|
|
Line 29: |
Line 29: |
| Director Enclosure cc: Region IV, Office P.O. Box641300, Pullman, WA 99164-1 300 509-335-8641 | | Director Enclosure cc: Region IV, Office P.O. Box641300, Pullman, WA 99164-1 300 509-335-8641 |
| * Fax: 509-335-4433 ' www.wsu.edu/nrc i " | | * Fax: 509-335-4433 ' www.wsu.edu/nrc i " |
| .-
| |
|
| |
|
| (2) All piping extending more than 5 feet below the surface of the pool shall have adequate provisions to prevent inadvertent siphoning of the pool. | | (2) All piping extending more than 5 feet below the surface of the pool shall have adequate provisions to prevent inadvertent siphoning of the pool. |
Latest revision as of 17:59, 11 March 2020
|
---|
Category:Letter
MONTHYEARIR 05000027/20242022024-09-13013 September 2024 Washington State University - U.S. NRC Security Inspection Report No.05000027/2024202 - Cover Letter ML24150A3122024-08-29029 August 2024 Examination Report Letter No. 50-027/OL-24-01 Washington State University ML24242A2872024-08-29029 August 2024 Washington State University - 2024 Annual Report for the Wsu Nuclear Science Center ML24150A3142024-08-29029 August 2024 Examination Result Letter No. 50-027/OL-24-01 Washington State University ML24150A3812024-05-31031 May 2024 Examination Confirmation Letter No. 50-027 OL-24-01 Wsu 24-01 IR 05000027/20242012024-05-0808 May 2024 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000027/2024201 ML24064A2792024-04-11011 April 2024 Washington State University - Issuance of Amendment No 22 to Facility Operating License No R 76 ML24071A1872024-03-11011 March 2024 Supplemental Information No. 2 in Reference to Wsu LAR 2023-1: License Amendment Request – Section 5 of the Technical Specifications and Bases for the Washington State University Modified Triga Reactor and Facility License R-76, Proposed Am ML24054A1972024-02-23023 February 2024 Supplemental Information in Reference to Wsu LAR 2023-1: License Amendment Request – Section 5 of the Technical Specifications and Bases for the Washington State University Modified Triga Reactor and Facility License R-76, Proposed Amendmen ML24011A1702024-01-11011 January 2024 Washington State University, Revised Responses to Request for Additional Information in Reference to LAR 2023-1: License Amendment Request - Section 5 of the Technical Specifications and Bases ML24003A9152024-01-0303 January 2024 Washington State University, Change in Level 1 Management for the Wsu Reactor Facility ML24003A7892024-01-0303 January 2024 Washington State Univ., Request to Rescind Responses to Request for Additional Information in Reference to LAR 2023-1: License Amendment Request – Section 5 of the Technical Specifications and Bases for the Washington State University Modif ML23334A1952023-11-30030 November 2023 Response to Request for Additional Information in Reference to LAR 2023-1: License Amendment Request – Section 5 of the Technical Specifications and Bases for the Washington State University Modified Triga Reactor and Facility License R-76, ML23261A6082023-09-20020 September 2023 Washington State University – Rfai License Amendment Request for Section 5 of the Technical Specifications for the Washington State University Modified Triga Nuclear Reactor and Facility License R-76 ML23242A3122023-08-30030 August 2023 Washington State University Modified Triga Reactor, 2023 Annual Report ML23102A2052023-08-28028 August 2023 Examination Result Letter No. 50-027/OL-23-01, Washington State University ML23220A3862023-08-0808 August 2023 License Amendment Request – Section 5 of the Technical Specifications and Bases for the Washington State University Modified Triga Reactor and Facility License R-76, Proposed Amendment 22 IR 05000027/20232012023-06-13013 June 2023 Washington State University – U.S. Nuclear Regulatory Commission Routine Inspection Report 05000027-2023201 ML23102A2022023-05-10010 May 2023 Examination Confirmation Letter No. 50-027/Ol-23-01 Washington State University IR 05000027/20222012022-10-0606 October 2022 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000027/2022201 ML22242A3062022-08-30030 August 2022 Washington State University Modified Triga Reactor - 2022 Annual Report for the Wsu Nuclear Science Center ML22137A1022022-06-0606 June 2022 Examination Confirmation Letter No. 50-27/OL-22-01, Washington State University IR 05000027/20212012021-08-27027 August 2021 Washington State University - U.S. Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000027/2021201 ML21228A1322021-08-16016 August 2021 2021 Annual Report for the Wsu Nuclear Science Center ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20258A0312020-09-14014 September 2020 Examination Confirmation Letter No. 50-027/OL-21-01, Washington State University IR 05000027/20202012020-08-24024 August 2020 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000027/2020201 ML20045D7822020-02-14014 February 2020 Washington State University Modified Triga Reactor: Nuclear Science Center Emergency Plan Updates - Summary of Changes (Revision 1/2020) ML20027C5532020-01-27027 January 2020 Washington State Univ., License Amendment Request (Supplemental) - Nuclear Radiation/Science Center Name Change and Removal of Primary Coolant Ph Specification ML19273A9412019-09-30030 September 2019 Washington State University, License Amendment Request - Nuclear Radiation/Science Center Name Change and Removal of Primary Coolant Ph Specification ML19246C1622019-09-0303 September 2019 Washington State University Modified Triga Reactor - Change to Level 2 Management in the Facility Organization IR 05000027/20192012019-08-30030 August 2019 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-027/2019-201 ML19235A0592019-08-20020 August 2019 Submittal of the 2019 Annual Report for the Wsu Nuclear Science Center ML19210D9652019-07-30030 July 2019 Examination Report No. 50-027/OL-19-01, Washington State University ML19204A2042019-07-29029 July 2019 Washington State University - Approval of the Revised Operator Requalification Program for the Washington State University Research Reactor ML19172A1042019-06-18018 June 2019 Washington State University Modified Triga Reactor - Change in Level 2 Management ML19072A0472019-03-18018 March 2019 Examination Confirmation Letter No. 50-027/OL-19-01, Washington State University ML18334A1022018-11-19019 November 2018 Washington State Univ., Submittal of Reactor Staff Requalification Program IR 05000027/20182022018-10-19019 October 2018 Washington State University - U.S. Nuclear Regulatory Commission Security Inspection Report No. 50-027/2018-202 (Letter) ML18235A3182018-08-20020 August 2018 Annual Report for the Wsu Facility for the Period July 1, 2017 Through June 30, 2018 IR 05000027/20182012018-08-13013 August 2018 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-027/2018-201 ML18179A4932018-06-28028 June 2018 Examination Report No. 50-027/OL-18-01, Washington State University Nuclear Radiation Center ML18012A0492018-01-10010 January 2018 Washington State University - Response to Part 71 Quality Assurance Program Approval Biennial Change Report ML17237A0522017-08-22022 August 2017 Washington State University Submittal of Annual Operating Report for the Period July 1, 2016 Through June 30, 2017 IR 05000027/20172012017-08-17017 August 2017 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000027/2017201 ML17181A2032017-07-0606 July 2017 Examination Report No. 50-027/OL-17-01, Washington State University ML17067A4042017-04-17017 April 2017 Washington State University GL 2016-01 Closeout Form Letter for Rtrs with No Credited NAM ML17073A0072017-03-16016 March 2017 Examination Confirmation Letter, 50-027/OL-17-01, Washington State University ML16321A4042016-11-0707 November 2016 Washington State University Response to Generic Letter 2016-01: Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML16266A2142016-10-25025 October 2016 Request for Withholding Information from Public Disclosure for the Virgil C. Summer Nuclear Station, Units 2 and 3 2024-09-13
[Table view] |
Text
WASHINGTON STATE Nuclear Radiation Center
, UNIVERSITY September 22, 2010 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Reference:
Washington State University Docket No. 50-27, License No. R-76
Subject:
Submittal of Proposed Technical Specifications for the Washington State University Research Nuclear Reactor Washington State University (WSU) has applied to renew operating License Number R-76 (Docket number 50-27). As part of the license renewal process, Washington State University is has submitted proposed Technical Specifications.
There was a minor typographical error on page 37 of the submittal of proposed technical specifications. The page that is included with this letter is intended to replace page 37 of the previous submittal. The sentence referring to 10 CFR 2.70 should refer to 10 CFR 2.390.
There have been no additions, deletions, or changes of any kind to any other section of the Technical Specifications other than the changes on page 37.
I declare under penalty of perjury that to the best of my knowledge the foregoing is true and correct.
Date Executed A-01?07ojO Respectfully Submitted Donald Wall, Ph.D.
Director Enclosure cc: Region IV, Office P.O. Box641300, Pullman, WA 99164-1 300 509-335-8641
- Fax: 509-335-4433 ' www.wsu.edu/nrc i "
(2) All piping extending more than 5 feet below the surface of the pool shall have adequate provisions to prevent inadvertent siphoning of the pool.
(3) A pool level alarm shall be provided to indicate a loss of coolant if the pool level drops more than 2 feet below the normal level.
(4) The reactor shall not be operated with less than 15 feet of water above the top of the core.
Basis: This specification is based on thermal hydraulic calculations which show that the TRIGA-30/20 LEU core can operate in a safe manner at power levels up to 2000 kW with natural convection flow of the coolant water. A comparison between operation of the TRIGA-30/20 LEU and standard TRIGA MARK III has shown them to be safe for the above power level. Thermal and hydraulic characteristics of mixed cores are essentially the same as those for TRIGA-30/20 LEU and standard cores.
In the event of accidental siphoning of pool water through system pipes, the pool water level will drop no more than 5 ft from the top of the pool.
Loss of coolant requires corrective action. The loss of coolant alarm activates in the reactor control room and at an off-site alarm monitoring station.
5.8 Physical Security The Licensee shall maintain in effect and fully implement all provisions of the NRC staff-approved physical security plan, including amendments and changes made pursuant to the authority of 10 CFR 50.54(p). The approved security plan consists of documents withheld from public disclosure pursuant to 10 CFR 2.390, collectively titled, "Washington State University, Pullman, Washington TRIGA Reactor Security Plan."
5.9 Site and Facility Description Applicability: This specification applies to the Washington State University TRIGA reactor site location and specific facility design features.
Objective: The objective is to specify the location of facility design features.
Specifications:
(1) The Washington State University research reactor shall be operated by the Washington State University Nuclear Radiation Center.
(2) The Dodgen Research Facility is the building that houses the Washington State University Nuclear Radiation Center. The Dodgen Research Facility is divided into two areas:
(a) Controlled Access Areas (b) laboratories and office space that are not Controlled Access Areas 37