ML081220735: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/08/2008
| issue date = 05/08/2008
| title = Correction to Amendment No. 159, Revision of Required Wattage in TS 5.5.7, Ventilation Filter Testing Program for Control Room Fresh Air System Heater  Tac No. MD4961)
| title = Correction to Amendment No. 159, Revision of Required Wattage in TS 5.5.7, Ventilation Filter Testing Program for Control Room Fresh Air System Heater  Tac No. MD4961)
| author name = Donohew J N
| author name = Donohew J
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:May 8, 2008  
{{#Wiki_filter:May 8, 2008 Vice President, Operations Entergy Operations, Inc.
 
River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775
Vice President, Operations Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775  


==SUBJECT:==
==SUBJECT:==
RIVER BEND STATION, UNIT 1 - CORRECTION TO AMENDMENT NO. 159, RE: REVISION OF REQUIRED WATTAGE IN TS 5.5.7, VENTILATION FILTER TESTING PROGRAM FOR CONTROL ROOM FRESH AIR SYSTEM HEATER (TAC NO. MD4961)  
RIVER BEND STATION, UNIT 1 - CORRECTION TO AMENDMENT NO. 159, RE: REVISION OF REQUIRED WATTAGE IN TS 5.5.7, VENTILATION FILTER TESTING PROGRAM FOR CONTROL ROOM FRESH AIR SYSTEM HEATER (TAC NO. MD4961)


==Dear Sir or Madam:==
==Dear Sir or Madam:==


On February 28, 2008, the Commission i ssued Amendment No. 159 to Facility Operating License No. NPF-47 for the River Bend Station, Unit 1 (RBS). The amendment is publicly available under Agencywide Documents Access and Management System (ADAMS) Accession No. ML080160549. The amendment was in response to your application dated March 28, 2007, as supplemented by letter dated October 24, 2007. It revised the required wattage specified in the Technical Specification 5.5.7.e, Ventilation Filter Testing Program, for the Control Room Fresh Air System (CRFAS) heater for testing and an administrative change to update "ANSI N510-1989" to "ASME N510-1989."
On February 28, 2008, the Commission issued Amendment No. 159 to Facility Operating License No. NPF-47 for the River Bend Station, Unit 1 (RBS). The amendment is publicly available under Agencywide Documents Access and Management System (ADAMS) Accession No. ML080160549. The amendment was in response to your application dated March 28, 2007, as supplemented by letter dated October 24, 2007. It revised the required wattage specified in the Technical Specification 5.5.7.e, Ventilation Filter Testing Program, for the Control Room Fresh Air System (CRFAS) heater for testing and an administrative change to update ANSI N510-1989 to ASME N510-1989.
 
When we issued Amendment No. 159, we inadvertently issued the first page of Enclosure 1 to the amendment with two errors. Neither of these errors, which are addressed below, affect the revised Technical Specification pages or the safety evaluation issued in the amendment.
When we issued Amendment No. 159, we inadvertently issued the first page of Enclosure 1 to the amendment with two errors. Neither of these errors, which are addressed below, affect the revised Technical Specification pages or the safety evaluation issued in the amendment.  
First, in the listing of the date of the application for the amendment in Paragraph 1.A on the first page of Enclosure 1, an incorrect date of March 8, 2007, was given instead of the correct date of March 28, 2007.
 
Second, on the bottom of the first page of Enclosure 1, there is a footnote that states the following: "By Amendment No. 158, issued on December 31, 2007, the Facility Operating License was transferred from Entergy Gulf States, Inc., to Entergy Gulf States Louisiana, LLC.
First, in the listing of the date of the application for the amendment in Paragraph 1.A on the first page of Enclosure 1, an incorrect date of March 8, 2007, was given instead of the correct date of March 28, 2007.  
On the date the instant license amendment request was filed, Entergy Operations, Inc. was authorized to act as agent for Entergy Gulf States, Inc., and had exclusive responsibility and control over the physical construction, operation and maintenance of the facility. As a result of the license transfer, Entergy Operations, Inc., is authorized to act as agent for Entergy Gulf States, Inc., and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility." [Underline added]
 
The last sentence of this footnote is incorrect and should have been stated as follows: "As a result of the license transfer, Entergy Operations, Inc., is authorized to act as agent for Entergy Gulf States Louisiana, LLC, and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility." The difference in the two sentences is underlined.
Second, on the bottom of the first page of Enclosure 1, there is a footnote that states the following: "By Amendment No. 158, issued on December 31, 2007, the Facility Operating License was transferred from Entergy Gulf States, Inc., to Entergy Gulf States Louisiana, LLC.
On the date the instant license amendment request was filed, Entergy Operations, Inc. was authorized to act as agent for Entergy Gulf States, Inc., and had exclusive responsibility and control over the physical construction, operation and maintenance of the facility. As a result of the license transfer, Entergy Operations, Inc., is authorized to act as agent for Entergy Gulf States, Inc., and has exclusive responsibility and control over the physi cal construction, operation and maintenance of the facility." [Underline added]  
 
The last sentence of this footnote is incorrect and should have been stated as follows: "As a result of the license transfer, Entergy Operations, Inc., is authorized to act as agent for Entergy Gulf States Louisiana, LLC, and has exclusive responsibility and control over the physical construction, oper ation and maintenance of the facility." The difference in the two sentences is underlined.
As stated above in the footnote, in the Amendment No. 158, the RBS license held by Entergy Gulf States, Inc. was transferred to Entergy Gulf States Louisiana, LLC. As part of that license transfer, Entergy Operations, Inc., which operates the unit, was authorized to act as agent for Entergy Gulf States Louisiana, LLC, the new licensee, and has exclusive responsibility and control over the physical constr uction, operation and maintenance of the facility. Therefore, Entergy Gulf States Louisiana, LLC, not Entergy Gulf States, Inc., should have been referred to in the last sentence of the footnote; however, the NRC staff inadvertently stated Entergy Gulf States, Inc.
 
Enclosed is a new first page to Enclosure 1 of Amendment No. 159 with the corrected application date and footnote, as discussed above. We apologize for any problems caused by this mistake.  


Sincerely,  
As stated above in the footnote, in the Amendment No. 158, the RBS license held by Entergy Gulf States, Inc. was transferred to Entergy Gulf States Louisiana, LLC. As part of that license transfer, Entergy Operations, Inc., which operates the unit, was authorized to act as agent for Entergy Gulf States Louisiana, LLC, the new licensee, and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility. Therefore, Entergy Gulf States Louisiana, LLC, not Entergy Gulf States, Inc., should have been referred to in the last sentence of the footnote; however, the NRC staff inadvertently stated Entergy Gulf States, Inc.
 
Enclosed is a new first page to Enclosure 1 of Amendment No. 159 with the corrected application date and footnote, as discussed above. We apologize for any problems caused by this mistake.
/RA/  
Sincerely,
 
                                              /RA/
Jack N. Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
Jack N. Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
 
Docket No. 50-458  


==Enclosure:==
==Enclosure:==
Corrected page for Amendment No. 159  
Corrected page for Amendment No. 159 cc w/encl: See next page
 
cc w/encl: See next page  
 
As stated above in the footnote, in the Amendment No. 158, the RBS license held by Entergy Gulf States, Inc. was transferred to Entergy Gulf States Louisiana, LLC. As part of that license transfer, Entergy Operations, Inc., which operates the unit, was authorized to act as agent for Entergy Gulf States Louisiana, LLC, the new licensee, and has exclusive responsibility and control over the physical constr uction, operation and maintenance of the facility. Therefore, Entergy Gulf States Louisiana, LLC, not Entergy Gulf States, Inc., should have been referred to in the last sentence of the footnote; however, the NRC staff inadvertently stated Entergy Gulf States, Inc.
 
Enclosed is a new first page to Enclosure 1 of Amendment No. 159 with the corrected footnote, as discussed above. We apologize for any problems caused by this mistake.
 
Sincerely,
 
/RA/
 
Jack N. Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


Docket No. 50-458  
As stated above in the footnote, in the Amendment No. 158, the RBS license held by Entergy Gulf States, Inc. was transferred to Entergy Gulf States Louisiana, LLC. As part of that license transfer, Entergy Operations, Inc., which operates the unit, was authorized to act as agent for Entergy Gulf States Louisiana, LLC, the new licensee, and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility. Therefore, Entergy Gulf States Louisiana, LLC, not Entergy Gulf States, Inc., should have been referred to in the last sentence of the footnote; however, the NRC staff inadvertently stated Entergy Gulf States, Inc.
Enclosed is a new first page to Enclosure 1 of Amendment No. 159 with the corrected footnote, as discussed above. We apologize for any problems caused by this mistake.
Sincerely,
                                                  /RA/
Jack N. Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458


==Enclosure:==
==Enclosure:==
Corrected page for Amendment No. 159  
Corrected page for Amendment No. 159 cc w/encl: See next page DISTRIBUTION:
 
PUBLIC                    RidsNrrDorlDpr              RidsNrrPMJDonohew      GHill, OIS (2)
cc w/encl: See next page  
LPLIV r/f                  RidsNrrDorlLpl4            RidsOgcRp RidsAcrsAcnwMailCenter    RidsNrrLAJBurkhardt        RidsRgn4MailCenter ADAMS Accession No.: ML081220735 OFFICE        NRR/LPL4/PM            NRR/LPL4/LA            OGC                NRR/LPL4/BC NAME          JDonohew              JBurkhardt            MSmith, NLO        THiltz DATE          5/6/08                5/6/08                5/7/08              5/8/08 OFFICIAL AGENCY RECORD


DISTRIBUTION
River Bend Station                                                       (2/25/2008) cc:
: PUBLIC LPLIV r/f RidsAcrsAcnwMailCenter RidsNrrDorlDpr  RidsNrrDorlLpl4 RidsNrrLAJBurkhardt RidsNrrPMJDonohew RidsOgcRp RidsRgn4MailCenter GHill, OIS (2)
Senior Vice President                   Attorney General Entergy Nuclear Operations               State of Louisiana P.O. Box 31995                           P.O. Box 94095 Jackson, MS 39286-1995                   Baton Rouge, LA 70804-9095 Vice President, Oversight                President of West Feliciana Entergy Nuclear Operations               Police Jury P.O. Box 31995                           P.O. Box 1921 Jackson, MS 39286-1995                   St. Francisville, LA 70775 Senior Manager, Nuclear Safety          Mr. Brian Almon
ADAMS Accession No.:  ML081220735 OFFICE NRR/LPL4/PM NRR/LPL4/LA OGC NRR/LPL4/BC NAME JDonohew JBurkhardt MSmith, NLO THiltz DATE 5/6/08 5/6/08 5/7/08 5/8/08 OFFICIAL AGENCY RECORD
& Licensing                            Public Utility Commission Entergy Nuclear Operations              William B. Travis Building P.O. Box 31995                          P.O. Box 13326 Jackson, MS 39286-1995                  1701 North Congress Avenue Austin, Texas 78701-3326 Senior Vice President
 
& Chief Operating Officer              Mr. Jim Calloway Entergy Operations, Inc.                Public Utility P.O. Box 31995                          Commission of Texas Jackson, MS 39286-1995                  1701 N. Congress Avenue Austin, TX 78711-3326 Associate General Counsel Entergy Nuclear Operations              Ms. H. Anne Plettinger P.O. Box 31995                          3456 Villa Rose Drive Jackson, MS 39286-1995                  Baton Rouge, LA 70806 Manager, Licensing                      Mr. Richard Penrod, Senior Environmental Entergy Operations, Inc.                  Scientist/State Liaison Officer River Bend Station                      Office of Environmental Services 5485 US Highway 61N                      Northwestern State University St. Francisville, LA 70775              Russell Hall, Room 201 Natchitoches, LA 71497 Louisiana Dept. of Environmental Quality Radiological Emergency Planning and      Senior Resident Inspector Response Division                      P.O. Box 1050 P.O. Box 4312                            St. Francisville, LA 70775 Baton Rouge, LA 70821-4312 Regional Administrator, Region IV Louisiana Dept. of Environmental Quality U.S. Nuclear Regulatory Commission Office of Environmental Compliance      611 Ryan Plaza Drive, Suite 400 P.O. Box 4312                            Arlington, TX 76011-8064 Baton Rouge, LA 70821-4312
River Bend Station         (2/25/2008)  
 
cc:
Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
 
Vice President, Oversight Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995  
 
Senior Manager, Nuclear Safety
& Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
 
Senior Vice President  
  & Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS  39286-1995
 
Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995  
 
Manager, Licensing Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775  
 
Louisiana Dept. of Environmental Quality Radiological Emergency Planning and Response Division P.O. Box 4312 Baton Rouge, LA  70821-4312
 
Louisiana Dept. of Environmental Quality Office of Environmental Compliance P.O. Box 4312 Baton Rouge, LA  70821-4312 Attorney General State of Louisiana P.O. Box 94095 Baton Rouge, LA  70804-9095
 
President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, LA  70775
 
Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326  
 
Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326  
 
Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806  
 
Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497  
 
Senior Resident Inspector P.O. Box 1050 St. Francisville, LA 70775  
 
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064


ENTERGY GULF STATES LOUISIANA, LLC AND ENTERGY OPERATIONS, INC.*
ENTERGY GULF STATES LOUISIANA, LLC AND ENTERGY OPERATIONS, INC.*
DOCKET NO. 50-458 RIVER BEND STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 159 License No. NPF-47  
DOCKET NO. 50-458 RIVER BEND STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 159 License No. NPF-47
: 1. The Nuclear Regulatory Commission (the Commission) has found that:  
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
 
A. The application for amendment by Entergy Operations, Inc. (the licensee), dated March 28, 2007, as supplemented by letters dated October 24, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
A. The application for amendment by Entergy Operations, Inc. (the licensee), dated March 28, 2007, as supplemented by letters dated October 24, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I;  
* By Amendment No. 158, issued on December 31, 2007, the Facility Operating License was transferred from Entergy Gulf States, Inc., to Entergy Gulf States Louisiana, LLC. On the date the instant license amendment request was filed, Entergy Operations, Inc. was authorized to act as agent for Entergy Gulf States, Inc., and had exclusive responsibility and control over the physical construction, operation and maintenance of the facility. As a result of the license transfer, Entergy Operations, Inc., is authorized to act as agent for Entergy Gulf States Louisiana, LLC, and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.}}
 
B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission;  
 
C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the  
 
public, and (ii) that such activities will be conducted in compliance with the Commission's regulations;  
 
D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and
 
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.  
 
____________________________________________________
* By Amendment No. 158, issued on December 31, 2007, the Facility Operating License was transferred from Entergy Gulf States, Inc., to Entergy Gulf States Louisiana, LLC. On the date the instant license amendment request was filed, Entergy Operations, Inc. was authorized to act as agent for Entergy Gulf States, Inc., and had exclusive responsibility and control over the physical construction, operation and maintenance of the facility. As a result of the license transfer, Entergy Operations, Inc., is authorized to act as agent for Entergy Gulf States Louisiana, LLC, and has exclusive responsibility and control over the physi cal construction, operation and maintenance of the facility.}}

Latest revision as of 02:54, 13 March 2020

Correction to Amendment No. 159, Revision of Required Wattage in TS 5.5.7, Ventilation Filter Testing Program for Control Room Fresh Air System Heater Tac No. MD4961)
ML081220735
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/08/2008
From: Donohew J
NRC/NRR/ADRO/DORL/LPLIV
To:
Entergy Operations
Donohew J N, NRR/DLPM,415-1307
References
TAC MD4961
Download: ML081220735 (4)


Text

May 8, 2008 Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 - CORRECTION TO AMENDMENT NO. 159, RE: REVISION OF REQUIRED WATTAGE IN TS 5.5.7, VENTILATION FILTER TESTING PROGRAM FOR CONTROL ROOM FRESH AIR SYSTEM HEATER (TAC NO. MD4961)

Dear Sir or Madam:

On February 28, 2008, the Commission issued Amendment No. 159 to Facility Operating License No. NPF-47 for the River Bend Station, Unit 1 (RBS). The amendment is publicly available under Agencywide Documents Access and Management System (ADAMS) Accession No. ML080160549. The amendment was in response to your application dated March 28, 2007, as supplemented by letter dated October 24, 2007. It revised the required wattage specified in the Technical Specification 5.5.7.e, Ventilation Filter Testing Program, for the Control Room Fresh Air System (CRFAS) heater for testing and an administrative change to update ANSI N510-1989 to ASME N510-1989.

When we issued Amendment No. 159, we inadvertently issued the first page of Enclosure 1 to the amendment with two errors. Neither of these errors, which are addressed below, affect the revised Technical Specification pages or the safety evaluation issued in the amendment.

First, in the listing of the date of the application for the amendment in Paragraph 1.A on the first page of Enclosure 1, an incorrect date of March 8, 2007, was given instead of the correct date of March 28, 2007.

Second, on the bottom of the first page of Enclosure 1, there is a footnote that states the following: "By Amendment No. 158, issued on December 31, 2007, the Facility Operating License was transferred from Entergy Gulf States, Inc., to Entergy Gulf States Louisiana, LLC.

On the date the instant license amendment request was filed, Entergy Operations, Inc. was authorized to act as agent for Entergy Gulf States, Inc., and had exclusive responsibility and control over the physical construction, operation and maintenance of the facility. As a result of the license transfer, Entergy Operations, Inc., is authorized to act as agent for Entergy Gulf States, Inc., and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility." [Underline added]

The last sentence of this footnote is incorrect and should have been stated as follows: "As a result of the license transfer, Entergy Operations, Inc., is authorized to act as agent for Entergy Gulf States Louisiana, LLC, and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility." The difference in the two sentences is underlined.

As stated above in the footnote, in the Amendment No. 158, the RBS license held by Entergy Gulf States, Inc. was transferred to Entergy Gulf States Louisiana, LLC. As part of that license transfer, Entergy Operations, Inc., which operates the unit, was authorized to act as agent for Entergy Gulf States Louisiana, LLC, the new licensee, and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility. Therefore, Entergy Gulf States Louisiana, LLC, not Entergy Gulf States, Inc., should have been referred to in the last sentence of the footnote; however, the NRC staff inadvertently stated Entergy Gulf States, Inc.

Enclosed is a new first page to Enclosure 1 of Amendment No. 159 with the corrected application date and footnote, as discussed above. We apologize for any problems caused by this mistake.

Sincerely,

/RA/

Jack N. Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosure:

Corrected page for Amendment No. 159 cc w/encl: See next page

As stated above in the footnote, in the Amendment No. 158, the RBS license held by Entergy Gulf States, Inc. was transferred to Entergy Gulf States Louisiana, LLC. As part of that license transfer, Entergy Operations, Inc., which operates the unit, was authorized to act as agent for Entergy Gulf States Louisiana, LLC, the new licensee, and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility. Therefore, Entergy Gulf States Louisiana, LLC, not Entergy Gulf States, Inc., should have been referred to in the last sentence of the footnote; however, the NRC staff inadvertently stated Entergy Gulf States, Inc.

Enclosed is a new first page to Enclosure 1 of Amendment No. 159 with the corrected footnote, as discussed above. We apologize for any problems caused by this mistake.

Sincerely,

/RA/

Jack N. Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosure:

Corrected page for Amendment No. 159 cc w/encl: See next page DISTRIBUTION:

PUBLIC RidsNrrDorlDpr RidsNrrPMJDonohew GHill, OIS (2)

LPLIV r/f RidsNrrDorlLpl4 RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrLAJBurkhardt RidsRgn4MailCenter ADAMS Accession No.: ML081220735 OFFICE NRR/LPL4/PM NRR/LPL4/LA OGC NRR/LPL4/BC NAME JDonohew JBurkhardt MSmith, NLO THiltz DATE 5/6/08 5/6/08 5/7/08 5/8/08 OFFICIAL AGENCY RECORD

River Bend Station (2/25/2008) cc:

Senior Vice President Attorney General Entergy Nuclear Operations State of Louisiana P.O. Box 31995 P.O. Box 94095 Jackson, MS 39286-1995 Baton Rouge, LA 70804-9095 Vice President, Oversight President of West Feliciana Entergy Nuclear Operations Police Jury P.O. Box 31995 P.O. Box 1921 Jackson, MS 39286-1995 St. Francisville, LA 70775 Senior Manager, Nuclear Safety Mr. Brian Almon

& Licensing Public Utility Commission Entergy Nuclear Operations William B. Travis Building P.O. Box 31995 P.O. Box 13326 Jackson, MS 39286-1995 1701 North Congress Avenue Austin, Texas 78701-3326 Senior Vice President

& Chief Operating Officer Mr. Jim Calloway Entergy Operations, Inc. Public Utility P.O. Box 31995 Commission of Texas Jackson, MS 39286-1995 1701 N. Congress Avenue Austin, TX 78711-3326 Associate General Counsel Entergy Nuclear Operations Ms. H. Anne Plettinger P.O. Box 31995 3456 Villa Rose Drive Jackson, MS 39286-1995 Baton Rouge, LA 70806 Manager, Licensing Mr. Richard Penrod, Senior Environmental Entergy Operations, Inc. Scientist/State Liaison Officer River Bend Station Office of Environmental Services 5485 US Highway 61N Northwestern State University St. Francisville, LA 70775 Russell Hall, Room 201 Natchitoches, LA 71497 Louisiana Dept. of Environmental Quality Radiological Emergency Planning and Senior Resident Inspector Response Division P.O. Box 1050 P.O. Box 4312 St. Francisville, LA 70775 Baton Rouge, LA 70821-4312 Regional Administrator, Region IV Louisiana Dept. of Environmental Quality U.S. Nuclear Regulatory Commission Office of Environmental Compliance 611 Ryan Plaza Drive, Suite 400 P.O. Box 4312 Arlington, TX 76011-8064 Baton Rouge, LA 70821-4312

ENTERGY GULF STATES LOUISIANA, LLC AND ENTERGY OPERATIONS, INC.*

DOCKET NO. 50-458 RIVER BEND STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 159 License No. NPF-47

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Entergy Operations, Inc. (the licensee), dated March 28, 2007, as supplemented by letters dated October 24, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

  • By Amendment No. 158, issued on December 31, 2007, the Facility Operating License was transferred from Entergy Gulf States, Inc., to Entergy Gulf States Louisiana, LLC. On the date the instant license amendment request was filed, Entergy Operations, Inc. was authorized to act as agent for Entergy Gulf States, Inc., and had exclusive responsibility and control over the physical construction, operation and maintenance of the facility. As a result of the license transfer, Entergy Operations, Inc., is authorized to act as agent for Entergy Gulf States Louisiana, LLC, and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.