ML102850617: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 46: Line 46:
As stated cc w/encl: See next page
As stated cc w/encl: See next page


OFFICE      LA:DLR                PM:RPB2:DLR          BC:RPB2:DLR          PM:RPB2:DLR NAME                                NFerrer              DWrona                NFerrer DATE          /  /10              /  /10                /  /10                /  /10
OFFICE      LA:DLR                PM:RPB2:DLR          BC:RPB2:DLR          PM:RPB2:DLR NAME                                NFerrer              DWrona                NFerrer DATE          /  /10              /  /10                /  /10                /  /10 TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 1, 2010 PARTICIPANTS                        AFFILIATIONS Nate Ferrer                        U.S. Nuclear Regulatory Commission (NRC)
 
TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 1, 2010 PARTICIPANTS                        AFFILIATIONS Nate Ferrer                        U.S. Nuclear Regulatory Commission (NRC)
William Holston                    NRC Seung Min                          NRC Albert Wong                        NRC Keith Axler                        Center for Nuclear Waste Regulatory Analyses (CNWRA)
William Holston                    NRC Seung Min                          NRC Albert Wong                        NRC Keith Axler                        Center for Nuclear Waste Regulatory Analyses (CNWRA)
Elizabeth Trillo                    CNWRA Todd Mintz                          CNWRA Terry Grebel                        Pacific Gas and Electric Company (PG&E)
Elizabeth Trillo                    CNWRA Todd Mintz                          CNWRA Terry Grebel                        Pacific Gas and Electric Company (PG&E)
Line 79: Line 77:
As stated cc w/encls: Distribution via Listserv
As stated cc w/encls: Distribution via Listserv


OFFICE      LA:DLR                PM:RPB2:DLR          BC:RPB2:DLR          PM:RPB2:DLR NAME                                NFerrer              DWrona                NFerrer DATE          /  /10                /  /10                /  /10                /  /10
OFFICE      LA:DLR                PM:RPB2:DLR          BC:RPB2:DLR          PM:RPB2:DLR NAME                                NFerrer              DWrona                NFerrer DATE          /  /10                /  /10                /  /10                /  /10 TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 8, 2010 PARTICIPANTS                      AFFILIATIONS Nate Ferrer                      U.S. Nuclear Regulatory Commission (NRC)
 
TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 8, 2010 PARTICIPANTS                      AFFILIATIONS Nate Ferrer                      U.S. Nuclear Regulatory Commission (NRC)
Kim Green                        NRC Jeff Poehler                      NRC Stan Gardocki                    NRC Garry Armstrong                  NRC Terry Grebel                      Pacific Gas and Electric Company (PG&E)
Kim Green                        NRC Jeff Poehler                      NRC Stan Gardocki                    NRC Garry Armstrong                  NRC Terry Grebel                      Pacific Gas and Electric Company (PG&E)
Kyle Duke                        PG&E Kevin Braico                      PG&E Chalmer Myer                      Strategic Teaming And Resource Sharing (STARS)
Kyle Duke                        PG&E Kevin Braico                      PG&E Chalmer Myer                      Strategic Teaming And Resource Sharing (STARS)

Latest revision as of 18:47, 11 March 2020

Lr - Draft Telecon Summaries for 7/1/10 and 7/8/10
ML102850617
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/15/2010
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML102850617 (17)


Text

DiabloCanyonNPEm Resource From: Ferrer, Nathaniel Sent: Thursday, July 15, 2010 3:14 PM To: Grebel, Terence; Soenen, Philippe R Cc: DiabloHearingFile Resource

Subject:

Draft Telecon Summaries for 7/1/10 and 7/8/10 Attachments: Telecon Summary 07-01-10 AMPs and AMRs.doc; Telecon Summary 07-08-10 S&S and AMRs.doc Terry & Philippe, Attached are drafts of the Teleconference Call Summaries from 7/1/2010 and 7/8/2010. Please review and let me know if there are any corrections/changes needed.

Please let me know if you have any questions.

Nathaniel Ferrer Project Manager Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301)4151045 1

Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 1949 Mail Envelope Properties (26E42474DB238C408C94990815A02F090A76E5A35C)

Subject:

Draft Telecon Summaries for 7/1/10 and 7/8/10 Sent Date: 7/15/2010 3:14:18 PM Received Date: 7/15/2010 3:14:21 PM From: Ferrer, Nathaniel Created By: Nathaniel.Ferrer@nrc.gov Recipients:

"DiabloHearingFile Resource" <DiabloHearingFile.Resource@nrc.gov>

Tracking Status: None "Grebel, Terence" <TLG1@PGE.COM>

Tracking Status: None "Soenen, Philippe R" <PNS3@PGE.COM>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 422 7/15/2010 3:14:21 PM Telecon Summary 07-01-10 AMPs and AMRs.doc 73210 Telecon Summary 07-08-10 S&S and AMRs.doc 109562 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

LICENSEE: Pacific Gas and Electric Company FACILITY: Diablo Canyon Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JULY 1, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATIONAGING MANAGEMENT PROGRAMS The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E) held a telephone conference call on July 1, 2010, to obtain clarification on the staffs draft request for additional information (D-RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application (LRA).

By email dated June 11, 2010, the staff sent D-RAIs to PG&E regarding aging management programs. PG&E reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of the staffs D-RAIs. Enclosure 2 provides discussions on D-RAI for which the applicant requested clarification. No changes to other D-RAIs were necessary as a result of this telephone conference call. Formal RAIs will be issued by a separate letter. provides a listing of the participants.

The applicant had an opportunity to comment on this summary.

Nathaniel Ferrer, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated cc w/encl: See next page

OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME NFerrer DWrona NFerrer DATE / /10 / /10 / /10 / /10 TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 1, 2010 PARTICIPANTS AFFILIATIONS Nate Ferrer U.S. Nuclear Regulatory Commission (NRC)

William Holston NRC Seung Min NRC Albert Wong NRC Keith Axler Center for Nuclear Waste Regulatory Analyses (CNWRA)

Elizabeth Trillo CNWRA Todd Mintz CNWRA Terry Grebel Pacific Gas and Electric Company (PG&E)

Philippe Soenen PG&E Daniel Gibbons PG&E Kevin Braico PG&E David Gonzalez PG&E Gary Holtz PG&E Chalmer Myer Strategic Teaming And Resource Sharing (STARS)

Dave Kunsemiller STARS Enclosure 1

Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Draft Request for Additional Information Aging Management Programs/Aging Management Review D-RAI B2.1.20-1 LRA Table 3.4.2-1 and 3.4.2-3 included carbon steel valves exposed to atmosphere/weather (external) and managed by the AMP B2.1.20 External Surfaces Monitoring. The GALL AMP XI.M36, External Surfaces Monitoring recommends visual inspection of external surfaces for evidence of material loss and leakage.

During an examination of DCPP plant documentation for External Surfaces Monitoring Program, There were instances of in-scope carbon steel valves within LRA Table 3.4.2-1 and 3.4.2-3 (identification numbers MU-0237, MU-0238, MU-0273, MU-0883 and MU-0884 ) that were buried and therefore not accessible for the visual inspection methods recommended in GALL AMP XI.M36, External Surfaces Monitoring. The DCPP LRA states that the External Surfaces Monitoring Program relies on visual inspection to detect degradation by aging. It is unclear to staff that the in-scope buried valves can be monitored by visual inspection. In addition, it is not clear to the staff that buried valves are properly managed by AMP B2.1.20 External Surfaces Monitoring because they are exposed to soil environments and not external air.

Provide clarification regarding the correct categorization of the environments to which the in-scope valves are subjected to (external air or soil environments). Provide information confirming that the AMP B2.1.20 External Surfaces Monitoring Program, with the requirement for visual inspection, is appropriate to manage aging of these inaccessible buried in-scope components.

Discussion: Based on the discussion with the applicant, it was determined that the valves in question were from a different LRA table and were not composed of carbon steel. Additionally two of the 5 valves in question had different identification numbers. The staff will revise this question as follows. The revised question will be sent as a formal RAI.

RAI B2.1.20-1 LRA Table 3.3.2-5 included valves exposed to atmosphere/weather (external) and managed by the AMP B2.1.20 External Surfaces Monitoring. The GALL AMP XI.M36, External Surfaces Monitoring recommends visual inspection of external surfaces for evidence of material loss and leakage.

During an examination of DCPP plant documentation for External Surfaces Monitoring Program, there were instances of in-scope valves within LRA Table 3.3.2-5 (identification numbers MU-0-267, MU-0-268, MU-0-273, MU-0-883 and MU-0-884 within the make water system) that were buried and therefore not accessible for the visual inspection methods recommended in GALL AMP XI.M36, External Surfaces Monitoring. The DCPP LRA states that the External Surfaces Monitoring Program Enclosure 2

relies on visual inspection to detect degradation by aging. It is unclear to staff that the in-scope buried valves can be monitored by visual inspection. In addition, it is not clear to the staff that buried valves are properly managed by AMP B2.1.20 External Surfaces Monitoring because they are exposed to soil environments and not external air.

Provide clarification regarding the correct categorization of the environments to which the in-scope valves are subjected to (external air or soil environments). Provide information confirming that the AMP B2.1.20 External Surfaces Monitoring Program, with the requirement for visual inspection, is appropriate to manage aging of these inaccessible buried in-scope components.

Enclosure 2

LICENSEE: Pacific Gas and Electric Company FACILITY: Diablo Canyon Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JULY 8, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION SCOPING AND SCREENING AND AGING MANAGEMENT REVIEW The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E) held a telephone conference call on July 8, 2010, to obtain clarification on the staffs draft request for additional information (D-RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application (LRA).

By e-mails dated June 17 and June 21, 2010, the staff sent D-RAIs to PG&E regarding aging management programs. PG&E reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of the staffs D-RAIs. Enclosure 2 provides discussions on D-RAIs for which the applicant requested clarification. No changes to other D-RAIs were necessary as a result of this telephone conference call. Formal RAIs will be issued by a separate letter. provides a listing of the participants.

The applicant had an opportunity to comment on this summary.

Nathaniel Ferrer, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated cc w/encls: Distribution via Listserv

OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME NFerrer DWrona NFerrer DATE / /10 / /10 / /10 / /10 TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 8, 2010 PARTICIPANTS AFFILIATIONS Nate Ferrer U.S. Nuclear Regulatory Commission (NRC)

Kim Green NRC Jeff Poehler NRC Stan Gardocki NRC Garry Armstrong NRC Terry Grebel Pacific Gas and Electric Company (PG&E)

Kyle Duke PG&E Kevin Braico PG&E Chalmer Myer Strategic Teaming And Resource Sharing (STARS)

Dave Kunsemiller STARS Jim Johnson STARS Enclosure 1

Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Draft Request for Additional Information Scoping and Screening/Aging Management Review D-RAI 2.1.6-1 LRA Section B2.1.32 describes the Structures Monitoring Program (SMP) as managing cracking, loss of material, and change in material properties by monitoring the condition of structures and structural supports that are in the scope of license renewal. The applicant states that though coatings may have been applied to the external surfaces of structural members, no credit was taken for these coatings in the determination of aging effects for the underlying materials. The applicant further states that the SMP evaluates the condition of the coatings as an indication of the condition of the underlying materials.

NUREG-1801, Generic Aging Lessons Learned (GALL) Report, states that Proper maintenance of protective coatings inside containment is essential to ensure operability of post-accident safety systems that rely on water recycled through the containment sump/drain system. On page B-13 of the LRA, line item XI.S8 states that the NUREG-1801 Protective Coating Monitoring and Maintenance Program is not applicable to Diablo Canyon.

1. Please justify why NUREG-1801 XI.S8 does not apply to Diablo Canyon.
2. Since degradation of Service Level 1 protective coatings in containment can potentially become a debris source that challenges the safety function of the Emergency Core Cooling System, please provide a justification for not including Service Level 1 protective coatings in scope by rule in 10 CFR 54.4(a)(2).
3. Provide the details of how Service Level 1 protective coatings in containment will be properly maintained and not become a debris source that might challenge the safety function of the Emergency Core Cooling System, during the period of extended operation.

Discussion: Based on discussion with the applicant, it was determined that the D-RAI was related to section B2 LRA. The staff will revise the question number to RAI B2-1. The revised question will be sent as a formal RAI.

D-RAI 3.1.2.2.7-2 In LRA Section 3.1.2.2.7.1, the applicant indicated that for managing aging due to stress corrosion cracking of stainless steel high pressure conduits (flux thimble guide-tubes-to seal table) exposed to reactor coolant, the applicants Water Chemistry (B2.1.2) AMP will be augmented by their American Society of Mechanical Engineers (ASME)Section XI Inservice Inspection, Subsections IWB, IWC, and IWD (B2.1.1) AMP. For stainless steel flux thimble tubes exposed to reactor coolant, cracking due to SCC is managed by the DCPP Water Chemistry (B2.1.2) AMP. The staff notes that in LRA Table 3.1.2, the flux thimble tubes are Enclosure 2

included as a subcomponent of the RV Bottom Mounted Instrument Guide Tube, which aligns to GALL Item IV.A2-1(RP-13) for the aging effect cracking.

The staff reviewed LRA Section 3.1.2.2.7.1 against the criteria in NUREG-1800, The Standard Review Plan for Review of License Renewal Applications (SRP-LR), Section 3.1.2.2.7.1, which states cracking due to SCC could occur in the PWR stainless steel reactor vessel flange leak detection lines and bottom-mounted instrument guide tubes. The GALL report recommends further evaluation to ensure that these aging effects are adequately managed. The SRP-LR further states that the GALL report recommends that a plant-specific AMP be evaluated because existing programs may not be capable of mitigating or detecting cracking due to SCC.

Acceptance criteria are described in Branch Technical Position RLSB-1 (Appendix A.1 of the SPR-LR).

Branch Technical Position RLSB-1 states that a plant-specific AMP should include a "detection of aging effects" program element. The DCPP Water Chemistry Program provides mitigation of cracking through control of impurities, but does not provide for detection of aging effects. The ASME Section XI Inservice Inspection Program, Subsections IWB, IWC, and IWD AMP, provides for inspections of components. The standard examination requirements for flux thimble tubes under the ASME Section XI Inservice Inspection Program, Subsections IWB, IWC, and IWD AMP, is a VT-2 visual inspection per ASME Code Section XI, Table IWB-2500-1, Examination Category B-P, which would not generally be capable of detecting cracking unless a leak is already present, producing visible water and/or boric acid. The program description in LRA Section B.2.1.1 does not describe any augmented inspections for the flux thimble tubes which would be capable of early detection of cracking.

1. Identify any specific examinations included in the ASME Section XI Inservice Inspection Program, Subsections IWB, IWC, and IWD AMP, which would be capable of detecting cracking in the flux thimble tubes before a throughwall crack and leakage occurs.
2. If the ASME Section XI Inservice Inspection Program, Subsections IWB, IWC, and IWD AMP does not provide for detection of cracking prior to a leak, provide a plant-specific AMP or combination of existing AMPs that include a "detection of aging effect" program element for managing the aging effect of cracking due to SCC in the flux thimble tubes; and
3. Describe what examination techniques will be used to detect (or confirm the absence of) the aging effect of cracking in the flux thimble tubes, either as part of the ASME Section XI Inservice Inspection Program, Subsections IWB, IWC, and IWD, or an additional plant-specific program.

Discussion: Based on discussion with the applicant, it was determined that components of concern were the Reacctor Vessel (RV) Bottom Mounted Instrument Guide Tube (High Pressure Conduits, Seal Fittings), and not the flux thimble tubes. The staff will revise the question as follows. The revised question will be sent as a formal RAI.

Enclosure 2

RAI 3.1.2.2.7-2 In LRA Section 3.1.2.2.7.1, the applicant indicated that for managing aging due to stress corrosion cracking of stainless steel high pressure conduits (flux thimble guide-tubes-to seal table) exposed to reactor coolant, the applicants Water Chemistry (B2.1.2) AMP will be augmented by their American Society of Mechanical Engineers (ASME)Section XI Inservice Inspection, Subsections IWB, IWC, and IWD (B2.1.1) AMP. For stainless steel flux thimble tubes exposed to reactor coolant, cracking due to SCC is managed by the DCPP Water Chemistry (B2.1.2) AMP. The staff notes that in LRA Table 3.1.2, the flux thimble tubes are included as a subcomponent of the RV Bottom Mounted Instrument Guide Tube, which aligns to GALL Item IV.A2-1(RP-13) for the aging effect cracking.

The staff reviewed LRA Section 3.1.2.2.7.1 against the criteria in NUREG-1800, The Standard Review Plan for Review of License Renewal Applications (SRP-LR), Section 3.1.2.2.7.1, which states cracking due to SCC could occur in the PWR stainless steel reactor vessel flange leak detection lines and bottom-mounted instrument guide tubes.

The GALL report recommends further evaluation to ensure that these aging effects are adequately managed. The SRP-LR further states that the GALL report recommends that a plant-specific AMP be evaluated because existing programs may not be capable of mitigating or detecting cracking due to SCC. Acceptance criteria are described in Branch Technical Position RLSB-1 (Appendix A.1 of the SPR-LR).

Branch Technical Position RLSB-1 states that a plant-specific AMP should include a "detection of aging effects" program element. The DCPP Water Chemistry Program provides mitigation of cracking through control of impurities, but does not provide for detection of aging effects. The ASME Section XI Inservice Inspection Program, Subsections IWB, IWC, and IWD AMP, provides for inspections of components. The standard examination requirements for flux thimble tubes under the ASME Section XI Inservice Inspection Program, Subsections IWB, IWC, and IWD AMP, is a VT-2 visual inspection per ASME Code Section XI, Table IWB-2500-1, Examination Category B-P, which would not generally be capable of detecting cracking unless a leak is already present, producing visible water and/or boric acid. The program description in LRA Section B.2.1.1 does not describe any augmented inspections for the flux thimble tubes which would be capable of early detection of cracking.

1. Identify any specific examinations included in the ASME Section XI Inservice Inspection Program, Subsections IWB, IWC, and IWD AMP, which would be capable of detecting cracking in the RV Bottom Mounted Instrument Guide Tube (High Pressure Conduits, Seal Fittings) before a throughwall crack and leakage occurs.
2. If the ASME Section XI Inservice Inspection Program, Subsections IWB, IWC, and IWD AMP does not provide for detection of cracking prior to a leak, provide a plant-specific AMP or combination of existing AMPs that include a "detection of aging effect" program element for managing the aging effect of cracking due to SCC in the RV Bottom Mounted Instrument Guide Tube (High Pressure Conduits, Seal Fittings);

and Enclosure 2

3. Describe what examination techniques will be used to detect (or confirm the absence of) the aging effect of cracking in the RV Bottom Mounted Instrument Guide Tube (High Pressure Conduits, Seal Fittings), either as part of the ASME Section XI Inservice Inspection Program, Subsections IWB, IWC, and IWD, or an additional plant-specific program.

D-RAI 2.3-08 10 CFR 54.4(a) provides criteria for determining whether systems or components are in scope for license renewal. The staff confirms inclusion of all components subject to AMR by reviewing the components within the license renewal boundary.

During the scoping and screening review process, the continuation from one drawing to another could not be established. Drawing numbers and/or locations could not be located where identified, the continuation drawing was not provided, or piping expected to be in scope based on one drawing led to a different conclusion on a connecting drawing. Consequently, the staff is unable to complete its scoping and screening review for the particular systems. Specific examples are identified in the table below:

License Renewal Application (LRA) Continuation Location / Issue Section / Drawing Number 2.3.3.5 - Makeup Water System The applicant indicates the line going into the firewater tank at location 166-D is in scope of license renewal LR-DCPP-16-106716-16 under 10 CFR 54.4(a)(2) for attached piping. However, LR-DCPP-16-106716-06 on the continuation drawing (location 68-E), the line going into the firewater tank is not highlighted.

The applicant depicts nonsafety-related piping components to the auto resin sample system (at location 189-D) as in scope for license renewal under LR-DCPP-16-106716-18 10 CFR 54.4(a)(2) for spatial interaction. No spatial interaction termination was identified prior to the continuation flag and the continuation drawing was not provided.

At location 198-A on the interface to the charging pump 2-3 seal cooling tank, the continuation drawing LR-DCPP-16-106716-19 identified (LR-DCPP-08-107708-05) did not show the continuation.

At location 219-D, there are several continuations LR-DCPP-16-106716-21 shown as arrows to/from other areas, e.g., control room, main domestic/drinking water, hot recirculation Enclosure 2

and hot water. There are no spatial interaction terminations identified prior to the continuation arrows, and the continuation drawing was not identified.

At location 217-C, a continuation of domestic water into battery rooms is shown that was terminated with a spatial interaction flag. There was no continuation LR-DCPP-16-106716-21 drawing identified. The staff is concerned with possible interaction resulting from a failure of this water piping in the battery rooms.

2.3.3.14 - Diesel Generator System The applicant depicts the diesel engine lube oil reservoir 1-1 as not being in scope for license renewal.

LR-DCPP-21-106721-06 However, the diesel engine lube oil reservoir for the subsequent LRA drawings for the diesel generator system is shown highlighted in scope for license renewal under 10 CFR 54.4(a)(1).

2.3.3.16 - Gaseous Radwaste System The applicant depicts piping in scope for license renewal under 10 CFR 54.4(a)(2) going to the nitrogen LR-DCPP-24-106724-02 system (at location 29-A). However, the continuation LR-DCPP-24-106724-03 drawing was not provided.

2.3.3.17 - Liquid Radwaste System The drawing depicts several lines in scope of license renewal running from Laundry Distillate Tanks 0-1 and 0-2 to the auxiliary building sump. However, on the LR-DCPP-19-106719-12 continuation drawing (LR-DCPP-19-106719-06), the color of these lines changes from red [(a)(2)] to green

[(a)(1) or (a)(3)]. The basis for this transition is not clear.

2.3.4.1 - Turbine Steam Supply Enclosure 2

System At locations 161-A, 161-B, 162-A, 162-B, 163-A, and LR-DCPP-04-106704-16 163-B), connections are shown to the service air LR-DCPP-04-107704-16 system with only component identification numbers and no connecting lines.

The staff requests that the applicant provide sufficient information for the continuation issues identified above to permit the staff to review all portions of the systems within the license renewal boundary.

Discussion: Based on discussion with the applicant, it was determined that components of concern within the listed drawing LR-DCPP-16-106716-06, are actually within license renewal boundary drawing LR-DCPP-16-106718-06. The staff will revise this portion of the question as follows. The revised question will be sent as a formal RAI.

License Renewal Application (LRA) Continuation Location / Issue Section / Drawing Number 2.3.3.5 - Makeup Water System The applicant indicates the line going into the firewater tank at location 166-D is in scope of license renewal LR-DCPP-16-106716-16 under 10 CFR 54.4(a)(2) for attached piping. However, LR-DCPP-16-106718-06 on the continuation drawing (location 68-E), the line going into the firewater tank is not highlighted.

D-RAI 2.3.3.2-01 10 CFR 54.4(a) provides criteria for determining whether systems or components are in scope for license renewal. In DCPP LRA Section 2.3.3.2, under System Intended Functions, the applicant indentifies the cask pit storage cask restraint fixtures as in scope of license renewal under 10 CFR 54.4(a)(2). The DCPP LRA Section 2.1.2.1, Title 10 CFR 54.4(a)(1) - Safety Related, notes that components that are classified as Design Class I are considered safety-related. Item 3 of FSAR Chapter 3, Section 3.2.2.3, Design Class I, Quality/Code Class III Fluid Systems and Fluid System Components, indicates that those portions of systems other than radioactive waste management systems that contain or may contain radioactive material, and whose postulated failure could result in conservatively calculated potential offsite exposures in excess of 0.5 rem whole body (or its equivalent to parts of the body) at the site boundary or beyond are considered to be Design Class I (Code Class III).

Based on this definition, the cask pit storage cask restraint fixtures should be considered as Design Class I components. Therefore, the cask pit storage cask restraint fixtures meet the definition of 10 CFR 54.4(a)(1). The staff is concerned that if the cask pit storage cask restraint Enclosure 2

fixtures are scoped incorrectly, then an appropriate review for spatial interactions with nearby nonsafety-related systems may not have been adequate. The staff requests that the applicant justify the designation of the cask pit storage cask restraint fixtures as 10 CFR 54.4(a)(2).

Discussion: Based on discussion with the applicant, it was determined that the cask pit storage cask restraint fixtures were added to the scope of license renewal within LRA Errata submitted by PG&E, in letter dated June 18, 2010. Therefore this question is withdrawn and will not be sent as a formal RAI.

D-RAI 2.3.3.3-01 10 CFR 54.4(a) provides criteria for determining whether systems or components are in scope for license renewal. On license renewal boundary drawings LR-DCPP-17-106717-07 and LR-DCPP-17-106717-7A for the ASW system, the applicant shows components in piping, denoting the component is not in scope of license renewal. Among the intake structure components that the applicant depicts as not in scope are the bar racks and traveling screens. In FSAR Chapter 10, Section 10.4.5.2, the bar racks are noted to have a function to intercept large submerged debris. The traveling screens are described as being able to intercept all material larger than the screen mesh opening. Given that the ASW system is in scope of license renewal under 10 CFR 54.4(a)(1), this would imply that the bar racks and traveling screens have support functions for the ASW system, which require them to be in the scope of license renewal under 10 CFR 54.4(a)(2). The staff requests that the applicant justify the exclusion of the bar racks and traveling screens from scope of license renewal per 10 CFR 54.4(a)(2).

Discussion: Based on discussion with the applicant, it was determined that the travelling screens are within the scope of license renewal listed in LRA Table 2.4-10. The bar racks are also within the scope of license renewal as structural steel within LRA Table 2.4-10. Therefore this question is withdrawn and will not be sent as a formal RAI.