem        2017 Tim          261 mrem            89 mrem        1319 mrem        1894 Paul          154 mrem            0 mrem        1625 mrem        2004 Name        Annual TEDE        Annual TEDE    Annual TEDE  Total Received Dose: Non ROG      Dose: MWROG        Dose:CPS    @ 300 mrem John            0 mrem            245 mrem        1547 mrem        2092 Tim          261 mrem            89 mrem        1319 mrem        1969 Paul          154 mrem            0 mrem        1625 mrem        2079 SAT              UNSAT                  Comment Number TERMINATING CUES:
Operator(s) has been named to assist in the LLRT tasks.
STOP TIME:
Page 9 of 10
 
JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS AND INITIATING CUE:
You are part of a team that is responsible for performing LLRTs during a refueling outage. You have been given the responsibility to set up for a test on RWCU LLRT 1MC-061. This will require you and one other member of your team to perform tasks in the Containment Steam Tunnel approximately 30cm from 1G33-F053. The tasks are estimated to take 90 minutes to complete.
The SRO in charge of the LLRTs has asked you to determine the following:
* Expected dose that you would receive.
* Which members of the team could assist you without requiring a Dose Level Extension Form.
The following is a list of LLRT Team Members and their exposure history.
Name      Annual TEDE Dose:          Annual TEDE Dose:      Annual TEDE Dose:
Non ROG                    Mid West ROG            Clinton Station John      0 mrem                      245 mrem                1547 mrem Tim      261 mrem                    89 mrem                1319 mrem Paul      154 mrem                    0 mrem                  1625 mrem Page 10 of 10
 
CLINTON POWER STATION Job Performance Measure Verify Conditions are met to Enter Mode 2 JPM Number: 30010101SAN01 Revision Number: 00 Date:
Developed By:
Instructor                          Date Validated By:
SME or Instructor                    Date Reviewed By:
Operations Representative            Date Approved By:
Training Department                  Date
 
JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:    All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
_________  1. Task description and number, JPM description and number are identified.
_________  2. Knowledge and Abilities (K/A) references are included.
_________  3. Performance location specified. (in-plant, control room, or simulator)
_________  4. Initial setup conditions are identified.
_________  5. Initiating and terminating cues are properly identified.
_________  6. Task standards identified and verified by SME review.
_________  7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
_________  8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Current Procedure Rev.                            Date:
Procedure Rev. Referenced                        Date:
* If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.
_________  9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
_________  10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
_________  11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                            Date SME/Instructor                                            Date SME/Instructor                                            Date Page 2 of 10
 
JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision    Date                              Description 00                New format and numbering convention, revalidated. This replaces JPM 300101.0101. Revision number reset to 0.
Page 3 of 10
 
JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
NLO            RO            SRO            STA            SRO Cert JPM
 
==Title:==
Verify Conditions are met to Enter Mode 2 JPM Number:      30010101SAN01                                    Revision Number:00 Task Number and
 
==Title:==
300101.01, Complete Control Room actions to perform preparation for startup and approach to critical.
K/A System          K/A Number            Importance (RO/SRO)
Generic            2.1.31              4.2                  3.9 Suggested Testing Environment: Any Actual Testing Environment:        Simulator                      Plant          Control Room Testing Method:            Simulate    Faulted/Alternate Path:          Yes        No Perform                  SRO Only:          Yes        No Time Critical:        Yes          No Estimated Time to Complete: 30 minutes                  Actual Time Used:              minutes
 
==References:==
CPS 3001.01, Approach to Critical, Rev. 24A CPS 3001.01C001, Preparation for Startup Checklist, Rev. 17 CPS 3001.01C002, Mode 2 Checklist, Rev. 15B EVALUATION
 
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory            Unsatisfactory Comments:
Evaluators Name:                                        (Print)
Evaluators Signature:                                  Date:
Page 4 of 10
 
JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
SIMULATOR SET-UP CONDITIONS
* None TASK STANDARDS:
* Does not enter Mode 2 due to discrepancies not in compliance with Technical Specification.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* Copy of completed CPS 3001.01, Approach to Critical, Rev. 24A
* Copy of completed CPS 3001.01C001, Preparation for Startup Checklist, Rev. 17
* Copy of completed CPS 3001.01C002, Mode 2 Checklist, Rev. 15B PROCEDURAL/
 
==REFERENCES:==
* CPS 3001.01, Approach to Critical, Rev. 24A
* CPS 3001.01C001, Preparation for Startup Checklist, Rev. 17
* CPS 3001.01C002, Mode 2 Checklist, Rev. 15B EVALUATOR INSTRUCTIONS:
* Present the completed copy of CPS 3001.01, CPS 3001.01C001, and CPS 3001.01C002 to the operator when the Initiating Cue is presented.
* Amplifying cues are provided within the JPM steps.
Page 5 of 10
 
JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS AND INITIATING CUE:
You have taken the shift as the CRS in Mode 4. Review the procedures CPS 3001.01, Approach to Critical, CPS 3001.01C001, Preparation for Startup Checklist, CPS 3001.01C002, Mode 2 Checklist, and identify any actions required to support placing the plant into Mode 2.
NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide a MARKED UP copy of the following procedures to the student.
* Copy of completed CPS 3001.01, Approach to Critical, Rev. 24A
* Copy of completed CPS 3001.01C001, Preparation for Startup Checklist, Rev. 17
* Copy of completed CPS 3001.01C002, Mode 2 Checklist, Rev. 15B START TIME:
Page 6 of 10
 
JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS
: 1. Reviews:
: 1) CPS 3001.01 Approach to Critical
: 2) CPS 3001.01C001, Preparation for Startup Checklist
: 3) CPS 3001.01C002, Mode 2 Checklist Standard:          Operator begins review of completed:
: 1) CPS 3001.01 Approach to Critical
: 2) CPS 3001.01C001, Preparation for Startup Checklist
: 3) CPS 3001.01C002, Mode 2 Checklist Cue:                None Comments SAT              UNSAT                    Comment Number Page 7 of 10
 
JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)
: 2. RCIC Inoperable Standard:    Operator recognizes that RCIC Inoperability does not impact plant startup, LCO 3.5.3. and N/As Step 9.10 of CPS 3001.01C001.
Cue:          None Comments      Not required to be Operable until 150 psig.
SAT                UNSAT                Comment Number
          *3. RHR B NOT in Standby Standard:    Operator identifies that RHR B must be placed in Standby to enter Mode 2.
Cue:          None Comments      RHR B NOT in Standby does not satisy LCOs for ECCS, Containment Spray, and Suppression Pool Cooling:
ITS 3.5.1 Action A.1 ITS 3.6.1.7 Action A.1 ITS 3.6.2.3 Action A.1 LCO 3.0.4 requires the LCO to be met for mode change.
SAT                UNSAT                Comment Number Page 8 of 10
 
JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)
          *4. RHR B Test Prep Switch in TEST Standard:        Operator identifies that RHR B Test Prep Switch must be in NORMAL.
Cue:              None Comments          ORM 2.5.2 Action 3.5.2 NOT satisfied.
SAT                UNSAT                Comment Number TERMINATING CUES:
Does not enter Mode 2 due to discrepancies.
STOP TIME:
Page 9 of 10
 
JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)
Initiating Cue You have taken the shift as the CRS in Mode 4. Review the procedures CPS 3001.01, Approach to Critical, CPS 3001.01C001, Preparation for Startup Checklist, CPS 3001.01C002, Mode 2 Checklist, and identify any actions required to support placing the plant into Mode 2.
Page 10 of 10
 
CLINTON POWER STATION Job Performance Measure Review and Approve a Jet Pump Operability Test JPM Number: 90410101SAF01 Revision Number: 00 Date:
Developed By:
Instructor                        Date Validated By:
SME or Instructor                Date Reviewed By:
Operations Representative        Date Approved By:
Training Department              Date
 
JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:    All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
_________  1. Task description and number, JPM description and number are identified.
_________  2. Knowledge and Abilities (K/A) references are included.
_________  3. Performance location specified. (in-plant, control room, or simulator)
_________  4. Initial setup conditions are identified.
_________  5. Initiating and terminating cues are properly identified.
_________  6. Task standards identified and verified by SME review.
_________  7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
_________  8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Current Procedure Rev.                            Date:
Procedure Rev. Referenced                        Date:
* If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.
_________  9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
_________  10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
_________  11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                            Date SME/Instructor                                            Date SME/Instructor                                            Date Page 2 of 13
 
JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision    Date                              Description 00                New format and numbering convention, revalidated. This replaces JPM 033342J001. Revision number reset to 0.
Page 3 of 13
 
JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
NLO            RO            SRO              STA            SRO Cert JPM
 
==Title:==
Review and Approve a Jet Pump Operability Test JPM Number:      90410101SAF01                                    Revision Number:00 Task Number and
 
==Title:==
904101.01, Perform the Jet Pump Operability Test K/A System          K/A Number            Importance (RO/SRO)
Generic            2.2.12              3.0                  3.4 Suggested Testing Environment: Any Actual Testing Environment:        Simulator                      Plant          Control Room Testing Method:            Simulate            Alternate Path:          Yes        No Perform                  SRO Only:          Yes        No Time Critical:        Yes        No Estimated Time to Complete: 25 minutes                  Actual Time Used:              minutes
 
==References:==
CPS No. 9041.01, Jet Pump Operability Test, Rev. 36 CPS No. 9041.01D001, Jet Pump Operability Test Data Sheet, Rev. 34 EVALUATION
 
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory            Unsatisfactory Comments:
Evaluators Name:                                        (Print)
Evaluators Signature:                                  Date:
Page 4 of 13
 
JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to perform, simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
SIMULATOR SET-UP CONDITIONS
* None TASK STANDARDS:
* CPS No. 9041.01, Jet Pump Operability Test, has been reviewed satisfactorily.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* Completed copy of CPS 9041.01, Jet Pump Operability Test
* Completed copy of CPS 9041.01D001, Jet Pump Operability Test Data Sheet that contains calculation error at step 8.1.4. Do not complete section 8.3.2-4 based on the assumption that sections 8.1.4 and 8.2.4 are satisfactory.
* Calculator PROCEDURAL/
 
==REFERENCES:==
* CPS 9041.01, Jet Pump Operability Test, Rev. 36
* CPS 9041.01D001, Jet Pump Operability Test Data Sheet, Rev. 34 EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
Page 5 of 13
 
JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS AND INITIATING CUE:
Review the supplied CPS 9041.01, Jet Pump Operability Test and CPS 9041.01D001, Jet Pump Operability Test Data Sheet for acceptability.
NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide the following to the student.
* Completed copy of CPS 9041.01, Jet Pump Operability Test
* Completed copy of CPS 9041.01D001, Jet Pump Operability Test Data Sheet that contains calculation error at step 8.1.4. Do not complete section 8.3.2-4 based on the assumption that sections 8.1.4 and 8.2.4 are satisfactory.
* Calculator START TIME:
Page 6 of 13
 
JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS 5.0    Prerequisites
: 1. Reviews Section 5, PREREQUISITES, to determine if proper blocks are filled out.
5.1, Recirculation System Status 5.1.1 Initial 5.1.1.1.1) Loop flow mismatch maintained within 5% of rated core flow (4.225 mlbm/hr) when effective core flow is  70% of rated core flow (59.15 mlbm/hr),
5.2 (Record) Record Rx power using OD-3, 3D Monicore, or APRM indication 5.3 (Initial) Notify SMngt of test start, and log Time and Date.
Standard:          Determines that all the proper squares are complete.
Cue:                None Comments SAT                UNSAT                  Comment Number Page 7 of 13
 
JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)
Faulted Step 8.1  Indicated Recirc Loop Flow versus Established Loop Flow based on FCV Position
              ) Procedure may be performed via Appendix A: Performance of Computerized CPS 9041.01D001, Refer to 2.1.7. criteria.
          *2. Reviews Section 8.1 to determine if it is completed correctly.
Standard:      Determines that Step 8.1.4 has been incorrectly calculated for Recirc Loop B and that the correct Loop Flow % Deviation for Recirc Loop B would be outside the Acceptance Value.
Cue:          If operator immediately wants to return the document to the originator request that he complete the review to determine if there are any other problems.
Comments      B Loop Flow % Deviation should actually be 11.2%
SAT                UNSAT                  Comment Number 8.2 Indicated Total Core Flow versus Established Total Core Flow
: 3. Reviews Section 8.2 to determine if it is completed correctly.
Standard:      Determines that Step 8.2.4 has been completed correctly.
Cue:          None Comments SAT                UNSAT                  Comment Number Page 8 of 13
 
JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM) 8.2  Indicated Jet Pump Flow/dP versus Established Jet Pump Flow/dP
: 4. Reviews Section 8.3.1 to determine if it is completed correctly.
(Record) Using computer points B33NA009 - 028, or P619 indications, record for each jet pump for the operating loops, the indicated diffuser-to-lower plenum Jet Pump flow or Jet Pump dP.
Standard:        Determines that Step 8.3.1 is completed correctly.
Cue:              None Comments SAT                UNSAT                  Comment Number Page 9 of 13
 
JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)
NOTE For TWO LOOP operation, if the results of steps 8.1.4 and 8.2.4 are acceptable, the surveillance results are acceptable, and steps 8.3.2, 8.3.3, 8.3.4 may be omitted (N/Ad).
For SINGLE LOOP operation, these steps should be performed for the operating jet pumps, but acceptance criteria has not been established.
          *5. Reviews Steps 8.3.2, 8.3.3, and 8.3.4 to determine if they have been completed correctly.
Standard:        Determines from NOTE preceeding Step 8.3.2 that because Step 8.1.4 is not within the Acceptance Value, Steps 8.3.2, 8.3.3, 8.3.4 need to be completed.
Cue:              If operator wants to return the document to the originator request that he complete the review to determine if there are any other problems.
Comments SAT                UNSAT                Comment Number
: 6. Reviews Step 8.4, to determine if it has been completed correctly.
Standard:        Determines that Step 8.4 was completed correctly.
Cue:              None Comments          Step may be N/Ad SAT                UNSAT                Comment Number Page 10 of 13
 
JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)
: 7. Reviews Steps 8.5 to determine if it has been completed correctly.
Standard:    Determines that Step 8.5 was completed correctly.
Cue:          None Comments SAT                UNSAT                Comment Number
          *8. Signs for Review and Approval Standard:    Determines that because Step 8.1.4 was completed incorrectly and Steps 8.3.2, 8.3.3, and 8.3.4 are not completed, CPS 9041.01D001 should not be signed.
Cue:          None Comments SAT                UNSAT                Comment Number Page 11 of 13
 
JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)
TERMINATING CUES:
Problems with CPS 9041.01, Jet Pump Operability Test, have been identified and test is not signed off.
STOP TIME:
Page 12 of 13
 
JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)
Initiating Cue Review the supplied CPS 9041.01, Jet Pump Operability Test and CPS 9041.01D001, Jet Pump Operability Test Data Sheet for acceptability.
Page 13 of 13
 
CLINTON POWER STATION Job Performance Measure Redirect Worker in a High Radiation Area JPM Number: 99555501SAN01 Revision Number: 00 Date:
Developed By:
Instructor                          Date Validated By:
SME or Instructor                    Date Reviewed By:
Operations Representative            Date Approved By:
Training Department                  Date
 
JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:    All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
_________  1. Task description and number, JPM description and number are identified.
_________  2. Knowledge and Abilities (K/A) references are included.
_________  3. Performance location specified. (in-plant, control room, or simulator)
_________  4. Initial setup conditions are identified.
_________  5. Initiating and terminating cues are properly identified.
_________  6. Task standards identified and verified by SME review.
_________  7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
_________  8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Current Procedure Rev.                            Date:
Procedure Rev. Referenced                        Date:
* If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.
_________  9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
_________  10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
_________  11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                            Date SME/Instructor                                            Date SME/Instructor                                            Date Page 2 of 9
 
JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision    Date                              Description 00                New format and numbering convention, revalidated. This replaces JPM 995555.0103. Revision number reset to 0.
Page 3 of 9
 
JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
NLO            RO            SRO              STA            SRO Cert JPM
 
==Title:==
Redirect Worker in a High Radiation Area JPM Number:      99555501SAN01                                    Revision Number:01 Task Number and
 
==Title:==
995555.01, Perform radiological practices for High Radiation Zone K/A System          K/A Number            Importance (RO/SRO)
Generic            2.3.10                                  3.3 Suggested Testing Environment: Any, Simulator is preferred Actual Testing Environment:        Simulator                      Plant          Control Room Testing Method:            Simulate    Faulted/Alternate Path:          Yes        No Perform                  SRO Only:          Yes          No Time Critical:        Yes          No Estimated Time to Complete: 15 minutes                  Actual Time Used:              minutes
 
==References:==
RP-AA-460, Controls for High and Very High Radiation Areas, Rev. 7 RP-AA-400, ALARA Program, Rev. 3 EVALUATION
 
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory            Unsatisfactory Comments:
Evaluators Name:                                        (Print)
Evaluators Signature:                                  Date:
Page 4 of 9
 
JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to perform, simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
The NLO is waiting in a low dose area.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* Copy of Aux Bldg Steam Tunnel Survey Map PROCEDURAL/
 
==REFERENCES:==
* RP-AA 460, Controls for High and Very High Radiation Areas, Rev. 7
* RP-AA-400, ALARA Program, Rev. 3 EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
Page 5 of 9
 
JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS AND INITIATING CUE:
: 1. The Unit is shutdown, you are the CRS.
: 2. An NLO is in the Aux Bldg Steam Tunnel to perform valve manipulations for feedwater flow trouble shooting.
: 3. You have just directed the NLO to CLOSE 1FW042A Rx Feedwater Flow Inst Root
: 4. Respond to reports from the NLO.
START TIME:
Page 6 of 9
 
JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS RP-AA-460, Controls for High and Very High Radiation Areas 4.1.2.2, Only RP personnel are authorized to alter the position of radiological boundaries or barricades associated with a HRA/LHRA/VHRA.
: 1. RP barricade blocks access to valve.
Standard:          Does not allow the NLO to move the barricade.
Cue:                As the NLO report that there is a roped off area with a radiation sign and a swing gate with a light on it. Requests permission to move the rope to be able to access the 1FW042A valve.
Comments SAT                UNSAT                  Comment Number Page 7 of 9
 
JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)
Note May direct the performance of step 3 before step 2
            *2  Directs RP to move barricade.
Standard:      Contacts RP or directs NLO to contact RP to have barricade moved.
Cue:
* As the NLO report that RP will not be able to be move the barricade until after shift turnover in 30 minutes.
* If the CRS contacts RP then above report should come from RP.
Comments SAT                  UNSAT              Comment Number RP-AA-400, ALARA Program 3.10.1 ENSURE that department personnel comply with ALARA Program procedures and requirements.
          *3. Directs NLO to low dose area.
Standard:      Has NLO go to low dose area and/or exit Locked High Radiation Area Cue:            When operator gives direction to the NLO give the CRS the survey map of Aux Bldg Steam Tunnel and have him determine the Low Dose Area.
Comments SAT                  UNSAT              Comment Number TERMINATING CUES:
The NLO is waiting in a low dose area.
STOP TIME:
Page 8 of 9
 
JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)
Initiating Cue
: 1. The Unit is shutdown, you are the CRS.
: 2. An NLO is in the Aux Bldg Steam Tunnel to perform valve manipulations for feedwater flow trouble shooting.
: 3. You have just directed the NLO to CLOSE 1FW042A Rx Feedwater Flow Inst Root
: 4. Respond to reports from the NLO.
Page 9 of 9
 
CLINTON POWER STATION Job Performance Measure Complete a NARS Form and Make the Required Notifications JPM Number: 99999924SAN01 Revision Number: 00 Date:
Developed By:
Instructor                    Date Validated By:
SME or Instructor              Date Reviewed By:
Operations Representative      Date Approved By:
Training Department            Date
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:    All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
_________  1. Task description and number, JPM description and number are identified.
_________  2. Knowledge and Abilities (K/A) references are included.
_________  3. Performance location specified. (in-plant, control room, or simulator)
_________  4. Initial setup conditions are identified.
_________  5. Initiating and terminating cues are properly identified.
_________  6. Task standards identified and verified by SME review.
_________  7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
_________  8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Current Procedure Rev.                            Date:
Procedure Rev. Referenced                        Date:
* If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.
_________  9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
_________  10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
_________  11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                            Date SME/Instructor                                            Date SME/Instructor                                            Date Page 2 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision    Date                              Description 00                New format and numbering convention, revalidated. This replaces JPM 999999.24. Revision number reset to 0.
Page 3 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
 
==Title:==
NLO            RO            SRO              STA            SRO Cert JPM
 
==Title:==
Complete a NARS Form and Make the Required Notifications JPM Number:      99999924SAN01                                    Revision Number:00 Task Number and
 
==Title:==
999999.24, Preparation of Notification Form K/A System          K/A Number            Importance (RO/SRO)
Generic            2.4.38              2.2                  4.0 Suggested Testing Environment: Any Actual Testing Environment:        Simulator                      Plant          Control Room Testing Method:            Simulate    Faulted/Alternate Path:          Yes        No Perform                  SRO Only:          Yes        No Time Critical:        Yes          No Estimated Time to Complete: 30 minutes                  Actual Time Used:              minutes
 
==References:==
EP-AA-1003, Radiological Emergency Plan Annex for Clinton Station, Rev. 6 EP-AA-111, Emergency Classification and Protective Action Recommendations, Rev. 10 EP-AA-111-F-07, Clinton Plant Based PAR Flowchart, Rev B EP-MW-114-100, Midwest Region Offsite Notifications, Rev. 5 EVALUATION
 
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory            Unsatisfactory Comments:
Evaluators Name:                                        (Print)
Evaluators Signature:                                  Date:
Page 4 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
SIMULATOR SET-UP CONDITIONS
* None TASK STANDARDS:
* NARS Form is filled out correctly and Notifications made within the required time.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* A copy of FG1 (Page CL 3-25) and Fission Product Barrier Matrix (Page CL 3-8) from EP-AA-1003, Radiological Emergency Plan Annex for Clinton Station
* A copy of EP-AA-111, Emergency Classification and Protective Action Recommendations
* A copy of EP-AA-111-F-07, Clinton Plant Based PAR Flowchart
* A copy of EP-MW-114-100, Midwest Region Offsite Notifications
* EP-MW-114-100-F-01, Nuclear Accident Reporting System (NARS) Form PROCEDURAL/
 
==REFERENCES:==
* EP-AA-1003, Radiological Emergency Plan Annex for Clinton Station, Rev. 6
* EP-AA-111, Emergency Classification and Protective Action Recommendations, Rev. 10
* EP-AA-111-F-07, Clinton Plant Based PAR Flowchart, Rev B
* EP-MW-114-100, Midwest Region Offsite Notifications, Rev. 5 EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
Page 5 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS AND INITIATING CUE:
You are the Shift Manager.
A LOCA has occurred in the plant.
RPV Level is less than -187 inches.
Containment Pressure is 15 psig.
The inboard and outboard MSIVs on the D Main Steam Line have failed to shut manually.
Wind direction is varying between 280 and 284 degrees Wind speed is 10 mph.
No release of radioactive materials has occurred.
An EAL initial classification of General Emergency as EAL FG1 has just been declared.
You are to complete the NARS Form, EP-MW-114-100-F-01, and make the required notifications.
Report when the task is complete. This JPM is time critical.
NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide a copy of the following procedures to the student.
* A copy of FG1 (Page CL 3-25) and Fission Product Barrier Matrix (Page CL 3-8) from EP-AA-1003, Radiological Emergency Plan Annex for Clinton Station
* EP-AA-111, Emergency Classification and Protective Action Recommendations
* EP-AA-111-F-07, Clinton Plant Based PAR Flowchart
* EP-MW-114-100, Midwest Region Offsite Notifications
* EP-MW-114-100-F-01, Nuclear Accident Reporting System (NARS) Form START TIME:
Page 6 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS
: 1. UTILITY MESSAGE NO. ___________
Standard:          1 Cue:                None Comments            START TIME FOR NEXT SECTION:____________ (Time Critical)
(Same as JPM Start Time)
SAT              UNSAT                    Comment Number
: 2. STATE MESSAGE NO. ___________
Standard:          N/A Cue:                None Comments SAT              UNSAT                    Comment Number Page 7 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
: 3. 1. STATUS
[A] ACTUAL
[B] DRILL/EXERCISE Standard:    Either Cue:          None Comments SAT              UNSAT              Comment Number
          *4. 2. STATION
[A] BRAIDWOOD [C] CLINTON    [E] LASALLE    [G] ZION
[B] BYRON      [D] DRESDEN  [F] QUAD CITIES Standard:    [C] CLINTON Cue:          None Comments SAT              UNSAT              Comment Number Page 8 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
          *5. 3. ONSITE CONDITION
[A] UNUSUAL EVENT
[B] ALERT
[C] SITE AREA EMERGENCY
[D] GENERAL EMERGENCY
[E] RECOVERY
[F] TERMINATED Standard:    [D] GENERAL EMERGENCY Cue:          None Comments SAT                UNSAT                Comment Number
          *6. 4. ACCIDENT CLASSIFIED                  ACCIDENT TERMINATED TIME (3[A-E]):______________            TIME (3[F]): _____________
DATE (3[A-E]): _____________            DATE (3[F]): _____________
EAL#: _____________________
Standard:    ACCIDENT CLASSIFIED Present Date and Time when Cue was acknowledged.
EAL#: FG1 ACCIDENT TERMINATED Time and Date: N/A Cue:          None Comments SAT                UNSAT                Comment Number Page 9 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
: 5. RELEASE STATUS    6.
          *7.
[A] NONE
[B] OCCURRING
[C] TERMINATED Standard:    [A] NONE Cue:          None Comments SAT              UNSAT              Comment Number
          *8. 6. TYPE OF RELEASE
[A] NOT APPLICABLE
[B] GASEOUS
[C] LIQUID Standard:    [A] NOT APPLICABLE Cue:          None Comments SAT              UNSAT              Comment Number Page 10 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
          *9. 7. WIND DIR (DEGREES FROM)
Standard:          280 - 284____
(DEGREES FROM)
Cue:          None Comments        Operator May just indicate 280 SAT              UNSAT                Comment Number
          *10. 8. WIND SPEED
[A] METERS/SEC:__________
[B] MILES/HR:_____________
Standard:      9. WIND SPEED
[A] METERS/SEC:__________
[B] MILES/HR:    10______
Cue:          None Comments SAT              UNSAT                Comment Number Page 11 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
          *11. 9. RECOMMENDED ACTIONS UTILITY RECOMMENDATION
[A] NONE (UE, Alert, and SAE Only)
                  -----------------------------------------------(GE Only)-----------------------------------------------------
[B] SHELTER ILLINOIS SUB AREAS:_________________________________________
AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS
[C] SHELTER IOWA SUB AREAS:____________________________________________
AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS
[D] EVACUATE ILLINOIS SUB AREAS:_______________________________________
AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS
[E] SHELTER IOWA SUB AREAS:____________________________________________
AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS Standard:      Determines Protective Action Recommendation using EP-AA-111 & EP-AA-111-F-07
[D] EVACUATE ILLINOIS SUB AREAS:_____ 1, 3, 4____________________________
AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS Cue:          None Comments        Given wind speed encompasses 2 sectors.
SAT                      UNSAT                        Comment Number
: 12. 10. ADDITIONAL INFORMATION Standard:      None Cue:          None Comments SAT                      UNSAT                        Comment Number Page 12 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
          *13. MAKE THE NOTIFICATION Standard:      Dial NARS Code 36 Cue:          You receive a beep and the following agencies respond as on line:
Illinois EMA DeWitt Co. Sheriff Illinois REAC DeWitt Co. EOC Comments SAT              UNSAT                Comment Number
          *14. CONDUCT A ROLL CALL Standard:      Checks off each agency as they respond.
Cue:          Acknowledge each agency on line.
Comments      May be done in conjunction with step 13.
SAT              UNSAT                Comment Number Page 13 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
          *15. FILL IN TIME AND DATE OF ROLL CALL Standard:      Time and Date of Roll Call is filled in on Page 2 of the NARS Form.
Cue:          None Comments      STOP TIME FOR TIME CRITICAL PORTION OF JPM:_____________
(<15 Minutes)
SAT              UNSAT                  Comment Number
          *16. READ THE NARS MESSAGE Standard:      Message is correctly read Cue:          Acknowledge the message Comments      Compare with provided Answer Key SAT              UNSAT                  Comment Number Page 14 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
: 17. 11. TRANSMITTED BY:
Standard:    Completes Block 11. with Name. Phone Number Calling from, and Time/Date.
Cue:          None Comments SAT                UNSAT              Comment Number
: 18. 12. RECEIVED BY:
Standard:    Asks for name of the IEMA representative and enters information on the NARS Form Cue:          Give the operator the name Ken Evans Comments SAT                UNSAT              Comment Number Page 15 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
: 19. REPEAT THE ROLL CALL Standard:    Operator checks off each agency as they respond Cue:          Respond as roll is called.
Comments SAT                UNSAT                    Comment Number
: 20. ASK if there are any questions about the information provided.
Standard:    Answers any questions.
Cue:          None Comments SAT                UNSAT                    Comment Number
: 21. STATE NARS communication is complete.
Standard:    States that NARS communication is complete.
Cue:          None Comments SAT                UNSAT                    Comment Number Page 16 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
TERMINATING CUES:
NARS Form is correctly filled out and Notification is made within the required time.
STOP TIME:
Page 17 of 18
 
JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)
Initiating Cue You are the Shift Manager.
A LOCA has occurred in the plant.
RPV Level is less than -187 inches.
Containment Pressure is 15 psig.
The inboard and outboard MSIVs on the D Main Steam Line have failed to shut manually.
Wind direction is varying between 280 and 284 degrees Wind speed is 10 mph.
No release of radioactive materials has occurred.
An EAL initial classification of General Emergency as EAL FG1 has just been declared.
You are to complete the NARS Form, EP-MW-114-100-F-01, and make the required notifications.
Report when the task is complete. This JPM is time critical.
Page 18 of 18}}

Latest revision as of 14:40, 14 March 2020

Initial Submittal of the Administrative Jpms for the Clinton Initial Examination - July 2005
ML052560442
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/18/2005
From: Charles Phillips
NRC/RGN-III/DRS/OLB
To:
References
50-461/05-301 50-461/05-301
Download: ML052560442 (105)


Text

CLINTON POWER STATION Job Performance Measure Complete a CPS 3006.01C007, Control Rod Withdrawal Checklist - Mode 3 JPM Number: 30060117LAF01 Revision Number: 00 Date:

Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

_________ 1. Task description and number, JPM description and number are identified.

_________ 2. Knowledge and Abilities (K/A) references are included.

_________ 3. Performance location specified. (in-plant, control room, or simulator)

_________ 4. Initial setup conditions are identified.

_________ 5. Initiating and terminating cues are properly identified.

_________ 6. Task standards identified and verified by SME review.

_________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

_________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Current Procedure Rev. Date:

Procedure Rev. Referenced Date:

  • If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.

_________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

_________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

_________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 15

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 New JPM Page 3 of 15

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

NLO RO SRO STA SRO Cert JPM

Title:

Complete a CPS No. 3006.01C007, Control Rod Withdrawal Checklist - Mode 3 JPM Number: 30060117LAN01 Revision Number:00 Task Number and

Title:

300601.17, Perform Control Rod Withdrawal Checklist - Mode 3.

K/A System K/A Number Importance (RO/SRO)

Generic 2.1.23 3.9 4.0 Suggested Testing Environment:Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted/Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

CPS No. 3006.01C007, Control Rod Withdrawal Checklist - Mode 3, Rev. 4c EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 4 of 15

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

SIMULATOR SETUP CONDITIONS

  • IC-83 on the ILT_EXAM_JPM_LOAD, or any IC setup with the plant in Mode 3 and the Mode Switch in the Refuel position. Do not remove the key from the Mode Switch.

TASK STANDARDS:

  • CPS No. 3006.01C007 is completed correctly.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Copy of CPS No. 3006.01C007, Control Rod Withdrawal Checklist - Mode 3 with Sections A

& B complete.

  • CPS No. 9000.01, CONTROL ROOM SURVEILLANCE LOG , Rev 034 A
  • CPS No. 9000.01D001, CONTROL ROOM SURVEILLANCE LOG - MODE 1, 2, 3 DATA SHEET Rev 049 D PROCEDURAL/

REFERENCES:

  • CPS No. 3006.01C007, Control Rod Withdrawal Checklist - Mode 3, Rev. 4c
  • CPS No. 9000.01, CONTROL ROOM SURVEILLANCE LOG , Rev 034 A
  • CPS No. 9000.01D001, CONTROL ROOM SURVEILLANCE LOG - MODE 1, 2, 3 DATA SHEET Rev 049 D EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 15

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS AND INITIATING CUE:

The plant is in Mode 3 and it is desired to perform control rod withdrawals. CPS No.

3006.01C007, Control Rod Withdrawal Checklist - Mode 3, has been started in preparation for withdrawing the first rod (24-29).

The CRS directs you to initiate Table 1 of CPS No. 3006.01C007 by performing Section C steps 1 through 4.

Day 1 is todays date, and the time is 0110.

NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide a MARKED UP copy of the following procedure to the student.

  • CPS No. 3006.01C007, Control Rod Withdrawal Checklist - Mode 3 with Sections A & B complete.

START TIME:

Page 6 of 15

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS No. 3006.01C007 Control Rod Withdrawal Checklist - Mode 3

1. Enters todays date under Day 1 of Table 1 Standard: Todays date is entered under Day 1 of Table 1.

Cue: None, self revealing Comments SAT UNSAT Comment Number

2. 2.a)1)

Operator conducts an IRM channel check.

Standard: IRM channel check is completed satisfactorily using DCS indications and/or P678 charts, and the operator initials the appropriate block.

Cue: If operator asks, provide IRM Backpanel Readings Cue Sheet. Provide CPS 9000.01D001. Provide CPS 9000.01 if asked for.

Comments SAT UNSAT Comment Number Page 7 of 15

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

3. 2.a)2)

Operator conducts a SDV level ATM channel check.

Standard: SDV level ATM channel check is completed satisfactorily, and the operator initials the appropriate block.

Cue: Provide the SDV level RPS ATM Cue Sheet. Provide CPS 9000.01D001.

Provide CPS 9000.01 if asked for.

Comments SAT UNSAT Comment Number

4. 2.a)3)

Verify that all surveillances in Section B are current.

Standard: Operator verifies that all surveillances are current, and initials the appropriate block.

Cue: Dates indicate that all surveillances are current.

Comments SAT UNSAT Comment Number Page 8 of 15

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

5. 2.a)4)

If the control rod has been withdrawn for 7 days, then insert it at least one notch, and verify accumulator pressure is 1550 psig.

Standard: No action required.

Cue: None, self revealing Comments SAT UNSAT Comment Number Page 9 of 15

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

6. 2.b)

Verify all other control rods in a 5 by 5 array centered on the control rod being withdrawn are disarmed.

Standard: Block should be marked NA, because Steps 2.a)1 thru 4) are being met.

Cue:

Comments If the operator checks this, no other rods are disarmed.

SAT UNSAT Comment Number Page 10 of 15

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

Faulted Step

  • 7. 3.

Verify the Reactor Mode Switch is locked in the REFUEL position.

Standard: Operator identifies that the key is still in the Mode Switch, and notifies the CRS.

The operator does not initial the appropriate block until the key has been removed.

Key may be placed in the Key Locker.

Cue: Acknowledge the report and tell the operator to remove the key and continue with the task.

Take the key from the operator, and notify the operator that the key will be placed in the Key Locker.

Comments To be Locked in the REFUEL position the reactor mode switch key must be removed from the console per ITS B 3.9.2, SR 3.9.2.1.

SAT UNSAT Comment Number

8. 4.

Verify all control rods , other than the control rod being withdrawn, are fully inserted.

Standard: Operator verifies that all the control rods are inserted, and initials the appropriate block.

Cue:

Comments SAT UNSAT Comment Number Page 11 of 15

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

TERMINATING CUES:

The key has been removed from the Mode Switch and Section C, Steps 1 through 4 of CPS No.

3006.01C007 have been completed.

STOP TIME:

Page 12 of 15

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS AND INITIATING CUE:

The plant is in Mode 3 and it is desired to perform control rod withdrawals. CPS No.

3006.01C007, Control Rod Withdrawal Checklist - Mode 3, has been started in preparation for withdrawing the first rod (24-29).

The CRS directs you to initiate Table 1 of CPS No. 3006.01C007 by performing Section C steps 1 through 4.

Day 1 is todays date, and the time is 0110.

Page 13 of 15

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

IRM Backpanel Readings (Cue Sheet for JPM Step 2 if needed)

A 6 E 5 C 6 G 5 B 6 F 6 D 5 H 5 Page 14 of 15

JPM Number: 30060117LAF01 Clinton Power Station Job Performance Measure (JPM)

SDV Level RPS ATM Readings (Cue Sheet for JPM Step 3 if needed) 1C11-N601A 0 1C11-N601B -1 1C11-N601C -0.5 1C11-N601D -0.25 Page 15 of 15

CLINTON POWER STATION Job Performance Measure Verify Conditions Are Met to Enter Mode 2 From Mode 1 JPM Number: 30060106LAF01 Revision Number: 00 Date:

Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

_________ 1. Task description and number, JPM description and number are identified.

_________ 2. Knowledge and Abilities (K/A) references are included.

_________ 3. Performance location specified. (in-plant, control room, or simulator)

_________ 4. Initial setup conditions are identified.

_________ 5. Initiating and terminating cues are properly identified.

_________ 6. Task standards identified and verified by SME review.

_________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

_________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Current Procedure Rev. Date:

Procedure Rev. Referenced Date:

  • If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.

_________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

_________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

_________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 13

JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 New format and numbering convention, revalidated. This replaces JPM 300601.06. Revision number reset to 0.

Page 3 of 13

JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

NLO RO SRO STA SRO Cert JPM

Title:

Verify Conditions Are Met to Enter Mode 2 From Mode 1 JPM Number: 30060106LAF01 Revision Number:00 Task Number and

Title:

300601.06, Complete Control Room actions to perform Shifting Reactor Mode Switch to START & HOT STBY.

K/A System K/A Number Importance (RO/SRO)

Generic 2.1.31 4.2 3.9 Suggested Testing Environment:Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted/Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

CPS No. 3006.01 Unit Shutdown Rev 33a CPS No. 9000.06D001, HEATUP/COOLDOWN, INSERVICE LEAK &

HYDROSTATIC TESTING 30 MINUTE TEMPERATURE LOG Rev 30a EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 4 of 13

JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)

Page 5 of 13

JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

SIMULATOR SETUP CONDITIONS IC-86 on the ILT_EXAM_JPM_LOAD or any other IC with the following conditions:

  • Power level at 8%.
  • APRM C failed to 4% power.
  • MOV Test Prep Switches for DW Clg and Chill Wtr (5050) and SSW System Div 3 (5064) in TEST.
  • Keys in 4 other MOV Test Prep Switches with switches in NORM TASK STANDARDS:
  • Completes applicable steps of CPS 3006.01 Unit Shutdown, Section 8.6 & 8.4.7.5.
  • Determines that the mode change should not be performed.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Marked up copy of CPS 3006.01, completed to step 8.6 with the exception of step 8.4.7.5.
  • Copy of CPS 3006.01, Appendix C.
  • Copy of CPS 9000.06D001 PROCEDURAL/

REFERENCES:

  • CPS 3006.01, Unit Shutdown, Rev. 33a EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 6 of 13

JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS AND INITIATING CUE:

A plant shutdown is in progress. You are directed to verify conditions are met to enter Mode 2 IAW CPS 3006.01, Unit Shutdown.

NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide a MARKED UP copy of the following procedure to the student.

  • CPS 3006.01, completed to step 8.6 with the exception of step 8.4.7.5.
  • CPS 3006.01, Appendix C.
  • CPS 90005.01D001.

START TIME:

Page 7 of 13

JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS 8.6 Shifting Reactor Mode Switch To Start & Hot Stby

1. 8.6.1.1 Section 8.4 completed as appropriate.

Standard: Operator checks CPS 3006.01 Section 8.4 and determines that 8.4.7.5. has not been initialed. Reports to the CRS.

Cue: Acknowledge the report as CRS and, if necessary, direct the operator to perform 8.4.7.5.

Comments SAT UNSAT Comment Number Page 8 of 13

JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)

Faulted Step

  • 2. 8.4.7.5 Verify IRM/APRM overlap is achieved.

) Overlap between IRMs and APRMs exist when sufficient (4 channels per ITS LCO 3.3.1.1 Table functions) IRMs and APRMs concurrently have on-scale readings such that the transition between MODE 1 and MODE 2 can be made without either APRM downscale rod block (5% RTP), or IRM upscale rod block (108/125 full scale).

Standard:

  • Operator determines that APRM C is giving a downscale rod block and step 8.4.7.5. is not satisfied.
  • Operator reports to the CRS that APRM C is reading 4% and has a Downscale Rod Block.

Cue: As the CRS, acknowledge report. If necesssary, direct operator to complete Section 8.6 to determine if there are any other problems.

Comments SAT UNSAT Comment Number Page 9 of 13

JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)

Faulted Step

  • 3. 8.6.1.2 Verify/place MOV TEST PREP switches in NORMAL.

[Listed on Appendix C]

Standard:

  • Operator checks Appendix C and verifies completed entries and identifies switches on section 5050 & 5064 have not been checked.
  • Operator determines that switches for DW Clg & Chill Wtr and SSW System Div 3 are in TEST, and places switches in NORMAL.

Cue: If report is made about switches being in TEST, acknowledge report as CRS. If necessary direct the operator to place the switches in Normal.

If asked, the MSIV Leakage Control MOV TPS are in NORMAL (Backpanel)

Comments SAT UNSAT Comment Number

4. 8.6.1.3.

Prepare for use during cooldown CPS 9000.06D001, Heatup/Cooldown, Inservice Leak and Hydrostatic Testing 30 Minute Temperature Log.

Standard: Operator reviews CPS 9000.06D001 and fills in appropriate blocks.

Cue: Provide a copy of CPS 9000.06D001.

Comments SAT UNSAT Comment Number Page 10 of 13

JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)

NOTE APRM rod blocks will occur at 5% with mode switch in RUN.

5. 8.6.2 Insert control rods per the specified sequence to decrease reactor power to 6 - 8%.

Standard: Operator verifies that power is 6 - 8%.

Cue: None Comments SAT UNSAT Comment Number

6. 8.6.3.1 Verify IRM/APRM Overlap completed per 8.4.7.

Standard: Actions per this step should have been identified in step 1, and completed in step 2 of this JPM. If the actions were not completed earlier then they should be completed now. Refer to Step 2 for standard Cue: None Comments SAT UNSAT Comment Number Page 11 of 13

JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)

7. 8.6.3.2 Adjust IRM Range Switches so all operable IRMs read on scale (preferred 15 -

75)

Standard: Operator verifies that all operable IRMs are reading on scale and are in the range of 15 - 75.

Cue: None Comments SAT UNSAT Comment Number TERMINATING CUES:

The operator determines the Mode change should not be made.

STOP TIME:

Page 12 of 13

JPM Number: 30060106LAF01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS AND INITIATING CUE:

A plant shutdown is in progress. You are directed to verify conditions are met to enter Mode 2 IAW CPS 3006.01, Unit Shutdown.

Page 13 of 13

CLINTON POWER STATION Job Performance Measure Perform a Jet Pump Operability Test per CPS No. 9041.01 JPM Number: 90410101LAN01 Revision Number: 00 Date:

Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

_________ 1. Task description and number, JPM description and number are identified.

_________ 2. Knowledge and Abilities (K/A) references are included.

_________ 3. Performance location specified. (in-plant, control room, or simulator)

_________ 4. Initial setup conditions are identified.

_________ 5. Initiating and terminating cues are properly identified.

_________ 6. Task standards identified and verified by SME review.

_________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

_________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Current Procedure Rev. Date:

Procedure Rev. Referenced Date:

  • If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.

_________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

_________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

_________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 New format and numbering convention, revalidated. This replaces JPM 012202J005. Revision number reset to 0.

Page 3 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

NLO RO SRO STA SRO Cert JPM

Title:

Perform a Jet Pump Operability Test per CPS No. 9041.01 JPM Number: 90410101LAN01 Revision Number:03 Task Number and

Title:

904101.01, Perform the Jet Pump Operability Test K/A System K/A Number Importance (RO/SRO)

Generic 2.2.12 3.0 3.4 Suggested Testing Environment: Any Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 40 minutes Actual Time Used: minutes

References:

CPS No. 9041.01, Jet Pump Operability Test, Rev. 36 CPS No. 9041.01D001, Jet Pump Operability Test Data Sheet, Rev. 34 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 4 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to perform, simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

SIMULATOR SET-UP CONDITIONS

  • None TASK STANDARDS:
  • CPS No. 9041.01, Jet Pump Operability Test, has been completed satisfactorily.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Calculator PROCEDURAL/

REFERENCES:

  • CPS No. 9041.01, Jet Pump Operability Test, Rev 36
  • CPS No. 9041.01D001, Jet Pump Operability Test Data Sheet, Rev. 34 EVALUATOR INSTRUCTIONS:
  • Preference is to perform JPM on the simulator, but may also be performed in the Main Control Room with the plant at or near 90% power (ie>70%), and Reactor Recirc in 2 loop operation.

Page 5 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS AND INITIATING CUE:

You are the extra RO and the CRS has directed you to perform CPS No. 9041.01, Jet Pump Operability Test, using the supplied CPS No. 9041.01, Jet Pump Operability Test and CPS 9041.01D001, Jet Pump Operability Test Data Sheet.

The computerized method of performing CPS No. 9041.01 is not available at this time.

APRM calibrations are NOT in progress.

NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide the following to the student.

  • CPS No. 9041.01, Jet Pump Operability Test, Rev 36
  • CPS No. 9041.01D001, Jet Pump Operability Test Data Sheet, Rev. 34
  • Calculator START TIME:

Page 6 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS 5.0 Prerequisites

1. 5.1, Recirculation System Status 5.1.1 Initial 5.1.1.1.1) Loop flow mismatch maintained within 5% of rated core flow (4.225 mlbm/hr) when effective core flow is 70% of rated core flow (59.15 mlbm/hr),

5.2 (Record) Record Rx power using OD-3, 3D Monicore, or APRM indication 5.3 (Initial) Notify SMngt of test start, and log Time and Date.

Standard:

  • Checks the following squares for:

5.1.1.1.1), 5.2, & 5.3

  • 5.1.1 Initials the 9041.01D001
  • 5.2 Documents power on the 9041.01D001 Cue: Report that authorization has been granted Report that logging information will be done by the B operator.

Comments This is a passive surveillance but if performed in the MCR obtain permission to access the information from the various locations.

SAT UNSAT Comment Number Page 7 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

NOTE During two-loop (single-loop) operation, steps pertaining to single-loop (two-loop) operation should have N/A in initial or data blanks.

If APRM calibrations are in progress, DCS computer points for RR Flow may be invalid. Check alternate data sources to verify values.

  • 2 8.1.1 (Record) Use computer points B33DA013 (Loop A) and B33DA014 (Loop B) to determine operating Recirculation Loop A and/or B Flow in GPM.

Standard: Record Recirc Loop A and/or B flows on CPS No. 9041.01D001 Cue: Provide Data Sheet for Section 8.1 and 8.2 Comments Recirc Loop Drive Flows on DCS display 4A use computer points B33-DA013 and B33-DA014.

SAT UNSAT Comment Number

  • 3. 8.1.2 (Record) Use computer points B33-DA009 (FCV 1B33-F060A) and B33-DA010 (FCV 1B33-F060B) to determine operating Recirculation FCV position.

Standard: Record positions of FCVs B33-F060A and B33-F060B on CPS N0.

9041.01D001.

Cue: If performed in the Simulator, RVDT is selected for both FCVs.

Comments F060A and F060B valve positions on DCS display 4A use computer points B33-DA009 and B33-DA010.

If performed in the MCR ensure permission is granted to open 1H13-P634.

SAT UNSAT Comment Number Page 8 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

  • 4. 8.1.3 Determine the Established Recirculation Loop and/or B flow using step 8.1.3.2 as follows:

IF RR Pumps for TWO LOOP operation are in fast speed, THEN Use Figure 1a (1b) and Recirc FCV A (B) position from step 8.1.2 (x-axis value) to determine Established Recirc Loop A (B) Flow (y-axis value).

Standard: Determine Established Recirc Loop A and B Flows and record on CPS No.

9041.01D001.

Cue:

Comments The valves should be between:

A 29100 - 29200 B 29100 - 29200 SAT UNSAT Comment Number

  • 5. 8.1.4 (Record) For each operating Recirc Loop A and/or B, calculate the %

deviation of the indicated loop flow from the established loop flow using the data sheet formula.

Standard: Calculate percent deviation for both loops and record on CPS No. 9041.01D001.

Cue:

Comments SAT UNSAT Comment Number Page 9 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM) 8.2 Indicated Total Core Flow versus Established Total Core Flow

  • 6. 8.2.1 (Record) Use computer point B33NA001 to determine Indicated Total Core Flow.

Standard: Record total Jet Pump Flow on CPS No. 9041.01D001.

Cue:

Comments Total Core Flow on DCS display 4A uses computer point B33-NA001.

SAT UNSAT Comment Number

7. 8.2.2 (Record) Calculate the Total Recirc Flow, sum of Loop A and B Flow from step 8.1.1 using the data sheet formula.

Standard: Calculate and record Total Recirc Flow on CPS No. 9041.01D001 Cue:

Comments SAT UNSAT Comment Number Page 10 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

  • 8. 8.2.3 (Record) Determine and record the Established Total Core Flow value per 8.2.3.1 or 8.2.3.2 below.
1. For TWO LOOP operation, using Figure 2a and the Total Recirc Flow from step 8.2.2 as the x-axis value, determine the Established Total Core Flow.

Standard: Determine and record the Established Total Core Flow on CPS No. 9041.01D001.

Cue:

Comments SAT UNSAT Comment Number

  • 9. 8.2.4 (Record) Calculate the percent deviation in Total Core Flow from Established Core Flow using the data sheet formula.

Standard: Calculate and record percent deviation on CPS No. 9041.01D001.

Cue: If asked, engineering judgement is not being used.

Comments SAT UNSAT Comment Number Page 11 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM) 8.3 Indicated Jet Pump Flow/dP Versus Established Jet Pump Flow/dP

  • 10. 8.3.1 (Record) Using computer points B33NA009 - 028, or P619 indications, record for each jet pump for the operating loops, the indicated diffuser-to-lower plenum Jet Pump flow or Jet Pump dP.

Standard: Record Jet Pump Flows using computer points on CPS No. 9041.01D001 Cue: Provide Data Sheet for Section 8.3 Comments SAT UNSAT Comment Number Page 12 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

NOTE For TWO LOOP operation, if the results of steps 8.1.4 and 8.2.4 are acceptable, the surveillance results are acceptable, and steps 8.3.2, 8.3.3, 8.3.4 may be omitted (N/Ad).

For SINGLE LOOP operation, these steps should be performed for the operating jet pumps, but acceptance criteria has not been established.

11. 8.3.2 (Record) Calculate the Average Jet Pump Flow for each recirc loop using Formula #1 or Average Jet Pump dP (P619 dP meter scales are in %)

for each recirc loop using Formula #2.

Standard: Not required due to steps 8.1.4 and 8.2.4 are acceptable Steps 8.3.2, 8.3.3, 8.3.4 may be omitted Cue:

Comments SAT UNSAT Comment Number Page 13 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

12. 8.4 (Initial) If an Engineering evaluation was performed, are jet pumps OPERABLE.

Standard: Engineering evaluation is not performed Cue:

Comments Step can be NAd SAT UNSAT Comment Number

13. 8.5 (Initial) Notify SMngt at test completion.

Standard: Notify SMngt at test completion.

Cue: Acknowledge completion.

Comments The student will need to provide procedure and D001.

SAT UNSAT Comment Number TERMINATING CUES:

CPS No. 9041.01, Jet Pump Operability Test, completed satisfactorily.

STOP TIME:

Page 14 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

Data for Section 8.1 and 8.2 Reactor Power 96%

INDICATED Loop A Flow 31429 INDICATED Loop B Flow 32006 B33-DA009 B33-F060A Recirc FCV Position RVDT 58%

B33-DA010 B33-F060B Recirc FCV Position RVDT 59%

B33NA001 Indicated Total Core Flow 75.6 Page 15 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

Jet Pump Flow for Section 8.3 Jet Pump Number JP 1 3.96 JP 2 3.96 JP 3 3.70 JP 4 3.74 JP 5 3.77 JP 6 3.78 JP 7 3.70 JP 8 3.73 JP 9 3.70 JP 10 3.63 JP 11 4.10 JP 12 4.10 JP 13 3.86 JP 14 3.85 JP 15 3.99 JP 16 3.91 JP 17 3.86 JP 18 3.81 JP 19 3.80 JP 20 3.80 Page 16 of 17

JPM Number: 90410101LAN01 Clinton Power Station Job Performance Measure (JPM)

Initiating Cue You are the extra RO and the CRS has directed you to perform CPS No. 9041.01, Jet Pump Operability Test, using the supplied CPS No. 9041.01, Jet Pump Operability Test and CPS 9041.01D001, Jet Pump Operability Test Data Sheet.

The computerized method of performing CPS No. 9041.01 is not available at this time.

APRM calibrations are NOT in progress.

Page 17 of 17

CLINTON POWER STATION Job Performance Measure Determine Expected Dose Operator Would Receive While Performing an LLRT JPM Number: 99555501NAN01 Revision Number: 00 Date:

Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

_________ 1. Task description and number, JPM description and number are identified.

_________ 2. Knowledge and Abilities (K/A) references are included.

_________ 3. Performance location specified. (in-plant, control room, or simulator)

_________ 4. Initial setup conditions are identified.

_________ 5. Initiating and terminating cues are properly identified.

_________ 6. Task standards identified and verified by SME review.

_________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

_________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Current Procedure Rev. Date:

Procedure Rev. Referenced Date:

  • If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.

_________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

_________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

_________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 10

JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 New format and numbering convention, revalidated. This replaces JPM 033299J006. Revision number reset to 0.

Page 3 of 10

JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

NLO RO SRO STA SRO Cert JPM

Title:

Determine Expected Dose Operator Would Receive While Performing LLRT JPM Number: 99555501NAN01 Revision Number:00 Task Number and

Title:

995555.01, Complete in-plant radiological practices for High Radiation Zone K/A System K/A Number Importance (RO/SRO)

Generic 2.3.10 2.9 3.3 Suggested Testing Environment:Any Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

CPS No. RP-AA-203, Exposure Control and Authorization, Rev. 2 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 4 of 10

JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Expected dose is determined and operators, who would not exceed their dose limit, are selected.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Radiation survey map of the Containment Steam Tunnel
  • RP-AA-203, Exposure Control and Authorization
  • Calculator PROCEDURAL/

REFERENCES:

  • CPS No. RP-AA-203, Exposure Control and Authorization, Rev. 2 EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 10

JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS AND INITIATING CUE:

You are part of a team that is responsible for performing LLRTs during a refueling outage. You have been given the responsibility to set up for a test on RWCU LLRT 1MC-061. This will require you and one other member of your team to perform tasks in the Containment Steam Tunnel approximately 30cm from 1G33-F053. The tasks are estimated to take 90 minutes to complete.

The SRO in charge of the LLRTs has asked you to determine the following:

  • Expected dose that you would receive.
  • Which members of the team could assist you without requiring a Dose Level Extension Form.

The following is a list of LLRT Team Members and their exposure history.

Name Annual TEDE Dose: Annual TEDE Dose: Annual TEDE Dose:

Non ROG Mid West ROG Clinton Station John 0 mrem 245 mrem 1547 mrem Tim 261 mrem 89 mrem 1319 mrem Paul 154 mrem 0 mrem 1625 mrem NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide the following to the student.

  • Radiation survey map of the Containment Steam Tunnel
  • Calculator START TIME:

Page 6 of 10

JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS

1. Locates survey map of the Containment Steam Tunnel Standard: Describes the locations where survey maps can be found.

Cue: When operator describes where survey maps are located, provide him with a copy of the Containment Steam Tunnel map.

Comments Survey maps may be found in the following locations:

  • Service Building entrance to the RCA
  • R & S line near the Maintenance Area
  • Radiation Protection Desk
  • Access Control Point SAT UNSAT Comment Number Page 7 of 10

JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)

2. Determines the Dose Rate near 1G33-F053 Standard: Dose Rate determined to be 200 mr/hr @ 30 cm from valve 1G33-F053, and/or 150 mr/hr in the area around 1G33-F053.

Cue: None Comments SAT UNSAT Comment Number

  • 3. Calculates expected dose.

Standard: Expected dose calculated to be:

  • 300 mrem if the 200 mr/hr rate is used.
  • 225 mrem if the 150 mr/hr rate is used.

Cue: None Comments SAT UNSAT Comment Number Page 8 of 10

JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)

  • 4 Determines which operators could assist without requiring a Dose Level Extension Form.

Standard: Operator determines that Tim could assist.

Cue: None Comments: The Admin Limit that would require a Dose Level Extension Form is 2000 mr/yr.

Name Annual TEDE Annual TEDE Annual TEDE Total Received Dose: Non ROG Dose: MWROG Dose:CPS @ 225 mrem John 0 mrem 245 mrem 1547 mrem 2017 Tim 261 mrem 89 mrem 1319 mrem 1894 Paul 154 mrem 0 mrem 1625 mrem 2004 Name Annual TEDE Annual TEDE Annual TEDE Total Received Dose: Non ROG Dose: MWROG Dose:CPS @ 300 mrem John 0 mrem 245 mrem 1547 mrem 2092 Tim 261 mrem 89 mrem 1319 mrem 1969 Paul 154 mrem 0 mrem 1625 mrem 2079 SAT UNSAT Comment Number TERMINATING CUES:

Operator(s) has been named to assist in the LLRT tasks.

STOP TIME:

Page 9 of 10

JPM Number: 99555501NAN01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS AND INITIATING CUE:

You are part of a team that is responsible for performing LLRTs during a refueling outage. You have been given the responsibility to set up for a test on RWCU LLRT 1MC-061. This will require you and one other member of your team to perform tasks in the Containment Steam Tunnel approximately 30cm from 1G33-F053. The tasks are estimated to take 90 minutes to complete.

The SRO in charge of the LLRTs has asked you to determine the following:

  • Expected dose that you would receive.
  • Which members of the team could assist you without requiring a Dose Level Extension Form.

The following is a list of LLRT Team Members and their exposure history.

Name Annual TEDE Dose: Annual TEDE Dose: Annual TEDE Dose:

Non ROG Mid West ROG Clinton Station John 0 mrem 245 mrem 1547 mrem Tim 261 mrem 89 mrem 1319 mrem Paul 154 mrem 0 mrem 1625 mrem Page 10 of 10

CLINTON POWER STATION Job Performance Measure Verify Conditions are met to Enter Mode 2 JPM Number: 30010101SAN01 Revision Number: 00 Date:

Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

_________ 1. Task description and number, JPM description and number are identified.

_________ 2. Knowledge and Abilities (K/A) references are included.

_________ 3. Performance location specified. (in-plant, control room, or simulator)

_________ 4. Initial setup conditions are identified.

_________ 5. Initiating and terminating cues are properly identified.

_________ 6. Task standards identified and verified by SME review.

_________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

_________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Current Procedure Rev. Date:

Procedure Rev. Referenced Date:

  • If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.

_________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

_________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

_________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 10

JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 New format and numbering convention, revalidated. This replaces JPM 300101.0101. Revision number reset to 0.

Page 3 of 10

JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

NLO RO SRO STA SRO Cert JPM

Title:

Verify Conditions are met to Enter Mode 2 JPM Number: 30010101SAN01 Revision Number:00 Task Number and

Title:

300101.01, Complete Control Room actions to perform preparation for startup and approach to critical.

K/A System K/A Number Importance (RO/SRO)

Generic 2.1.31 4.2 3.9 Suggested Testing Environment: Any Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted/Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 30 minutes Actual Time Used: minutes

References:

CPS 3001.01, Approach to Critical, Rev. 24A CPS 3001.01C001, Preparation for Startup Checklist, Rev. 17 CPS 3001.01C002, Mode 2 Checklist, Rev. 15B EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 4 of 10

JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

SIMULATOR SET-UP CONDITIONS

  • None TASK STANDARDS:
  • Does not enter Mode 2 due to discrepancies not in compliance with Technical Specification.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Copy of completed CPS 3001.01, Approach to Critical, Rev. 24A
  • Copy of completed CPS 3001.01C001, Preparation for Startup Checklist, Rev. 17
  • Copy of completed CPS 3001.01C002, Mode 2 Checklist, Rev. 15B PROCEDURAL/

REFERENCES:

  • CPS 3001.01, Approach to Critical, Rev. 24A
  • CPS 3001.01C001, Preparation for Startup Checklist, Rev. 17
  • CPS 3001.01C002, Mode 2 Checklist, Rev. 15B EVALUATOR INSTRUCTIONS:
  • Present the completed copy of CPS 3001.01, CPS 3001.01C001, and CPS 3001.01C002 to the operator when the Initiating Cue is presented.
  • Amplifying cues are provided within the JPM steps.

Page 5 of 10

JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS AND INITIATING CUE:

You have taken the shift as the CRS in Mode 4. Review the procedures CPS 3001.01, Approach to Critical, CPS 3001.01C001, Preparation for Startup Checklist, CPS 3001.01C002, Mode 2 Checklist, and identify any actions required to support placing the plant into Mode 2.

NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide a MARKED UP copy of the following procedures to the student.

  • Copy of completed CPS 3001.01, Approach to Critical, Rev. 24A
  • Copy of completed CPS 3001.01C001, Preparation for Startup Checklist, Rev. 17
  • Copy of completed CPS 3001.01C002, Mode 2 Checklist, Rev. 15B START TIME:

Page 6 of 10

JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS

1. Reviews:
1) CPS 3001.01 Approach to Critical
2) CPS 3001.01C001, Preparation for Startup Checklist
3) CPS 3001.01C002, Mode 2 Checklist Standard: Operator begins review of completed:
1) CPS 3001.01 Approach to Critical
2) CPS 3001.01C001, Preparation for Startup Checklist
3) CPS 3001.01C002, Mode 2 Checklist Cue: None Comments SAT UNSAT Comment Number Page 7 of 10

JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)

2. RCIC Inoperable Standard: Operator recognizes that RCIC Inoperability does not impact plant startup, LCO 3.5.3. and N/As Step 9.10 of CPS 3001.01C001.

Cue: None Comments Not required to be Operable until 150 psig.

SAT UNSAT Comment Number

  • 3. RHR B NOT in Standby Standard: Operator identifies that RHR B must be placed in Standby to enter Mode 2.

Cue: None Comments RHR B NOT in Standby does not satisy LCOs for ECCS, Containment Spray, and Suppression Pool Cooling:

ITS 3.5.1 Action A.1 ITS 3.6.1.7 Action A.1 ITS 3.6.2.3 Action A.1 LCO 3.0.4 requires the LCO to be met for mode change.

SAT UNSAT Comment Number Page 8 of 10

JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)

  • 4. RHR B Test Prep Switch in TEST Standard: Operator identifies that RHR B Test Prep Switch must be in NORMAL.

Cue: None Comments ORM 2.5.2 Action 3.5.2 NOT satisfied.

SAT UNSAT Comment Number TERMINATING CUES:

Does not enter Mode 2 due to discrepancies.

STOP TIME:

Page 9 of 10

JPM Number: 30010101SAN01 Clinton Power Station Job Performance Measure (JPM)

Initiating Cue You have taken the shift as the CRS in Mode 4. Review the procedures CPS 3001.01, Approach to Critical, CPS 3001.01C001, Preparation for Startup Checklist, CPS 3001.01C002, Mode 2 Checklist, and identify any actions required to support placing the plant into Mode 2.

Page 10 of 10

CLINTON POWER STATION Job Performance Measure Review and Approve a Jet Pump Operability Test JPM Number: 90410101SAF01 Revision Number: 00 Date:

Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

_________ 1. Task description and number, JPM description and number are identified.

_________ 2. Knowledge and Abilities (K/A) references are included.

_________ 3. Performance location specified. (in-plant, control room, or simulator)

_________ 4. Initial setup conditions are identified.

_________ 5. Initiating and terminating cues are properly identified.

_________ 6. Task standards identified and verified by SME review.

_________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

_________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Current Procedure Rev. Date:

Procedure Rev. Referenced Date:

  • If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.

_________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

_________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

_________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 13

JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 New format and numbering convention, revalidated. This replaces JPM 033342J001. Revision number reset to 0.

Page 3 of 13

JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

NLO RO SRO STA SRO Cert JPM

Title:

Review and Approve a Jet Pump Operability Test JPM Number: 90410101SAF01 Revision Number:00 Task Number and

Title:

904101.01, Perform the Jet Pump Operability Test K/A System K/A Number Importance (RO/SRO)

Generic 2.2.12 3.0 3.4 Suggested Testing Environment: Any Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 25 minutes Actual Time Used: minutes

References:

CPS No. 9041.01, Jet Pump Operability Test, Rev. 36 CPS No. 9041.01D001, Jet Pump Operability Test Data Sheet, Rev. 34 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 4 of 13

JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to perform, simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

SIMULATOR SET-UP CONDITIONS

  • None TASK STANDARDS:
  • CPS No. 9041.01, Jet Pump Operability Test, has been reviewed satisfactorily.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Completed copy of CPS 9041.01, Jet Pump Operability Test
  • Completed copy of CPS 9041.01D001, Jet Pump Operability Test Data Sheet that contains calculation error at step 8.1.4. Do not complete section 8.3.2-4 based on the assumption that sections 8.1.4 and 8.2.4 are satisfactory.
  • Calculator PROCEDURAL/

REFERENCES:

  • CPS 9041.01, Jet Pump Operability Test, Rev. 36
  • CPS 9041.01D001, Jet Pump Operability Test Data Sheet, Rev. 34 EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.

Page 5 of 13

JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS AND INITIATING CUE:

Review the supplied CPS 9041.01, Jet Pump Operability Test and CPS 9041.01D001, Jet Pump Operability Test Data Sheet for acceptability.

NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide the following to the student.

  • Completed copy of CPS 9041.01, Jet Pump Operability Test
  • Completed copy of CPS 9041.01D001, Jet Pump Operability Test Data Sheet that contains calculation error at step 8.1.4. Do not complete section 8.3.2-4 based on the assumption that sections 8.1.4 and 8.2.4 are satisfactory.
  • Calculator START TIME:

Page 6 of 13

JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS 5.0 Prerequisites

1. Reviews Section 5, PREREQUISITES, to determine if proper blocks are filled out.

5.1, Recirculation System Status 5.1.1 Initial 5.1.1.1.1) Loop flow mismatch maintained within 5% of rated core flow (4.225 mlbm/hr) when effective core flow is 70% of rated core flow (59.15 mlbm/hr),

5.2 (Record) Record Rx power using OD-3, 3D Monicore, or APRM indication 5.3 (Initial) Notify SMngt of test start, and log Time and Date.

Standard: Determines that all the proper squares are complete.

Cue: None Comments SAT UNSAT Comment Number Page 7 of 13

JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)

Faulted Step 8.1 Indicated Recirc Loop Flow versus Established Loop Flow based on FCV Position

) Procedure may be performed via Appendix A: Performance of Computerized CPS 9041.01D001, Refer to 2.1.7. criteria.

  • 2. Reviews Section 8.1 to determine if it is completed correctly.

Standard: Determines that Step 8.1.4 has been incorrectly calculated for Recirc Loop B and that the correct Loop Flow % Deviation for Recirc Loop B would be outside the Acceptance Value.

Cue: If operator immediately wants to return the document to the originator request that he complete the review to determine if there are any other problems.

Comments B Loop Flow % Deviation should actually be 11.2%

SAT UNSAT Comment Number 8.2 Indicated Total Core Flow versus Established Total Core Flow

3. Reviews Section 8.2 to determine if it is completed correctly.

Standard: Determines that Step 8.2.4 has been completed correctly.

Cue: None Comments SAT UNSAT Comment Number Page 8 of 13

JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM) 8.2 Indicated Jet Pump Flow/dP versus Established Jet Pump Flow/dP

4. Reviews Section 8.3.1 to determine if it is completed correctly.

(Record) Using computer points B33NA009 - 028, or P619 indications, record for each jet pump for the operating loops, the indicated diffuser-to-lower plenum Jet Pump flow or Jet Pump dP.

Standard: Determines that Step 8.3.1 is completed correctly.

Cue: None Comments SAT UNSAT Comment Number Page 9 of 13

JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)

NOTE For TWO LOOP operation, if the results of steps 8.1.4 and 8.2.4 are acceptable, the surveillance results are acceptable, and steps 8.3.2, 8.3.3, 8.3.4 may be omitted (N/Ad).

For SINGLE LOOP operation, these steps should be performed for the operating jet pumps, but acceptance criteria has not been established.

  • 5. Reviews Steps 8.3.2, 8.3.3, and 8.3.4 to determine if they have been completed correctly.

Standard: Determines from NOTE preceeding Step 8.3.2 that because Step 8.1.4 is not within the Acceptance Value, Steps 8.3.2, 8.3.3, 8.3.4 need to be completed.

Cue: If operator wants to return the document to the originator request that he complete the review to determine if there are any other problems.

Comments SAT UNSAT Comment Number

6. Reviews Step 8.4, to determine if it has been completed correctly.

Standard: Determines that Step 8.4 was completed correctly.

Cue: None Comments Step may be N/Ad SAT UNSAT Comment Number Page 10 of 13

JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)

7. Reviews Steps 8.5 to determine if it has been completed correctly.

Standard: Determines that Step 8.5 was completed correctly.

Cue: None Comments SAT UNSAT Comment Number

  • 8. Signs for Review and Approval Standard: Determines that because Step 8.1.4 was completed incorrectly and Steps 8.3.2, 8.3.3, and 8.3.4 are not completed, CPS 9041.01D001 should not be signed.

Cue: None Comments SAT UNSAT Comment Number Page 11 of 13

JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)

TERMINATING CUES:

Problems with CPS 9041.01, Jet Pump Operability Test, have been identified and test is not signed off.

STOP TIME:

Page 12 of 13

JPM Number: 90410101SAF01 Clinton Power Station Job Performance Measure (JPM)

Initiating Cue Review the supplied CPS 9041.01, Jet Pump Operability Test and CPS 9041.01D001, Jet Pump Operability Test Data Sheet for acceptability.

Page 13 of 13

CLINTON POWER STATION Job Performance Measure Redirect Worker in a High Radiation Area JPM Number: 99555501SAN01 Revision Number: 00 Date:

Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

_________ 1. Task description and number, JPM description and number are identified.

_________ 2. Knowledge and Abilities (K/A) references are included.

_________ 3. Performance location specified. (in-plant, control room, or simulator)

_________ 4. Initial setup conditions are identified.

_________ 5. Initiating and terminating cues are properly identified.

_________ 6. Task standards identified and verified by SME review.

_________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

_________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Current Procedure Rev. Date:

Procedure Rev. Referenced Date:

  • If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.

_________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

_________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

_________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 9

JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 New format and numbering convention, revalidated. This replaces JPM 995555.0103. Revision number reset to 0.

Page 3 of 9

JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

NLO RO SRO STA SRO Cert JPM

Title:

Redirect Worker in a High Radiation Area JPM Number: 99555501SAN01 Revision Number:01 Task Number and

Title:

995555.01, Perform radiological practices for High Radiation Zone K/A System K/A Number Importance (RO/SRO)

Generic 2.3.10 3.3 Suggested Testing Environment: Any, Simulator is preferred Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted/Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

RP-AA-460, Controls for High and Very High Radiation Areas, Rev. 7 RP-AA-400, ALARA Program, Rev. 3 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 4 of 9

JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to perform, simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

The NLO is waiting in a low dose area.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Copy of Aux Bldg Steam Tunnel Survey Map PROCEDURAL/

REFERENCES:

  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 9

JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS AND INITIATING CUE:

1. The Unit is shutdown, you are the CRS.
2. An NLO is in the Aux Bldg Steam Tunnel to perform valve manipulations for feedwater flow trouble shooting.
3. You have just directed the NLO to CLOSE 1FW042A Rx Feedwater Flow Inst Root
4. Respond to reports from the NLO.

START TIME:

Page 6 of 9

JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS RP-AA-460, Controls for High and Very High Radiation Areas 4.1.2.2, Only RP personnel are authorized to alter the position of radiological boundaries or barricades associated with a HRA/LHRA/VHRA.

1. RP barricade blocks access to valve.

Standard: Does not allow the NLO to move the barricade.

Cue: As the NLO report that there is a roped off area with a radiation sign and a swing gate with a light on it. Requests permission to move the rope to be able to access the 1FW042A valve.

Comments SAT UNSAT Comment Number Page 7 of 9

JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)

Note May direct the performance of step 3 before step 2

  • 2 Directs RP to move barricade.

Standard: Contacts RP or directs NLO to contact RP to have barricade moved.

Cue:

  • As the NLO report that RP will not be able to be move the barricade until after shift turnover in 30 minutes.
  • If the CRS contacts RP then above report should come from RP.

Comments SAT UNSAT Comment Number RP-AA-400, ALARA Program 3.10.1 ENSURE that department personnel comply with ALARA Program procedures and requirements.

  • 3. Directs NLO to low dose area.

Standard: Has NLO go to low dose area and/or exit Locked High Radiation Area Cue: When operator gives direction to the NLO give the CRS the survey map of Aux Bldg Steam Tunnel and have him determine the Low Dose Area.

Comments SAT UNSAT Comment Number TERMINATING CUES:

The NLO is waiting in a low dose area.

STOP TIME:

Page 8 of 9

JPM Number: 99555501SAN01 Clinton Power Station Job Performance Measure (JPM)

Initiating Cue

1. The Unit is shutdown, you are the CRS.
2. An NLO is in the Aux Bldg Steam Tunnel to perform valve manipulations for feedwater flow trouble shooting.
3. You have just directed the NLO to CLOSE 1FW042A Rx Feedwater Flow Inst Root
4. Respond to reports from the NLO.

Page 9 of 9

CLINTON POWER STATION Job Performance Measure Complete a NARS Form and Make the Required Notifications JPM Number: 99999924SAN01 Revision Number: 00 Date:

Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

_________ 1. Task description and number, JPM description and number are identified.

_________ 2. Knowledge and Abilities (K/A) references are included.

_________ 3. Performance location specified. (in-plant, control room, or simulator)

_________ 4. Initial setup conditions are identified.

_________ 5. Initiating and terminating cues are properly identified.

_________ 6. Task standards identified and verified by SME review.

_________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

_________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Current Procedure Rev. Date:

Procedure Rev. Referenced Date:

  • If the Current Procedure Rev. and the Procedure Rev. Referenced are different then revise the JPM.

_________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

_________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

_________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 New format and numbering convention, revalidated. This replaces JPM 999999.24. Revision number reset to 0.

Page 3 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

NLO RO SRO STA SRO Cert JPM

Title:

Complete a NARS Form and Make the Required Notifications JPM Number: 99999924SAN01 Revision Number:00 Task Number and

Title:

999999.24, Preparation of Notification Form K/A System K/A Number Importance (RO/SRO)

Generic 2.4.38 2.2 4.0 Suggested Testing Environment: Any Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted/Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 30 minutes Actual Time Used: minutes

References:

EP-AA-1003, Radiological Emergency Plan Annex for Clinton Station, Rev. 6 EP-AA-111, Emergency Classification and Protective Action Recommendations, Rev. 10 EP-AA-111-F-07, Clinton Plant Based PAR Flowchart, Rev B EP-MW-114-100, Midwest Region Offsite Notifications, Rev. 5 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 4 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

SIMULATOR SET-UP CONDITIONS

  • None TASK STANDARDS:
  • NARS Form is filled out correctly and Notifications made within the required time.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • A copy of FG1 (Page CL 3-25) and Fission Product Barrier Matrix (Page CL 3-8) from EP-AA-1003, Radiological Emergency Plan Annex for Clinton Station
  • A copy of EP-AA-111, Emergency Classification and Protective Action Recommendations
  • A copy of EP-AA-111-F-07, Clinton Plant Based PAR Flowchart

REFERENCES:

  • EP-AA-111, Emergency Classification and Protective Action Recommendations, Rev. 10
  • EP-AA-111-F-07, Clinton Plant Based PAR Flowchart, Rev B
  • EP-MW-114-100, Midwest Region Offsite Notifications, Rev. 5 EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.

Page 5 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS AND INITIATING CUE:

You are the Shift Manager.

A LOCA has occurred in the plant.

RPV Level is less than -187 inches.

Containment Pressure is 15 psig.

The inboard and outboard MSIVs on the D Main Steam Line have failed to shut manually.

Wind direction is varying between 280 and 284 degrees Wind speed is 10 mph.

No release of radioactive materials has occurred.

An EAL initial classification of General Emergency as EAL FG1 has just been declared.

You are to complete the NARS Form, EP-MW-114-100-F-01, and make the required notifications.

Report when the task is complete. This JPM is time critical.

NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide a copy of the following procedures to the student.

  • A copy of FG1 (Page CL 3-25) and Fission Product Barrier Matrix (Page CL 3-8) from EP-AA-1003, Radiological Emergency Plan Annex for Clinton Station
  • EP-AA-111, Emergency Classification and Protective Action Recommendations
  • EP-AA-111-F-07, Clinton Plant Based PAR Flowchart

Page 6 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS

1. UTILITY MESSAGE NO. ___________

Standard: 1 Cue: None Comments START TIME FOR NEXT SECTION:____________ (Time Critical)

(Same as JPM Start Time)

SAT UNSAT Comment Number

2. STATE MESSAGE NO. ___________

Standard: N/A Cue: None Comments SAT UNSAT Comment Number Page 7 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

3. 1. STATUS

[A] ACTUAL

[B] DRILL/EXERCISE Standard: Either Cue: None Comments SAT UNSAT Comment Number

  • 4. 2. STATION

[A] BRAIDWOOD [C] CLINTON [E] LASALLE [G] ZION

[B] BYRON [D] DRESDEN [F] QUAD CITIES Standard: [C] CLINTON Cue: None Comments SAT UNSAT Comment Number Page 8 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

  • 5. 3. ONSITE CONDITION

[A] UNUSUAL EVENT

[B] ALERT

[C] SITE AREA EMERGENCY

[D] GENERAL EMERGENCY

[E] RECOVERY

[F] TERMINATED Standard: [D] GENERAL EMERGENCY Cue: None Comments SAT UNSAT Comment Number

  • 6. 4. ACCIDENT CLASSIFIED ACCIDENT TERMINATED TIME (3[A-E]):______________ TIME (3[F]): _____________

DATE (3[A-E]): _____________ DATE (3[F]): _____________

EAL#: _____________________

Standard: ACCIDENT CLASSIFIED Present Date and Time when Cue was acknowledged.

EAL#: FG1 ACCIDENT TERMINATED Time and Date: N/A Cue: None Comments SAT UNSAT Comment Number Page 9 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

5. RELEASE STATUS 6.
  • 7.

[A] NONE

[B] OCCURRING

[C] TERMINATED Standard: [A] NONE Cue: None Comments SAT UNSAT Comment Number

  • 8. 6. TYPE OF RELEASE

[A] NOT APPLICABLE

[B] GASEOUS

[C] LIQUID Standard: [A] NOT APPLICABLE Cue: None Comments SAT UNSAT Comment Number Page 10 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

  • 9. 7. WIND DIR (DEGREES FROM)

Standard: 280 - 284____

(DEGREES FROM)

Cue: None Comments Operator May just indicate 280 SAT UNSAT Comment Number

  • 10. 8. WIND SPEED

[A] METERS/SEC:__________

[B] MILES/HR:_____________

Standard: 9. WIND SPEED

[A] METERS/SEC:__________

[B] MILES/HR: 10______

Cue: None Comments SAT UNSAT Comment Number Page 11 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

  • 11. 9. RECOMMENDED ACTIONS UTILITY RECOMMENDATION

[A] NONE (UE, Alert, and SAE Only)


(GE Only)-----------------------------------------------------

[B] SHELTER ILLINOIS SUB AREAS:_________________________________________

AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS

[C] SHELTER IOWA SUB AREAS:____________________________________________

AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS

[D] EVACUATE ILLINOIS SUB AREAS:_______________________________________

AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS

[E] SHELTER IOWA SUB AREAS:____________________________________________

AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS Standard: Determines Protective Action Recommendation using EP-AA-111 & EP-AA-111-F-07

[D] EVACUATE ILLINOIS SUB AREAS:_____ 1, 3, 4____________________________

AND ADVISE REMAINDER OF THE EPZ TO MONITOR LOCAL RADIO STATIONS Cue: None Comments Given wind speed encompasses 2 sectors.

SAT UNSAT Comment Number

12. 10. ADDITIONAL INFORMATION Standard: None Cue: None Comments SAT UNSAT Comment Number Page 12 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

  • 13. MAKE THE NOTIFICATION Standard: Dial NARS Code 36 Cue: You receive a beep and the following agencies respond as on line:

Illinois EMA DeWitt Co. Sheriff Illinois REAC DeWitt Co. EOC Comments SAT UNSAT Comment Number

  • 14. CONDUCT A ROLL CALL Standard: Checks off each agency as they respond.

Cue: Acknowledge each agency on line.

Comments May be done in conjunction with step 13.

SAT UNSAT Comment Number Page 13 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

  • 15. FILL IN TIME AND DATE OF ROLL CALL Standard: Time and Date of Roll Call is filled in on Page 2 of the NARS Form.

Cue: None Comments STOP TIME FOR TIME CRITICAL PORTION OF JPM:_____________

(<15 Minutes)

SAT UNSAT Comment Number

  • 16. READ THE NARS MESSAGE Standard: Message is correctly read Cue: Acknowledge the message Comments Compare with provided Answer Key SAT UNSAT Comment Number Page 14 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

17. 11. TRANSMITTED BY:

Standard: Completes Block 11. with Name. Phone Number Calling from, and Time/Date.

Cue: None Comments SAT UNSAT Comment Number

18. 12. RECEIVED BY:

Standard: Asks for name of the IEMA representative and enters information on the NARS Form Cue: Give the operator the name Ken Evans Comments SAT UNSAT Comment Number Page 15 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

19. REPEAT THE ROLL CALL Standard: Operator checks off each agency as they respond Cue: Respond as roll is called.

Comments SAT UNSAT Comment Number

20. ASK if there are any questions about the information provided.

Standard: Answers any questions.

Cue: None Comments SAT UNSAT Comment Number

21. STATE NARS communication is complete.

Standard: States that NARS communication is complete.

Cue: None Comments SAT UNSAT Comment Number Page 16 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

TERMINATING CUES:

NARS Form is correctly filled out and Notification is made within the required time.

STOP TIME:

Page 17 of 18

JPM Number: 99999924SAN01 Clinton Power Station Job Performance Measure (JPM)

Initiating Cue You are the Shift Manager.

A LOCA has occurred in the plant.

RPV Level is less than -187 inches.

Containment Pressure is 15 psig.

The inboard and outboard MSIVs on the D Main Steam Line have failed to shut manually.

Wind direction is varying between 280 and 284 degrees Wind speed is 10 mph.

No release of radioactive materials has occurred.

An EAL initial classification of General Emergency as EAL FG1 has just been declared.

You are to complete the NARS Form, EP-MW-114-100-F-01, and make the required notifications.

Report when the task is complete. This JPM is time critical.

Page 18 of 18