ML17326A319: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17326A319
| number = ML17326A319
| title = Forwards LER 79-052/03L-0
| title = Forwards LER 79-052/03L-0
| release date = 05/31/2018
| package contents = {{Adams package content
| package contents = {{Adams package content
| number = ML17326A320
| number = ML17326A320
| issue date = 10/30/1979
| issue date = 10/30/1979
| title = Forwards LER 79-052/03L-0
| title = LER 79-052/03L-0:on 791001,during Investigation of High Level Indication for Steam Generation 4,transmitter BLP-142 Found to Have Drifted 7% High.Cause of Condition Under Investigation.Transmitter Recalibr
| author name = DELONG S D
| author name = Delong S
| author affiliation = INDIANA MICHIGAN POWER CO.
| author affiliation = INDIANA MICHIGAN POWER CO.
| addressee name =  
| addressee name =  
Line 21: Line 22:
| issue date = 10/30/1979
| issue date = 10/30/1979
| title = Forwards LER 79-052/03L-0
| title = Forwards LER 79-052/03L-0
| author name = SHALLER D V
| author name = Shaller D
| author affiliation = INDIANA MICHIGAN POWER CO.
| author affiliation = INDIANA MICHIGAN POWER CO.
| addressee name = KEPPLER J G
| addressee name = KEPPLER J G

Latest revision as of 05:07, 7 March 2020

Forwards LER 79-052/03L-0
Date released: 05/31/2018 Download: ML17326A319


LER 79-052/03L-0:on 791001,during Investigation of High Level Indication for Steam Generation 4,transmitter BLP-142 Found to Have Drifted 7% High.Cause of Condition Under Investigation.Transmitter Recalibr
ML17326A320
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/30/1979
From: Delong S
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A320 (3)
Forwards LER 79-052/03L-0
ML17326A318
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/30/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A318 (1)