| event text = At 1300 EDT, a Technical Specification required shutdown was initiated at Calvert Cliffs Unit 1. Technical Specification Action 3.1.4.C (Restore Control Element Assembly [CEA] alignment) was entered on 10/11/2019 at 1100 EDT, with a Required Action to reduce thermal power to less than 70 percent Rated Thermal Power and restore CEA alignment within 2 hours. This Required Action was not completed within the Completion Time; therefore, a Technical Specification required shutdown was initiated, and this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(i). | | event text = At 1300 EDT, a Technical Specification required shutdown was initiated at Calvert Cliffs Unit 1. Technical Specification Action 3.1.4.C (Restore Control Element Assembly [CEA] alignment) was entered on 10/11/2019 at 1100 EDT, with a Required Action to reduce thermal power to less than 70 percent Rated Thermal Power and restore CEA alignment within 2 hours. This Required Action was not completed within the Completion Time; therefore, a Technical Specification required shutdown was initiated, and this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(i). | ||
At 1345 EDT, CEA alignment was restored and Technical Specification 3.1.4 (Control Element Assembly Alignment) was met. Reactor Power is being stabilized. | At 1345 EDT, CEA alignment was restored and Technical Specification 3.1.4 (Control Element Assembly Alignment) was met. Reactor Power is being stabilized. | ||
There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. | There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20191014en.html#en54325 | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20191014en.html#en54325 | ||
}}{{unit info | }}{{unit info | ||
Latest revision as of 23:41, 23 February 2020
| Where | |
|---|---|
| Calvert Cliffs Maryland (NRC Region 1) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
| Time - Person (Reporting Time:+-2.63 h-0.11 days <br />-0.0157 weeks <br />-0.0036 months <br />) | |
| Opened: | Michael Saul 14:22 Oct 11, 2019 |
| NRC Officer: | Donald Norwood |
| Last Updated: | Oct 11, 2019 |
| 54325 - NRC Website
| |