|
|
(11 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17076A021 | | | number = ML17076A021 |
| | issue date = 03/16/2017 | | | issue date = 03/16/2017 |
| | title = 2017/03/16 NRR E-mail Capture - Acceptance Review - Dresden, Units 2 & 3 - License Amendment Request to Adopt TSTF-542 - OPDRVs (CAC Nos. MF9295/MF9296) | | | title = NRR E-mail Capture - Acceptance Review - Dresden, Units 2 & 3 - License Amendment Request to Adopt TSTF-542 - OPDRVs (CAC Nos. MF9295/MF9296) |
| | author name = Haskell R S | | | author name = Haskell R |
| | author affiliation = NRC/NRR/DORL/LPLIII-2 | | | author affiliation = NRC/NRR/DORL/LPLIII-2 |
| | addressee name = Mathews M | | | addressee name = Mathews M |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Haskell, RussellSent:Thursday, March 16, 2017 11:24 AMTo:'Mitchel.Mathews@exeloncorp.com'Cc:Oesterle, Eric; Klein, Alex; Waters, Michael; Green, KimberlySubject:Acceptance Review - Dresden, Units 2 & 3 - License Amendment Request to Adopt TSTF-542 - OPDRVs (CAC Nos. MF9295/MF9296)Dear Mr. Mathews, By letter dated February 10, 2017, Exelon Generation Company, LLC (EGC, or Exelon) submitted a license amendment request for Dresden Nuclear Power Station (DNPS), Units 2 and 3. The amendment would replace existing Technical Specification (TS) requirements related to "operations with a potential for draining the reactor vessels" (OPDRVs) with new requirements on reactor pressure vessel (RPV) water inventory control to protect Safety Limit 2.1.1.3. Safety Limit 2.1.1.3 requires RPV water level to be greater than the top of active irradiated fuel. The proposed changes are based on the final safety evaluation associated with Technical Specification Task Force (TSTF) Traveler TSTF-542, Revision 2, "Reactor Pressure Vessel Water Inventory Control," dated December 20, 2016. | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Haskell, Russell Sent: Thursday, March 16, 2017 11:24 AM To: 'Mitchel.Mathews@exeloncorp.com' Cc: Oesterle, Eric; Klein, Alex; Waters, Michael; Green, Kimberly |
| The purpose of this e-mail is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | | |
| | ==Subject:== |
| | Acceptance Review - Dresden, Units 2 & 3 - License Amendment Request to Adopt TSTF-542 - OPDRVs (CAC Nos. MF9295/MF9296) |
| | |
| | ==Dear Mr. Mathews,== |
| | |
| | By letter dated February 10, 2017, Exelon Generation Company, LLC (EGC, or Exelon) submitted a license amendment request for Dresden Nuclear Power Station (DNPS), Units 2 and 3. The amendment would replace existing Technical Specification (TS) requirements related to operations with a potential for draining the reactor vessels (OPDRVs) with new requirements on reactor pressure vessel (RPV) water inventory control to protect Safety Limit 2.1.1.3. Safety Limit 2.1.1.3 requires RPV water level to be greater than the top of active irradiated fuel. The proposed changes are based on the final safety evaluation associated with Technical Specification Task Force (TSTF) Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, dated December 20, 2016. |
| | The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. | | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence. |
| Based on the information provided in your submittal, the NRC staff is conservatively estimating this licensing request to take approximately 540 hours to complete. This estimate is based on the NRC staff's initial review of the application and subject to change due to several factors including requests for additional information and unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. EGC's application dated February 10, 2017, requested that the NRC staff complete its review by August 1, 2017 (i.e., approximately a 6 month review schedule). It is unlikely we will meet the requested issuance date since the NRC staff expects to complete this review in December 2017. Should there be emergent complexities or challenges identified during the staffs detailed review resulting in changes to the projected level of effort or forecasted completion date, these will be communicated during routine staff interactions between the NRC and EGC. If you have any questions, please contact me at (301) 415-1129 or Russell.Haskell@nrc.gov. Sincerely, Russell S. Haskell II United States Nuclear Regulatory Commission (NRC) Licensing Project Manager - NRR/DORL/LPL 3 2Dresden Nuclear Power Station, Units 2 and 3 Russell.Haskell@NRC.Gov; (301) 415-1129; Office: O-8C01; Mail-Stop O-8G9A Hearing Identifier: NRR_PMDA Email Number: 3405 Mail Envelope Properties (8d413e2480f04fa89b731eb65b95b338) | | Based on the information provided in your submittal, the NRC staff is conservatively estimating this licensing request to take approximately [[estimated NRC review hours::540 hours]] to complete. This estimate is based on the NRC staffs initial review of the application and subject to change due to several factors including requests for additional information and unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. EGCs application dated February 10, 2017, requested that the NRC staff complete its review by August 1, 2017 (i.e., approximately a 6 month review schedule). It is unlikely we will meet the requested issuance date since the NRC staff expects to complete this review in December 2017. Should there be emergent complexities or challenges identified during the staffs detailed review resulting in changes to the projected level of effort or forecasted completion date, these will be communicated during routine staff interactions between the NRC and EGC. |
| | If you have any questions, please contact me at (301) 415-1129 or Russell.Haskell@nrc.gov. |
| | Sincerely, Russell S. Haskell II United States Nuclear Regulatory Commission (NRC) |
| | Licensing Project Manager - NRR/DORL/LPL 3 1 |
| | |
| | Dresden Nuclear Power Station, Units 2 and 3 Russell.Haskell@NRC.Gov; (301) 415-1129; Office: O-8C01; Mail-Stop O-8G9A 2 |
| | |
| | Hearing Identifier: NRR_PMDA Email Number: 3405 Mail Envelope Properties (8d413e2480f04fa89b731eb65b95b338) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance Review - Dresden, Units 2 & 3 - License Amendment Request to Adopt TSTF-542 - OPDRVs (CAC Nos. MF9295/MF9296) Sent Date: 3/16/2017 11:23:56 AM Received Date: 3/16/2017 11:23:57 AM From: Haskell, Russell Created By: Russell.Haskell@nrc.gov Recipients: "Oesterle, Eric" <Eric.Oesterle@nrc.gov> Tracking Status: None "Klein, Alex" <Alex.Klein@nrc.gov> Tracking Status: None "Waters, Michael" <Michael.Waters@nrc.gov> Tracking Status: None "Green, Kimberly" <Kimberly.Green@nrc.gov> Tracking Status: None | | Acceptance Review - Dresden, Units 2 & 3 - License Amendment Request to Adopt TSTF-542 - OPDRVs (CAC Nos. MF9295/MF9296) |
| "'Mitchel.Mathews@exeloncorp.com'" <Mitchel.Mathews@exeloncorp.com> Tracking Status: None Post Office: HQPWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 4081 3/16/2017 11:23:57 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: | | Sent Date: 3/16/2017 11:23:56 AM Received Date: 3/16/2017 11:23:57 AM From: Haskell, Russell Created By: Russell.Haskell@nrc.gov Recipients: |
| }} | | "Oesterle, Eric" <Eric.Oesterle@nrc.gov> |
| | Tracking Status: None "Klein, Alex" <Alex.Klein@nrc.gov> |
| | Tracking Status: None "Waters, Michael" <Michael.Waters@nrc.gov> |
| | Tracking Status: None "Green, Kimberly" <Kimberly.Green@nrc.gov> |
| | Tracking Status: None |
| | "'Mitchel.Mathews@exeloncorp.com'" <Mitchel.Mathews@exeloncorp.com> |
| | Tracking Status: None Post Office: HQPWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 4081 3/16/2017 11:23:57 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARRS-17-029, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-02-10010 February 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. Project stage: Request ML17076A0212017-03-16016 March 2017 NRR E-mail Capture - Acceptance Review - Dresden, Units 2 & 3 - License Amendment Request to Adopt TSTF-542 - OPDRVs (CAC Nos. MF9295/MF9296) Project stage: Acceptance Review ML17191A2582017-07-11011 July 2017 RAI Related to License Amendment Request to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler-542, Revision 2 (CAC NOS.MF9295 and MF9296) Project stage: RAI RS-17-086, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-07-13013 July 2017 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. Project stage: Supplement RS-17-173, Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-12-20020 December 2017 Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control Project stage: Supplement RS-17-174, Additional Supplement to Dresden Nuclear Power Station, Units 2 and 3 - Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-12-21021 December 2017 Additional Supplement to Dresden Nuclear Power Station, Units 2 and 3 - Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control Project stage: Supplement ML17272A7832018-01-0808 January 2018 Issuance of Amendments to Adopt TSTF-542 TS Changes (CAC Nos. MF9295 and MF9296; EPID L-2017-LLA-0176) Project stage: Approval 2017-03-16
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24271A0282024-09-26026 September 2024 E-Mail - Dresden Nuclear Power Station, Unit 1 - Site Visit Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2472024-08-20020 August 2024 Acceptance of Requested Licensing Action Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24176A0232024-06-21021 June 2024 NRR E-mail Capture - Dresden Nuclear Power Station, Units 2 and 3 - Acceptance Review of the Amendment Request to Adopt 10 CFR 50.69 ML24159A0122024-06-0606 June 2024 NRR E-mail Capture - Dresden Nuclear Power Station, Units 2 and 3 - Acceptance of Licensing Amendment to Adopt TSTF-505 and TSTF-591 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24066A0802024-04-0101 April 2024 Email to Christian Williams Decision on the Exemption Request for Dresden Nuclear Power Station Unit 2 and Unit 3 Independent Spent Fuel Storage Installation in Morris, Illinois ML24065A4892024-03-28028 March 2024 Email to Christian Williams Availability of Environmental Assessment for the Exemption Request for Dresden Nuclear Power Station Unit 2 and Unit 3 Independent Spent Fuel Storage Installation in Morris, Illinois ML24078A3772024-03-15015 March 2024 Email to the State of Illinois Requesting Review of the Dresden Exemption Request Environmental Assessment ML24066A0872024-03-0404 March 2024 NRR E-mail Capture - Dresden 2 and 3 - Request for Additional Information for Alternative Request I5R-22 ML24067A1242024-03-0101 March 2024 Email to Christian Williams: Request for Additional Information Regarding Dresden Relief Request Dated February 23, 2024 ML24065A2922024-02-28028 February 2024 2/28/24 Email from Constellation: Clarifying Information Regarding Dresden Relief Request Dated February 23, 2024 ML23339A0882023-12-0404 December 2023 NRR E-mail Capture - NRC Acceptance Review Re Dresden, Units 2 and 3 Request for Relief I5R-22 ML23328A0092023-11-22022 November 2023 Supplement - Dresden Security Rule Exemption Request – ISFSI Docket No. Reference (EPID L-2023-LLE-0031) (Email) ML23304A0172023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Dresden 1, 2 & 3 - Exemption from Security Rule (L-2023-LLE-0031) ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23263A9932023-09-20020 September 2023 NRR E-mail Capture - Dresden Nuclear Power Station, Units 2 and 3 - Acceptance of Licensing Action Submittal Re Amendment to Adopt TSTF-564 ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23052A0652023-02-21021 February 2023 NRR E-mail Capture - Dresden Units 2 and 3 - Request for Additional Information for Alternative Request RV-23H ML23026A0172023-01-23023 January 2023 NRR E-mail Capture - (External_Sender) IEMA Response Action - Request for Comments on the Proposed Issuance of Amendment to Technical Specification 4.3.1 for Dresden Nuclear Power Station, Units 2 and 3 ML23019A0132023-01-12012 January 2023 NRR E-mail Capture - Final RAI Dresden 2 and 3 - License Amendment Pertaining to GNF3 Fuel Transition ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22325A1212022-11-21021 November 2022 NRR E-mail Capture - NRC Acceptance Review Re Dresden, Units 2 and 3 Request for Relief RV-02D (EPID L-2022-LLR-0075), RV-03 (EPID L-2022-LLR-0076), and RV-23H ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22290A0842022-10-13013 October 2022 NRR E-mail Capture - Dresden 2 and 3 - RAI License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies ML22258A1882022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review: Dresden 2 and 3 License Amendment Request to Revise Technical Specification 3.1.4, ML22258A1872022-09-13013 September 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3, Amendment Request - Transition to GNF3 Fuel ML22229A0752022-08-16016 August 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief 16R-09 ML22229A0762022-08-16016 August 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief 16R-10 ML22203A0442022-07-21021 July 2022 Request for Additional Information (RAI) ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22199A2412022-07-18018 July 2022 NRR E-mail Capture - Acceptance Review: Dresden Units 2 and 3 - License Amendment Request New Fuel Vault Storage and SFP Criticality Safety Analysis Methodology ML22199A2422022-07-13013 July 2022 NRR E-mail Capture - Draft RAI Dresden 2 and 3 Proposed Alternative Related to Sblc Nozzle Inspection for the Sixth Inservice Inspection Interval ML22103A2112022-04-12012 April 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief (16R-01) - EPID L-2022-LLR-0037 ML22103A2132022-04-12012 April 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief (16R-02) - EPID L-2022-LLR-0038 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22039A2042022-02-0808 February 2022 NRR E-mail Capture - Public Meeting Dresden/Quad Cities - Proposed Alternative to Use ASME Code Case N-921 ML22027A3592022-01-26026 January 2022 U1: CY2022 Inspection Plan, Docket No. 05000010, License No. DPR-2 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21321A3802021-11-17017 November 2021 NRR E-mail Capture - NRC Acceptance Review of Dresden Nuclear Power Station, Units 2 and 3, Request for Exemption from 10 CFR 2.109(b) ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21244A4012021-08-10010 August 2021 (Final) Request for Information (RAI) Dresden, Units 1, 2, 3, and ISFSI Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50 Appendix E ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application 2024-09-06
[Table view] |
Text
NRR-PMDAPEm Resource From: Haskell, Russell Sent: Thursday, March 16, 2017 11:24 AM To: 'Mitchel.Mathews@exeloncorp.com' Cc: Oesterle, Eric; Klein, Alex; Waters, Michael; Green, Kimberly
Subject:
Acceptance Review - Dresden, Units 2 & 3 - License Amendment Request to Adopt TSTF-542 - OPDRVs (CAC Nos. MF9295/MF9296)
Dear Mr. Mathews,
By letter dated February 10, 2017, Exelon Generation Company, LLC (EGC, or Exelon) submitted a license amendment request for Dresden Nuclear Power Station (DNPS), Units 2 and 3. The amendment would replace existing Technical Specification (TS) requirements related to operations with a potential for draining the reactor vessels (OPDRVs) with new requirements on reactor pressure vessel (RPV) water inventory control to protect Safety Limit 2.1.1.3. Safety Limit 2.1.1.3 requires RPV water level to be greater than the top of active irradiated fuel. The proposed changes are based on the final safety evaluation associated with Technical Specification Task Force (TSTF) Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, dated December 20, 2016.
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
Based on the information provided in your submittal, the NRC staff is conservatively estimating this licensing request to take approximately 540 hours22.5 days <br />3.214 weeks <br />0.74 months <br /> to complete. This estimate is based on the NRC staffs initial review of the application and subject to change due to several factors including requests for additional information and unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. EGCs application dated February 10, 2017, requested that the NRC staff complete its review by August 1, 2017 (i.e., approximately a 6 month review schedule). It is unlikely we will meet the requested issuance date since the NRC staff expects to complete this review in December 2017. Should there be emergent complexities or challenges identified during the staffs detailed review resulting in changes to the projected level of effort or forecasted completion date, these will be communicated during routine staff interactions between the NRC and EGC.
If you have any questions, please contact me at (301) 415-1129 or Russell.Haskell@nrc.gov.
Sincerely, Russell S. Haskell II United States Nuclear Regulatory Commission (NRC)
Licensing Project Manager - NRR/DORL/LPL 3 1
Dresden Nuclear Power Station, Units 2 and 3 Russell.Haskell@NRC.Gov; (301) 415-1129; Office: O-8C01; Mail-Stop O-8G9A 2
Hearing Identifier: NRR_PMDA Email Number: 3405 Mail Envelope Properties (8d413e2480f04fa89b731eb65b95b338)
Subject:
Acceptance Review - Dresden, Units 2 & 3 - License Amendment Request to Adopt TSTF-542 - OPDRVs (CAC Nos. MF9295/MF9296)
Sent Date: 3/16/2017 11:23:56 AM Received Date: 3/16/2017 11:23:57 AM From: Haskell, Russell Created By: Russell.Haskell@nrc.gov Recipients:
"Oesterle, Eric" <Eric.Oesterle@nrc.gov>
Tracking Status: None "Klein, Alex" <Alex.Klein@nrc.gov>
Tracking Status: None "Waters, Michael" <Michael.Waters@nrc.gov>
Tracking Status: None "Green, Kimberly" <Kimberly.Green@nrc.gov>
Tracking Status: None
"'Mitchel.Mathews@exeloncorp.com'" <Mitchel.Mathews@exeloncorp.com>
Tracking Status: None Post Office: HQPWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 4081 3/16/2017 11:23:57 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: