|
|
(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 06/14/2007 | | | issue date = 06/14/2007 |
| | title = Public Meeting Summary - Category One Annual Assessment Meeting, H.B. Robinson Steam Electric Plant Unit 2, Docket No. 50-261 | | | title = Public Meeting Summary - Category One Annual Assessment Meeting, H.B. Robinson Steam Electric Plant Unit 2, Docket No. 50-261 |
| | author name = Musser R A | | | author name = Musser R |
| | author affiliation = NRC/RGN-II/DRP/RPB4 | | | author affiliation = NRC/RGN-II/DRP/RPB4 |
| | addressee name = Walt T | | | addressee name = Walt T |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:June 14, 2007Carolina Power and Light CompanyATTN:Mr. Tom WaltVice President - Robinson PlantH. B. Robinson Steam Electric Plant Unit 2 3851 West Entrance Road Hartsville, SC 29550 | | {{#Wiki_filter:June 14, 2007 Carolina Power and Light Company ATTN: Mr. Tom Walt Vice President - Robinson Plant H. B. Robinson Steam Electric Plant Unit 2 3851 West Entrance Road Hartsville, SC 29550 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 22: |
Line 22: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| - CATEGORY ONE ANNUAL ASSESSMENTMEETING, H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2, DOCKET NO. | | - CATEGORY ONE ANNUAL ASSESSMENT MEETING, H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2, DOCKET NO. |
| 50-261 | | 50-261 |
|
| |
|
| ==Dear Mr. Walt:== | | ==Dear Mr. Walt:== |
|
| |
|
| This refers to the May 21, 2007, meeting conducted at our request at the Hartsville MemorialLibrary Conference Room ,147 W. College Ave., Hartsville, South Carolina. The NRC's Chief of Reactor Projects Branch 4, and Resident staff assigned to the H. B. Robinson Steam Electric Plant met with Progress Energy - Carolina Power and Light Company (CP&L) to discuss the NRC's Reactor Oversight Process (ROP) and the Robinson assessment of safety performance for the period of January 1, 2006 - December 31, 2006. Attendees included CP&L management, CP&L site staff and two members of the public. Enclosed is the NRC's presentation slides.The discussions focused on the following topics: The NRC 's assessment program, the resultsof the Robinson assessment, and future NRC inspection activities. The NRC answered questions from your staff, the media and the public, following the meeting. The meeting was informative and did not result in any specific action items or decisions. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosures will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document system PE - CP&L2(ADAMS). ADAMS is accessible from the NRC Web site athttp://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact me at (404) 562-4603.Sincerely,/RA/Randall A. Musser, ChiefReactor Projects Branch 4 Division of Reactor Projects | | This refers to the May 21, 2007, meeting conducted at our request at the Hartsville Memorial Library Conference Room ,147 W. College Ave., Hartsville, South Carolina. The NRCs Chief of Reactor Projects Branch 4, and Resident staff assigned to the H. B. Robinson Steam Electric Plant met with Progress Energy - Carolina Power and Light Company (CP&L) to discuss the NRCs Reactor Oversight Process (ROP) and the Robinson assessment of safety performance for the period of January 1, 2006 - December 31, 2006. Attendees included CP&L management, CP&L site staff and two members of the public. Enclosed is the NRCs presentation slides. |
| | The discussions focused on the following topics: The NRC s assessment program, the results of the Robinson assessment, and future NRC inspection activities. The NRC answered questions from your staff, the media and the public, following the meeting. The meeting was informative and did not result in any specific action items or decisions. |
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system |
| | |
| | PE - CP&L 2 (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | Should you have any questions concerning this meeting, please contact me at (404) 562-4603. |
| | Sincerely, |
| | /RA/ |
| | Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| NRC Presentation Slides - NRC CY 2006 Robinson Annual Assessment Meeting | | NRC Presentation Slides - NRC CY 2006 Robinson Annual Assessment Meeting |
| | |
| | OFFICE RII:DRP SIGNATURE RXM /RA/ |
| | NAME RMusser DATE 06/14/2007 June 15, 2007 June 15, 2007 June 15, 2007 June 15, 2007 June 15, 2007 June 15, 2007 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PE - CP&L 3 cc w/encl.: |
| | William G. Noll David T. Conley Director, Site Operations Associate General Counsel - Legal Dept. |
| | Carolina Power & Light Company Progress Energy Service Company, LLC H. B. Robinson Steam Electric Plant Electronic Mail Distribution Electronic Mail Distribution John H. O'Neill, Jr. |
| | Ernest J. Kapopoulos, Jr. Shaw, Pittman, Potts & Trowbridge Plant General Manager 2300 N. Street, NW Carolina Power & Light Company Washington, DC 20037-1128 H. B. Robinson Steam Electric Plant Electronic Mail Distribution Chairman of the North Carolina Utilities Commission Paul Fulford, Manager c/o Sam Watson, Staff Attorney Performance Evaluation and Electronic Mail Distribution Regulatory Affairs PEB 5 Electronic Mail Distribution Robert P. Gruber Executive Director C. T. Baucom, Supervisor Public Staff - NCUC Licensing/Regulatory Programs 4326 Mail Service Center Carolina Power & Light Company Raleigh, NC 27699-4326 H. B. Robinson Steam Electric Plant Electronic Mail Distribution Public Service Commission State of South Carolina J. F. Lucas, Manager P. O. Box 11649 Support Services - Nuclear Columbia, SC 29211 Carolina Power & Light Company H. B. Robinson Steam Electric Plant Distribution w/encl. (See page 4) |
| | Electronic Mail Distribution Henry J. Porter, Director Div. of Radioactive Waste Mgmt. |
| | Dept. of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt. |
| | S. C. Department of Health and Environmental Control Electronic Mail Distribution Beverly Hall, Chief Radiation Protection Section N. C. Department of Environment, Health and Natural Resources Electronic Mail Distribution |
|
| |
|
| _________________________OFFICERII:DRPSIGNATURERXM /RA/NAMERMusserDATE06/14/2007June 15, 2007June 15, 2007June 15, 2007June 15, 2007June 15, 2007June 15, 2007 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO PE - CP&L3cc w/encl.:William G. Noll Director, Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail DistributionErnest J. Kapopoulos, Jr.Plant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail DistributionPaul Fulford, ManagerPerformance Evaluation and Regulatory Affairs PEB 5 Electronic Mail DistributionC. T. Baucom, SupervisorLicensing/Regulatory Programs Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail DistributionJ. F. Lucas, ManagerSupport Services - Nuclear Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail DistributionHenry J. Porter, DirectorDiv. of Radioactive Waste Mgmt.
| | PE - CP&L 4 Letter to Tom Walt from Randall A. Musser dated June 14, 2007. |
| Dept. of Health and Environmental Control Electronic Mail DistributionR. Mike GandyDivision of Radioactive Waste Mgmt.
| |
| S. C. Department of Health and Environmental Control Electronic Mail DistributionBeverly Hall, Chief RadiationProtection Section N. C. Department of Environment, Health and Natural Resources Electronic Mail DistributionDavid T. ConleyAssociate General Counsel - Legal Dept.
| |
| Progress Energy Service Company, LLC Electronic Mail DistributionJohn H. O'Neill, Jr.Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail DistributionRobert P. GruberExecutive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326Public Service CommissionState of South Carolina P. O. Box 11649 Columbia, SC 29211Distribution w/encl. (See page 4)
| |
| PE - CP&L4Letter to Tom Walt from Randall A. Musser dated June 14, 2007.
| |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 42: |
Line 55: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| - CATEGORY ONE ANNUAL ASSESSMENTMEETING, H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2, DOCKET NO. | | - CATEGORY ONE ANNUAL ASSESSMENT MEETING, H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2, DOCKET NO. |
| 50-261Distribution w/encl | | 50-261 Distribution w/encl: |
| :L. Regner, NRR C. Evans, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC}}
| | L. Regner, NRR C. Evans, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC}} |
|
---|
Category:Letter
MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 ML24297A2182024-10-28028 October 2024 – NRC Operator License IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 ML24242A2612024-08-29029 August 2024 Operator Licensing Examination Approval 05000261/2024301 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24114A0152024-06-0303 June 2024 Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML24033A0592024-02-0202 February 2024 Response to Request for Additional Information License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 – Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) 05000261/LER-2023-002, Plant Trip During Reactor Protection System Testing2023-08-17017 August 2023 Plant Trip During Reactor Protection System Testing 05000261/LER-2023-001, Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation2023-08-10010 August 2023 Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) IR 05000261/20234022023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 2024-09-11
[Table view] Category:Meeting Summary
MONTHYEARML24165A2362024-06-21021 June 2024 Duke Robinson Technical Report 5-22-24 Public Meeting Summary ML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML23129A0012023-06-26026 June 2023 May 2, 2023, Summary of Meeting Duke Energy to Discuss an H. B. Robinson Steam Electric Plant, Unit No. 2 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High ML22262A2882022-10-0303 October 2022 Summary of September 14, 2022, Observation Public Meeting with Duke Energy Progress, LLC to Discuss a Planned TSTF-577, Rev. 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 ML22174A2872022-07-14014 July 2022 Summary of Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML22166A0182022-07-0707 July 2022 Summary of June 13, 2022, Closed Meeting with Duke Energy Progress, Llc to Discuss Licensee Responses Provided to a Request for Additional Information Associated with a License Amendment Request to Adopt Technical Specifications Task Force ML22131A3802022-05-12012 May 2022 Public Meeting Summary - 2021 Annual Assessment Meeting Regarding the H. B. Robinson Steam Electric Plant, Docket No. 50-261, Meeting Number 20210460 ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22091A2692022-04-19019 April 2022 Summary of March 30, 2022, Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Surveillance Requirements 3.8.1.16 for H. B. Robinson Steam Electric Plant, Unit 2 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21182A2202021-07-0909 July 2021 Summary of June 24, 2021, Meeting with Duke Energy Progress, LLC, Regarding a Proposed Amendment Concerning TSTF-577, Revised Frequencies for Steam Generator Frequencies for Steam Generator Tube Inspections, for the H. B. Robinson Steam Ele ML21068A4172021-03-17017 March 2021 Summary of Meeting with Duke Energy Progress, LLC, Regarding a Proposed Relief Request Concerning Containment Inspections of Liners and Moisture Barriers for the H. B. Robinson Steam Electric Plant, Unit 2 ML20141L6282020-05-20020 May 2020 EOC Meeting Summary ML19331A8062020-01-29029 January 2020 Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19123A1592019-05-0101 May 2019 Summary of Public Meeting with H. B. Robinson Steam Electric Plant, to Provide Opportunities to Discuss the Annual Assessment of the H.B Robison Steam Electric Plant with the Public for Period of January 1, 2018 - December 31, 2018 ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML17340A1302017-12-22022 December 2017 Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson ML17254A3492017-09-19019 September 2017 Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request Regarding a Transmission Upgrade at the H. B. Robinson Steam Electric Plant Unit No. 2 ML17223A1212017-08-17017 August 2017 Summary of August 3, 2017, Meeting with Duke Energy Progress, LLC on Proposed License Amendment Request to Implement Fuel Reload Design Methodology Reports for Shearon Harris and H. B. Robinson ML17097A2492017-04-0606 April 2017 Public Meeting Summary, 2016 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML16235A2382016-10-17017 October 2016 Summary of the July 12-13, 2016 Audit Supporting the U.S. Nuclear Regulatory Commission Review of DPC-NE-1008-P, Nuclear Design Methodology Using CASMO-5/SIMULATE-3 for Westinghouse Reactors ML16123A0312016-05-26026 May 2016 Summary of Meeting with Duke Energy Progress, Inc. to Discuss a Proposed License Amendment Requests Regarding a 24 Month Fuel Cycle and an Alternative Source Term for Robinson, Unit No. 2 ML16123A0362016-05-0505 May 2016 Summary of the H.B. Robinson Steam Electric Plant, Unit 2 - February 9-10, 2016 Audit Associated With License Amendment Request to Transition to the National Fire Protection Association 805 Standard (CAC No. MF2746) ML16034A5242016-03-11011 March 2016 Summary of February 1, 2016, Pre-submittal Meeting with Duke Energy Regarding Consolidation of Emergency Operations Facilities ML15343A0712015-12-23023 December 2015 September 22-26, 2014, Summary of H. B. Robinson Steam Electric Plant, Unit 2 - Audit Associated with License Amendment Request to Transition to the National Fire Protection Association 805 Standard ML15280A2532015-11-25025 November 2015 Summary of Mtg. with Duke Energy Progress Inc. to Discuss Fuel Reload Design Methodology Reports & Proposed License Amendment Request Shearon Harris Nuclear Power Plant Unit 1 and H.B. Robinson Steam Electric Plant Unit No. 2 (MF6701/MF6702 ML15288A1312015-11-17017 November 2015 Summary of Meeting with Duke Energy Progress, Inc. to Discuss H. B. Robinson Steam Electric Plant Unit No. 2 - Proposed License Amendment Request Transmission Upgrades ML15281A1982015-11-10010 November 2015 Summary of Meeting with Duke Energy Progress Inc., to Discuss the H. B. Robinson Steam Electric Plant Unit No. 2, License Amendment Request to Adopt National Fire Protection Association Standard 805 ML15117A5812015-05-0606 May 2015 April 14, 2015, Summary of Public Meeting on Calculation of Risk for NFPA-805 Fire Areas Crediting Control Room Abandonment ML15125A4382015-05-0505 May 2015 Public Meeting Summary - 2014 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant ML15068A3492015-03-18018 March 2015 Summary of March 4, 2015, Meeting with Duke Energy Progress, Inc., Regarding Pre-Submittal Meeting for 24-Month Fuel Cycle Proposed License Amendment Request ML14210A0502014-07-30030 July 2014 June 30, 2014, Summary of the Category 1 Public Meeting with Duke Energy Progress Inc. to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14154A0932014-06-0303 June 2014 May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML14112A4712014-05-0202 May 2014 Conference Call Summary - Regarding the Spring 2014 Steam Generator Inspections During a Forced Outage ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13238A0542013-08-23023 August 2013 Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13155A1052013-06-12012 June 2013 May 2, 2013, Summary of Meeting with Duke Energy Concerning the Relocation of the Emergency Operating Facilities ML13150A0742013-05-29029 May 2013 Meeting Summary - Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13127A0502013-05-20020 May 2013 Summary of April 18, 2013, Meeting with Duke Energy Concerning the National Fire Protection Association (NFPA) 805: Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML12332A1932012-12-13013 December 2012 Summary of Public Meeting with Duke Energy Concerning GL 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plan Re H. B. Robinson Steam Electric Plant, Unit 2 ML12107A3552012-04-16016 April 2012 4/11/2012 Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML1113703382011-05-17017 May 2011 Meeting Summary Letter Regarding Performance Improvement Plan ML11116A0202011-05-12012 May 2011 April 12, 2011, Summary of Pre-Application Meeting with Carolina Power & Light Company and Florida Power Corporation, on Brunswick, Units 1 & 2, Crystal River, Unit 3, and H. B. Robinson, Unit 2 ML1023804682010-08-26026 August 2010 08/18/10 Summary of Meeting NRC Initial Exam Writer'S Workshop ML1015803032010-06-0707 June 2010 Summary of Meeting with Augmented Inspection Team to Discuss the Results of an Augmented Inspection at the H.B. Robinson Team Electric Plant ML1013904872010-05-19019 May 2010 Summary of Category 1 Public Meeting with Carolina Power & Light Company H. B. Robinson Steam Electric Plant Fire Event on March 28, 2010 ML1011703342010-04-27027 April 2010 Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2 2024-06-21
[Table view] |
Text
June 14, 2007 Carolina Power and Light Company ATTN: Mr. Tom Walt Vice President - Robinson Plant H. B. Robinson Steam Electric Plant Unit 2 3851 West Entrance Road Hartsville, SC 29550
SUBJECT:
PUBLIC MEETING
SUMMARY
- CATEGORY ONE ANNUAL ASSESSMENT MEETING, H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2, DOCKET NO.
50-261
Dear Mr. Walt:
This refers to the May 21, 2007, meeting conducted at our request at the Hartsville Memorial Library Conference Room ,147 W. College Ave., Hartsville, South Carolina. The NRCs Chief of Reactor Projects Branch 4, and Resident staff assigned to the H. B. Robinson Steam Electric Plant met with Progress Energy - Carolina Power and Light Company (CP&L) to discuss the NRCs Reactor Oversight Process (ROP) and the Robinson assessment of safety performance for the period of January 1, 2006 - December 31, 2006. Attendees included CP&L management, CP&L site staff and two members of the public. Enclosed is the NRCs presentation slides.
The discussions focused on the following topics: The NRC s assessment program, the results of the Robinson assessment, and future NRC inspection activities. The NRC answered questions from your staff, the media and the public, following the meeting. The meeting was informative and did not result in any specific action items or decisions.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system
PE - CP&L 2 (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 562-4603.
Sincerely,
/RA/
Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects
Enclosure:
NRC Presentation Slides - NRC CY 2006 Robinson Annual Assessment Meeting
OFFICE RII:DRP SIGNATURE RXM /RA/
NAME RMusser DATE 06/14/2007 June 15, 2007 June 15, 2007 June 15, 2007 June 15, 2007 June 15, 2007 June 15, 2007 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PE - CP&L 3 cc w/encl.:
William G. Noll David T. Conley Director, Site Operations Associate General Counsel - Legal Dept.
Carolina Power & Light Company Progress Energy Service Company, LLC H. B. Robinson Steam Electric Plant Electronic Mail Distribution Electronic Mail Distribution John H. O'Neill, Jr.
Ernest J. Kapopoulos, Jr. Shaw, Pittman, Potts & Trowbridge Plant General Manager 2300 N. Street, NW Carolina Power & Light Company Washington, DC 20037-1128 H. B. Robinson Steam Electric Plant Electronic Mail Distribution Chairman of the North Carolina Utilities Commission Paul Fulford, Manager c/o Sam Watson, Staff Attorney Performance Evaluation and Electronic Mail Distribution Regulatory Affairs PEB 5 Electronic Mail Distribution Robert P. Gruber Executive Director C. T. Baucom, Supervisor Public Staff - NCUC Licensing/Regulatory Programs 4326 Mail Service Center Carolina Power & Light Company Raleigh, NC 27699-4326 H. B. Robinson Steam Electric Plant Electronic Mail Distribution Public Service Commission State of South Carolina J. F. Lucas, Manager P. O. Box 11649 Support Services - Nuclear Columbia, SC 29211 Carolina Power & Light Company H. B. Robinson Steam Electric Plant Distribution w/encl. (See page 4)
Electronic Mail Distribution Henry J. Porter, Director Div. of Radioactive Waste Mgmt.
Dept. of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.
S. C. Department of Health and Environmental Control Electronic Mail Distribution Beverly Hall, Chief Radiation Protection Section N. C. Department of Environment, Health and Natural Resources Electronic Mail Distribution
PE - CP&L 4 Letter to Tom Walt from Randall A. Musser dated June 14, 2007.
SUBJECT:
PUBLIC MEETING
SUMMARY
- CATEGORY ONE ANNUAL ASSESSMENT MEETING, H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2, DOCKET NO.
50-261 Distribution w/encl:
L. Regner, NRR C. Evans, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC