ENS 53557: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 9: Line 9:
| unit = 2
| unit = 2
| utype = W-4-LP, W-4-LP
| utype = W-4-LP, W-4-LP
| cfr = 10 CFR 50.72(b)(2)(iv)(B)
| cfr = 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50.72(b)(3)(iv)(A)
| emergency class =  Non Emergency  
| emergency class =  Non Emergency  
| notification date = 08/22/2018 11:23
| notification date = 08/22/2018 11:23
Line 21: Line 21:
The automatic actuation of the Reactor Protection System (RPS) is being reported as a four-hour report under 10 CFR 50.72 (b)(2)(iv)(B).
The automatic actuation of the Reactor Protection System (RPS) is being reported as a four-hour report under 10 CFR 50.72 (b)(2)(iv)(B).
The expected actuation of the Auxiliary Feedwater System (an engineered safety feature) is being reported as an eight-hour report under 10 CFR 50.72 (b)(3)(iv)(A).   
The expected actuation of the Auxiliary Feedwater System (an engineered safety feature) is being reported as an eight-hour report under 10 CFR 50.72 (b)(3)(iv)(A).   
The NRC Senior Resident Inspector has been notified for this event."
The NRC Senior Resident Inspector has been notified for this event.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20180823en.html#en53557
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20180823en.html#en53557
}}{{unit info
}}{{unit info

Latest revision as of 01:05, 24 February 2020

ENS 53557 +/-
Where
Watts Bar Tennessee Valley Authority icon.png
Tennessee (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+7.38 h0.308 days <br />0.0439 weeks <br />0.0101 months <br />)
Opened: Dean Baker
11:23 Aug 22, 2018
NRC Officer: Bethany Cecere
Last Updated: Aug 22, 2018
53557 - NRC Website