ML20011A270: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:--
J,                                                                          ,    ___.
37 4
                                                                                          -          1
: s.      :
i: y %>,          a w-      s-
                                                                                          , ;' ' r . -
Washington Public Power Supply System
                                                                                        * %M                    '
    -                                                                                    , [g :
Box 1223 Eima, Washington 98541 (206)482-4428                , ],
db ('. Q October 2, 1981                M                ;
G03-81-2571 Qpg            ?.
Nuclear Regulatory Commission, Region V                                ".*Ny[@,
Suite 202, Walnut Creek Plaza
* 1990 N. California Boulevard                                                '
3" Walnut Creek, California 94596. g                                                ~
Attention: Mr. B. H. Faulkenberry                                                              '
Chief, Reactor Construction Projects Branch 4
Gentlemen:                                                                                    '3 3
 
==Subject:==
PROJECT N05. 3 AND 5
                                                                                                                    .a i
NRC INSPECTION OF WNP-3 AND WNP-5 DOCKET NUMBERS 50-508 AND 50-509 INTERIM REPORT OF POTENTIAL 50.55(e)
PIPE HANGER STIFF CLAMPS l
l On July 9,1981, your office "as provided with an interim report of a potential 10CFR50.55(e) concerning pipe hanger stiff clamps. Addi-tional evaluation was required to resolve design questions encountered during the course'of the e.gineering study.                                -
The architect / engineer's intended final report, which addresses major points of the subject and includes the program to be implemented for final resolution of the deficiencies identified, was submitted for Supply System review on September 15, 1981.      The Supply System has re-viewed the report; however, prior to forwarding it to your office, we have requested the architect / engineer and stiff clamp supplier to per-form additional technical cvaluations./ It is anticipated that one month will be required to obtain and review this evaluation.
We will provide the final report on this hubject by November 4, 1981.
Should you have any questions or desire further information, please feel free to contact es directly.
V y ru      yours R. S. Leddick cc:  J. Adams - PP&L                Program Director D. Smithpeter - BPA Ebasco - New York WNP-3/5 Files - Richland 811oogo407 811002 gDRADOCK 05000508 PDR
_}}

Latest revision as of 03:12, 21 February 2020

Interim Deficiency Rept Re Pipe Hanger Stiff Clamps, Initially Reported on 810709.AE Rept Submitted on 810915. Addl Evaluations Requested.Final Rept to Be Submitted by 811104
ML20011A270
Person / Time
Site: Satsop
Issue date: 10/02/1981
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20011A269 List:
References
10CFR-050.55E, 10CFR-50.55E, GO3-81-2571, NUDOCS 8110080407
Download: ML20011A270 (1)


Text

--

J, , ___.

37 4

- 1

s.  :

i: y %>, a w- s-

, ;' ' r . -

Washington Public Power Supply System

  • %M '

- , [g :

Box 1223 Eima, Washington 98541 (206)482-4428 , ],

db ('. Q October 2, 1981 M  ;

G03-81-2571 Qpg  ?.

Nuclear Regulatory Commission, Region V ".*Ny[@,

Suite 202, Walnut Creek Plaza

3" Walnut Creek, California 94596. g ~

Attention: Mr. B. H. Faulkenberry '

Chief, Reactor Construction Projects Branch 4

Gentlemen: '3 3

Subject:

PROJECT N05. 3 AND 5

.a i

NRC INSPECTION OF WNP-3 AND WNP-5 DOCKET NUMBERS 50-508 AND 50-509 INTERIM REPORT OF POTENTIAL 50.55(e)

PIPE HANGER STIFF CLAMPS l

l On July 9,1981, your office "as provided with an interim report of a potential 10CFR50.55(e) concerning pipe hanger stiff clamps. Addi-tional evaluation was required to resolve design questions encountered during the course'of the e.gineering study. -

The architect / engineer's intended final report, which addresses major points of the subject and includes the program to be implemented for final resolution of the deficiencies identified, was submitted for Supply System review on September 15, 1981. The Supply System has re-viewed the report; however, prior to forwarding it to your office, we have requested the architect / engineer and stiff clamp supplier to per-form additional technical cvaluations./ It is anticipated that one month will be required to obtain and review this evaluation.

We will provide the final report on this hubject by November 4, 1981.

Should you have any questions or desire further information, please feel free to contact es directly.

V y ru yours R. S. Leddick cc: J. Adams - PP&L Program Director D. Smithpeter - BPA Ebasco - New York WNP-3/5 Files - Richland 811oogo407 811002 gDRADOCK 05000508 PDR

_